revision of pima county code title 13, chapter 13.20
TRANSCRIPT
REVISION OF PIMA COUNTY CODE
TITLE 13, CHAPTER 13.20 –
CONSTRUCTION, CONNECTIONS,
AND FEES
December 12, 2018
Housekeeping
•
•
•
•
2
Introduction
•
•
•
3
Overview•
–
–
–
–
–
–
–
–
– 4
Overview
•
•
•
5
13.20.100 – Acronyms and Definitions
•
•
•
6
13.20.200 – Capacity
•
•
7
13.20.250 – System Improvement Design
•
•
8
13.20.300 – Large Agency
•
•
9
13.20.350 – Private Sewage Connection,
Ownership, and Repair
•
•
•
–
10
13.20.400 – Wastewater Infrastructure Fees (aka Connection Fees)
•
11
13.20.450 – Protection of the Existing SCS
•
•
12
13.20.500 – System Improvement
Construction
•
‟
•
13
13.20.500 – System Improvement
Construction
•
•
•
14
13.20.600 – Fees
•
•
15
Special Facility Surcharges for Proposed
Public Pump Stations
•
–
–
•
–
16
Special Facility Charges for Proposed
Public Pump Stations
17
Service Tiers
Number of Residential
Lots
Total Surcharge Minimum of 20% Down Payment Due at Final
Acceptance of the Pump Station*
Tier 1 1-100 $150,000 $30,000
Tier 2 101-200 $200,000 $40,000
Tier 3 201-300 $250,000 $50,000
Tier 4 310-400 $300,000 $60,000
Tier 5 401-500 $350,000 $70,000
Special Case 1
>500 Case by Case Basis
*Remaining balance of surcharge is divided by the number of Residential Units and is due at time of Wastewater Infrastructure Fee payment.
Updated Customer Service Fees
18
Acceptance/Approval Current Fee Proposed Fee
Capacity Allocation for Subdivision None $199
Capacity Allocation for Commercial, Industrial, or Multi-family None $172
Preliminary Sewer Design $166 plus $50 per
sheet
$112 plus $54 per sheet
Final Plat, Easement, and Right of Way $166 plus $50 per
sheet
$112 plus $54 per sheet
Sewer Improvement Plan $166 plus $50 per
sheet
$112 plus $88 per sheet
Private Residential Connection None $36
Private Commercial, Industrial, or Multi-family Connection None $82
Temporary Connection – Private Connection Review and One
(1) Year Administration
Various $214
One (1) Year Renewal and Administration Various $178
Wastewater Infrastructure Fee (aka Connection Fee) Payment
Plan
$500 $173
Wastewater Infrastructure Fee Refund $125 $142
Wastewater Infrastructure Fee Recovery Various $326
Small Activity Construction Permit Various $411 Flat Fee for all
Resubmittal – Administration Only Various $45
Construction Permit $25 Admin plus
2.5% of bid
Base Fee - $1079 plus $3.06 per Linear Foot (LF)
Resubmittal – Administration Only 1% of bid $294
Additional CCTV Inspections None $0.28 per LF
Inspection of Non-Linear Projects $25 Admin plus
2.5% of Bid
Base Fee - $1079 plus 2.5% of Itemized Bid
Single Manhole Construction Permit (changed from Small
Activity Construction Permit)
$100 $640
Resubmittal – Administration Only Various $115
19
Methodology of Review Fee Calculation
•
•
•
20
Example: Capacity Allocation
•
–
–
•
•
21
Simple & Moderate Projects
22
Weighted Average
23
24
Acceptance/Approval Current Fee Proposed Fee
Capacity Allocation for Subdivisions
N/A $199
Capacity Allocations for Commercial/ Industrial /Multi-family
N/A $172
Preliminary SewerDesign
$166 Plus$50/Sheet
$112 Plus $54/Sheet
Final Plat/ Easements/ Right of Way
$166 Plus$50/Sheet
$112 Plus $54/Sheet
Sewer Improvement Plan
$166 Plus$50/Sheet
$112 Plus $88/Sheet
25
Acceptance/Approval Current Fee Proposed Fee
Private Connection N/A
Residential $36
Commercial/Industrial/Multi-family
$82
Temporary Connection –Private Connection Review and One (1) Year Administration
Various $214
One (1) Year Renewal and Administration
Various $178
26
Acceptance/Approval Current Fee Proposed Fee
Wastewater Infrastructure Fee Refund
$125 $142
Wastewater Infrastructure Fee Payment Plan
$500 $173
Wastewater Infrastructure Fee Recovery
Various $326
27
Permit Current Fee Proposed Fee
System Improvement Construction Permit
Base Fee-Proposed IncludesFlow Management
Plan Review
$25 $821 $258
$1,079
Inspection Fees 2.5% of Bid
Proposed Includes Cost Per Linear Foot &
Initial CCTV
$2.78$0.28
$3.06 /LF
Review Fees
•
•
•
•
•
28
SizeExisting Proposed %
Small $898 $1,103 23%
Medium $998 $1,245 25%Large $1,148 $1,441 26%
Methodology of Construction Permit Fees
•
–
–
–
•
–
–
–
29
What the Data Said…
•
–
–
•
–
–
–
•
30
New Methodology – Linear Foot
•
•
•
31
32
Permit Current Fee Proposed Fee
Single Manhole Construction Permit
Base Fee $25 $640
Inspection 2.5% of Bid Included
33
Permit Current Fee Proposed Fee
Small ActivityConstruction Permit
Sewer Lateral Tap Into SCS 12-inches or less
$100Renewal $50
$411Renewal $68
Sewer Lateral Tap Into SCS Greater Than 12-
inches
$150Renewal $75
$411Renewal $68
Existing Manhole Tap $150Renewal $75
$411Renewal $68
34
Permit Current Fee Proposed Fee
Manhole Adjustment Projects
None $411Renewal $68
Manhole Reconstruction
None $411Renewal $68
Example of System Improvement
Construction Permits
•
–
–
–
35
Current Permit Fees Proposed Permit Fees
Administrative $25 Base Fee $1,079.00
Inspection - 2.5% of Bid $3,385.51
Inspection at $3.06/LF $5,394.78
Total Permit Cost $3,410.51 Total Permit Cost $6,473.78
Example of System Improvement
Construction Permits
•
–
–
–
36
Current Permit Fees Proposed Permit Fees
Administrative $25 Base Fee $1,079.00
Inspection - 2.5% of Bid $1,881.88
Inspection at $3.06/LF $2,392.92
Total Permit Cost $1,906.88 Total Permit Cost $3,471.92
Example of System Improvement
Construction Permits
•
–
–
–
37
Current Permit Fees Proposed Permit Fees
Administrative $25 Base Fee $1,079.00
Inspection - 2.5% of Bid $3,596.25
Inspection at $3.06/LF $7,129.80
Total Permit Cost $3,621.25 Total Permit Cost $7,154.80
Submitting Written Comments
38
Mary Allen, PE201 N Stone Ave, 3rd FloorTucson, AZ 85701
OR
Questions?
39