National Highways Authorityof India Independent Engineer Services during from Km 149.250 to Km 271.0 NATIONA (MINISTRYOFROA Pl Independent Engineer Serv of Moradabad -Bareilly State of Uttar Prade RE a Operation & Maintenance Period for 4 laning of Moradabad - Bar 050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHD 1. ALHIGHWAYSAUTHORITYOF INDIA ADTRANSPORT& HIGHWAYS,GOVT.O lotNo.G-5&6,Sector –10,Dwarka NewDelhi–110075 vices during Operation & Maintenance Per Section of NH-24 from Km 149.250 to Km 2 esh on DBFOT(Toll) basis under NHDP Ph EQUESTFORPROPOSAL(RFP) August,2016 Request for Proposal reilly Section of NH-24 DP Phase-III A. A OFINDIA) riod for 4 Laning 271.050 in the hase-IIIA

Upload: others

Post on 28-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad

from Km 149.250 to Km 271.050

NATIONA(MINISTRYOFROAD

Pl

Independent Engineer Services during Operation & Maintenance Period for

of Moradabad -Bareilly

State of Uttar Pradesh on

RE

yof India

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH

271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase

1.

ONALHIGHWAYSAUTHORITYOF INDIA FROADTRANSPORT& HIGHWAYS,GOVT.OF

lotNo.G-5&6,Sector –10,Dwarka NewDelhi–110075

Services during Operation & Maintenance Period for

Section of NH-24 from Km 149.250 to Km 271.050

State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase

EQUESTFORPROPOSAL(RFP)

August,2016

Request for Proposal

Bareilly Section of NH-24

in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

A OFINDIA)

Services during Operation & Maintenance Period for 4 Laning

271.050 in the

basis under NHDP Phase-IIIA

Page 2: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-

24 from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

2.

CONTENTS

Sr.No. Particulars PageNos.

1 SECTION1:InformationtoConsultants 3-7

2 SECTION2: LetterofInvitation 8-25

3 SECTION3:FormatforSubmissionof FirmsCredentials.

26-31

4 SECTION4:FormatforSubmissionof TechnicalProposal.

32-42

5 SECTION5:Formatforsubmissionof Financial Proposal.

43-51

6 SECTION6:TermsofReference. 52-65

7 SECTION7: DraftFormofContract. 66-132

Page 3: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

3

REQUESTFORPROPOSAL(RFP)

SECTION1:INFORMATIONTO CONSULTANTS

Sub:Independent Engineer Services during Operation & Maintenance Period for 4 laning of

Moradabad - Bareilly Section of NH-24 from Km 149.250 to Km 271.050 in the State of Uttar

Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

1. The National Highways Authority of India (NHAI) invites proposals for

engaging anIndependentEngineer(IE)onthe basisofInternational

CompetitiveBiddingforthefollowingcontract package in the State of

Uttar Pradeshunder NHDP Phase –IIIA.

TABLE1: DETAILSOF PROJECT

Sl.

No.

Consultancy Package NH

No.

State Project

Stretch

Project

Length (km)/

Total Project

Cost (Cr.)

Assignment

period

(months)

1 Independent Engineer Services

during Operation &

Maintenance Period for 4 laning

of Moradabad - Bareilly Section

of NH-24 from Km 149.250 to

Km 271.050 in the State of Uttar

Pradesh on DBFOT(Toll) basis

under NHDP Phase-III A.

24 Uttar

Pradesh

4 lane Stretch

from km

149.250 to

km 271.050

121.800 km /

1983.63 Cr.

36 months

TheRFPshallbereceivedthrough“INFRACON”(www.infracon.nic.in)and willbe evaluatedbased on detailsfurnished on“INFRACON”.Assuchbefore submitting theproposal,theConsultant(thefirmandallkey personnel)shall mandatorilyregisterandenlistthemselves, ontheMoRTHportal“INFRACON” anduploadallrelevantinformationtoenablecorrectevaluationofRFP.

All the bidders registered on “INFRACON” shall form a Team on “INFRACON” which would be assigned unique INFRACON Team ID. Bidders while submitting the RFP proposal shall furnish registration details including INFRACON Team ID. A copy of INFRACON Operation Procedure is enclosed for bidder’s reference

2. Selection of IE shall be as per selection procedures given in the Model Concession Agreement and general procurement methods followed inNHAI. TheselectedIEshallbeintimatedto theConcessionaire.

3. The proposal shall besubmitted inEnglishLanguage andallcorrespondence

wouldbeinthesamelanguage.

Page 4: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

4

4. TheOperation&Maintenanceof DBFOTprojectsbroadlyincludeOperationand MaintenanceactivitiesoftheConcessionaire forcompleted construction works andProjectsFacilitiesareopenedtotrafficaspertheConcessionAgreements.

5. AspertheTermsandConditions oftheConcession Agreement(s), the IndependentEngineerisbroadlyrequiredto:

(i) reviewoftheDrawingsandDocuments; (ii) determinetheProjectFacilitiesCompletionSchedule; (iii) review,inspectionandmonitoringofConstructionWorks; (iv) conductingTestsoncompletionofconstructionandissuing

CompletionCertificate; (v) review,inspectionandmonitoringofO&M; (vi) review,inspectionandmonitoringofDivestment

Requirements; (vii) determining,asrequiredundertheAgreement,thecostsofany

worksorservicesand/ortheirreasonableness; (viii) determining,asrequiredundertheAgreement,theperiodorany

extensionthereof,forperforminganydutyorobligation;

(ix) assistingthePartiesin resolutionofdisputes;and (x) undertakingall other duties and functions in

accordance withtheConcessionAgreement.

6. TheinterestedconsultancyfirmsmaydownloadtheRFPfromNHAIWebsitew.e.f. 21.09.2016to 20.10.2016upto 1700 hrs.TheConsultantwhodownloadthe

RFPdocumentfromthewebsitewillberequiredtopaythenon-refundablefeeof Rs5000/-atthetime of thesubmission of theBidproposal. The RFPwillbe invitedthroughe-tenderingportal.Refer Procedureundere-tenderingfor submissionofRFPthroughe-tendering.

7. In this document, unless the context otherwise requires, reference to a firm or

consultantorbidderorapplicantshallbeconstruedasreferencetoanyindividual

firm,organization, companyortheirJV,reputedengineering institutions suchas

IITs/NITs/DeemedUniversities.

8. Theproposalshouldbesubmittedbyconsultancy firmsinanEnvelope/package dulymarkedasTechnicalProposal. Fora given DBFOTProject, Stage -1of the Evaluation shall consider theevaluation of the Technical Proposal (i.e. Part

1).Thefirmsscoring thequalifyingmarks (minimum 75%) asmentioned in RFP shall belistedinthedescendingorderoftheirtechnicalscoreand5topranking firmsshallonly beconsideredforfurtherevaluationprovidednoneof themis inconflictofinterestwiththe Concessionaire. Thefirmsinconflictofinterestshallbesubstitutedbynextrankingfirm nothavingconflictofinterestwiththeConcessionaire.Understage2,thefinancialproposal ofsuchfive

firmsasselected aboveshallbeopened andevaluated. The weightage of TechnicalandFinancialscoreshallbe80%&20%respectively. Thefinalselection of the

firm shall be based on the highest combined score of Technical and FinancialProposal.

Page 5: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

5

9 ThetotaltimeperiodfortheassignmentasIndependent Engineerwillbefor36 months.

Onexpiryortermination ofaforesaid period,theAuthority mayinits discretionrenewtheappointment.

10. Consultants mayapplyeitherasasolefirmorformingJointVenturewithother consultants.

In case of Joint Venture, the maximum number of Joint Venture

partnersislimitedto2(i.e.onelead+1JVpartners). Formulationofmorethanone

JVwithdifferentpartnersforthesameworkisnot allowedandallsuchproposal

involvingthefirmsshallbetreatedasnon-responsive.

11. TheApplicant whether asoleapplicant orleadmember withjointventure may includean

Associatecompanyalso. TheapplicantshallsubmitaMemorandumof Understanding(MOU)withtheAssociateregardingtherole andresponsibilitiesof thisAssociateCompanyalongwiththeproposal. Keypersonnelviz., TeamLeader andHighwayMaintenanceEngineershallbedeployednecessarilybysolefirmor JVpartners. Upto50%oftheremainingkeypersonnelandsubprofessionalstaff canbeprovidedbytheassociatefirm..

12 Consultingfirmsmeetingthefollowingcriteriaandnotinconflictofinterestwith

theConcessionaire areonlyeligibleforapplying forthisassignment. Firmsnot meetingthesecriterianeednotapply.

(A)Eligibilitycriteriaforsoleapplicant

S.

No. Experienceoftheapplicantincompletedprojectsinlastseven

years

Annual Turnover*

PreparationofDPR(NH/SH/Equivalent)

ProjectSupervision/IC (NH/SH/Equivalent)

1. The firmshouldhaveprepared DPR/FS cumPPRforatleast Two projects of 4/6 laning** of 30% of

projectlengtheach or one

project of 4/6 laning** of 50%ofprojectlength.

The firm should have experienceofProject Supervision/IEof (a)at least two construction

projects of four/six laning**

of30%ofprojectlengtheach oroneproject offour/six

laning**of 50%ofproject length

and (b)atleast one O&M project

underDBFOT/OMT/O&M of

four/six laning**of

50%ofproject

length(minimum50km).

Annual turnover (average of

last5 years or in each of the preceding two years) of the

firm from consultancy business should be equalto or more

than

Rs.2.5Crore.

* Annual Turnover should be duly certified by statutory body like Chartered AccountantorIndependentAuditorswho are competenttodosoasrecognizedbythe Stateconcerned.

Page 6: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

6

B) EligibilityCriteriaforpartnersincaseofJV(notmorethan1JVpartnershallbe allowed). LeadPartnershouldmeetatleast75%andJVpartnershouldmeetat least40% eligibility criteria of Annual Turnover. Lead partner and the JV partner both shall have experience of atleast one project of eligible category as in para 12 (A) above.

Note: Theweightagegivenforexperienceofa firmwoulddependontheroleofthefirm

intherespectiveassignments. Thefirm’sexperiencewouldgetfullcreditifit was

thesolefirmin therespectiveassignment. Experienceweightageforfirmsjoining

LeadpartnerJVpartnershallbeconsideredinthesameproportionaspayment

hasbeenreceived**bythefirmtowardsconsultancyworkintheproject.

**Forweightageofexperiencein any pastConsultancyassignmentexperiencecertificate

fromtheclientshallbeaccepted. Intheabsenceofexperiencecertificatefromthe client,proportionof paymentreceivedtowardsConsultancyworkdulycertifiedby

statutory body like Chartered Accountant or Independent Auditors who are

competenttodosoasrecognisedbythe Stateconcernedshallbe accepted. Annual

turnoverdulycertifiedbyCharteredAccountantshallbeaccepted. Incaseofnon- availabilityof suchdocumentsnoweightageofturnover/experiencewillbe considered.

13. Followingenhancementfactorwillbeusedforthecostofservicesprovidedand forthe

turnoverfromconsultancybusinesstoacommonbasevalueforworks completedin

India:

Yearofcompletionof services/turnover Enhancementfactor

Financialyearin whichRFPinvited 1.00

OneyearpriortoRFP 1.10

TwoyearpriortoRFP 1.21

ThreeyearpriortoRFP 1.33

FouryearpriortoRFP 1.46

Five yearpriortoRFP 1.61

Applicantshouldindicateactualfiguresofcostsandamountfortheworksexecuted bythemwithoutaccountingfortheabovementionedfactors.

In case the financial figures and values of services provided are in foreign currency,theaboveenhancement factorswillnotbeapplied. Instead,current market exchange rate (State Bank ofIndia BCSelling rate asonlast date of

submissionofthebid)willbeappliedforthepurposeofconversionofamount inforeigncurrencyintoIndianRupees.

Page 7: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

7

14..The Bidder including individual or any of its Joint Venture Member should, in the

last 2 years, have neither failed to perform for the works of Expressways, National Highways, ISC (Inter State Connectivity) & EI (Economic Importance) works, as evidenced by imposition of a penalty by an arbitral or judicial authority or a judicial pronouncement or arbitration award against the Bidder including individual or any of its Joint Venture Member, as the case may be, nor has been expelled or terminated by Ministry of Road Transport & Highways or its implementing agencies for breach by such Bidder including individual or any of its Joint Venture Member. Consultants (sole firm or lead firm and any of

the JV partners) who donotfulfil the aforesaid condition as on last date of submission of proposal, need not apply as their RFP proposal will not be

entertained.

15. NHAI will not be responsible for any delay, loss or non-receipt of RFP

documentsentbypost/courier. Further,NHAIshallnot be responsibleforany

delayinreceivingtheProposal and reserves the right to accept/reject any orall applicationswithoutassigninganyreasonthereof.

16. The Technical proposal (in Original) must be submitted in a hard bound form

with all pages numbered serially, along with an index of submission. (Hard bound implies binding between two covers through stitching or otherwise whereby it may not be possible to replace any paper without disturbing the documents). Spiral bound form, loose form, etc. will be not accepted. A copy of the Technical Proposal should also be uploaded on the e-portal. Financial Proposals shall have to be submitted only in Electronic Form (to be uploaded on the e-portal). In the event, any of the instructions mentioned herein have not been adhered to, NHAI may reject the Proposal..

17. NHAI will be at liberty to keep the credentials submitted by the Consultants at bidding stage, in public domain and the same may be uploaded on NHAI web- site. By

submitting the proposal, the Consultants shall be deemed to have no objection to upload/hoist the information pertaining to their credentials as well as of their key personnelonNHAIweb-site.

18. The individual key personnel proposed in the bid by the consultants or any

replacement thereof should undertake that they shall have no objection in uploading/hoisting of their credentials by NHAI in public domain.

19. RFP submission must be received not later than 1100 hrs on 21.10.2016 in the

manner specifiedin theRFPdocumentattheaddressgivenbelow.

Chief GeneralManager(Tech)-cum-R.O., National Highways Authority Of India,

Regional Office,

3/248, Vishal Khand, Gomti Nagar,

Lucknow , Pin – 226010.

Ph.0522-2391287/97E mail- [email protected]

Page 8: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

8

SECTION 2.LETTEROFINVITATIONTOCONSULTANTS

1 INTRODUCTION

1.1 Bidsareinvitedfromconsultingfirmseitherasasolefirm/jjointventurewith other

consultantwillingto act as IEto submit a proposal for providing

consultingservicesrequiredfortheassignmentnamedin theattachedLetterof

Invitation.Yourproposal could form the basis for future negotiations and

ultimately a contractbetweenyourfirmandtheNHAI.

1.2 A brief description of the assignment and itsobjectives are given in

theTermsofReference(TOR).

1.3 ThisRFPis neitheran agreementnoran offerbytheAuthoritytothe prospective

Applicantsor anyotherperson. ThepurposeofthisRFPistoprovideinterested

partieswithinformationthatmaybeusefultothemin theformulationoftheir

ProposalspursuanttothisRFP. ThisRFP includesstatementsand assumptions, whichreflectvariousassessmentsarrivedatbytheAuthorityinrelationtothe

Consultancy. Suchassessmentsandstatementsdonotpurporttocontainallthe

informationthateachApplicantmayrequire. Theinformationcontainedinthis

RFP,maynot becomplete,accurate,adequateorcorrect. EachApplicantshould, therefore,conductitsowninvestigationsaboutthe assignment andthe local

conditionsbeforesubmittingtheproposalby payingavisittotheClientandthe project

site, sending written queries to the client, before the date and time

specifiedintheDataSheet.

1.4 Pleasenotethat(i)thecostsofpreparing theproposal andnegotiating forthe contract,

including a visit to site, are not reimbursable as a direct cost of assignment and (ii)NHAIisnotboundtoacceptanyoftheproposalsreceived byitandreservestherightto annul the selection process atany time prior to contractaward,without

therebyincurringanyliabilitytotheConsultants

1.5 Wewishtoremindyouthatinordertoavoidconflictofinterestsituations,any

firmassociated with the Concessionaireof the Project Highway as its Design and/orSupervision Consultant and/or the Contractor(s) as Design Consultant and/orConstructionSupervisionConsultantduring construction period and defect

Liablity period of the project or previous operation & maintenance period is noteligibleto participatein thebidding. The restriction herein shall not apply after a period of 5 (five) years from the completion of their consultancy assignment.

1.6 Those Consultants who wereengaged by Ministry/NHAI for the above

projectasDesignConsultantsforpreparationofDetailProjectReportsshallnot bepermittedto submitproposalforprovidingtheconsultancyservicesas Independent

Consultant forthesameprojectfor first operation & maintenance period of the

project eitherindividually orinJVwithotherfirms. The restriction herein shall not

Page 9: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

9

apply after a period of 5 (five) years from the completion of their DPR consultancy assignment for the project.

Further, the consutants will not propose any personnel who had been engaged by the concessionaire on the same project within last one year.

1.7 Consultant have an obligation to disclose any situation ofactualor potential conflictthatimpacts their capacity to serve the best interest of their Client, or than mayreasonablybeperceivedashavingthiseffect. Failuretodisclosesaid situations may lead to the disqualification of the Consultant or the termination of its Contract

and/or any other action as deemed fit by the Authorityatanystage.

1.8 It is the NHAI’s policy that the consultants observe the highest standard of

ethicsduringtheselectionandexecutionofsuchcontracts.Inpursuanceofthis

policy,theNHAI:

(a) Defines,forthepurposeofthisparagraph,thetermssetforthbelowas

follows:

(i) “corruptpractice” means the offering, giving, receiving, or soliciting,directlyor indirectly,ofanythingofvaluetoinfluencethe actionofapublicofficialintheselectionprocessorin contract execution;

(ii) “fraudulentpractice” means a misrepresentation or omission of factsinorderto influenceaselection processor theexecution of a

contract;

(iii) “collusive practices” means a scheme orarrangementbetween twoor

more consultantswithor without the knowledge of the Client,

designed to establish pricesat artificial,non-competitive levels;

(iv) “coercivepractices”meansharmingorthreateningtoharm,directly orindirectly, persons ortheirpropertytoinfluence their participationin aprocurementprocess,oraffecttheexecutionofa contract.

(b) will reject a proposal for award if it determines that the Consultant recommendedfor

award has, directly or through an agent, engaged in corrupt, fraudulent,collusiveor coercivepracticesincompetingforthe contractinquestion;

(c) willdeclareafirmineligible,eitherindefinitelyorforastatedperiodoftime, tobe awarded

a contract if it at any time determines that the firm has

engagedincorruptorfraudulentpracticesincompetingfor,orinexecuting,

acontract;and

(d) will have the right to require that a provision be included requiring consultantsto

permit the NHAI to inspect their accounts and records relating to theperformanceof the contract and to have them audited by authorizedrepresentativesofNHAI.

Page 10: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

10

1.9 Consultants, their Sub-Consultants, and their associates shall not be under adeclaration of ineligibility for corrupt and fraudulent practices.

Furthermore,theConsultantsshallbe awareoftheprovisionsonfraudand corruption

stated in the specific clauses in the General Conditionsof Contract.

1.10 Consultantsshallfurnishinformationoncommissionsandgratuities,if any, paidor to

be paid to agents relating to this proposal and during execution of theassignmentiftheConsultantisawardedtheContract,in theFinancialProposal.

1.11 The Data Sheet indicates how long Consultants’ Proposals must remain valid after

the submission date. During this period, Consultants shall maintain the

availability of Professional staff nominated in the Proposal. The Client will make its

best effort to complete negotiations within this period. Should the need arise,

however, the Client may request Consultants to extend the validity period of their

proposals. Consultants who agree to such extension shall confirm that they maintain

the availability of the Professional staff nominated in the Proposal, or in their

confirmation of extension of validity of the Proposal, Consultants could submit new

staff in replacement. If any consultantseeks any

replacement(s),whileextendingthebidvalidity,thenthesame shall be

evaluatedforascertainingsuitabilityofreplacement asperthe

provisionsoftheRFPandnoremuneration shallbedeductedforany

suchreplacement(s). However,thetechnicalevaluation shalltakeinto

accountoftheoriginallysubmittedCV(s)onlyirrespective of replacement

sought.Consultants who do not agree have the right to refuse to extend the validity

of their Proposals.

2. CLARIFICATIONSANDAMENDMENTOFRFPDOCUMENTS

2.1 TheConsultantsmayrequestaclarificationofanyoftheRFPdocumentsup

tothenumberofdaysindicatedin theDataSheetbeforetheProposal submission date.

Anyrequest forclarification mustbesentinwriting by papermail,facsimile,orelectronicmailtotheClient’saddressindicatedin theDataSheet.TheClientwillrespondbycable,facsimile,orelectronicmail to such requests and will send copies of the response (including an

explanationofthequerybutwithoutidentifyingthesourceof inquiry)to all consultants who have purchased the RFPdocument. Clarification/amendmentwillalsobehostedonNHAIweb-site.

2.2 At any time before the submission of Proposals, the Client may for any

reason,whetherat itsowninitiativeor inresponsetoaclarificationrequested by aConsultingfirm,modifytheRFPdocumentsbyamendment. Any amendmentshallbeissuedinwritingthroughaddendum. Addendummay besentby

mail,cable,telex,facsimileorelectronicmailtoconsultantsor/and

Page 11: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

11

willbehostedonNHAIwebsitewhichwillbebindingonthem. TheClient mayatitsdiscretionextendthedeadlineforthesubmissionofProposals.

3. PREPARATIONOFPROPOSAL

3.1 YouarerequestedtosubmityourTechnicalproposalonlystrictlyusingthe

formatsenclosedherewith(refersection3and 4).

The proposal shall be written in the English language as specified in the

DataSheet.All pagesoftheProposalshallbesignedbyanauthorized representative. The representative’s authorization shall be confirmed by

writtenPowerofAttorneydulynotarizedtobesubmittedwiththeproposal.

IncaseofJVaMoUindicating thespecificProjects,inputandroleofeach

Partneretc.shallbesubmittedwiththeproposal.

Part1:TechnicalProposal

3.2 You are expected to examine all terms andconditionsincluded inthe

documents.Failureto actortoprovideallrequestedinformationwillbe at yourownrisk

andmayresultin rejectionofyourproposal.

3.3 During preparation of the Technical proposal you may give particular

attentiontothefollowing:

i. Theman-months fortheassignment shallbethatstatedintheTermsof Reference.

Thesameshallbe consideredforthepurposeofevaluationas wellasaward.

ii. TheConsultants shouldprefer to field as many of theirpermanent staff as

possible and higher marks shall be given in this regard. The permanent staff would be considered those already employed with the firmprior to one year from the month during which this Tender Notice is

issued. Moreweightage will be given to those keypersonnel who are employed with more years with the firm.

iii. No alternative to key professional staff may be proposed and only oneCurriculumVitae(CV)maybesubmittedforeachpositionand

iv. A good working knowledge of the language specified in the data sheet

isessentialforkey professionalstaffonthisassignment. Reports

mustbeinthelanguage(s)specifiedinthedatasheet.

v. ForKey Personnel e.g. Team Leader, Resident-cum-Highway Engineer,

HighwayMaintenance Engineer and Road Safety Expert, the Consultants shouldprefer candidates having worked on PPP Projects. Such personnel shall be rated higher than the candidates having nosuch experience at all”

3.4 Your Technical Proposal must provide the following information, using butnot

Page 12: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

12

limitedtotheformatsattachedinthe Section3&4.

i. A brief description of the firm’s organisationand an outline of

recentexperience of the Consultants and, in the case of Joint Venture, for

eachpartner, on assignments of a similar nature. The information whichyoushall provideoneachassignmentshouldindicate,inter-alia,the

profilesof thestaffprovided,duration,contractamount andfirm’s

involvement.Thedetailsofassignmentsonhandshallalsobefurnished.

ii. Any comments or suggestions on the ToRand a description of

themethodology(work plan) which the firm proposes to execute the

services,illustratedwithbarchartsofactivities.

iii. Thecompositionoftheproposedstaffteam,thetaskswhichshallbe

assignedtoeachandtheirtiming;

iv. RequirementforsubmissionofCVs.

a. CVsstrictlyin theprescribedformatandrecentlysignedin blueink oneachpageby boththeproposedprofessionalstaffandthe

ManagingDirector/Head ortheauthorizedrepresentativeofthe firm. b. Keyinformationshouldincludeyearswiththe firmanddegreeof

responsibilityheldin variousassignments.In CVformat,at

summary,theindividualshalldeclarehis qualification&total experience(in years)againstthe requirementsspecifiedinTORfor

theposition(Ref.Enclosure-BofTOR).If any informationisfound

incorrect, atanystage, action including termination and

debarmentfromfutureNHAIprojectsupto2yearsmaybetaken byNHAIonthepersonnelandtheFirm.

c. Deleted.

d. CVsofKeyPersonnelhavingintermittentinputswillbe considered

onlyiftheassignments onhandason7daysbeforeduedateof proposalincludingthoseforwhichLOAhasbeenreceivedfrom

theClientorforwhichConsultanthasbeendeclaredas H1donot

exceed3(three)forQuality CumMaterialExpertand6(six)for Road

Safety Expert Engineer, Pavement Specialist,Bridge/StructuralEngineer,Traffic& TransportationExpert,

HTMS/TollExpert.

e. AlltheCVswhicharetobeevaluated shouldbecompleteinall respectsincludingsigningandcertificationbytheindividualand thefirm

f. If aCVscorelessthan75%marks,whatevermarksitscorewillbe carried

forwardformaximum2noskeypersonnelfor

determiningthetotalscoreofthefirm. However,if theKey Personneldoesnot fulfilltheminimumacademicqualification(as

mentionedatEnclosure-BofTORofRFP),theoverallscoreofhis

Page 13: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

13

CVwillbeevaluatedaszero.IftheKeyPersonneldoesnotfulfill theminimumqualificationrelatedtoexperience(as mentionedat

Enclosure-BofTORofRFP),thenzeromarkswillonlybe assigned

forthatsubcriteria,butthemarksobtainedbythe CVofthe Key

Personnel will be carried forward for maximum 2 noskey personnel fordetermining thetotal scoreofthefirm. Incase,a firmis H-

1,thenmaximum2(two)suchKeyPersonnel(whoseCV scoreslessthan

75%orwhodoesnotfulfilltheminimum qualification)

willhavetobereplacedbythefirmatthetimeof contractnegotiations.Thereductioninremunerationof such

replacementswillbe madeasperClause4.5(c)ofthecontractfor

consultancyservices.

g. IncaseCVofapersonis turnedouttobefake/incorrect/inflatedduring theassignment,theconsultancyfirmsshallhavetorefundthesalary andperksdrawnincludinginterest@12%perannuminrespectof the personapartfromotherconsequences.Inadditiontoabove,10%ofthe

v. DeploymentScheduleforeachkeypersonnelshouldbe formulatedand incorporated in the Technical Proposal which will be reviewed on

quarterlybasis.

vi. Estimates ofthetotaltime effort(personxmonths)tobeprovided for the services,

supported by bar chart diagrams showing the time proposed (person x

months) for each professional staff and sub professionalstaff.

vii. Deleted

viii. Each key personnel of the preferred Consultant shall be called for

interviewat thetimeofnegotiationatthecostofConsultant.

Page 14: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

14

ix. Replacement ofkey personnel shall be considered onlyinunavoidable circumstances. Innocasemorethantworeplacements ofkeypersonnel shallbepermittedduringnegotiationandinsuchcasesConsultantand

suchkeypersonnel shallhavetosubmitaffidavittotheeffectthat during theperiodofassignmentspecifiedinpara8 ofSection:1,thereplacedkey personnelshallnotbeprofessionallyemployedanywherein NHAIworks.

NHAIshallnot furtherconsiderCVof suchkeypersonneldirectlyor indirectlyfor anyofitsprojectsforthisperiod.10%reductionin remunerationshallbeconsideredfor eachsuchsubstitutionupto2 replacements. Incaseduringnegotiations, morethantworeplacements

aresoughtbytheH1consultant,his proposalshallbeconsideredasNon- Responsive. In such case the combined score of next five top firms, meetingthenon-conflictconditionshallbeevaluatedtoarriveatnewH1.

Incasewhenlessthanfivefirmsareavailable, thenexthighestscoring firmshallbeconsideredasH1.

In case during interaction with the key personnel at the time of

negotiationitisfoundthatthekeypersonnelproposedisun-suitablefor theassignmentposition,hisreplacementby equivalentorbettershallbe

providedbythe consultant. Thekeypersonnelwithsuchun-suitableCV

shallnotbeconsideredinanyfuturebidsforthatpositionfortwoyears.

Nodeduction forsuchreplacement whoarenotfound suitable during interactionshallbemade.

Intheeventualitythatafirmbecomesnon-responsive, forthethirdtime, due to

theaction ofreplacements ofmorethan2 key personnel during

negotiation,thefirmandits constituentJV partnersandAssociatesshallbe

debarreduptotwoyearsforNHAIconsultancyprojects.

x. Anyadditionalinformation.

3.5Thetechnicalproposalmustnotincludeanyfinancialinformation.

Part2:FinancialProposal

3.6 YourFinancialProposalmustbestrictlyusingtheformatsattachedinSection

5.Noadditionalitems/quantities otherthanthatspecified intheformatsshouldbe

proposedbytheConsultantssincethesameshallnotbe consideredforthe evaluation/award. For the first 12 months from the Date of Commencement of Services, Consultants shall be paid billing rates as indicated above. Beginning 13thmonthsoftheservicesprovided,billingratesshallbeincreasedfortheremuneration

partonly@5%every12monthsforlocalcurrencyforthesubsequentperiodofservicesrenderedbythepersonnelof allcategoriesnamely(i)keyPersonnel;(ii)sub-

Page 15: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

15

Professionalpersonneland(iii)Supportstaff.However,forevaluationandawardof theBidproposals, thequotedinitialrate(asapplicableforfirst12months)shallbe multipliedbythetotaltimeinputforeachpositionon thiscontract,i.e.without consideringthe increaseinthebillingrates.

3.7 TheFinancialProposal shouldclearlyidentifyasaseparateamount,thelocal taxes(including social security), duties, fees, levies and other charges imposed

under theapplicablelaw,ontheconsultants,thesub-consultants,andtheirpersonnel (otherthan nationalsorpermanentresidentsofthegovernment’scountry);unlessthe Data Sheet specifies otherwise. This cost, however, will not be considered in evaluation.

3.8 Consultantsto state cost in INR.

3.9 The service tax shall be considered for release along with invoice, subject to

conditionthatConsultantsubmitstheproofofdepositofthesamewithaCertificate fromCAfirmwithinaperiodof90days ofreceiptofsuchservicetax.

4. SUBMISSION,RECEIPTANDOPENINGOFPROPOSALS

4.1 PREPARATION&SUBMISSIONOFAPPLICATIONS:

i. Detailed RFP may be downloaded from https://nhai.eproc.in and the

Applicationmaybesubmittedonlinefollowingtheinstructionsappearing

onthescreen. A Vendormanualcontainingthedetailedguidelinesfore- tenderingsystemisalsoavailableonhttps://nhai.eproc.in.

ii.

ThefollowingshallbetheformofvariousdocumentsintheApplication:

A.

OnlyElectronicForm(tobeuploadedonthehttps://nhai.eproc.insite)

(a) Technicalproposalasindicatedinpara‘B’below (b) FinancialproposalasperformatprescribedinSECTION-5OFRFP.

Page 16: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

16

B.HardcopyofTechnicalproposalinOriginaltobesubmittedinSealedEnvelopandalsoElectronicformtobeuploadedonthehttps://nhai.eproc.in

(I) TechnicalProposalinHardBoundFormincluding

(a) PowerofAttorneyforsigningtheApplication

(b) Ifapplicable,thePowerofAttorneyforLeadMemberofJV; (c) Copy of Memorandum of Understanding between JV

partners,ifapplicable;

(d) CopyofMemorandum ofUnderstanding withAssociate, if applicable

(e) Firmscredentialsas performatprescribedinSECTION-3OF RFP.

(f) Technical proposal asperformat prescribed inSECTION-4 OFRFP.

(II) Receipt of onlinepayment towards cost of RFP of Rs10000/- (Rupees Tenthousand only) in shape of DDin favourof NationalHighwaysAuthorityofIndia; and

(III) OnlinereceiptofpaymentofApplication processing feeof Rs.1,295/-(Rupees One

thousand twohundredNinetyFiveonly)inclusiveof all taxesin

favourofM/s.CIIndiaPrivateLimited,NewDelhi electronically.

iii. TheApplicantshallsubmittheoriginaldocumentsspecifiedabove in point

no.4.1(ii)Btogetherwiththeirrespectiveenclosuresandsealit inan

envelopeandmarktheenvelopeas “TechnicalProposal”fortheProjectfor

whichproposalis submittedandnameandaddressoftheApplicant.The

envelopemustbe clearlymarked“DONOTOPEN,EXCEPTINTHE PRESENCE

OF THEEVALUATION COMMITTEE”. Inaddition,the Applicationdue

dateshouldbe indicatedontherighthandcornerofthe envelope.

Theoriginaldocumentsshouldbesubmittedbefore 1100hours

IndianStandardTimeon 21.10.2016,at thebelowmentionedaddressin the manner and form as detailedin theRFP. Areceipt thereof should be

obtainedfromthebelowmentionedperson.

ATTN.OF:

Chief GeneralManager(Tech)-cum-R.O., National Highways Authority Of India,

Regional Office,

3/248, Vishal Khand, Gomti Nagar,

Lucknow , Pin – 226010.

Ph.0522-2391287/97

E mail- [email protected]

Page 17: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

17

iv. TheApplicantshalluploadscannedcopiesoftheTechnicalProposaland Financial Proposalasspecifiedinpointnos.4.1(ii)A&Baboveonthe https://nhai.eproc.in

before 1100 hours Indian Standard Time on21.10.2016.

Hardcopyofthedocumentsasspecifiedinpointnos.4.1(ii)Babove only is

required to be submitted.FinancialProposal is to be submittedOn-

lineonlyandnohardcopysubmissionistobemade. Intheeventofanydiscrepancybetweentheoriginalandthecopy(inelectronic

form),theoriginalshallprevail.

v. Itmaybenotedthatthescannedcopiescanbepreparedinfileformati.e.

PDFand/orZIPonly.TheApplicantscanuploadasinglefileofsizeof10 MBonlybutcanuploadmultiplefile

4.2Modification/Substitution/Withdrawalofbids:

(i) TheBiddermaymodify,substituteorwithdrawitse-bidaftersubmission.Prior tothe

BidDueDate.NoBidshallbemodified,substitutedorwithdrawnby the

BidderonoraftertheBidDueDate. (ii) Any alteration/ modification in theBid or additional information

suppliedsubsequentto theBidDueDate,unlessthesamehas beenexpresslysoughtforby theAuthority,shallbedisregarded.

(iii) Formodificationof e-bid,bidderhasto detachits oldbidfrome-tenderingportal andupload/resubmitdigitallysignedmodifiedbid.

(iv) For withdrawal ofbid, bidder has to click on withdrawal icon ate-tendering portal

andcanwithdrawitse-bid. (v) Beforewithdrawalofabid,itmayspecificallybenotedthatafterwithdrawalofa

bidforanyreason,biddercannotre-submite-bidagain

4.3 OPENINGANDEVALUATIONOFAPPLICATIONS:

(i) OpeningofProposalswillbedonethroughonlineforFinancialProposal andbothon-lineandmanuallyforTechnicalProposal.

(ii) For participatinginthetender,the authorizedsignatoryholdingPowerof Attorney shallbetheDigitalSignatory. Incasetheauthorized signatory holdingPowerof AttorneyandDigitalSignatoryare notthesame,the bid shallbeconsiderednon-responsive.

TheAuthorityshall openEnvelopecontainingTechnicalProposalreceivedas mentioned in point nos. 4.1 (ii) B at 11:30 hours Indian Standard Time on 21.10.2016in thepresenceoftheApplicantswhochooseto attend.ThisAuthority willsubsequently opentheTechnicalProposalasmentionedinpointno.4.1(ii)

A(a)aboveandevaluatetheApplications inaccordancewiththeprovisionsset outin theRFP.

Page 18: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

18

(iii) TheFinancialProposal4.1(ii)A(b)willbe openedonlineoftheshortlisted applicantswhoqualifyforfinancialopeningasper RFP.Thedateof openingof FinancialProposalwillbenotifiedlateron.

5 PROPOSALEVALUATION 5.1 Atwo-stageprocedureshallbeadoptedforevaluatingtheproposals. 5.2 Deleted.

TechnicalProposal 5.3 The Evaluation Committee appointed by the NHAI shall carry out its

evaluationapplying the evaluation criteria and point system specified in the data sheet. Eachresponsive proposal shallbeattributedatechnical score(St.) The technical proposal should score at least 75 points to be considered responsive.

TheAuthorityshallshortlist5(five)topfirmsonthebasisoftheir technicalscorenotintheconflictofinterestwiththeconcessionaire.

FinancialProposal

5.4 AftertheevaluationofTechnical Proposalsiscompletedandtheshortlistof5 firmsis

finalised,NHAImaynotifythoseconsultantswhoseproposalswerenot consideredasperconditionsofRFPindicatingthattheirFinancialProposalwill notbeopenedonline. TheNHAIshallsimultaneouslynotifythefinallyselected 05(five)shortlistedfirms indicating thedateandtime setforopening oftheFinancialProposals.

5.5 The Financial Proposals shall be openedpubliclyinthe

presenceoftheconsultants’representativeswhochoosetoattend. Thenameof

theconsultant,thetechnicalscores,andtheproposedpricesshallbereadaloud and recordedwhentheFinancialProposalsare opened. TheClientshallprepare minutesofthepublicopening.

5.6 The Evaluation Committee will determine whether the submitted Financial Proposals

arecomplete(i.e.whethertheyhaveincludedcostofallitemsofthe

correspondingproposals;ifnot,thenthecosttowardssuchmissing items will beconsideredasNIL,buttheConsultant shall, however, berequired tocarry outsuch obligations withoutanyadditionalcompensation. Incaseundersuch circumstances,

ifClientfeelsthatthework cannot be carried out within the overall costas perthe submitted financialproposal, suchproposals shallbe considerednonresponsive.

5.7 TheEvaluationCommitteeshalldetermineifthefinancialproposaliscomplete andwithoutcomputationalerrors. Theorderofpriorityasamongthesefirmson thebasisoffinancialbidswillalsobedetermined andthelowestfinancialbid shallrankfirstforawardofcontract.

Page 19: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

19

5.8 The lowest Financial Proposal (Fm) will be given a financial score (Sf) of 100 points. The financial scores (Sf) of the other Financial Proposals will be computed as Sf=100 x Fm/F, where Sf is the financial score, Fm is the lowest price and F the price of the proposal under consideration. Proposals shall finally be ranked according to their combined technical (St) and financial (Sf) scores using the weights indicatedinthedatasheet: S= St x T% + Sf x P%. The Firm achieving the highest combined technical financial score will be invited for negotiations.

6 NEGOTIATIONS

6.1 Prior to the expiration period of validity of proposal, the NHAI shall notify thesuccessful firm (first ranking firm) in writing by registeredletteror facsimile and

may either issue LOA if negotiations are not required or may

inviteittonegotiatethecontract. Incasetwoormorefirms offersamelowest

financialbid,thefirmachievingthehighestTechnicalscoreshallbeinvitedfirst

fornegotiations.

6.2 Negotiationsnormallytakeonetotwodays. Theaimistoreachagreementonall

points,andinitialadraftcontractbytheconclusionofnegotiations.

6.3 Negotiations shall commence with a discussion of your technical proposal, the

proposed methodology (work plan), staffing. Agreement must then be reached on

thestaffingand bar charts, which shall indicate activities, staff, periods in the field and in the home office, staff months, logistics and

reporting.Specialattentionshallbepaidtooptimisetherequiredoutputsfrom

thefirmwithintheavailable budgetandtodefineclearly the inputs required

fromtheNHAItoensuresatisfactoryimplementation oftheassignment.

6.4 It is the responsibility of the Consultant, before starting financial

negotiations, to contact the local tax authorities to determine the local tax amount to be paid by the Consultant under the Contract. The financial negotiations willincludeaclarification(ifany)ofthefirm’staxliabilityinthe Client’s country,

andthemanner inwhichitwillbereflectedintheContract; andwillreflecttheagreedtechnicalmodificationsin the cost of the services.

6.5 Having selected a firm, among other things, onthe basis ofanevaluation of

proposedkeyprofessional staff, theNHAI expects tonegotiate, acontract on thebasisofthestaffnamedintheproposaland,priortocontractnegotiations, willrequireassurancethatthisstaffshallbeactuallyavailable.

6.6 Replacement of key personnel shall be considered only in unavoidable

circumstances.In nocasemorethantworeplacementsofkeypersonnelshallbe permitted during negotiation and in such cases Consultant and such key personnel

Page 20: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

20

shallhavetosubmitaffidavittotheeffectthatduringtheperiodof assignmentspecifiedinpara8ofSection:1,thereplacedkeypersonnelshallnot beprofessionally employedanywhereinNHAIworks.NHAIshallnotfurther considerCVofsuchkeypersonneldirectlyorindirectlyfor anyof itsprojectsfor

thisperiod. 10%reduction inremuneration shall beconsidered foreach such substitution upto2replacements. Incaseduringnegotiations, morethantwo replacementsaresoughtbytheH1consultant,hisproposalshallbe consideredas Non-

Responsive. Insuchcasethecombinedscoreofnextfive topfirms,meeting thenon-conflictconditionshallbeevaluatedtoarriveatnewH1. Incasewhen lessthanfivefirms areavailable,thenexthighestscoringfirm shall be considered asH1.

Incaseduringinteractionwiththekeypersonnelatthetimeofnegotiationit is

foundthatthekeypersonnelproposedisun-suitablefortheassignmentposition,

hisreplacementbyequivalentorbettershallbeprovidedbytheconsultant. The keypersonnelwithsuchun-suitableCVshallnotbeconsideredin anyfuturebids forthat

positionfortwoyears.

Intheeventualitythatafirmbecomesnon-responsive,forthethirdtime,dueto theactionofreplacementsofmorethan2keypersonnelduringnegotiation,the

firmanditsconstituent JVpartnersandAssociatesshallbedebarred uptotwo yearsforNHAIconsultancyprojects.

6.7 Eachkeypersonnelofthepreferredconsultantshallbecalledfor interviewat

thetimeofnegotiationatthecost of theConsultant.Atthetimeof interview,the

keypersonnelshallproducetheoriginalsofthecertificates(Proofof age, Qualifications

and experience from theirrespective employers) insupport of theirCVsfor

verificationandreturn.Thenegotiationsshallbeconcludedwitha reviewofthedraftformofContract. TheNHAIandthefirmwillfinalisethe

contracttoconcludenegotiations.

6.8 Eachkeypersonnelofthepreferredconsultantshallbecalledforinterviewat thetimeofnegotiationatthecost of

theConsultant.Thenegotiationsshallbeconcludedwitha reviewofthedraftformofContract. TheNHAIandthefirmwillfinalisethe contracttoconcludenegotiations

7 AWARDOFCONTRACT 7.1 After completion of negotiations with the consultants, the Client shall award

theContracttotheselectedConsultant.

7.2 The successful firm with whom the contract is signed is expected to commence theassignmentonthedateandatthelocationspecifiedinthedata sheet.

8. PERFORMANCECLAUSE

IndependentEngineersshallbeexpectedtofullycomplywithalltheprovisions

ofthe`TermsofReference’, andshallbefullyresponsible forsupervising and

Page 21: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

21

ensuringthattheDesigns,ConstructionandMaintenance andOperationofthe facility takes place in accordance with the provisions of the Concession Agreement.FailureoftheIndependentEngineerto notifyingNHAIandthe Concessionaireonnon-

complianceoftheprovisionsoftheConcessionAgreementbytheConcessionaire,non-adherencetotheprovisionofToRandnon-adherence tothetimescheduleprescribedunderToRshallamounttonon-performance.

The Independent Engineer shall appoint senior most technical director or

equivalentasitsauthorisedrepresentative, whoshallcorrespond withtheNHAI

besidesTeamLeadertomonitortheperformanceofitsstaff,undertakequarterly

siteinspectionsandgive areporttoNHAIonsuchinspectionforcommentsand suggestions of NHAI for future compliance, issue on behalf of the IE, the

ProvisionalCompletionCertificateandCompletionCertificateandshallcarryout

anysuchtaskasmaybedecided byNHAI. TheIEshalltakepriorapproval of NHAI before

issuing Provisional Completion Certificateand Completion Certificate.Theproposalsubmittedshallalsoincludethenameofthe

authorisedrepresentativealong withthe authorization letter and power of attorney.

No separatepaymentshallbemadeforsuchinputsandsitevisitsofthe authorized

representativeasthesameshallbetreatedasincidentaltotheassignment.

9. CONSULTANT’SPROPOSAL

9.1 Broadjob-descriptionand minimumqualificationand experiencerequirementsfor

keypersonnelmentionedabovearegivenin Enclosure–B.However,highermarks shall be accorded to the Candidate with higher relevant qualification and

experienceinPPPprojects.TheageoftheKeyPersonnel should notbemore than 65 years on the date of submission of proposal. AgeLimitforthe positionsofTeamLeader,PavementSpecialistand QualitycumMaterialExpert isrelaxby5yearsi.e.upto70yearsofageatthetimeofsubmission of proposalandhecancontinueupto 73years,subjecttoproductionofMedical

FitnessCertificate.Consultantsare advisedintheirowninterestto framethe technicalproposalin anobjectivemanneras faraspossiblesothatthesecouldbe

properlyassessedinrespectofpointstobegivenas partofevaluationcriteria.The bio-dataofthekeypersonnel shouldbesignedoneverysheetbythepersonnel concerned and the last sheet of each bio-data should also be signed by the

authorisedsignatoryfortheConsultant.Thekeypersonnelshallalsocertifyatthe endoftheir bio-data proformathattheyhavenotleftanyoftheNHAI works withoutcompletingoftheirassignmentandhavenotacceptedanyotherofferat thetimeofsigningofthebio-dataandassuchshallbe availabletoworkwiththe

IndependentEngineer,iftheProjectisawarded.IncasethekeypersonnelleavestheassignmentwithoutapprovalofNHAI,NHAIwouldbeat libertytotakeany appropriateactionagainstthatkeypersonnelincludingdebarment.

Page 22: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

22

9.2 Inadditiontoabove,theconsultantsarerequiredtoproposesub-professionalstaff as detailedin Enclosure-Awiththeminimumqualificationandexperience requirementsasgiveninEnclosure–B.

10. PERFORMANCESECURITY

The successful consulting firm shall have to submit a Bank Guarantee (BG) for anamount of2.50%oftheContract Value within15daysofissueofLOA. TheBGshallbevalidforaperiodof38monthsi.e.upto2monthsbeyondthe

expiryoftheContractof36months. TheBGshallbeintheformatspecifiedin AppendixI of draft contract form and furnished from a NationalisedBank,IDBIor ICICI/ICICIBank/ForeignBank/EXIMBank/AnyScheduledCommercial BankapprovedbyRBIhavinganetworthofnotlessthan500croreas perlatest AnnualReportoftheBank. Inthecaseofa ForeignBank(issuedby aBranchin India) the net worth in respect of Indian operations shall only be taken into account. IncaseofForeignBank,the BGissuedbyForeignBankshouldbecounter guaranteed by any NationalisedBank in India. In case of JV, theBG shallbe furnishedonbehalfofthe JVandnotindividuallybythemembers.

11.AUTHORISEDSIGNATORIES

TheAuthorityshallrequiretheIndependentEngineertodesignateandnotifyto theAuthorityandtheConcessionaireupto2 (two)personsemployedinitsfirmto sign

forandonbehalf oftheIndependent Engineer, andany communication or

documentrequiredtobe signedbytheIndependentEngineershallbe validand

effectiveonlyifsignedbyany ofthedesignatedpersons;providedthatthe IndependentEngineermay,bynoticeinwriting,substituteanyofthe designated

personsbyanyofitsemployees.

Page 23: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

23

DATASHEET (AsMentionedinLetterofInvitationtoConsultants)

SubclauseNo.inLetterofInvitationtoConsultants

1.3 Pre-ProposalConferenceshallbeheldat:RO-Lucknowofficeon14.10.2016 at14.00hrs.

1.11 Theproposalshallbevalidfor120daysafterthelastdateofsubmission.

2.1 Clarification mayberequested 7dayspriortoPre-ProposalConference. The

addressforrequestingclarificationis:

Chief GeneralManager(Tech)-cum-R.O., National Highways Authority Of India,

Regional Office,

3/248, Vishal Khand, Gomti Nagar,

Lucknow , Pin – 226010.

Ph.0522-2391287/97

E mail- [email protected]

TheLanguageofdocumentsandcorrespondencewillbeEnglish

3.3 Allthepersonnel shall have working knowledge of English and all the reports

etc.shallbewritteninEnglish.

3.7 NHAIshall reimburse onlyservicetax. Consultant has to assess all other

taxesandshould inbuiltthem intheir financial proposal. These taxes(other thanservicetax)should not be provided separately. Consultants are requested to consult TaxConsultantsfordetails.

3.8 The Consultants to state local cost in INR only.

4.6 Thetimeandlastdateofsubmission:1100hrson 21.10.2016.

5.3 ThepointsassignedtoTechnicalEvaluationcriteriaare:

S.No. Description Marks

1 Relevantexperiencefortheassignment 25

2 Qualifications and competence of the key staff for the assignment

75

Total 100

Page 24: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

24

(i) SubcriteriaforRelevantExperienceofthefirmfortheassignment

YearofEstablishmentoftheFirm(IncaseofJVyearofestablishmentof

LMshallbeconsidered)(Min5Years)

2

AverageAnnualTurnover(last5years)fromconsultancybusiness (Min.2.5crore)

2

No.ofkeypersonnelwiththefirm 2

Experiencein DPR/FeasibilitycumPPR preparationfortwoprojectsof 4/6 laningof30% ofprojectlengtheachor one projectof4/6laningof50%of

projectlengthin last7years.

5

Experienceas IndependentEngineer/Supervisionconsultantstwo constructionprojectsoffour/sixlaning**of30%ofprojectlengtheachor oneprojectsoffour/sixlaning**of50%ofprojectlengthinlast7years.

6

Experience asIndependent Engineer/ Supervision consultants oneO&M projectunderDBFOT/OMT offour/sixlaning**of50%ofprojectlength (minimum50km)in last7years.

8

Employer’scertificate shouldbesubmittedsubstantiating theexperience claimedby thefirm.

**Consultants should give detailsof the experience of the firm considering thecompleted and the on-going highway assignments, separately forPPPand non-PPPProjects along with experience from clients. This listofthecompletedworksshouldalsoincludethose assignmentswhicharesubstantially(90%ofContractvalue)completed. No Qualification/Experience etc. shall be considered without proof of experience.

(ii) Sub criteria for Adequacy of the proposed work plan and methodology in

responsetotheToR.

(iii) Qualificationandcompetenceoffollowingprofessional/sub-professional stafffor the

assignment shall beevaluated. The weightage forvarious key staff areas under:-

S. No

StaffPosition No.ofProfessional Staff

Marks perStaff

Total Marks.

1 TeamLeader 1 25 25

2 HighwayMaintenanceEngineer 1/2/3 18/9/6 18

3 QualitycumMaterialExpert 1 7 7

4 PavementSpecialist 1 7 7

5 RoadSafetyExpert 1 7 7

6 Bridge/StructuralEngineer 1 6 6

7 Traffic&TransportationExpert 1 3 3

8 HTMS/TollExpert 1 2 2

Total 75

Page 25: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

25

Subcriteriaforqualificationof keyPersonnel(i.e.Professionalstaff)

Generalqualifications 25

Adequacyfortheproject 70

Employmentwithfirm 5

Total 100

Thetechnical proposalshouldscoreatleast75pointstobeconsideredresponsive for financialevaluation

5.6 ThesinglecurrencyforpriceconversionisINR.

5.8 Theweightagegiventotechnicalproposalis T=80%.

TheweightagegiventofinancialproposalisP=20%.

7.2 Commencement of Assignment: The firm shall begin carrying out the services

within15daysofsigningoftheConsultancyAgreement.

Remarks:BasedonexperienceandtheConsultingIndustry’sCapacity,Projectspecific requirementetc.,NHAImaymodifytheabovecriteriaforSelectionofIE.

Page 26: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from Km

149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

26

SECTION 3. FORMATSFORSUBMISSIONOFFIRMSCREDENTIALS

The proposalshould contain thefollowing information inenclosed formatattachedat AppendixA.

• YearofEstablishmentofFirm

• Averageannualturnover(lastfiveyears)

Note: TheFirmshallsubmitCertificateofIncorporationandauditedbalancesheetforthe

lastfiveyears(FY2011-2012,FY2012-2013,FY2013-2014,FY2014-2015 & FY 2015-2016)**. Forclaimingexperienceof Highwayprojects,CompletionCertificate fromEmployershouldbeenclosed.Theproposalshouldalsocontainthedetailsof the keypersonnel viz. theirname, qualification, expertise area, experience and yearsofassociationwiththefirm.

AppendixA

Thefollowinginformationrelatedtothe firmshouldbeprovidedintheproposal. i. Nameofthepackageappliedfor:-

ii. Yearofestablishmentoffirm*

Consultant Yearof

Establishment Country TypeofOrganization

Individual

Partnership Corporation Other

Individual/ LeadPartner(of

JV)

NOTE:-YearofEstablishmentofLeadPartnerofJVshallbeconsidered. *CopyofCertificateofincorporationshallbesubmitted.

iii. Office/BusinessAddress/Telephonenos./CableAddress.

iv. Narrativedescriptionoffirm(Notmorethan2sheets)

v. Nameoftwo(2)principalswhomaybecontactedwithtitleandtelephone number/faxnumber.

Page 27: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from Km

149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

27

vi. FinancialStatementofthelastfiveyears.**

S.N. Particulars 2015-16 2014-15 2013-14 2012-13 2011-12

i.

Annualturnover fromConsulting

ii. TotalAssets

iii. CurrentAssets

**a) The amountshallbestatedinINR.

b) Thecurrencyconversionratefortherespectiveyearsshallbe mentionedfor other

internationalcurrencies. c) BalanceSheet/AuditorCertificateoflast5years(FY2011-2012,FY2012-2013,FY2013-2014,FY2014-2015 & FY 2015-2016) shallbesubmittedasevidenceofAnnualTurnover”.

d) Whereverdetailsfor AuditedBalanceSheet,FinancialStatement,Balance Sheet/Auditor Certificate of last 5 years are sought, the last 5 year shall be precedingtheyearin whichBidsubmissionistobemade.

In case the annual accounts for the latest financial year are not audited and

thereforetheApplicantcannotmakeit available,theApplicantshallgivean undertaking to this effect duly certified by statutory body like Chartered AccountantorIndependentAuditorwhoarecompetenttodosoasrecognizedby the state concerned. In such a case, the Applicant shall provide the Audited

AnnualReportsfor 5(five)yearsprecedingtheyearforwhichtheAuditedAnnual Reportisnotbeingprovided.

Page 28: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from Km

149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

28

vii. Experience***asIndependentEngineerorConstruction/MaintenanceSupervision of Highway Projects, separately for PPPandnon-PPP Projects during the last7 years.

S No

Projects Name/

Year

Typeof Services Rendere

d

Descrip- tion of Highway Project/ Length (kms)

Client (with comp

lete contact

person

, teleph one Nos.

and Fax

Nos.)

Total Feefor

the Consult

ancy Assign ment (INR)

Fee receive

d by

Applicant (in

case of

JV/ Association

)

%age of

total fee

receivedby the

firm

App rox.

Cost of

Period

Sole consultant/

prime consultant

of JV / minor

consultant of

JV/ or sub consultant/ asAssociate

consultant

1 2 3 4 5 6 7 8 9 10

A. Completed/ Substantiallycompletedprojects: 1.

2.

3. B. Projectsinprogress: 1.

2. 3.

Page 29: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

29

viii. Experience***inDPR/FeasibilityStudyof4/6laningHighwayprojectsduringthelast7years.

S

No Projects

Name / Year

Type of

Servic es Re

nder ed

Length of

Project (kms)

Client (with

complet e

address, contact

person

, telephon e Nos.and

FaxNo s.)

Total Feefor

the Consu ltancy Assig nment (INR)

Feein INR (A

pplica nt’s

share in

%ageof totalfee received

bythe firm

Period

Sole Cons

ultant/ prime

consultantof JV / mi

norconsul tant of JV/

or sub consultant

/ as Associate

(Road/ Highway projects

with or

1 2 3 4 5 6 7 8 9

A. Completed/ Substantiallycompletedprojects: 1. 2. 3.

.

. B. Projectsinprogress: 1.

2. 3.

.

Page 30: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

30

ix) Experience***inProjectSupervision/IEforOperationandMaintenanceofHighway Projects,separatelyforPPPandnon-PPPProjectsduringthelast7years.

S

No Projects

Name/ Year

Type Services Rendere d

Descrip- tion of Highway Project/ Length (kms)

Client (with comp lete cont act teleph one Nos. and Fax Nos.)

Total Feefor the Consul tancy Assign ment (INR)

Feereceived by Applicant (incase of JV/Assoc iation)

%age oftotal fee receive dby the firm

Period

Sole consul tant prime consulta nt of JV / mi nor consul tant of JV/ or

sub consul tant

1 2 3 4 5 6 7 8 9

A. Completed/Substantiallycompletedprojects: 1. 2. 3.

. B. Projectsinprogress: 1. 2.

3.

***a)4/6laneasapplicablefortheprojectforwhichRFPisinvited.

b) Onlythoseprojects,tobeincludedin thetablewhichareHighwaysProjectsandfor

whichclientscertificatesfromtheconcernedGovernmentagenciesareenclosedwith

theproposal. Thecertificate shouldbe issued byanOfficer notbelow therankof

ExecutiveEngineer.

c) Theweightagegivenforexperienceofafirmwoulddependontheroleofthefirmin

therespectiveassignments. Thefirm’sexperiencewouldgetfullcreditifitwasthe solefirmintherespectiveassignment. Experienceweightageforfirmsas Lead partner/JVpartner/Associateshallbeconsideredinthesameproportionaspayment has beenreceivedbythefirmtowardsconsultancyworkintheproject

Page 31: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

31

d) Forweightage of experience in any past Consultancy assignment experience certificatefromtheclientshallbe accepted. Inthe absenceofexperiencecertificate

fromtheclient,proportion ofpayment received towardsConsultancy workduly

certifiedby statutorybodylikeCharteredAccountantorIndependentAuditorswho are

competent to do soasrecognized bythe State concerned shall beaccepted.

AnnualturnoverdulycertifiedbyCharteredAccountantshallbeaccepted. Incase ofnon-availabilityof suchdocumentsnoweightageof turnover/experiencewillbe considered.

(e) AssignmentsonhandincludingthoseforwhichtheLetterofAcceptancefromthe

clientsreceivedason7dayspriortoduedateforsubmission ofproposals: The

detailsshallbegiveninthefollowingformat.

S.

No

Nameof Assignment

Client Roleofthe firm

Dateof letterof

Acceptance

Dateof Agreement

ifsigned

Present statusof

Assignment

TeamMembers providedbythe

firm Sole,

Lead/

Otherin

JVorsub- consultant

Name DOB Position

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Page 32: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

32

AppendixB-1 Technicalproposalsubmissionform.

AppendixB-2

Firm’s comments and suggestions on the Terms

Referenceandondata,services,andfacilitiestobeprovided

AppendixB-3

Approach paper on methodology and work plan of performing

AppendixB-4 CompositionoftheTeamandTask(s)ofeachTeammember

AppendixB-5 CurriculumvitaeofproposedProfessionalstaff.

AppendixB-6 TimeschedulefordeploymentofProfessionalstaff

AppendixB-7 Activity(works)schedule.

AppendixB-8 Affidavit for correctness of CVs of key personnel and experienceclaimedbythefirm.

SECTION4.FORMATFORSUBMISSIONOFTECHNICALPROPOSAL

Page 33: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

33

APPENDIXB-1

TechnicalProposalSubmissionForm. FROM(Nameof Firm)

……………………

……………………. To, Chief GeneralManager(Tech)-cum-R.O., National Highways Authority of India,

Regional Office,

3/248, Vishal Khand, Gomti Nagar,

Lucknow , Pin – 226010.

Ph.0522-2391287/97

E mail- [email protected]

Ladies/Gentlemen:

Sub:Independent Engineer Services during Operation & Maintenance Period for 4

laning of Moradabad - Bareilly Section of NH-24 from Km 149.250 to Km 271.050 in

the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

We, the undersigned, offer to provide the consulting services for the above in accordancewithyourRequestforProposaldated.........2015andourProposaldated

……….. whileduly examining and understanding the contents of RFP. We areherebysubmittingourProposal,whichincludesthisTechnicalProposalsealedin an

envelope for the above mentioned work. We certify that allthe information

providedinourproposalincludingenclosuresis trueandcorrectand allenclosures

accompanyingourproposalaretruecopiesoftheirrespectiveoriginals.

Wefurthercertifythatinthelast3years,weoranymemberofourJV/Associates haveneither failed toperformanycontract/assignment norhavebeenexpelled from anycontract/assignmentnorhad anycontract/assignmentterminatedforour breach. My/Our registration No. on Infracon is ……. and my/our Infracon Team ID is

…………….

Ifnegotiations areheldduring theperiod ofvalidity oftheProposal i.e.before

_ we undertake to negotiate on the basis of the proposed staff. Our Proposalisbindinguponusandsubjecttothemodificationsresultingfromcontract negotiations. Weunderstandyou arenotboundtoacceptanyProposalyoureceive.

Page 34: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

34

Weremain,

Yourssincerely,

AuthorizedSignatory

NameandAddressofFirm (LeadMemberincaseofJV)

Page 35: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

35

APPENDIXB-2: COMMENTAND SUGGESTIONS OF CONSULTANTS ON THE

TERMS OFREFERENCE AND ONSERVICESANDFACILITIESTOBEPROVIDEDBY

THENHAI

OntheTermsofReference(notmorethanonepage):

1.

2.

3.

4.

….

OntheservicesandfacilitiestobeprovidedbytheNHAI(notmorethanonepage)

1.

2.

3.

4.

….

Page 36: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

36

APPENDIXB-3:APPROACHPAPERONMETHODOLOGYANDWORKPLANFOR

PERFORMINGTHEASSIGNMENT

(notmorethansixpages)

Page 37: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

37

Sl.No. Name Position Task

1

2

3

4

..

Sl.No. Name Position Task

1

2

3

4

..

APPENDIXB-4: COMPOSITIONOFTHETEAMPERSONNEL,ANDTASK(S)OF

EACHTEAMMEMBER

1. Technical/ManagerialStaff

..

2. SupportStaff

..

Page 38: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from Km

149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

38

Photogr

APPENDIX B-5: FORMAT OF CURRICULUM VITAE (CV) FOR PROPOSED

PROFESSIONALSTAFF

ProposedPosition:………………………………………………

Nameof Firm:........................................................................................

Nameof Staff:........................................................................................

Profession :..............................................................................................

DateofBirth: Years with Firm/Entity : ...........................................Nationality : .............................. MembershipofProfessionalSocieties:.........................................................................

DetailedTaskAssigned:..............................................................................................

PleaseattachprintoutofCValongwithall therelevantdetailsuploadedoninfraconportal.

SummaryofQualification&Experiencevis-à-vistherequirementsasperTOR

S. N o

Nameof Employer

PostHeld

Projec t Name

Period Assignmentinthe Project

Client ofthe

Projec t

Remark

From To

Education:

[Summarisecollege/university andotherspecialisededucationofstaffmember, giving theirnames,datesattended,anddegreesobtained.Use aboutonequarterofapage.]

KeyQualifications:

[Give an outline of staff member’s experience and training most pertinent to tasks on assignment. Describe degreeof responsibility held by staff member on relevant

previousassignmentsandgivedatesandlocations.Useabouthalfapage.]

EmploymentRecord: [Starting with present position, list in reverse order every employment held. List

allpositionsheldbystaffmembersince graduation,givingdates,name ofemploying organisations, titlesofpositions held, and locations of assignments. For experience in last ten

years, also givetypes of activities performed and client references, where appropriate.

Useaboutthree-quartersofapage.]

Page 39: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

39

Languages: [For English language indicate proficiency : excellent, good, fair, or poor; in

speaking,reading,andwriting]

SummaryofQualification&Experiencevis-à-vistherequirementsasperTOR

Requirements asperTOR

(Enclosure-B)

Possessedby theStaff Member

Break-upofexperience

BriefDescriptionofProject Man-months provided

CertificationbytheCandidate

I, the undersigned, (Name and Address) undertake that this CV correctly describes

myself,myqualificationsandmyexperienceandNHAIwouldbeatlibertytodebarme if any

information given in the CV, in particular the Summary of Qualification &Experiencevis-à-

vistherequirementsasperTORis foundincorrect. Ifurtherundertake thatIhave neither been debarredby NHAInorleft any assignment with the consultants engaged by

NHAI/contracting firm (firm to be supervised now) for anycontinuing work ofNHAI

without completing myassignment. I willbeavailable fortheentireduration

ofthecurrentproject(named…..). IfIleavethisassignment in themiddleofthework, NHAI would be at liberty to debar me from taking any assignment in any of the NHAI works for

an appropriate period of time to be decided byNHAI. Ihavenoobjection

ifmyservicesareextended byNHAIforthis workinfuture.

I furtherundertakethatif duetomyinabilitytoworkonthisprojectduetounavoidable circumstances,duetowhichconsultant’sfirmis forcedtoseekreplacement.Insuch unavoidable circumstances, I shall not undertake any employment in NHAI projects

duringtheperiodofassignmentofthisprojectandNHAIshallconsidermyCVinvalid tillsuchtime.

ForKeyPersonnelhavingintermittentinputs,addthefollowing:

IfurthercertifythatIamassociatedwiththefollowingassignmentsasondate(ason7 dayspriortoduedateforsubmissionofproposal)includingthoseforwhichLOAhas beenreceivedbythefirmandtheinputsintheseassignmentsshallnoteffecttheworkof thecurrentassignment.

Nameof

Assignment Client Dateof

LOA

Likely start (Month /Year)

Likely end (Month /Year)

Total inputof

theperson (man- months)

Page 40: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

40

Note:CVsofKeyPersonnel havingintermittent inputswillbeconsidered onlyifthe

assignmentsonhandas on7 daysbeforeduedateofproposalincludingthoseforwhich

LOAhasbeenreceivedfromtheClientorforwhichConsultanthasbeendeclaredasH1 donotexceed

3(three)forQuality CumMaterialExpertand6(six)forRoadSafetyExpertEngineer,

PaymentSpecialist,Bridge/StructuralEngineer,Traffic& TransportationExpert,and

HTMS/TollExpert.

………………………………………………………….. Date (SignatureofKeyPersonnel)

(Day/Month/Year)

Certificationby thefirm

The undersigned on behalf of ----------( name of consulting firm) certify that the qualificationandexperiencedetailsof Shri/(name

ofthe proposed personnel and address)as describedinthe CVhasbeencheckedand

foundtobecorrect. Itis alsocertifiedthatShri--------(nameofproposedpersonnel)to the best of

our knowledge has neitherbeendebarredbyNHAInor left hisassignment with any other

consulting firm engaged by NHAI / Contracting firm (firm to be supervised now) for the ongoing projects. We understand that if the information aboutleaving the past assignment

is known to NHAI, NHAI would beat liberty to remove thepersonnel fromthepresent

assignment anddebarhimforanappropriate periodtobedecidedbyNHAI.

………………………………………………………….. Date:……………… (Day/Month/Year)

[SignatureofauthorisedrepresentativeoftheFirm]

Note:-

a) Personnelis toaffixhisrecentphotographonfirstpageofCV. b) CompleteaddressandphonenumberofthePersonnelistobeprovided. c) Documentfor proofof ageistobeenclosed. d) Documentforproofofqualificationistobeenclosed. e) Ageofthepersonnelshallnotbemorethanasspecified. f) ExperienceCertificatesfromEmployerstobeattached.

Page 41: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from Km

149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

41

APPENDIXB-6:TIMESCHEDULEFORPROFESSIONALPERSONNEL

A.ActivitySchedule

Sl. No

.

Name Position MonthwiseProgram(informofBarChart)

[1st,2nd,etc. aremonthsfromthestartofassignment]

1st 2n

d 3r

d 4t

h 5t

h 6th 7th 8t

h 9th 10t

h 11t

h 12than

d subseq

uent years

Number of Months

1 Subtotal (1)

2 Subtotal (2)

3 Subtotal (3)

4 Subtotal (4)

- -

- -

Page 42: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from Km

149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

42

APPENDIX B-7:ACTIVITY(WORKS)SCHEDULE

A. ActivitySchedule

MonthwiseProgram(informofBarChart)

[1st,2nd,etc.aremonthsfromthestartofassignment]

Sl. ItemofActivity(Works) 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th

N1o. ............................................

2 ............................................

3 ............................................

4 ............................................

- ............................................

- ............................................

B. CompletionandSubmissionofReports

S.No Reports: Programme:(Date)

1 Monthlyreports (DesignandConstruction)

2 QuarterlyReports

3 VariousothersreportsasprovidedintheConcession

AgreementsuchasCompletionReport

Page 43: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

43

APPENDIXB-8:AFFIDAVITFORCORRECTNESSOFCVOFKEYPERSONNEL

ANDEXPERIENCECLAIMEDBYTHEFIRMS (Tobesubmittedonnon-judicialStampPaper)

I,theundersigned, onbehalf of _(nameoftheConsultant submittingthe

proposal),doherebycertifythatthedetailsfurnishedinthisproposal includingCVof

keypersonnelandexperienceclaimedbythefirm/firmsare true and

correcttothebestofmyknowledgeandbelief.

ManagingDirector/Headofthe Firm/AuthorisedRepresentativeof

thefirm* Address

*LeadMemberincaseofJV

Page 44: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

44

SECTION5: FORMATFORSUBMISSIONOFFINANCIALPROPOSAL.

AppendixC-1 Financialproposalsubmissionform

AppendixC-2 Summaryofcosts

AppendixC-3 Breakdownoflocalcurrencycosts

AppendixC-4 Breakdownofforeigncurrencycosts

Page 45: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

45

FROM:(NameofFirm) TO:

Chief GeneralManager(Tech)-cum-R.O., National Highways Authority of India,

Regional Office,

3/248, Vishal Khand, Gomti Nagar,

Lucknow , Pin – 226010.

Ph.0522-2391287/97

E mail- [email protected]

Sub:Independent Engineer Services during Operation & Maintenance Period for 4

laning of Moradabad - Bareilly Section of NH-24 from Km 149.250 to Km 271.050 in

the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

We, the undersigned, offer to provide the consulting services for the above in accordance with your Request for Proposal dated [Date], and our proposal. Our attached financial proposal isfor the sum of [Amount inwords and figures]. This

amountisexclusiveoftheservicetaxwhichwehaveestimatedat(AmountinWords andFigures).

Ourfinancialproposalshallbebindinguponus subjecttothe modificationsresulting

fromcontractnegotiations,uptotheexpirationofthevalidityperiodoftheproposal, i.e.,[Date].

Weundertakethat,incompeting for(and,iftheawardismadetous,in executing) theabovecontract, wewillstrictlyobservethelawsagainstfraudandcorruption in forceinIndianamely“PreventionofCorruptionAct1988”.

Commissionandgratuities, ifany,paidortobepaidbyustoagentsrelatingtothis proposalandcontractexecution,ifweareawardedthecontract,arelistedbelow:

NameandAddress Amountand Purpose of

ofAgents Currency Commission orGratuity

............................... ........................... ……..…………………

............................... ........................... ……………………….

Page 46: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

46

Weunderstandyou arenotboundtoacceptanyproposalyoureceive.

Weremain,

Yourssincerely,

ManagingDirector/Headof the firm/AuthorisedRepresentative of

thefirm* Nameofthefirm Address

*LeadMemberincaseofJV

Page 47: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

47

APPENDIXC-2: SUMMARYOFCOSTS

No.

Description

Amount (:LC)*

LocalConsultants

I RemunerationforLocalProfessionalStaff

II SupportingStaff

III Transportation

IV DutyTraveltoSite

V OfficeRent VI OfficeSupplies,UtilitiesandCommunication

VII OfficeFurnitureandEquipment VIII ReportsandDocumentPrinting

SubtotalLocalConsultant

ForeignConsultants

F-1 RemunerationforExpatriateStaff

F-II MobilizationandDemobilisation

SubtotalForeignConsultants

ConsultancyServicesTaxPayableinIndia

TotalCosts(IncludingTax)

Note:

LC*LocalCurrency

(i) The remuneration shall include the cost of accommodation and all other

miscellaneouspersonalexpensesasrequiredforcarryingouttheassignment.

(ii) PaymentswillbemadeasperstipulationsoftheConditionsofContract.

Page 48: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

48

APPENDIXC-3: BREAKDOWNOFLOCALCURRENCYCOSTS

I. REMUNERATIONFORLOCALPROFESSIONALSTAFF

No. Position Year1-3

Name No.ofman- months*

Rate Amount

KeyPersonnel (ProfessionalStaff)

1. Team Leader 1x36

2. Highway MaintenanceEngineer 2x36

3. Quality cum

Material Expert

1x12

4. Pavement Specialist 1x6

5. Road Safety Expert 1x6

6. Bridge/Structural

Engineer

1x6

7. Traffic &Transporta

tion Expert

1x4

8. HTMS/TollExpert 1x4

Sub–Total 146

Sub-professional

SurveyEngineer TBN 1x 6

Assistant Highway Maintenance Engineer

TBN 2x36

CAD Expert TBN 1x4

ElectricalEngineer TBN 1x4

HorticultureExpert TBN 1x4

QuantitySurveyor TBN 1x4

Sub-Total 94

Grand Total 240

TBN=ToBeNamed

*The man-month against each key personnel/sub –professional shall

besameasspecifiedinEnclosureA.

Page 49: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

49

II. SupportStaff

S.

No.

Position Name Staff

Months

Billing

Rate( )

Amount

( )

1 Technical Supervisor (Construction/Maintenanc

e) – 4 No.

TBN 144

2 LabortoryAsstt. 1 No. TBN 36

3 OfficeManager (1 No.) TBN 36

4 Accountant cum Cashier

(1 No.)

TBN 36

5 Steno-Cum-Computer

Operator (2 No.)

TBN 72

6 CAD/Draft Man (1 No) TBN 12

7 OfficeBoy (2 No.) TBN 72

Total: 408

Note:Billingratesasindicatedaboveshallbeincreasedin accordancewithclause6.2(a) Special Conditions of Contract for the personnel of all categories namely (i) key Personnel;(ii)sub-Professional personneland(iii)Supportstaff.Theincreaseasabove

shallbepayableonlyontheremunerationpart ofKeyPersonnel,Sub-Professional Personnelandsupportstaff.However,forevaluationof Bidproposals,the quotedinitial rate shall bemultiplied bythetotal timeinputforeachposition onthiscontract, i.e. withoutconsideringthesubsequentincreaseinthebillingrates.

III. Transportation(Fixedrateonrentalbasis)

ThevehiclesprovidedbytheConsultantsshallincludethecostforrental,drivers,

operation, maintenance, repairs, insurance, etc. for allcomplete approx. 4000km/monthrun.(Thevehiclesshallnotbemorethan3yearsold.)

S.

No

DescriptionofVehicles Qty. (No.ofvehicle-month)

Rate/ Vehicle-Month

Amount

1. Innova/Scorpio orequivalent(forTeamLea

der)

36

2. Indica/ Mahindra jeep or equivalent(for Highway Maintenance

Engineer andotherkey

staff).

72

3 Motor Cycle for sub-professional staff

108

Total

Page 50: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

50

IV. DutyTraveltoSite(FixedCosts): ProfessionalandSub-ProfessionalStaff

Trips NumberofTrips Rate* Amount

SitetoNHAIHQofficeandbackforkeypersonnel

18

SitetoNHAIHQofficeandbackforsub-professionalstaff

18

* Rate quoted includes Hotel charges(lodging &boarding), travel cost etc. completeforoneperson.

V. OfficeRent(FixedCosts)–Minimum200sqmareaofofficeshallberented.

Theofficeshallbelocatedat Moradabadandtheofficerentincludeselectricityandwater charges,maintenance,cleaning,repairs,securityetc.complete.

NosofMonths Rate/month Amount

36

VI. OfficeSupplies,UtilitiesandCommunication(FixedCosts)

Thecostshallincludeofofficesupplies,draftingsupplies,computerrunningcost,

domesticandinternationalcommunicationetc.asrequiredforofficefunctioning.

NosofMonths Rate/month Amount

36

VII. OfficeFurnitureandEquipment(Fixed cost)

Thecost shallinclude rental charges towardsall such furnitureand equipmentas required for properfunctioning of the office. Office furnitureshall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture,

conferencetableetc.Officeequipmentshallincludeas aminimumoftelephone(2 external&10internallines),photocopier(15ppm,12000copiespermonthwithA3&A4input) faxmachine, PCs(5 No., IntelCore2Duo E8300,19”colourTFT, Cache–6MB,RAM-

2GB,HDD– 250GB,DVDWriter,Keyboard,opticalscroll mouse,MS-Windows VistaBusiness, preloadedantivirusetc.),laserprinters(2 no.,14ppm,266MHz,5000pagespermonth,600x 600dpiorbetteretc., EngineeringPlan printer(1no.),bindingmachine(1no.),plotterA0size,overhead

projector,AC(4no.,1.5Ton),WaterCoolers(asrequired)etc.

Units Rate Amount 36

Page 51: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

51

VIII. ReportsandDocumentPrinting

No. Description No.of

Reports No.ofCopiesperRepor

t

Total Nos.ofcopies

Rateper Copy (Rs.)

Amount

1 MonthlyReports 36 2 72

2 QuarterlyReports 12 2 24

3 Variousothers

reportsas providedinthe

Concession

Agreement

50 2 100

Total

Page 52: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

52

SECTION6:TERMSOFREFERENCEFORINDEPENDENTENGINEER

1. Scope

1.1 TheseTermsofReference fortheIndependent Engineer (the“TOR”)arebeing

specifiedpursuanttotheConcessionAgreementdated 19th February 2010(the“Concession Agreement”),whichhas beenenteredintobetweentheAuthorityand M/s Moradabad Bareilly Expressway Ltd.for

Moradabad – BareillySectionfromKm. 149.250 to Km. 271.050ofNH-24intheStateofUttar Pradesh underNHDPPhase-IIIAon DBFOT(Toll)basis-

andacopyofwhichisannexedheretoandmarkedasAnnex-Ato formpartofthisTOR.

2 Definitionsandinterpretation

2.1 ThewordsandexpressionsbeginningwithorincapitallettersusedinthisTOR

andnotdefinedhereinbutdefinedintheAgreementshallhave,unlessrepugnant

tothecontext,themeaningrespectivelyassignedtothemintheAgreement.

2.2 ReferencestoArticles,ClausesandSchedulesinthis TORshall,exceptwherethe

contextotherwiserequires,bedeemedtobereferencesto the Articles,Clausesand Schedulesof theAgreement,andreferencesto Paragraphsshallbe deemedtobe referencestoParagraphsofthisTOR.

2.3 Therulesofinterpretationstatedin Clauses1.2,1.3and 1.4oftheAgreementshall

apply,mutatismutandis,tothisTOR.

3. RoleandfunctionsoftheIndependentEngineer

3.1 TheroleandfunctionsoftheIndependentEngineershallincludethefollowing:(i)

reviewoftheDrawingsandDocumentsassetforthin Paragraph4; (ii) determinetheProjectFacilitiesCompletionSchedule; (iii) review, inspection and monitoring of Construction Works as set forth in

Paragraph5;

(iv) conductingtests on completion of construction and issuing Completion Certificateassetforthin Paragraph5;

(v) review,inspectionandmonitoringofO&M assetforthinParagraph6; (vi) review,inspectionandmonitoringofDivestmentRequirementsassetforthin

Paragraph7; (vii) determining, as required under the Agreement, the costs of any works or

servicesand/ortheirreasonableness; (viii) determining, asrequiredundertheAgreement, theperiodoranyextension

thereof,forperforminganydutyorobligation;

(ix) assistingthePartiesinresolutionofdisputesassetforthinParagraph9;and (x) undertaking all other duties and functions in accordance with the

Agreement.

Page 53: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

53

3.The Independent Engineer shall discharge its duties in a fair, impartial and efficient manner, consistent withthehigheststandardsofprofessional integrity andGoodIndustryPractice.

4. ReviewofDrawingsandDocuments

4.1 TheIndependentEngineershallundertakeadetailedreviewoftheDrawingsto be

furnishedbytheConcessionaire alongwithsupportingdata,includingthegeo- technicalandhydrologicalinvestigations,characteristicsof materialsfromborrow areas and quarry sites, topographical surveys and traffic surveys. The IndependentEngineershallcompletesuch reviewand sendits comments/observations

to the Authority and the Concessionaire within 15 (fifteen) days of receipt of such Drawings. In particular, such commentsshall specifytheconformityor otherwiseofsuchDrawingswiththeScopeoftheProject andSpecificationsandStandards.

4.2 The Independent Engineer shall review any modified Drawings orsupporting

Documents senttoitbytheConcessionaire andfurnishitscomments within7

(seven)daysofreceivingsuchDrawingsorDocuments.

4.3 The Independent Engineer shall review the Drawings sent to it by the Safety

Consultant inaccordance withSchedule-Handfurnishitscommentsthereonto

theAuthorityandtheConcessionairewithin7(seven)daysof receivingsuch Drawings. The Independent Engineer shall also reviewthe Safety Report and furnishits commentsthereontotheAuthoritywithin15(fifteen)days ofreceiving suchreport.

4.4 The Independent Engineer shall review the detailed design, construction

methodology, quality assurance procedures and the procurement, engineering andconstruction timeschedule senttoitbytheConcessionaire andfurnishits commentswith15(fifteen)daysofreceiptthereof.

4.5 Upon reference by the Authority, the Independent Engineer shall review and

comment on the EPC Contract or any other contract for operation and

maintenanceoftheProjectHighway,andfurnishitscommentswithin7(seven)

daysfromreceiptofsuchreferencefromtheAuthority.

5. ConstructionWorks

5.1 In respect of the Drawings, Documents and Safety Report received by the

IndependentEngineerforits reviewandcommentsrelatingtotheConstruction

Works,theprovisionsofParagraph4shallapply,mutatismutandis.

5.2 TheIndependentEngineershallreviewthemonthlyprogressreportfurnishedby

theConcessionaireandsendits commentsthereontotheAuthorityandthe

Concessionairewithin7 (seven)daysofreceiptofsuchreport.

Page 54: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

54

5.3 3 TheIndependentEngineershallinspecttheConstruction WorksandtheProject Highway once every month, preferably after receipt of the monthly progress reportfromtheConcessionaire,butbeforethe20th(twentieth)dayofeachmonth

inanycase,andmakeout areportofsuchinspection(the“InspectionReport”) setting forth an overview of the status, progress, quality and safety of construction, including theworkmethodologyadopted,thematerialsusedand

theirsources,andconformityof ConstructionWorkswiththeScopeoftheProject and the Specifications and Standards. In aseparate section of the Inspection Report,theIndependentEngineershalldescribein reasonabledetailthelapses, defectsordeficienciesobservedbyitintheconstructionoftheProjectFacilities. The

Inspection Report shall also contain a review of the maintenance of the existing lanes in conformity with the provisions of the Agreement. The IndependentEngineershallsendacopyofitsInspectionReporttotheAuthority

andtheConcessionairewithin7(seven)days oftheinspection.

5.4 TheIndependentEngineermayinspecttheProjectHighwaymorethanonceina

monthifanylapses,defectsordeficienciesrequiresuchinspections.

5.5 For determining that the Construction Works conform to Specifications and

Standards,theIndependentEngineershallrequiretheConcessionairetocarryout, or

cause to be carried out, tests on a sample basis, to be specified by the

IndependentEngineerin accordancewithGoodIndustryPracticeforquality assurance. ForpurposeofthisParagraph5.5,thetestsspecifiedin theIRCSpecial Publication-

11(Handbookof QualityControlforConstructionofRoadsand

Runways)andtheSpecificationsforRoadandBridgeWorksissuedbyMoRTH(the“Qualit

yControlManuals”) oranymodification/substitution thereofshall bedeemedtobe testsconformingtoGoodIndustryPracticeforqualityassurance.

TheIndependentEngineershallissuenecessarydirectionstotheConcessionaire

forensuringthatthetestsareconductedin afairandefficientmanner,andshall

monitorandreviewtheresultsthereof.

5.6 ThesamplesizeoftheteststobespecifiedbytheIndependentEngineerunder

Paragraph5.5shallcomprise10%(tenpercent)ofthequantityor numberoftests prescribedforeachcategoryortypeoftestsin theQualityControlManuals; provided that the Independent Engineer may, for reasons to be recorded in writing,increasethe

aforesaidsamplesizebyup to10% (tenpercent)forcertain categoriesortypesoftests.

5.7 The timing of tests referred to in Paragraph 5.5, and the criteria for

acceptance/rejectionof theirresultsshallbe determinedbytheIndependent Engineer

inaccordance with the QualityControl Manuals. The tests shall be undertaken on a random sample basis and shall be in addition to,and independentof,theteststhatmaybecarriedoutby theConcessionaireforitsown

qualityassuranceinaccordancewithGoodIndustryPractice.

.

Page 55: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

55

5.8 In theeventthattheConcessionairecarriesoutanyremedialworksforremovalor rectificationofanydefectsordeficiencies,theIndependentEngineershallrequire theConcessionaireto carryout,or causetobecarriedout,teststo determinethat

suchremedialworkshavebroughttheConstructionWorksintoconformitywith the Specifications and Standards, and the provisions of this Paragraph 5 shall applytosuchtests.

5.9 IntheeventthattheConcessionairefailstoachieveanyoftheprojectmilestones

specifiedinthe ProjectFacilitiesCompletionSchedule,the IndependentEngineer

shallundertakeareviewoftheprogress ofconstructionandidentify potential delays,if any. IftheIndependentEngineershalldeterminethatcompletionofany

ProjectFacilityisnotfeasiblewithinthetimespecifiedintheAgreement,it shall

requiretheConcessionairetoindicatewithin15(fifteen)daysthestepsproposed tobe

takentoexpediteprogress,andtheperiodwithinwhichcompletionshallbe achieved. Upon receipt ofa report from theConcessionaire, the Independent

Engineershallreviewthesameandsendits commentstotheAuthorityandthe

Concessionaireforthwith.

5.10 If at anytimeduringtheConcessionPeriod,theIndependentEngineerdetermines

thattheConcessionaire has not madeadequate arrangements for thesafety of

workersandUsersinthezoneofconstructionorthatanyworkisbeingcarried

outinamannerthatthreatensthesafetyoftheworkersandtheUsers,itshall

makearecommendationtotheAuthorityforthwithidentifyingthewholeorpart oftheConstructionWorksthat shouldbesuspendedforensuringsafetyinrespect thereof.

5.11 IntheeventthattheConcessionairecarriesoutanyremedialmeasurestosecure thesafetyof

suspendedworks andUsers,itmay,bynoticeinwriting,requirethe Independent Engineer to inspect such works, and within 3 (three) days of receiving such notice, the Independent Engineer shall inspect the suspended worksandmakeareporttotheAuthorityforthwithrecommending whetheror

notsuchsuspensionmayberevokedbytheAuthority.

5.12 IfsuspensionofConstructionWorksis forreasonsnotattributabletothe Concessionaire,

theIndependentEngineershalldeterminetheextensionofdates

setforthintheProjectFacilitiesCompletionSchedule,towhichtheConcessionaire is reasonablyentitled,andshallnotifytheAuthorityandtheConcessionaireofthe same.

5.13 TheIndependentEngineershallissueaCompletionCertificateuponcompletion

ofeachProjectFacilityandMajorMaintenanceWork,ifany,specifiedunderand inaccordancewiththisAgreement.

5.14 UponreferencefromtheAuthority,theIndependentEngineershallmakeafair and reasonable assessment of the costs of providing information, works and servicesassetforthinArticle14andcertifythereasonableness ofsuchcostsfor

paymentbytheAuthoritytotheConcessionaire.

Page 56: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

56

5.TheIndependentEngineershallaidandadvisetheConcessionaireinpreparing theMaintenanceManual.

6. Operation&Maintenance

6.1 The Independent Engineershall review the annual Maintenance ProgrammefurnishedbytheConcessionaireandsenditscommentsthereontotheAuthori

ty and theConcessionairewithin15(fifteen)daysofreceiptoftheMaintenance Programme.

6.2 TheIndependentEngineershallreviewthemonthlystatusreportfurnishedby the

Concessionaireandsend itscommentsthereontothe Authorityandthe

Concessionairewithin7 (seven)daysofreceiptofsuchreport.

6.3 TheIndependentEngineershallinspecttheProjectHighwayonceeverymonth,

preferablyafterreceiptofthe monthlystatusreportfromthe Concessionaire,but beforethe20th(twentieth)dayof eachmonthinanycase,andmakeout anO&M Inspection

Reportsettingforthanoverviewofthestatus, qualityandsafetyof O&M including

itsconformity with theMaintenance Requirements andSafety Requirements. In a

separate section of the O&M Inspection Report,the Independent Engineer shall describe inreasonable detail thelapses, defects or deficiencies observed byitinO&M

oftheProjectHighway. TheIndependent Engineershallsendacopyof

itsO&MInspectionReporttothe Authorityandthe Concessionairewithin7

(seven)daysoftheinspection.

6.4 TheIndependentEngineermayinspecttheProjectHighwaymorethanonceina

month,ifanylapses,defectsordeficienciesrequiresuchinspections.

6.5 TheIndependentEngineershallinitsO&MInspectionReportspecifythetests,if any, thattheConcessionaire shall carry out orcause to becarried out forthe purposeofdeterminingthattheProjectHighwayis inconformitywiththe Maintenance

Requirements. Itshallmonitorandreviewtheresultsofsuchtests andtheremedialmeasures,ifany,takenby theConcessionaireinthisbehalf.

6.6 In respectofanydefectordeficiencyreferredtoinParagraph3of Schedule-K,the

Independent Engineer shall,inconformitywithGoodIndustryPractice,specify the permissible limit of deviation or deterioration with reference to the

Specifications andStandards andshall alsospecify thetimelimitforrepairor rectificationofanydeviationordeteriorationbeyondthepermissiblelimit.

6.7 The Independent Engineer shall determine if any delay has occurred in

completionofrepairorremedial worksinaccordance withtheAgreement, and shallalso

determine theDamages, ifanypayable bytheConcessionaire tothe

Authorityforsuchdelay.

Page 57: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

57

6.8 The Independent Engineer shall examine therequest of theConcessionaire for closureofanylane(s)ofthe carriagewayfor undertakingmaintenance/repair thereof,keepingin viewtheneedtominimisedisruptionintrafficandthetime required

for completing such maintenance/repair in accordance with Good Industry Practice. Itshall grantpermission withsuch modifications, asitmay deem necessary, within 3 (three) days of receiving a request from the Concessionaire.Uponexpiryof thepermittedperiodofclosure,theIndependent

Engineer shall monitor the re-opening of such lane(s), and in case of delay, determine the Damages payable bytheConcessionaire to theAuthority under Clause17.7.

6.9 The IndependentEngineer shallmonitorand review thecuring ofdefects and

deficienciesbytheConcessionaireassetforthinClause19.4.

6.10 In the event that the Concessionaire notifies the Independent Engineer ofany

modifications thatitproposestomaketotheProjectHighway,theIndependent Engineershallreviewthesameandsendits commentstotheAuthorityandthe Concessionairewithin15(fifteen)daysofreceivingtheproposal.

6.11 TheIndependentEngineershallundertaketrafficsampling,asandwhenrequired

bytheAuthority,underandinaccordancewithArticle22 andSchedule-O.

7. Termination

7.1 Atanytime,notearlierthan90(ninety)dayspriortoTerminationbutnotlater

than15(fifteen)dayspriortosuchTermination,theIndependentEngineershall, in the

presence of a representative of the Concessionaire, inspect the Project Highwayfordeterminingcompliancebythe ConcessionairewiththeDivestment

RequirementssetforthinClause30.1and,ifrequired,causeteststobecarriedout at

theConcessionaire’scostfordeterminingsuchcompliance.IftheIndependent

EngineerdeterminesthatthestatusoftheProjectHighwayissuchthatitsrepair andrectificationwouldrequirealargeramountthanthesumsetforthinClause

39.2,itshallrecommendretentionoftherequiredamountintheEscrowAccount andtheperiodofretentionthereof.

7.2 The Independent Engineer shall inspect the Project Highway once in every

15(fifteen) days during a period of 90 (ninety) days after Termination for

determiningtheliabilityoftheConcessionaire underArticle39inrespectofthe

defectsordeficienciesspecifiedtherein.Ifanysuchdefectordeficiencyisfound

bytheIndependentEngineer,itshallmakeareportinreasonabledetailandsend

itforthwithtotheAuthorityandtheConcessionaire.

8. Determinationofcostsandtime

Page 58: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

58

8.1 TheIndependentEngineershalldeterminethecosts,and/ortheirreasonableness, thatarerequiredtobedeterminedbyitundertheAgreement.

8.2 TheIndependent Engineershalldeterminetheperiod,oranyextensionthereof, thatisrequiredtobedeterminedbyit undertheAgreement

9. AssistanceinDisputeresolution

9.1 WhencalleduponbyeitherPartyintheeventofanyDispute,theIndependent EngineershallmediateandassistthePartiesinarrivingat anamicablesettlement.

9.2 In the event of any disagreement between the Parties regarding the meaning,

scopeandnatureofGoodIndustryPractice assetforthinanyprovisionofthe Agreement, the Independent Engineer shall specify such meaning, scope and

naturebyissuingareasonedwrittenstatementrelyingongoodindustrypractice

andauthenticliterature.

10. Otherdutiesandfunctions

TheIndependentEngineershallperformallotherdutiesandfunctionsspecifiedin theAgreement.

11. Miscellaneous

11.1 The Independent Engineer shall notify its programmeof inspection to the Authority andtotheConcessionaire, whomay,intheirdiscretion,deputetheir

respectiverepresentativestobepresentduringtheinspection.

11.2 Acopyofallcommunications, comments,instructions, DrawingsorDocuments sentby

IndependentEngineertothe ConcessionairepursuanttothisTOR,and a

copyofallthetestresultswithcomments oftheIndependentEngineerthereon

shallbefurnishedbytheIndependentEngineertotheAuthorityforthwith.

11.3 TheIndependent Engineer shallobtain,andtheConcessionaire shallfurnishin two

copies thereof, all communications and reports required to be submitted

underthisAgreementby theConcessionairetotheIndependentEngineer, whereupon

the Independent Engineer shall send one of the copies to the Authorityalongwithitscommentsthereon.

11.4 TheIndependentEngineershallretainat leastonecopyeachof allDrawingsand Documents received by it, including ‘as-built’ Drawings and keep in its safe

custody.

11.5 Upon completion of itsassignment hereunder, theIndependent Engineer shall dulyclassifyandlist allDrawings,Documents,resultsoftestsandotherrelevant records,

and hand them over to the Authority or such other person as the Authoritymayspecify,andobtainwrittenreceiptthereof.Twocopies ofthesaid documentsshallalsobe furnishedinmicrofilmform orin suchothermediumas

maybeacceptabletotheAuthority.

Page 59: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

59

MAN-MONTHSINPUTFORKEYPROFESSIONALSTAFF

INDEPENDENTENGINEERS

Enclosure-A

A:KeyPersonnel Man-months

1. TeamLeader 36

2. HighwayMaintenanceEngineer 72

3. QualitycumMaterialExpert 12

4. PavementSpecialist 6

5. RoadSafetyExpert 6

6. Bridge/StructuralEngineer 6

7. Traffic&TransportationExpert 4

8. HTMS/TollExpert 4

Total 146

B:SubProfessionalStaff

1. SurveyEngineer 6

2. AssistantHighwayMaintenanceEngineer 72

3. CAD Expert 4

4. ElectricalEngineer 4

5. HorticultureExpert 4

6. QuantitySurveyor 4

Total 94

Note:

1. Thekeypersonnelviz.,TeamLeaderand HighwayMaintenanceEngineershallbe

deployednecessarilybysolefirmorJVpartners. Upto50% oftheremainingkey personnelandsubprofessionalstaffcanbeprovidedbytheassociatefirm.

2.Thequalificationandexperienceof SubProfessionalstaff would notbe accounted

intheevaluation. However,ConsultantshallhavetogettheirCVs

approvedfromNHAIbeforemobilization. Theotherinputslikesupportstaff shallalsobeprovidedbytheConsultantofanacceptabletypecommensuration

withtheroles andresponsibilitiesofeachposition.

Page 60: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

60

EnclosureB

MINIMUMQUALIFICATIONOFKEYPERSONNEL&SUBPROFESSIONAL STAFF

QUALIFICATIONOFKEYPERSONNEL

TEAMLEADERCUMHIGHWAYENGINEER

This is the seniormostpositionand the expert engaged as the team leader shallbe

responsible for reviewing the entire Project implementation activities ofthe

Concessionaire. HeshallcheckalltheDesigns beingprepared bytheConcessionaire, ensure executionofworks onsiteasperspecificationandstandards,andcontinuously interact with the

NHAI and the Concessionaire. He shall review and suggest

modificationstotheMaintenanceManual,AnnualMaintenanceProgrammeof the

Concessionaire. Reviewofemergencyresponsearrangements needsspecialattention.

Heshallundertake Project site visits and shall guide, supervise, coordinateand monitortheworkofotherexpertsinhisteamaswellasthoseofthe Concessionaire.

ThecandidateisrequiredtobeaHighwayEngineer,whoshould haveaprovenrecord of

supervising, organisingand managing of Project preparationw.r.t

construction/maintenanceof highway projectsas defined below,financedby internationallendingagenciesandothers.

Heshouldhavethefollowingqualification/experience.

(1)EssentialQualifications.

(a) GraduateinCivilEngineeringfromrecognizeduniversity. (b)

TotalHighwayExperienceof10years.

(c) Atleast3years’experienceasTeamLeader/ProjectManagerorinsimilarcapacityin O&Mandotherrelated activities(likeMaintenance Manual, Maintenance Programmes,

Lane Closures, TrafficManagement, etc.) of completed 4/6 lane highwaysections.

(2) PreferentialQualifications.

(a) PostGraduateDegreeinHighwayEngineering. (b) HighwayDevelopmentProjectstakenupunderPPP.

Note: (1)SimilarCapacityincludesthefollowingpositions

i) OnbehalfofConsultant:TeamLeader/ResidentEngineer(ConstructionSupervision/IE) ii) OnbehalfofContractor:ProjectManager (Construction/ConstructionSupervision) iii) In GovernmentOrganizations:Superintending Engineer (or equivalent)and above (2) Only those projects will be considered for evaluation where the input of the personnel is 6

Page 61: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

61

months or more.

PAVEMENTSPECIALIST

Theexpertshallbeperiodicallymonitoringtheperformanceofthepaymentandensure

lifecyclecosteffectiveness.Heshallalsoberesponsibleforensuringcompleteadherence

toconstruction/maintenancestandardsduringConcessionperiod.Thus,the position requiresa

pavementspecialistwiththoroughknowledgeandunderstandingof international‘best practices’ inthe field ofDesign, Construction andmaintenance of flexible/rigidtype of

pavementsincludinglatestcodalstipulationsandspecifications.He

shallreviewandsuggestmodificationsto allpavementperformancerelatedaspectsin

maintenancemanual/programme.

Heshouldhavethefollowingqualification/experience.

(1)EssentialQualifications

(a)Graduatein CivilEngineeringfroma recognizedUniversity. (b)ProfessionalExperienceof10yearsinPavementDesign/Pavement

Construction/ PavementMaintenanceofHighways/ Roads/ Airfield

Runways

(c) Experienceof3yearsonprojectofsimilarnaturewithatleast1projectinvolving worksof4-laning/6-laning/Expressways.

2)PreferentialQualifications

(a) PostGraduateDegreeinHighwayEngineering/PavementDesign

(b) InternationalexperienceinthefieldofDesign,Construction andmaintenance of

flexible/rigid typeofpavements.

QUALITY-CUM-MATERIAL EXPERT

TheQuality/MaterialExpertshallinteraliareviewthetestresultsofboreholes,quarry

andborrowarea materialtofindouttheirstrength characteristics andsuitability for using

theminconstruction/maintenance. Heshall inspect theConcessionaire’s field laboratoriestoensurethattheyareadequatelyequippedandcapableofperformingall the

specified testing requirements of the contract. He shall look into the quality

assuranceaspectoftheconstruction/maintenance worksandsupervisethesetting-upof the

Concessionaire’s pre-casting yards, rock crushers, bituminous hot mix plants, concrete batching plant, etc. toensure that the specified requirements for such equipmentsare

fully met. He willreviewall sampling undertaken to determine pavement

strength/characteristics. Heshallreview and suggest modificationstoall

QualityandMaterialrelatedaspectsintheMaintenanceManual/Programme.

Page 62: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

62

Heshouldhavethefollowingqualification/experience. (1)EssentialQualifications.

(a)Graduatein CivilEngineeringfroma recognizedUniversity. (b)ProfessionalExperienceof10yearsinQuality/MaterialaspectsofHighways. (c)

Experienceofatleast3yearsonprojectsofsimilarnaturewithatleastone projectinvolvingworksof4/6laning/expressways.

2)PreferentialQualifications.

(a)PostGraduateDegreeinGeotechnicalEngineering/FoundationEngineering/Soil Mechanics.

HIGHWAYMAINTENANCEENGINEER

TheHighwayEngineershallberesponsibleforundertakingroutine/periodicinspection ofProjectHighwayandsupervisionofconstruction/ O&Mworks.Hisexpertise shall

includepavementconditionssurveys,datacollection, computeraideddesignmethods forCivil/HighwayEngineeringwithparticularreferenceto CADapplicationto the highwayrehabilitationand/orupgradingprojects.AllCDworksshallbeinspectedby

himatleastoncebeforeandaftermonsoonsoas toseethattheventwayisclearand protectionworksareintact.

Heshouldhavethefollowingqualification/experience.

(1)EssentialQualifications.

(a)Graduatein CivilEngineeringfroma recognizedUniversity. (b)ProfessionalExperienceof10yearsinhighwayworks

(Inspection/design/construction/maintenance). (c) Experienceofatleast3yearsinHighwayConstruction/Maintenance worksof similarnature. (d)Outof3yearsas in (c)aboveat leastoneprojectshouldinvolveworksof4/6

laning/expresswaysorsimilarproject.

(2)PreferentialQualifications.

(a)PostGraduateDegreein HighwayEngineering

TRAFFICANDTRANSPORTATIONEXPERT

TheTrafficandTransportationexpertshallreview andcheckthetrafficsurreys/analysis,

projections, andassignmentexercisestobecarriedoutbytheConcessionaire. Heshall also reviewdesign ofintersections andinterchanges, trafficsafety features, tollplaza

layout,tollcollectionmethodanduser facilities,schemefortrafficmanagement.Heshall also

study and comment on safety audit report prepared bythe Concessionaire and

Page 63: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

63

reportofSafetyConsultant.

Heshouldhavethefollowingqualification/experience.

(1)EssentialQualifications.

(a)Graduatein CivilEngineeringfromrecognizedUniversity. (b)TotalProfessionalExperienceof10 yearsinHighwayworks. (c)3yearsexperienceshallbeasTraffic&TransportationaspectsofHighway

projects ofsimilar nature of which atleast one project should involve works of4 /

6laning/Expresswayorsimilarproject. (d) ExperienceofRoadSafetyAspects,safetyaudit&studiesofHighwayProjects.

2)PreferentialQualifications.

(a)PostGraduateDegreein TrafficEngineering.

BRIDGE/STRUCTURALENGINEER

The Bridge Engineer shall be responsible for supervising the works of existing or proposedbridges,interchangesandanyotherstructurerelatedtotheProjectHighway Heshallundertake structureconditionsurveyonceinayearandsubmitanexclusive reportonrepairandrehabilitation requirements ofbridges/ structures. Heshallalso

inspectthebridgerehabilitationandrepairworkswhicharerequiredtobeundertaken bytheConcessionaire. Heshallreviewandsuggestmodifications tothemaintenance manual/programmerelatingtohisduties.

Heshouldhavethefollowingqualification/experience.

(1)EssentialQualifications.

(a)Graduatein CivilEngineeringfroma recognizedUniversity.

(b)ProfessionalExperienceof10years.

(c)3yearsexperienceinConstruction/ConstructionSupervisionofbridge/ interchange/anyotherStructuresincludingrehabilitation.

(d)Atleastoneprojectshouldinvolveworkof4/6laning/expresswaysorsimilar project.

2)PreferentialQualifications.

(a)PostGraduateDegreein StructuralEngineering.

Page 64: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

64

ROADSAFETYEXPERT

TheRoadSafetyExpertshallreviewallthe safetymeasurestakenbytheConcessionaire during

the concession period atsite. Conformity to the safety requirement as per detailedcontractrequirementshallalsobecheckedandapproved.Thisshallcoverall thetemporary/permanent structures,handlingofequipments, safetyofworkers/road usersandgenerating awareness/trainingofsitestaffofconcessionaire. Heshallalso lookintothe

causesofvariousaccidentsandreviewotherinsurancecoveragetaken by theConcessionaire.Heshallundertake,supervisesafetyaudit/inspectiononcein every quarterandfurnisha detailedreport.Heshallreviewemergencyresponsearrangement,

accident data, formats, safety provisions inO&M activities etc., as proposed by the Concessionaire.

(1)EssentialQualifications.

(a)Graduatein CivilEngineeringfroma recognizedUniversity. (b)ProfessionalExperienceof10years. (c)Minimum3years’experienceinRoadSafetyworksofMajorHighwayProjects

(4/6laningprojects)

(d)ExperienceinRoadSafetyAuditofat leastone 4/6lanehighway/expresswayproject.

2) PreferentialQualifications

(a)PostGraduateDegreein Traffic/Transportation/Safety Engineering.

(b)PreparationofRoadSafetyManagementPlanforinterurbanHighwaysinPPP

mode.

HTMS/TOLLINGEXPERT

Thecandidateshouldbe aSystemsEngineerhavingexperienceofat least10years. He shouldbeanexpertinpreparationofstandardsforsystemsoftollcollectionandHTMS. Heshould

beagraduate inElectronics/Computer Scienceorequivalent. Heshould have experienceofinternational latesttechnology/systems inthefieldofHTMS and tolling. HeshouldhaveworkexperienceofatleastoneinestablishingHTMSand onein tollingsystems.

Page 65: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

65

SUBPROFESSIONAL

SURVEYENGINEER ThecandidateshouldbeaGraduateinCivilEngineering/Survey

withatleast6years’experienceinthefieldofsurveyingoutofwhich3yearsshouldbe

onhighwayprojects withatleast1 similarhighwayproject.Firm mayfieldSurveyEngineerwithdiplomain CivilEngineering/Survey

havingatleast10years’ experienceinthefieldofsurveying

outofwhichatleast5yearsshouldbeinhighwayprojectswithatleast2projectsof similarnature.

This position requires thorough understanding of moderncomputer basedequipment/methodofsurveyingwithtotalstation,digitallevel,GPSetc.

ASSISTANTHIGHWAYMAINTENANCEENGINEER

TheCandidateshouldbeeitherGraduatein CivilEngineeringwith3years’experiencein

highways orDiploma inCivil Engineering with 7 years’experience in highways. He

shouldhavehandledatleastonehighwayprojectofsimilarnature.

CADEXPERT

He should be a Graduate in Civil Engineering with adequate computer training or

graduatein ComputerSciencehavingexperiencein computeraideddesignmethodsin

highwayengineering. Theincumbentshouldhave3years’experienceandshouldhave

handledatleastonehighwayprojectofsimilarnature.

ELECTRICALENGINEER

TheCandidateshouldbe aGraduateinElectricalEngineering. Heshouldhaveatleast6

yearsprofessionalexperience.

HORTICULTUREEXPERT

The Candidate should be a Graduate in Agriculture Science with specialization in Horticulture/Arboriculture.Heshouldhaveat least6yearsprofessionalexperience.

QUANTITYSURVEYOR

HeshouldbeGraduateorequivalentinCivilEngineeringhavingMin.5years of professional experienceinpreparationofhighwayprojectestimates. Heshouldhave Min. 3 years’experience in Preparation of Bill of Quantities/estimates for major highwayprojectscostingRs.100Crore orabove.

Page 66: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

66

SECTION7:DRAFTFORMOFCONTRACT

Note: ThisdraftAgreement isa genericdocument andshall bemodified based on

particularsof theDBFOTProject.

Page 67: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

67

CONTRACTFORCONSULTANT’SSERVICES

Between

(Nameof Client)

And

(NameofConsultant)

Dated:

Page 68: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

68

CONTENTS PageNo.

I. FORMOFCONTRACT…………………………………….. II

GENERALCONDITIONSOFCONTRACT……………….

1. GeneralProvisions……………………………………….

1.1 Definitions

1.2 RelationbetweentheParties

1.3 LawGoverningtheContract 1.4 Language 1.5 Headings

1.6 Notices 1.7 Location 1.8 AuthorityofMemberin charge 1.9 AuthorizedRepresentatives

1.10 TaxesandDuties

2. Commencement,Completion,Modification,andTermination ofContract…………………………………………………..

2.1 EffectivenessofContract………………………………….

2.2 TerminationofContractforFailuretoBecomeEffective

2.3 CommencementofServices 2.4 ExpirationofContract 2.5 EntireAgreement

2.6 Modification 2.7 ForceMajeure

2.7.1 Definition…………………………………………..

2.7.2 NoBreachofContract…………………………….. 2.7.3 Measurestobetaken 2.7.4 ExtensionofTime

2.7.5 Payments 2.7.6 Consultation

2.8 Suspension…………………………………………………

Page 69: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

69

2.9 Termination………………………………………..

2.9.1 BytheClient………………………………

2.9.2 BytheConsultants……………………….. 2.9.3 CessationofRightsandObligations……… 2.9.4 CessationofServices……………………… 2.9.5 Paymentupon Termination………………..

2.9.6 DisputesaboutEventsofTermination…….

3. ObligationsoftheConsultants……………………

3.1 General

3.1.1 StandardofPerformance………….. 3.1.2 LawGoverningServices…………..

3.2 ConflictofInterests……………………….

3.2.1 ConsultantsnottoBenefitfrom

Commissions,Discounts,etc.…….. 3.2.2 ProcurementRulesofFundingAgencies

3.2.3 ConsultantsandAffiliatesNotto

EngageincertainActivities………….. 3.2.4 ProhibitionofConflictingActivities…

3.3 Confidentiality………………………………..

3.4 LiabilityoftheConsultants…………………..

3.5 InsurancetobeTakenoutbytheConsultants… 3.6 Accounting,InspectionandAuditing…………. 3.7 Consultant’sActionsrequiringClient’spriorApproval

3.8 ReportingObligations………………………….. 3.9 DocumentspreparedbytheConsultants……….

ToBethePropertyoftheClient………………..

3.10 EquipmentandMaterialsFurnishedbytheClient

4. Consultants’PersonnelandSub-consultants……………………..

4.1 General………………………………………………… 4.2 DescriptionofPersonnel………………………… 4.3 ApprovalofPersonnel…………………………… 4.4 WorkingHours,Overtime,Leaveetc.

4.5 Removaland/orReplacementofPersonnel……………

4.6 ResidentProjectManager………………………….

Page 70: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

70

5. ObligationsoftheClient………………………………….

5.1 AssistanceandExemptions…………….

5.2 AccesstoLand…………………………. 5.3 ChangeintheApplicableLaw…………. 5.4 Services,FacilitiesandPropertyoftheClient 5.5 Payment…………………………………

5.6 CounterpartPersonnel………………….

6. PaymentstotheConsultants……………………………..

6.1 CostEstimates,CeilingAmount………………. 6.2 RemunerationandReimbursableExpenditures… 6.3 CurrencyofPayment…………………………..

6.4 ModeofBillingandPayment………………….

7. FairnessandGoodFaith…………………………………………

7.1 GoodFaith…………………………………….

7.2 OperationoftheContract……………………..

8. 8.1 AmicableSettlement…………………………. .

8.2 DisputeSettlement…………………………….

III SPECIALCONDITIONSOFCONTRACT……………………

IV APPENDICES PageNo.

AppendixA: DescriptionoftheServices…………….. AppendixB : ReportingRequirements………………… AppendixC: KeyPersonnelandSub-consultants……. AppendixD: MedicalCertificate………………………. AppendixE : HoursofWorkforKeyPersonnel………. AppendixF : DutiesoftheClient……………………… AppendixG : CostEstimatesinForeignCurrency…….. AppendixH : CostEstimatesinLocalCurrency……….. AppendixI : FormofPerformanceBankGuarantee AppendixJ : FormofBankGuaranteeforAdvancePayments AppendixK: Letterof invitation AppendixL : Letterof Award AppendixM : Minutesof pre-bidmeeting AppendixN: MinutesofNegotiationmeeting AppendixO: MemorandumofUnderstanding(incaseofJV)

V ANNEXURES..……………………………………………………..

Page 71: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

71

1.FORMOFCONTRACT

COMPLEXTIMEBASEDASSIGNMENTS

ThisCONTRACT(hereinaftercalledthe“Contract”)ismadeonthe _dayofthe Month of _ _, 200 , between, on the one hand (hereinafter Calledthe“Client)and,ontheotherhand,“Consultants”).

[Note*:IftheConsultantsconsistofmorethanoneentity,theaboveshouldbepartially amendedtoreadasfollows: “…(hereinafter called the“Client”) and,ontheotherhand, ajoint venture consisting ofthe following entities, each of which will be jointly severally liable to the Client for all the Consultants’obligationsunderthisContract,namely, and (hereinaftercalled“Consultants”)]

WHEREAS

(a) the Client has requested the Consultants to provide certain consulting

servicesas defined in the General Conditions of Contract attached to this

Contract(hereinaftercalledthe“Services”);

(b)the Consultants, having represented to the Client that they have the required

processional skills, and personnel and technical resources, have agreed toprovidetheServicesonthetermsandconditionssetforthinthis Contract;

NOWTHEREFOREthepartiesheretoherebyagreeasfollows:

1. Thefollowingdocumentsattachedheretoshallbedeemedtoformanintegralpart

ofthisContract:

(a) TheGeneralConditionsofContract(hereinaftercalled“GC”)’ (b)

The SpecialConditionsofContract(hereinaftercalled“SC”); (c)

ThefollowingAppendices:

[Note:If anyoftheseAppendicesarenotused,thewords“NotUsed”should be

insertedbelow next to thetitle of theAppendix onthesheet attached

heretocarryingthetitleofthatAppendix].

Page 72: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

72

AppendixA: DescriptionoftheServices……………..

AppendixB : ReportingRequirements…………………

AppendixC: KeyPersonnelandSub-consultants…….

AppendixD: MedicalCertificate……………………….

AppendixE : HoursofWorkforKeyPersonnel……….

AppendixF : DutiesoftheClient………………………

AppendixG : CostEstimatesinForeignCurrency……..

AppendixH : CostEstimatesinLocalCurrency………..

AppendixI : FormofPerformanceBankGuarantee

AppendixJ : FormofBankGuaranteeforAdvancePayments

AppendixK : Letterofinvitation

AppendixL : Letterof Award

Appendix-M : Minutesofpre-BidMeeting

Appendix-N : MinutesofNegotiationMeeting

Appendix-O: MemorandumofUnderstanding(incaseofJV)

2. Themutualrightsand obligationsoftheClientandtheConsultantsshallbeas setforthintheContract;inparticular

(a) The Consultants shall carry out the Services in accordance with the

provisionsoftheContract;and

(b) TheClientshallmakepaymentstotheConsultantsinaccordancewiththe

ProvisionsoftheContract.

Page 73: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

73

INWITNESSWHEREOF,thePartiesheretohavecausedthisContracttobesignedin their

respectivenamesasofthedayandyearfirstabovewritten.

FOR AND ON BEHALF OF [NAMEOFTHECLIENT]

By (AuthorizedRepresentative)

FOR AND ON BEHALF OF [NAMEOFTHECONSULTANTS]

By

(AuthorizedRepresentative)

[Note: IftheConsultants consistofmore thanone entity,allofthese entities should

appearassignatures,e.g.in thefollowingmanner]

FOR AND ON BEHALF OF EACH OF THEMEMBERSOFTHECONSULTANTS

[NameoftheMember]

By

(AuthorizedRepresentative)

[NameoftheMember]

By (AuthorizedRepresentative)etc.

Page 74: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

74

GENERALCONDITIONSOFCONTRACT

1. GeneralProvisions

Unless the context otherwise requires, the following terms whenever used in this Contracthavethe followingmeanings:

(a) “Applicable Law”meansthelawsandanyotherinstruments havingtheforce of law in

the Government’s country [or in such other country as may be

specifiedintheSpecialConditionsofContract(SC)],astheymaybeissuedand

inforcefromtimetotime.

(b)“Contract means the Contract signed by the Parties, to which these General

Conditions of Contract are attached, together with all the documents listed

inClause1ofsuchsignedContract;

(c)“Effective Date’ means the date on which this Contract comes into force and

effectpursuanttoClauseGC2.1;

(d)‘foreigncurrency’ means any currency other than the currency of

theGovernment;

(e)‘GCmeanstheseGeneralConditionsofContract;

(f) “Government”meanstheGovernmentofClient’sCountry;(g)‘Local

currency’meanstheIndianRupees;

(h)“Consultant” wherever mentioned in this Contract Agreement means the

“Independent Consultant (IE)” and includes sub-consultants or Associates

engagedbytheprimaryconsultant.

(i) “Member”, incasetheConsultants consistofajointventureofmorethanone

entity,meansanyoftheseentities,and“Members”means all oftheseentities;

(j) “Party’meanstheClientor theConsultants,asthecasemaybe, andPartiesmeans

bothofthem;

(k) “Personnel” means persons hired by the Consultants or by any Sub-

ConsultantsandorAssociatesasEmployeesandassignedtotheperformanceof

theServicesoranypartthereof; “Foreign Personnel” means suchpersons who

atthetimeofbeing so hired had their domicile outside the Government’s

Country, “LocalPersonnel” means such persons who at the time of being so hired had their domicile inside the Government’s Country; and ‘key personnel’

means thepersonnelreferredtoinClauseGC4.2(a).

Page 75: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

75

(l) "SC" means the Special Conditions of Contract by which these General ConditionsofContractmaybeamendedorsupplemented;

(m)"Services" means the work to be performed by the Consultants pursuant to

hiscontract, asdescribed inAppendix A hereto. Thescope ofwork willbe strictlyas

given in various Clauses in TOR. The approachand methodology to beadopted by the Consultant for carrying out the assignment as Independent Engineer may be modified depending on the site requirements and workprogrammeof the Concessionaire after mutual discussions with NHAI,

theConcessionaire and the Independent Engineer. Theworkplanasindicated bytheConsultantmaybemodifiedaccordinglyto thesiterequirements.

(n) "Sub-consultant and or Associates " means any entity to which the

Consultants subcontract any part of the Services in accordance with the provisionsofClauseGC3.7;and

(o) "Third Party" means any person or entity other than the Government, the

Client,theConsultantsoraSub-consultant.

1.2 RelationbetweentheParties Nothingcontained hereinshallbeconstruedasestablishing arelationofmasterand servantor ofprincipalandagentasbetweentheClientandtheConsultants.The

Consultants,subjecttothisContract,havecompletechargeof PersonnelandSub- consultants,

ifany,performingthe Services and shall be fully responsible for the

Servicesperformedbythemorontheirbehalfhereunder.

1.3 LawGoverningContract

This Contract, its meaning and interpretation, and the relation between theParties shallbegovernedbytheApplicableLaw.

1.4 Language This Contract has been executed in the language specified in the SC, which shall be

thebinding and controlling language for allmatters relating to the meaning or

interpretationofthisContract.

1.5 Headings Theheadingsshallnot limit,alteroraffectthemeaningofthisContract.

Page 76: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

76

1.6 Notices

1.6.1 Any notice, request or consent required or permitted to be given or made

pursuant to this Contract shall be in writing. Any such notice, request or

consentshallbedeemedtohavebeengivenormadewhendeliveredinperson

toanauthorizedrepresentativeof the Party to whom the communication is

addressed, orwhensentbyregisteredmail,telegramorfacsimiletosuchParty attheaddressspecifiedintheSC.

1.6.2 NoticewillbedeemedtobeeffectiveasspecifiedintheSC.

1.6.3 APartymaychangeits addressfornoticehereunderbygivingtheotherParty

NoticeofsuchchangepursuanttotheprovisionslistedintheSCwithrespect toClauseGC1.6.2.

1.7 Location

The Services shall be performed at such locations as are specified in

Appendix A hereto and, where the location of a particular task is not so specified,

at suchlocations.whetherinGovernment'sCountryorelsewhere,as

theClientmayapprove.

1.8 AuthorityofMemberinCharge

In case the Consultants consist of a joint venture of more than one entity, theMembers hereby authorize the entity specified in the SC to act on their

behalfinexercisingalltheConsultants'rightsand obligationstowardstheClient

underthisContract, including without limitation thereceiving ofinstructions

andpaymentsfromtheClient.

1.9 AuthorizedRepresentatives

Anyactionrequiredorpermitted tobetaken,andanydocumentrequired or

permittedtobeexecuted,underthisContractbytheClientortheConsultants

maybetakenorexecutedbytheofficialsspecifiedintheSC.

1.10 TaxesandDuties

Unlessotherwisespecifiedinthe SC,the Consultants,Sub-consultantsand Personnelshall pay such taxes, duties, fees and other impositions asmay be levied under theApplicable Law.NHAIshallreimburseonlyservice taxon productionofprojectspecificproofofpaymentofservicetax.

Page 77: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

77

2. Commencement,Completion,ModificationandTerminationofContract

2.1 EffectivenessofContract

ThisContractshallcomeintoforce andeffectonthedate(the"EffectiveDate")of the

Client's notice to the Consultants instructing the Consultants to begin carrying out the Services. This notice shall confirm that theeffectiveness conditions,ifany,listedintheSChavebeenmet.

2.2 TerminationofContractforFailuretoBecomeEffective

IfthisContracthasnotbecomeeffectivewithinsuchtimeperiodafterthedate

oftheContractsignedbythePartiesasshallbe specifiedin theSC,eitherParty may,bynotlessthanfour(4)weeks'writtennoticetotheotherParty,declare thisContracttobenullandvoid,andin theeventofsucha declarationbyeither Party,neither PartyshallhaveanyclaimagainsttheotherPartywithrespect hereto.

2.3 CommencementofServices

The Consultants shall begin carrying out the Services at the end of such time periodaftertheEffectiveDateasshallbespecifiedintheSC.

2.4 ExpirationofContract

Unlessterminatedearlier pursuanttoClauseGC 2.9hereof,thisContractshall

expirewhenserviceshavebeencompleted andallpayments havebeenmade attheendofsuchtimeperiodaftertheEffectiveDateasshallbespecifiedinthe SC.

2.5 EntireAgreement

This Contract contains all covenants, stipulations and provisions agreed by

theParties. No agent or representative of either Party has authority to make, and theParties shallnotbeboundbyorbeliablefor,anystatement, representation,promiseoragreementnotsetforthherein.

2.6 Modification

Modification of the terms and conditions of this Contract, including any modification ofthe scope of the Services, may only be made by written

agreement between theParties asthecasemaybe,hasbeenobtained. Pursuant to Clause

GC 7.2 hereof,however, each Party shall give due consideration to

anyproposalsformodificationmadebytheotherParty.

Page 78: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

78

2.7 ForceMajeure 2.7.1. Definition

(a) For the purposes of this Contract, "Force Majeure" means an event which isbeyond the reasonable control of a Party, and which makes a Party'sperformance of its obligations hereunder impossible or so

impractical as reasonablytobeconsideredimpossibleinthe circumstances, and includes, but is not limited to, war, riots, civil disorder, earthquake, fire, explosion, storm, flood or other adverse weather conditions, strikes, lockouts or other industrial action (except where such strikes, lockouts or

other industrial action are withinthe power ofthePartyinvoking ForceMajeuretoprevent), confiscation or anyotheractionbygovernmentagencies.

(b) Force Majeure shall not include (i) any event which is caused by the

negligenceorintentionalactionofapartyorsuchParty'sSub- consultants

oragents or employees, nor (ii) any event which a diligent Party couldreasonablyhavebeenexpectedtoboth(A)takeinto accountatthe.timeoftheconclusion ofthisContract and(B)avoid or overcomeinthecarryingoutofitsobligationshereunder.

(c) ForceMajeureshallnotincludeinsufficiencyoffundsorfailuretomake

anypaymentrequiredhereunder.

2.7.2 NoBreachofContract

The failure ofa Party to fulfill anyofits obligations hereunder shall not

beconsidered to be a breach of, or default under, this Contract insofar as suchinability arises from an event of Force Majeure, provided that the Party affected by such an event has taken all reasonableprecautions, duecare"andreasonable alternative measures, all with the objective of

carrying out thetermsandconditionsof this Contract.

2.7.3 MeasurestobeTaken

(a) A Partyaffected by an event of Force Majeure shall take all reasonablemeasures to remove such Party's inability to fulfill its obligationshereunderwithaminimumofdelay.

(b)APartyaffectedbyaneventofForceMajeureshallnotifytheother

Partyofsucheventassoonaspossible, andinanyeventnotlater than fourteen (14) days following the occurrence of such event, providing evidence

ofthenatureandcauseofsuchevent,andshall similarlygivenoticeoftherestorationofnormalconditionsassoonas possible.

(c)The Partiesshalltake all reasonablemeasuresto minimizethe consequencesofanyevent ofForceMajeure.

Page 79: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

79

2.7.4 ExtensionofTime

Any period within which a Party shall, pursuant to this Contract, completeanyactionortask,shallbeextended foraperiodequaltothe time during whichsuchPartywasunabletoperformsuchactionasa resultofForceMajeure.

2.7.5 Payments

During theperiod oftheir inability toperform theServices asaresult ofan

eventofForceMajeure,theConsultantsshallbeentitledtobe reimbursed foradditional costs reasonably and necessarily incurred by them during

suchperiod for the purposes of theServices and in

reactivatingtheServicesaftertheend ofsuchperiod.

2.7.6 Consultation

Notlaterthanthirty(30)daysaftertheConsultants, astheresultofan eventofForce Majeure, have become unable to perform a material portion

of theServices,thePartiesshallconsultwitheachotherwitha view to agreeing

on appropriate measures to be taken in the circumstances.

2.8. Suspension

The Client may, by written notice of suspension to the Consultants, suspend allpaymentstotheConsultantshereunderiftheConsultantsfail to perform any of theirobligations under this Contract, including the carrying out of

theServices, providedthatsuchnotice ofsuspension (i) shall specify the nature of the failure, and (ii) shall request the Consultants toremedy suchfailurewithinaperiodnotexceeding thirty (30)daysafterreceiptby theConsultantsofsuchnoticeofsuspension.

2.9 Termination

2.9.1 BytheClient

The Client may, by not less than thirty (30) days' written notice of terminationtothe Consultants(exceptintheeventlistedinparagraph(f) below,forwhichthereshallbe awrittennoticeofnotlessthansixty(60) days), such

notice to be given after theoccurrence ofanyoftheevents specifiedinparagraphs(a)through(h)ofthisClauseGC2.9.1,terminate this Contract.

Page 80: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

80

(a) if the Consultants fail to remedy a failure in the performance of their

obligationshereunder, as specified in a notice of suspension pursuant to Clause

GC 2.8hereinabove,withinthirty(30)daysofreceiptofsuchnoticeof suspension orwithinsuchfurtherperiodastheClientmayhavesubsequently approvedinwriting;

(b) if the Consultants become (or, if the Consultants consist of more than one entity,

ifany of their Members becomes) insolvent or bankrupt orenter into

anyagreementswiththeircreditorsforreliefofdebtortakeadvantageofany law for the benefit ofdebtorsorgointo liquidation orreceivership whether

compulsoryorvoluntary;

(c)iftheConsultants failtocomplywithanyfinaldecisionreachedasaresultof

arbitrationproceedingspursuanttoClauseGC8hereof;

(d)if the Consultants submit to the Client a statement which has a material effect on

the rights, obligations or interests of the Client and which the

Consultantsknowtobefalse;

(e) if, as the result of Force Majeure, the Consultants are unable to perform a

materialportionoftheServicesforaperiodofnot lessthansixty(60)days;or

(f) iftheClient,initssolediscretionandforanyreasonwhatsoever, decidesto

terminatethisContract.

(g)if the consultant, in the judgment of the Client has engaged in corrupt or fraudulent

practices in competing for or in executing the Contract. For

thepurposeofthisclause:

"corruptpractice"meanstheoffering,giving,receivingorsolicitingofanything

ofvaluetoinfluencetheactionof apublicofficialintheselectionprocessorin

contractexecution.

"fraudulent practice" meansamisrepresentation offactsinorder toinfluence a selection process or the execution of a contract to the detriment of the Borrower,andincludescollusivepractice among consultants (prior toorafter

submission of proposals) designed to establish prices at artificial non- competitivelevelsandtodeprivetheBorrowerofthebenefitsoffree andopen competition.

(h) ifConcessionairerepresentstoNHAIthattheConsultantisnotdischarginghis duties in

a fair, efficient and diligent manner and if the dispute remains unresolved,

NHAImayterminatethiscontract.

Page 81: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

81

2.9.2 BytheConsultants

TheConsultants may, bynotlessthanthirty (30)days'written notice totheClient, suchnotice

to be given after the occurrence of any of the events specified in paragraphs

(a)through(d)ofthisClauseGC2.9.2,terminatethisContract:

(a)ifthe Client fails to pay any money due to the Consultants pursuant to this

ContractandnotsubjecttodisputepursuanttoClause8hereofwithin forty-five(45)daysafterreceivingwrittennoticefromtheConsultants that

suchpaymentisoverdue;

(b) if the Client is in material breach of its obligations pursuant to this Contract

andhas not remedied the same within forty-five (45) days (or suchlonger

period astheConsultantsmayhavesubsequentlyapprovedin writing) following the receipt by the Client of the Consultants' notice specifyingsuchbreach;

(c) if,astheresultofForceMajeure,theConsultants areunabletoperforma

materialportionoftheServicesforaperiodofnot lessthansixty(60)days;or

(d)ifthe Client fails to comply with any final decision reached as a result

ofarbitrationpursuanttoClauseGC8hereof.

2.9.3. CessationofRightsandObligations

Upon termination ofthis Contract pursuant toClauses GC2.2orGC2.9hereof, or upon

expirationofthisContractpursuanttoClauseGC2.4hereof,all rightsand

obligationsofthePartieshereundershallcease,except: (i) suchrights and obligations as may have accrued on the date of

terminationorexpiration; (ii) theobligationofconfidentialitysetforthin ClauseGC3.3hereof; (iii) theConsultants' obligationtopermitinspection, copyingandauditing of

theiraccountsandrecordssetforthinClauseGC3.6(ii)hereof;and

(iv) anyrightwhichaPartymayhaveundertheApplicableLaw

2.9.4 CessationofServices

Upontermination ofthisContractbynoticeofeitherPartytotheotherpursuantto ClausesGC2.9.1orGC2.9.2hereof,theConsultantsshall,immediatelyupondispatch

orreceiptofsuchnotice,takeallnecessarystepstobringtheServicestoacloseina prompt and

orderly manner and shall make every reasonable effort to keep expenditures forthis

purpose toaminimum. With respect to documents prepared by the Consultants and equipment and materialsfurnishedbytheClient,the Consultants shall proceed as

provided, respectively, byClauses GC3.9or GC3.10 hereof.

Page 82: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

82

2.9.5 PaymentuponTermination

Upon termination of this Contract pursuant to Clauses GC 2.9.1 orGC2.9.2 hereof, theClient shall make the following payments to the Consultants (after offsetting againstthesepaymentsanyamountthatmaybeduefromtheConsultanttotheClient}:

(a) remunerationpursuanttoClauseGC6hereoffor Servicessatisfactorily

performedpriortotheeffectivedateoftermination;

(b) reimbursableexpenditures pursuant to Clause GC 6 hereof for

expendituresactuallyincurredpriortotheeffectivedateoftermination;and

(c) exceptinthecaseoftermination pursuanttoparagraphs (a)through(d)of

ClauseGC2.9.1hereof,reimbursementof anyreasonablecostincidentto the promptandorderly termination of the Contract including the cost of the returntraveloftheConsultants'personnelandtheireligibledependents.

2.9.6. DisputesaboutEventsofTermination

IfeitherPartydisputes whether aneventspecified inparagraphs (a)through (e)of ClauseGC2.9.1 orinClause GC2.9.2 hereof hasoccurred, such Party may, within forty-five(45)daysafter receipt of notice of termination from the other Party, refer the matter to arbitrationpursuanttoClauseGC8hereof,andthisContractshallnot beterminated onaccount

of sucheventexceptinaccordance withthetermsofany resultingarbitralaward.

3. ObligationoftheConsultants

3.1 General

3.1.1.Standardof Performance

TheConsultantsshallperformthe Servicesandcarryouttheirobligations hereunder withallduediligence, efficiencyandeconomy, inaccordance with generally accepted professional techniques and practices, and shall observe

soundmanagementpractices,and employ appropriate advanced technology and safe and effective equipment, machinery,materialsandmethods"The Consultants shall always" act, in respect of any matter relating to this Contract or to the

Services, as faithful advisers to theClient,andshallatall times support and safeguard the Client's legitimate interests inanydealings withSub-consultantsorThirdParties.

Page 83: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

83

3.1.2LawGoverningServices

The Consultantsshall performthe Servicesinaccordance with the Applicable Law and shall take all practicable steps to ensure that any Sub- consultants

and orAssociates,aswellasthePersonneloftheConsultantsand anySub-

consultantsandor Associates, comply with the Applicable Law. The Client shall

advise theConsultantsinwritingofrelevantlocalcustoms andtheConsultantsshall,aftersuchnotifications,respectsuchcustoms.

3.2 ConflictofInterests

3.2.1ConsultantsNottoBenefitfromCommissions,Discounts,etc.

The Remuneration of the Consultants pursuant to Clause GC 6 hereof shall constitutetheConsultants' soleremuneration inconnection withthisContract or the

Services and, subject to Clause GC 3.2.2 hereof, the Consultants shall not accept for

their own benefit any trade commission, discount or similar payment in

connection withactivities pursuant to this Contract or to the Services or in the

discharge of theirobligationshereunder,andtheConsultants shallusetheirbesteffortstoensurethatanySub-consultantsandorAssociates,

aswellasthePersonnelandagentsofeitherofthem,similarlyshallnotreceive

anysuchadditionalremuneration.

3.2.2 If the Consultants, as part of the Services, have the responsibility of advising

the Client on the procurement of goods, works or services, the Consultants

shallcomply with any applicable procurement guidelines of the Client (NHAI)and

orAssociatesBankoroftheAssociation,asthecasemaybe, and otherfundingagenciesandshallat alltimesexercisesuchresponsibilityinthe bestinterest

oftheClient. Anydiscounts or commissions obtained by the Consultants in the

exercise of suchprocurementresponsibilityshallbeforthe accountoftheClient.

3.2.3ConsultantsandAffiliatesNottoengageinCertainActivities

TheConsultantsagreethat, duringthe termofthisContractandafterits

termination,theConsultants and any entity affiliated with the Consultants, as well

asanySub-consultantandorAssociatesandanyentityaffiliatedwithsuch Sub-consultantand or Associates,shallbe disqualified from providing goods, works or services (other than the Services and any continuation thereof)foranyprojectresultingfromorcloselyrelatedtotheServices..

Page 84: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

84

3.2.4 ProhibitionofConflictingActivities

TheConsultantsshallnot engage, andshallcausetheirPersonnelas well as their Sub-consultants and or Associates and their Personnel not to engage, either directly orindirectly,in anyofthefollowingactivities:

(a) during the term of this Contract, any business or professional

activitiesinthe Government's country which would conflict with the activitiesassignedtothemunderthisContract;and

(b)after the termination of this Contract, such other activities as may

bespecifiedin theSC.

3.3 Confidentiality

The Consultants, their Sub-consultants and the Personnel of either of them shallnot,either during the term or within two (2) years after the expiration of this

Contract, disclose any proprietary or confidential information relating to

the Project, theServices,thisContractortheClient'sbusinessor

operationswithoutthepriorwrittenconsentoftheClient.

3.4 LiabilityoftheConsultants

Subject to additional provisions, ifany, set forth in theSC, the Consultants’

liabilityunderthisContractshallbeasprovidedbytheApplicableLaw.

3.5 InsurancetobeTakenOutbytheConsultants

TheConsultants(i)shalltakeout andmaintain,andshallcauseanySub- consultantstotakeoutandmaintain, attheir(ortheSub-consultants', asthe case may be) owncostbutontermsandconditions approved bythe Client, insuranceagainst

therisks,andforthecoverages, asshallbespecified inthe SC, and (ii) at the Client's request, shall provide evidence to the Client showing thatsuchinsurance hasbeen taken outandmaintainedandthatthe currentpremiumsthereforehavebeenpaid.

3.6 Accounting,InspectionandAuditing

TheConsultants(i)shallkeepaccurateand systematicaccountsandrecordsin respect of the Services, hereunder, in accordance with internationally accepted

accounting principles and in such form and detail as will clearly identify all relevant time charges and cost, and the bases thereof (including such bases asmay be specifically referredtointheSC); (ii) shallpermit the Client oritsdesignated

representative periodically, and up toone year from the expiration or termination of thisContract,toinspectthesameandmake

Page 85: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

85

copies thereof aswellastohavethemaudited byauditorsappointedbythe

Client;and(iii)shallpermitthe clientto inspectthe Consultant'saccountsand records

relating to the performance of the Consultant and to have them

auditedbyauditorsappointedbytheclient.

3.7 Consultants'ActionsRequiringClient'sPriorApproval

TheConsultantsshallobtaintheClient'spriorapprovalin writingbeforetaking anyofthefollowingactions:

(a)appointingsuch members of the Personnel as are listed in

Appendix C("Consultants'Sub-consultants'KeyPersonnel")merelybytitle butnotbyname;

(b) entering into a subcontract for the performance of any part of the

Services, itbeing understood (i) that the selection of the Sub-consultant andthetermsandconditions ofthesubcontract shallhavebeenapproved in writing by the Clientpriortotheexecutionofthesubcontract,and(ii) thattheConsultants shallremainfully liable for the performance of the Services bytheSub- consultant

anditsPersonnelpursuanttothisContract; and

(c)anyotheractionthatmaybespecifiedintheSC

3.8 ReportingObligations

The Consultants shall submit to the Client the reports and documents

specified inAppendix Bhereto, intheform, inthenumbers and within the

timeperiodssetforthinthesaidAppendix.

3.9 DocumentsPreparedbytheConsultantstoBethePropertyoftheClient

All plans, drawings, specifications, designs, reports, other documents and

softwareprepared by the Consultants for the Client under this Contract shall

become andremain the property of the Client, and the Consultants shall, not later than upontermination orexpiration ofthisContract, deliver all such documents to the

Client,togetherwithadetailedinventorythereof.

TheConsultantsmayretainacopyofsuchdocumentsand software. Restrictions

aboutthefuture useofthese documents andsoftware,ifany,shallbespecified intheSC.

Page 86: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

86

3.10 EquipmentandMaterialsFurnishedbytheClient

Equipment and materials made availableto the Consultants by the Client, orpurchased bytheConsultants with funds provided bythe Client, shallbe thepropertyoftheClientandshallbemarkedaccordingly.Upon termination or expiration of this Contract, the Consultants shall make available to the Client

an inventory of suchequipment and materials and shall dispose of- such equipment and materials inaccordance with the Client'sinstructions. Whileinpossessionofsuchequipmentandmaterials, theConsultants, unlessotherwise

instructed bytheClientinwriting, shallinsure themattheexpenseoftheClientin anamountequaltotheirfullreplacement value.

4. Consultants'PersonnelandSub-consultantsandorAssociates

4.1 General

The Consultants shall employ and provide suchqualified and experienced PersonnelandSub-consultantsasarerequiredtocarryouttheServices.

4.2 DescriptionofPersonnel

(a) Thetitles,agreedjob descriptions,minimumqualificationandestimated periodsofengagementinthecarryingout oftheServicesofeachofthe

Consultants'KeyPersonnel aredescribed inAppendixC.IfanyoftheKey Personnel

hasalreadybeenapprovedbytheclientshis/hernameislistedas well.

(b) If required to comply with the provisions of Clause GCC 3.1.1 hereof,

adjustments with respect to the estimated periods "of engagement of Key PersonnelsetforthinAppendixCmaybemadebythe Consultantsbywritten

notice to the Client, provided (i) that such adjustments shall not alter theoriginallyestimated periodofengagement ofanyindividual bymorethan10%oroneweek,whichever islarger,and

(ii)thattheaggregateofsuchadjustmentsshall not cause payments under this Contract to exceed the ceilings setforth inClause GC 6.1(b) of this Contract. Any other such adjustments shall only bemadewiththeClient's writtenapproval.

(c) If additional work is required beyond the scope of the Services

specifiedin AppendixA,theestimatedperiodsofengagementofKey Personnel set forth in Appendix C may be increased by agreement in writing between

theClientandthe Consultants, provided thatany such increaseshallnot,exceptasotherwiseagreed, causepayments underthis Contract to exceed the ceilings set forth in Clause GC 6.1 (b) of this Contract.

Page 87: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

87

4.3 Approvalof Personnel

TheKeyPersonneli.e.ProfessionalStaffandSub-consultantslistedbytitleaswell asby name in Appendix C are hereby approved by the Client. In respect of

otherKeyPersonnelwhichtheConsultantspropose,touseinthecarryingoutof

theServices,the Consultants shall submit tothe clientfor review andapproval a copy of

theirbiographical dataand(inthecaseofKeypersonnel tobeused within the country of the Government) a copy of a satisfactory medical certificate in the form

attachedhereto asAppendix D.IftheClient doesnot object in writing (stating the

reasons for the objection) within thirty (30) calendar days from the date of

receipt of suchbiographical data and (if applicable) such certificate, such Key Personnel shall bedeemedto havebeen approvedbytheClient.

4.4 WorkingHours,Overtime,Leave,etc.

(a) Working hours and holidays for Key Personnel are set forth in Appendix

Ehereto.Toaccountfortraveltime,foreignPersonnelcarrying outServicesinsidethe

Government's country shall be deemed to have commenced (or finished)workinrespectoftheServices suchnumber of days before their arrival in

(oraftertheir departure from) the

Government'scountryasisspecifiedinAppendix- Ehereto.

(b)The Personnel ofalltypes engaged byConsultant to provide Services on

thisContractshallnotbeentitledtobepaidforovertimenortotakepaid

sickleaveorvacationleave exceptasspecified inAppendixEhereto,and

exceptasspecified.In suchAppendix,theConsultants'remunerationshallbe

deemed to cover these items. Allleave to be allowed to the Personnel is

included inthestaff-months ofservicesetforin Appendix C.Anytaking ofleave byPersonnel shall be subject tothe prior approval bytheClient andthe

Consultants shallensurethatabsence forleavepurposes willnot

delaytheprogressandadequatesupervisionoftheServices.

4.5 Removaland/orReplacementofPersonnel

(a) ExceptastheClientmayotherwiseagree,nochangesshallbemadein

theKeyPersonnel. If,foranyreasonbeyond thereasonable controlof theConsultants,it becomes necessary to replace any of the Personnel, theConsultants shallforthwith provide as a replacement a person of

equivalent or betterqualifications. .

Page 88: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

88

(b) If the Client (i) finds that any of the Personnel has committed serious

misconduct or has been charged with having committed a criminal action,

or(ii)hasreasonable causetobedissatisfied withthe performanceofanyofthePersonnel,thentheConsultants shall,atthe

Client'swrittenrequestspecifying the grounds therefore, forthwith provide

as a replacement a person withqualificationsand experience

acceptabletotheClient.

(c) Any of the Personnel provided as a replacement under Clauses (a) and

(b)above, the rate of remuneration applicable to such person as well as

anyreimbursable expenditures (including expenditures due to the number ofeligible dependents) the Consultants may wish to claim as a

result of such replacement, shall besubject to theprior

writtenapprovalbytheClient.ExceptastheClientmayotherwiseagree, (i) the

Consultants shall bear all additional travel and other costs arising out of or incidental to any removal and/orreplacement,and

(ii)theremunerationtobepaidtoanyoftheKeyPersonnelprovidedas

areplacementshallbe 90%oftheremunerationwhichwouldhavebeen payable

to the Key Personnel replaced.However, for the reason other thandeath/extrememedicalground,(i)for totalreplacementabove 25%

upto37.5%ofKeyPersonnel,remunerationshallbereducedby20%(ii) for total

replacement above37.5%upto50%, remunerationshallbe reduced

by25%and(iii)fortotal replacement between50%&62.5%, remunerationshallbereducedby 30% (iv) For total replacements

beyond62.5% of thekeypersonneltheclientshallinitiateactionofhigher

penalty/termination/debarment upto2yearsasconsideredappropriate.

(d) In ordertopreventthetendencyofthepersonnelandconsultingfirmto submit

incorrectandinflated CV,they should sign every pageofCV beforesubmissionin ordertoauthenticatethatCV furnishedbythemis

correct.Theconsultingfirm andthepersonnelthroughconsultingfirm

shouldbeinformedbyNHAIwhileacceptingCVofthenewpersonnel

thatifCVisfoundin correctandinflatedat alaterdate,thepersonnel accepted wouldbe removed from hisassignment and debarred from

furtherNHAIworksforanappropriateperiodtobedecidedbyNHAI

andthenewproposedpersonnelinplaceofremovedpersonnelwould

bepaid15% lesssalarythantheoriginalpersonnel.15% reductioninthe salary will be imposed as apenalty for submitting the incorrect

information.Thispenaltywillbeimpostedonly once.Ifthesame consulting

firm submits incorrect information again second time,

necessaryactionwillbetakenbyNHAItoblack-listthatfirm.

Page 89: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

89

4.6 ResidentProjectManager

Ifrequired by the SC, the Consultants shall ensure that atall times during theConsultants'performance of the Services in the Government's country a resident project manager,acceptabletotheClient,shalltakechargeofthe performanceofsuchServices.

5. ObligationsoftheClient 5.1 AssistanceandExemptions

Unless otherwise specified in the SC,the Client shall use its best efforts to ensurethattheGovernmentshall:

(a) provide the Consultants, Sub-consultants and Personnel with work

permitsandsuch other documents as shall be necessary to enable the Consultants, Sub-consultantsorPersonneltoperformtheServices;

(b) assist for the Personnel and, if appropriate, their eligible

dependents to beprovided promptlywithallnecessaryentryandexit visas,residencepermits,exchange permits and any other documents required for their stay inGovernment'scountry;

(c) facilitate prompt clearance through customs of any property required for

theServices and of the personal effects of the Personnel and their -

eligibledependents;

(d) issue to officials, agents and representatives of the Government all

suchinstructions as may be necessary or appropriate for the prompt

andeffectiveimplementationoftheServices;

(e) assist the Consultants and the Personnel and any Sub-consultants and

orAssociates employed by the Consultants for the Services from any requirementtoregisterorobtainanypermittopracticetheir profession or to

establish themselves either individually or as a

corporateentityaccordingtotheApplicableLaw;

(f) grant to the Consultants, any Sub-consultants and or Associates and the

Personnelofeitherofthemtheprivilege,pursuanttotheApplicable Law,

ofbringing into Government's country reasonable amounts of

foreigncurrencyforthepurposesoftheServicesorforthepersonaluse ofthePersonnel andtheir dependents and of withdrawing any such amounts

as may be earnedthereinbythePersonnelintheexecutionof theServices:and

(g) Provide to theConsultants, Sub-consultants and or Associates and

Page 90: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

90

PersonnelanysuchotherassistanceasmaybespecifiedintheSC.

5.2 AccesstoLand

TheClientwarrantsthattheConsultantsshallhave,freeof charge,unimpeded accessto

all land in the Government's country inrespect of which access is requiredfortheperformanceoftheServices.TheClientwillberesponsiblefor any

damage to suchland or any property thereon resulting from such access and

will indemnify theConsultants and each of the Personnel in respect of liability

forany such damage,unlesssuchdamageiscausedbythe defaultornegligenceoftheConsultantsoranySub-consultantorthePersonnel

ofeitherofthem.

5.3 ChangeintheApplicableLaw

If,after thedate of thisContract, there isany change inthe Applicable Law with respect to taxes and duties which increases or decreases the cost or reimbursableexpenses incurred by the Consultants in performing the Services, then the remuneration and reimbursable expenses otherwise payabletotheConsultantsunder thisContractshallbeincreasedordecreased accordinglybyagreementbetweenthe Parties hereto, and corresponding adjustments shallbemadetotheceilingamountsspecifiedinClauseGC6.1(b).

5.4 Services,FacilitiesandPropertyoftheClient

TheClient shallmakeavailable totheConsultants andthePersonnel, forthe purposes of the services and free of any charge, the services, facilities and propertydescribedinAppendixFatthetimesandinthemannerspecifiedin saidAppendixF,providedthatifsuchservices,facilitiesandpropertyshallnot bemadeavailabletotheConsultantsas andwhensospecified,thePartiesshall agreeon(i)anytimeextensionthatitmay beappropriatetogranttothe ConsultantsfortheperformanceoftheServices,(ii)themanner in which the Consultants shall procure any such services, facilities andproperty from othersources,and(iii)theadditionalpayments,ifany,tobemadeto the Consultantsasa resultthereofpursuanttoClauseGC6.l(c)hereinafter..

5.5 Payment

In consideration of the Services performed by the Consultants under this

Contract, theClientshallmaketotheConsultants suchpaymentsandinsuch

mannerasisprovidedbyClauseGC6ofthisContract.

Page 91: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

91

5.6 CounterpartPersonnel

(a)If so provided in Appendix F hereto, the Client shall make available to

theConsultants, as and when provided in such Appendix F, and free of

charge,suchcounterpartpersonnelto beselectedbytheClient,withthe Consultants'advice,asshallbespecified insuch Appendix F. Counterpart personnel shallwork underthe exclusive direction of the Consultants. If any memberof the counterpartpersonnel fails to perform adequately any work

assigned to him by the Consultantswhichis consistentwith thepositionoccupiedbysuch- member,theConsultants mayrequestthe replacementofsuchmember,andtheClientshallnotunreasonablyrefuseto

actuponsuchrequest.

(b) Ifcounterpart personnelarenotprovided bytheClienttotheConsultants

asandwhenspecifiedinAppendixF,theClientandtheConsultants shall agreeon(i)howtheaffectedpartoftheServices shallbecarriedout,and (ii) the additional payments, if any, to be made by the Client to the ConsultantsasaresultthereofpursuanttoClauseGC6.1(c)hereof.

6. PaymentstotheConsultants

6.1 CostEstimates;CeilingAmount

(a) An estimateof the cost of the Services payable in localcurrencyissetforthin

AppendixH.

(b) ExceptasmaybeotherwiseagreedunderClauseGC2.6andsubjectto ClauseGC

6.1(c), payments under this Contract shall not exceed the ceilings in local

currency specified in the SC. The Consultants shall notify

theClientassoonascumulative charges incurredfortheServiceshavereached80%ofeitheroftheseceilings.

(c) Notwithstanding Clause GC6.l(b) hereof, if pursuanttoclauses GC5.3,

5.4or5.6hereof, the Parties shall agree that additional payments inlocaland/orforeigncurrency, as the case may be, shallbemadeto the Consultants in order to cover any necessary additional expenditures not envisaged in the costestimatesreferredtoinClause GC6.1(a)above,theceilingorceilings,asthecasemaybe,setforthin Clause GC6.1(b)above shall beincreased bytheamountoramounts, asthecasemaybe,ofanysuchadditionalpayments.

Page 92: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

92

6.2 RemunerationandReimbursableExpenditures

(a) Subject to the ceilings specified inClause GC 6.1(b) hereof, the Client

shallpaytotheConsultants (i)remuneration assetforthinClause GC 6.2(b),and(ii)reimbursableexpendituresassetforthinClauseGC6.2(c). If specifiedin the SC, said remuneration shall be subject to price

adjustmentasspecifiedintheSC.

(b) Remuneration for the Personnel shall be determined on the basis of

timeactuallyspentbysuchPersonnelintheperformance oftheServices afterthedatedeterminedinaccordancewithClauseGC2.3andClauseSC2.3(orsuc

hother date as the Parties shall agree in writing) (including

timefornecessarytravel via themost direct route) attherates referred

to,andsubjecttosuchadditionalprovisionsasaresetforth,intheSC.

(c) Reimbursable expendituresactuallyand reasonably incurred by the

Consultants intheperformance of theServices, asspecified inClause SC6.3(b).

6.3 CurrencyofPayment

(a) Deleted.

(b) The SC shall specify which items of remuneration and

reimbursable expenditures shallbepaid,respectively, in localcurrency,

6.4 ModeofBilling andPayment

BillingandpaymentsinrespectoftheServicesshallbemadeasfollows:

(a) The Client shall cause to be paid to the Consultants an interest bearing

advance payment as specified in the SC,andasotherwise set forthbelow. Theadvance payment will be due after provision by the ConsultantstotheClientof a bank guarantee by a bank acceptable to the

Client in an amount (oramounts) and in a currency ( or currencies) specified in the SC, such bankguarantee (I) to remain effectiveuntiltheadvancepaymenthasbeenfullysetoffasprovidedin theSC,and

(ii) to beintheform setforthinAppendix Iheretoorin suchotherformastheClientshallhaveapprovedinwriting.

Page 93: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

93

(b) Assoonas practicableandnotlaterthanfifteen(15days)after theendof eachcalendarmonthduringtheperiodoftheServices,theConsultants shall

submit to the Client, in duplicate, itemized statements,

accompanied by copies of receiptedinvoices,vouchersandotherappropriate supporting materials, of

theamounts payable pursuant to Clauses GC6.3 and6.4 forsuch month.

(c) The Client shall cause the payment of the Consultants periodically as giveninschedule of payment above within sixty (60) days after the receipt by theClientof bills with supporting documents. Onlysuchportion of a monthlystatementthatisnotsatisfactorily supportedmay

bewithheldfrompayment.Shouldanydiscrepancy befoundtoexistbetween actualpaymentand costsauthorized tobeincurred bytheConsultants, theClientmayadd orsubtractthedifferencefrom

anysubsequentpayments.Interestatthe rate specified intheSC shall become payable asfrom the above due dateonanyamountdueby,butnotpaidonsuchduedate.

(d) Thefinalpayment underthisClauseshallbemadeonlyafterthefinal reportand a

final statement, identified as such, shall have been submitted by the

Consultants and approved as satisfactory by the

Client.TheServicesshallbedeemedcompleted andfinallyacceptedby the Client and the final report and final statement shall be deemed approved

by the Client as satisfactory ninety(90) calendar days after receiptofthefinal

reportandfinalstatement bytheClient unless the Client, within such ninety

(90)-day period, gives writtennoticetothe Consultants specifying in detail deficiencies in the Services, the final reportor

finalstatement.TheConsultantsshallthereuponpromptlymake any

necessarycorrections,andupon completion of such corrections,

theforegoingprocessshallberepeated.Anyamountwhich

theClienthaspaidorcaused tobepaid inaccordance withthisClause in excess of the amountsactually payable in accordance with the provisions of

this Contract shall bereimbursed by the Consultants to the Client within

thirty, (30) days afterreceiptbytheConsultants of

noticethereof.AnysuchclaimbytheClientfor reimbursementmustbe madewithintwelve(12)calendarmonthsafterreceiptbytheClientofa

finalreportandafinalstatementapprovedbytheClientinaccordance

withtheabove.

(e) All payments under this Contract shall be made to the account of theConsultantsspecifiedin theSC.

7. FairnessandGoodFaith

Page 94: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

94

7.1 GoodFaith

TheParties undertake toactingood faithwithrespecttoeachother's rights

underthisContract and to adopt all reasonable measures to ensure the

realization of theobjectivesofthisContract.

7.2 OperationoftheContract

The Parties recognize that it is impractical in this Contract to provide for everycontingency which may arise during the life of the Contract, and the Parties herebyagree that itis their intention that this Contract shall operate fairlyasbetweenthem,andwithoutdetrimenttotheinterestofeitherofthem, and that, if

during the term of this Contract either Party believes that this Contractisoperatingunfairly,thePartieswillusetheirbesteffortstoagreeon such action as may be necessary to remove the cause or causes of such unfairness,

butnofailure toagreeonanyactionpursuant tothisClauseshall give rise to a dispute subject to arbitration in accordance with Clause GC8 hereof.

8. SettlementofDisputes

8.1 AmicableSettlement

ThePartiesshallusetheirbesteffortstosettleamicablyalldisputesarisingout oforinconnectionwiththisContractortheinterpretationthereof.

8.2 DisputeSettlement

AnydisputebetweenthePartiesastomattersarisingpursuanttothis Contract whichcannot besettled amicably within thirty (30) days after receipt byone Party

of the other Party's request for such amicable settlement may be submitted by

either Party for settlement in accordance with the provisions specifiedintheSC.

9. FakeCV

Ifanycaseoffake/incorrect/inflatedCVisfound,itshallbedealtwithveryseverely

andwouldresultinallpossiblepenalactionincludingblacklistingfromfutureprojects

ofNHAI.Thiswouldalsoapplyevenwhentheconsultingfirmisnot successfulin getting the

assignment. In case CV of a person is turned out to be

fake/incorrect/inflatedduringtheassignment,theconsultancy firmswill havetorefund

thesalaryandperksdrawnincludinginterest@12%perannuminrespectofthe

Page 95: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

95

personapartfrom other consequences.Inadditiontoabove,10%ofthesalaryand perks

toberefundedshallberecoveredfromtheFirmas penalty.

Page 96: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

96

III. SPECIALCONDITIONSOFCONTRACT GCClause

A. Amendmentsof,andSupplementsto,ClausesintheGeneral ConditionsofContract

1.1(a) Thewords’’intheGovernment’scountry”areamendedtoread‘inINDIA”

1.4 Thelanguageis:English

1.6.1 Theaddressesare:

Client: Chief GeneralManager(Tech)-cum-R.O.,

National Highways Authority Of India,

Regional Office,

3/248, Vishal Khand, Gomti Nagar,

Lucknow , Pin – 226010.

Ph.0522-2391287/97

E mail- [email protected]

Consultant

Attention:

Cable address:

Telex :

Facsimile :

[Note’: FillintheBlanks]

1.6.2 Noticewillbedeemedtobeeffectiveasfollows:

(a) in the case of personal delivery or registered mail, on delivery;

(b) in the case of telexes, 24 hours following confirmed transmission;

Page 97: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

97

(c) in the case of telegrams, 24 hours following confirmed transmission; and

(d) in the case of facsimiles, 24 hours following confirmed transmission;

1.8 TheMemberinChargeis:

(Note:IftheConsultants consistofajointventureofmorethanoneentity,thenameofthe entitywhoseaddressisspecifiedinSC 1.6.1shouldbeinsertedhere. IftheConsultants consistofoneentity, this Clause1.8shouldbedeletedfromtheSC)

1.9 TheAuthorisedRepresentativesare:

FortheClient: Chief GeneralManager(Tech)-cum-R.O.,

National Highways Authority Of India,

Regional Office,

3/248, Vishal Khand, Gomti Nagar,

Lucknow , Pin – 226010.

Ph.0522-2391287/97

E mail- [email protected]

FortheConsultants:

1.10 The Consultants, Sub-consultants and the Personnel shall pay the taxes,

duties, fees,leviesandotherimpositionsleviedundertheexisting, amended or enacted laws during life of this contract and the client shall performsuchdutiesinregardtothedeductionofsuchtax as maybelawfully imposed.

.

Page 98: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

98

2.1 Theeffectivenessconditionsarethefollowing: i) ApprovaloftheContractbytheclient

2.2 Thetimeperiodshallbefourmonthsorsuchothertimeperiodasthe

partiesmayagreeinwriting.

2.3 Thetimeperiodshallbeonemonth orsuchothertimeperiodasthe

Partiesmayagreeinwriting.

2.4 The time periodshall be 36 months

3.4 LimitationoftheConsultants'LiabilitytowardstheClient

(a) Except in case of gross negligence or wilfulmisconduct on the part of

the Consultants or on the part of any person or firm acting on behalf

of theConsultantsincarryingouttheServices,

theConsultants,withrespecttodamagecausedbytheConsultants

totheClient'sproperty,shallnotbeliabletotheClient:

(i) foranyindirectorconsequentiallossordamage;and

(ii) Consultant will maintain at its expenses; Professional

Liability Insurance including coverage for errors and

omissions caused by Consultant’s negligenceinthe performance of its duties under this agreement, (A) For the amountnotexceeding totalpayments forProfessional Feesand

ReimbursableExpenditures madeorexpectedtobemadetothe Consultants hereunder OR(B) the proceeds, the Consultants may be entitled to receive from anyinsurancemaintainedby theConsultants tocoversuchaliability,whicheverof(A)or(B) ishigher.

iii) ThepolicyshouldbeissuedonlyfromanInsuranceCompany operatinginIndia.

iv) Thepolicymustclearlyindicatethelimitofindemnity interms of “Any One Accident” (AOA) and “Aggregate limit on the policyperiod”(AOP) andinnocaseshouldbefor an amountless

thanstatedinthecontract.

v) IftheConsultantentersintoan agreementwithNHAIinajoint ventureor

‘inassociation’,thepolicymustbeprocuredand provided to NHAI by the jointventure/in association entity and not by the individual partners of the joint venture/association.

Page 99: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

99

vi) The contract may include a provision thereby the Consultant does

not cancel the policy midterm without the consent of NHAI. The

insurance companymayprovideanundertaking in thisregard.

(b) This limitation of liability shall not affect the Consultants' liability, if any,

fordamagetoThirdPartiescausedbytheConsultantsoranyperson orfirmactingonbehalfoftheConsultantsin carryingouttheServices.

(c) ProfessionalLiabilityInsurancemaybe acceptedforinitiallyoneyearwhich shall

beextendedannuallyforfiveyears.PLIshallbeuniformlytakenfora

periodoffiveyears.

3.5 Therisksandthecoverageshallbeasfollows

(a) ThirdPartymotorvehicleliabilityinsuranceas requiredunderMotor

VehiclesAct,1988inrespectofmotorvehicles operatedinIndiabythe

ConsultantsortheirPersonnel oranySub-consultants ortheirPersonnel

fortheperiodofconsultancy.

(b)Third Partyliability insurance withaminimumcoverage,ofRs.1.0millionfor

theperiodofconsultancy.

(c) Professional liability insurance as per 3.4 (a) (ii) of SC of the

consultancy,withaminimumcoverageequalto estimatedremuneration

andreimbursable.

(d)Employer’sliabilityandworkers’compensation insurance inrespect of

the Personnel of the Consultants and of any Sub-consultant, in

accordance withtherelevantprovisionsoftheApplicableLaw,aswellas,

withrespect tosuchPersonnel, any suchlife, health, accident, travelor

otherinsuranceasmaybeappropriate;and

(e) Insuranceagainstlossofordamageto(i)equipmentpurchasedinwhole

orinpartwithfunds provided under thisContract, (ii)theConsultants' property usedintheperformanceoftheServices,and(iii)anydocuments preparedbytheConsultantsintheperformanceoftheServices..

3.7(c) Theotheractionsare

"(i) taking any action under a civil works contract designating the

Consultants as"Engineer", for which action, pursuant to such civil works contract,thewrittenapprovaloftheClientas"Employer"isrequired".

Page 100: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

100

3.9 The Consultants shall not use these documents for purposes unrelated to thisContractwithoutthepriorwrittenapprovaloftheClient.

4.6 "The persondesignated as Team Leader cum Sr. Highway Engineerin AppendixCshallserveinthatcapacity,asspecifiedinClauseGC4.6."

6.1 (b) The ceiling in local currency is ……………………………………

6.2(a) "Paymentsfor remuneration made in accordance with Clause GC 6:2(a) inlocalcurrencyshallbeadjustedasfollows:

(i) Deleted .

(ii) Remunerationpaidinlocalcurrencypursuanttotheratessetforth

inAppendixHshallbe adjustedeverytwelve(12)months(and,the first time, with effect for the remuneration earned in the 13thcalendarmonthafterthedateofthecontract)by5% perannumfor

domesticpersonnel.

Notwithstanding any other provisions in the agreement in this

regard, thisprovision willprevailandoverrideanyotherprovisionto

thecontraryinthisagreement.

Page 101: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

101

6.2(b)(i)(1) Itisunderstood (i)thattheremuneration ratesshall cover (A)such

salariesandallowancesastheConsultantsshallhaveagreedtopayto

thePersonnelas well as factors for social charges and overhead, and (B) the cost ofbackstopping by home office staff not included inthePersonnel

listedinAppendixC, and(C)theConsultants'fee;(ii)

thatbonusesorothermeansofprofit-sharing shallnotbeallowedas

anelementofoverhead,and(iii)thatany rates specified for persons not yet appointed shall be provisional and shall be subject to revision,

withthewrittenapproval oftheClient,oncetheapplicable

salariesandallowancesareknown.

(2)Remunerationforperiodsoflessthanonemonthshallbecalculated onanhourly basisfor actual time spent in the Consultants' home office and directly attributable to the Services (one hour being

equivalentto1/240thof amonth)andonacalendar-daybasisfortime spentawayfromhomeoffice(onedaybeingequivalentto 1/30thof a month).

6.2(b)(ii) TheratesaresetforthinAppendixH l 6.3(a) Deleted. 6.3(b)(i) All remuneration shallbepaidinocalcurrency.

6.3(b)(ii) Deleted

6.3(b)(iii)Thereimbursableexpendituresin localcurrencyshallbethefollowing:

1) aperdiemallowanceataratein localcurrencyequivalentto

[Note:NameagreedforeigncurrencyspecifiedinClauseSC6.3(a)perday, for eachof the short-term foreign Personnel (i.e. with lessthan twelve

(12)months consecutive stay in India) for the first sixty (60) days

duringwhichsuchPersonnelshallbeinIndia;

2) a per diem allowance at a rate in local currency equivalent to ----

[Note:NameagreedforeigncurrencyspecifiedinClauseSC6.3(a)perday,for

eachoftheshort-term foreign Personnel foreachdayinexcessofsixty

(60)daysduringwhichsuchPersonnelshallbe in India;

3) alivingallowanceforeachofthelong-termforeignPersonnel(twelve

(12)monthsorlongerconsecutivestayinIndia)attheratesspecified inAppendixH;

Page 102: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

102

4) the cost of the following locally procured items: local transportation, officeaccommodations, camp facilities, camp services, subcontracted services,soil testing, equipment rentals, supplies, utilitiesand communication

chargesarising in India, all if and to the extent required for the purpose of theServices,atratesspecifiedinAppendix H;

5) thecostofequipment, materialsandsuppliestobeprocured locallyin IndiaasspecifiedinAppendixH;

6) the local currency cost of any subcontract required for the Services

andapprovedinwritingbytheClient;

7) any such additional payments inlocal currency forproperly procured

itemsasthe Parties may have agreed upon pursuant to the provisions ofClauseGC

6.1(c);and

8) thecostofsuchfurtheritemsasmayberequiredbytheConsultants for

thepurposeoftheServices,asagreedin writingbytheClient.

6.4(a) The following provisions shall apply to the interest bearing advance

paymentandtheadvancepaymentguarantee::

1) Anadvancepayment. Of10%ofthecontract priceinproportion tothe quoted

Indian currency (INR) in the bidshall be made within60days after receipt and verification of advancepayment bank guarantee. The advance payment will be set off by theClientinequalinstallments

againstthestatements forthe first12monthsoftheServiceuntiltheadvancepaymenthasbeenfully setoff.

2) The bank guarantee shall be in the amount oftheadvancepayment

3) Interest rate shall be 10% per annum (on outstanding amount) for

localcurrency..

6.4(c) Theinterestrateis6%perannum forlocalcurrency.

6.4(e) Theaccountsare:

-- Forlocalcurrency:

[Note:Insertaccountnumber,type ofaccountandnameandaddressoftheBank]

Page 103: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

103

8.2 Disputes shall be settled by arbitration in accordance with the followingprovisions:

8.2.1 SelectionofArbitrators

Each dispute submitted bya Party to arbitration shall be heard bya sole arbitrator or an arbitration panel composed of three arbitrators, in accordance with the followingprovisions:

(a) Where the Parties agree that the dispute concerns a technical matter,

they mayagreeto appointasolearbitratoror,failing

agreementontheidentityof suchsolearbitratororwithinthirty(30) daysafterreceiptbytheotherPartyoftheproposalofanamefor suchanappointment bythePartywho initiated the proceedings, either

Party may apply to the President, IndianRoads Congress,New Delhi, for a list of not fewer than five nominees and, on receiptofsuchlist,theParties shallalternately strikenamesthere from,andthelast remaining nominee onthe list shall bethe sole

arbitrator for thematterindispute. Ifthelastremaining nominee hasnotbeendeterminedinthis manner within sixty (60) days of the date of the list, the President,IndianRoadsCongress, New

Delhi,shallappoint,upontherequestofeitherParty andfrom such listorotherwise, a solearbitrator forthematter in dispute.

(b) Wherethe Partiesdonot agreethatthe disputeconcernsa technical

matter,the Client and the Consultants shall each appoint one arbitrator, and thesetwo arbitrators shall jointly appoint a third arbitrator, who shall chair thearbitration panel. Ifthearbitrators named by the Parties do not succeed in appointing a third arbitrator

within thirty (30) days after the latter of the two arbitratorsnamedbythePartieshas beenappointed,thethird arbitratorshall,at the requestof either Party, be appointed by

Secretary, theIndianCouncilofArbitration,NewDelhi.

(c) If, in a dispute subject to Clause SC8.2.1 (b ), one Party fails to appointits

arbitrator within thirty (30) days after the other Party has appointed

itsarbitrator, the Party which has named an arbitrator may apply

to the Secretary, Indian Council of Arbitration, New Delhi, to appoint a solearbitrator for the matter in dispute, and the arbitrator

appointed pursuant tosuch

applicationshallbethesolearbitratorforthatdispute.

Page 104: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from Km

149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

104

8.2.2 Rulesof Procedure

Arbitration proceedings shallbeconducted inaccordance withprocedures

oftheArbitration&ConciliationAct1996,ofIndiaunlesstheConsultantis aforeignnational/firm, where arbitration proceedings shall be conducted in accordance with the rules of procedure for arbitration of the United NationsCommissiononInternationalTradeLaw(UNCITRAL)as inforceon

thedateofthisContract.

8.2.3 SubstituteArbitrators

Iffor anyreasonanarbitratorisunabletoperformhisfunction,asubstitute shallbeappointedinthesamemannerastheoriginalarbitrator.

8.2.4 QualificationsofArbitrators

The sole arbitrator or the third arbitrator appointed pursuant to paragraphs (a)through(c)ofClause8.2.1hereofshallbe an

internationally/nationally recognized legal or technical expert with extensive experienceinrelationtothematter indispute.

8.2.5 Miscellaneous

Inanyarbitrationproceedinghereunder:

(a)Proceedingsshall,unlessotherwiseagreedbytheparties,beheldinDelhi.

(b)TheEnglishlanguageshallbetheofficiallanguageforallpurposes;and

(c)Thedecisionofsolearbitratororofamajorityofthearbitrators(orofthethirdarbitratorifthereisnosuchmajority)shallbe finalandbindingandshallbe enforceablein anycourtofcompetentjurisdiction,andthePartiesherebywaiveany objectionstoorclaimsofimmunityinrespectofsuchenforcement.

(d) Feestructureshallbeas per NHAI Policy Circular

Page 105: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24 from

Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

105

IV. APPENDICES

Appendix A: DescriptionoftheServices

[GivedetaileddescriptionsoftheServicestobeprovided;datesforcompletionofvarioustasks, placeofperformancefordifferenttasks;specifictaskstobeapprovedbyClient,etc.]

DetailsasperTOR

Page 106: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

106

AppendixB:ReportingRequirements

[Listformat,frequency,contentsofreportsandnumberofcopies;personstoreceivethem; datesofsubmission,etc.Ifnoreportsaretobesubmitted,statehere"Notapplicable".}

PleasereferTOR

Page 107: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

107

AppendixC:KeyPersonnelandSub-consultants

[Listunder: C-l Titles[andnames,ifalready available}, detailedjobdescriptionsand minimumqualifications.experienceofPersonneltobeassigned toworkinIndia,andstaff-monthsforeach.

C-2 SameinformationasC-lforKeylocalPersonnel.

C-3 Same as C-l for Key foreign Personnel to be assigned to work

outsideIndia.

C-4 List of approved Sub-consultants [if already available]; same

informationwith respecttotheirPersonnelasinC-lthroughC-4)

Page 108: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

108

AppendixD:MedicalCertificate

[ShowhereanacceptableformofmedicalcertificateforforeignPersonneltobestationed

inIndia.Ifthereisnoneedforamedicalcertificate,statehere:"Notapplicable."]

Page 109: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

109

AppendixE:HoursofWorkforKeyPersonnel

The Consultants Key personnel and all other Professional / Sub Professional /

SupportStaff/Sub-Consultancy personnel shallwork6days(Mondays through Saturday) everyweek and observe the GazettedHolidays of Government of India

as Holidays. TheConsultant shall work as per thework program of the concessionaire.

In this contextincasethe work plan of the Consultant needs suitable modifications, the

same shall becarriedoutandsubmitted totheclient forconsideration.TheConsultantshoursofworknormallyshallmatchwiththat of

Contractor’sactivitiesonthesite.Noextraremunerationshall be claimed or paid for extra

hours of work required in the interest of Projectcompletion.

In respect of foreign personnel, one day per trip as travel time from and to the countryoftheGovernmentshallbeallowed.

PleasereferTOR

Page 110: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

110

AppendixF:DutiesoftheClient

a. Access to thequality control laboratory forperforming various types of

tests,which willbeprovided bytheconcessionaire including thetesting

personnel.

b. RFQ, RFP, Concession Agreement, Bid submission, Site Data and

informationforfieldsurveysandinvestigations

c. Detailed Workplan and Programmefor Operation and Maintenance of

ProjectHighwayfromConcessionaire.

d. QualityAssurance Plan and Quality Control Procedures from the

Concessionaire.

e.Allthereportsandnecessarydataasper the reportingobligationof

concessionaireundertheconcessionAgreement.

f. Necessaryletters,whichwillbe requiredforVisa’sofforeignpersonneland

procuringotherservicesbytheconsultantforperformingprojectservices.

PleasereferTOR

Page 111: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

111

AppendixG:CostEstimatesinForeignCurrency

Deleted

Page 112: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

112

Appendix H: Cost Estimates in Local Currency.

List hereundercostestimateinlocalcurrency:

1. MonthlyratesforlocalPersonnel(KeyPersonnelandotherPersonnel)

2. Reimbursable/Rental/Fixedexpendituresasfollows:

a. Perdiemratesforsubsistenceallowanceforforeignshort-termPersonnelplus

estimatedtotals.

b. Livingallowancesforlong-termforeignPersonnel,plusestimatedtotals.

c. Costoflocaltransportation.

d. Costofotherlocalservices,rentals,utilities,etc.

Page 113: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

113

AppendixI:FORMOFPERFORMANCESECURITY

(PERFORMAMANCEBANKGUARANTEE) (Clause-

20ofTOR)

To

TheChairman,

NationalHighwaysAuthorityofIndia, G-5&6, Sector-10,Dwarka,

NewDelhi–110075

India WHEREAS [Name and address of Consultant]¹(hereinafter called “the consultant”)

hasundertaken,in pursuanceof ContractNo. dated to provides theservicesontermsandconditionssetforthin thisContract [Name of contract

and brief description of works) (hereinafter called the “the Contract”).

AND WHEREAS it has been stipulated by you in the said Contract that the Consultants shallfurnishyouwithaBankGuarantee byarecognized bankforthe sumspecified thereinassecurityforcompliance withhisobligationsinaccordance withtheContract;

ANDWHEREAS wehaveagreed to givetheConsultants suchaBankGuarantee; NOWTHEREOFweherebyaffirmthatwearetheGuarantor andresponsibletoyou, on behalf of the Consultants up to a total of __(amount of Guarantee)[in words],such sum being payable in the types and proportions of currencies in which theContract Priceispayable,and we undertake to pay you, upon your firstwrittendemandandwithoutcavilor argument,anysumorsumswithinthelimitsof [amount of Guarantee] as aforesaid withoutyourneedingtoproveortoshowgroundsorreasonsforyour demandforthesumspecifiedtherein.

We hereby waive the necessity of your demanding the said debt from the

Consultantsbeforepresentinguswiththedemand.

Wefurtheragreethatnochangeoradditiontoorothermodificationofthetermsof theContractoroftheservicestobeperformedthereunderorof anyoftheContract

documentswhichmaybemadebetweenyouandthe Consultants shall in any way release us

Page 114: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

114

from any liability under thisguarantee, andweherebywaivenoticeof anysuchchange,additionormodification.

TheliabilityoftheBankunderthisGuaranteeshallnotbeaffectedbyanychangein theconstitutionoftheconsultants oroftheBank.

Notwithstanding anything contained herein before, our liability under this guarantee is restricted to Rs. (Rs.)andtheguaranteeshallremainvalid till.Unlessaclaimorademandinwritingismadeuponusonorbefore

allourliabilityunderthisguaranteeshallcease.

Thisguarantee shallbevalidforaperiodof38monthsi.e.upto2monthsbeyondthe expiryofcontractof36months.

SignatureandSealoftheGuarantor Inpresenceof

NameandDesignation 1.

(Name,Signature&Occupation)

NameoftheBank

Address 2.

(Name&Occupation)

Date

1GivenamesofallpartnersiftheConsultantsisaJointVenture.

Page 115: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

115

AppendixJ:FormofBankGuaranteeforAdvancePayments

(ReferenceClause6.4(a)ofContract)

(TobestampedinaccordancewithStampAct,ifany,ofthecountryofissuingbank) Ref:

BankGuarantee:

Date:

DearSir,

InconsiderationofM/s. (hereinafter referred as the "Client", which expressionshall,unlessrepugnanttothecontextormeaningthereofincludeitsuccessors, administrators and assigns) having awarded toM/s. (hereinafter referred to as the "Consultant"which expression shall unless repugnant tothe context or meaning thereof, include itssuccessors,administrators,executorsand assigns), a contract by issue of client's Contract Agreement No. dated and the same having been unequivocallyacceptedbytheConsultant,resultinginaContractvaluedat

for Contract(hereinaftercalledthe"Contract")

(scopeofwork) and the Client having agreed to make an advance payment to the Consultant for performanceof the aboveContractamountingto (inwordsandfigures)asanadvance againstBankGuaranteetobe furnishedbytheConsultant.

We (Name of the Bank) having its Head Office at (hereinafter referred toastheBank), which expression shall, unless repugnant to the context or meaning thereof, include its successors, administrators executors and assigns) dohereby guarantee andundertake topaytheclient immediatelyondemand anyor,allmonies payable by the Consultant totheextentof- as aforesaid at any time upto @ withoutany demur, reservation, contest, recourse or protest and/or without any reference to the consultant. Any such demand made by the client on the Bank shall be conclusive andbinding notwithstanding any difference between the Client and the Consultant or anydisputepending beforeany Court,Tribunal, Arbitrator oranyotherauthority. we agreethat the Guarantee herein contained shall be irrevocable and shall continue

Page 116: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

116

to beenforceabletilltheClientdischargesthisguarantee.

Page 117: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

117

The Client shall have the fullest liberty without affecting in any way theliability of theBankunderthisGuarantee,fromtimetotimetovarytheadvanceortoextendthe timeforperformance of the contract by the Consultant. The Client shall have the fullest libertywithoutaffectingthisguarantee,topostponefromtimetotimetheexercise ofanypowersvestedinthemorofanyrightwhichtheymighthaveagainsttheClientand toexercisethesame at any time in any manner, and either to enforce or to forebear toenforce anycovenants, contained orimplied,intheContractbetweentheClientand theConsultantany other course or remedy or security available to the Client. The bank shall not berelievedofitsobligationsunderthesepresentsbyanyexercisebythe Clientofitslibertywithreferencetothemattersaforesaid oranyofthemorbyreason ofanyotheractor forbearanceorotheractsof omissionorcommissiononthepartofthe Clientoranyotherindulgence shown by the Client or by any other matter or thing whatsoever whichunderlawwouldbutforthisprovisionhavetheeffectofrelievingthe Bank.

TheBankalsoagreesthattheClientatitsoptionshallbeentitledtoenforcethisGuaranteeagainsttheBankasa principaldebtor,inthefirstinstancewithoutproceeding against theConsultant and notwithstanding any security orotherguarantee that the ClientmayhaveinrelationtotheConsultant'sliabilities.

Notwithstanding anythingcontainedhereinaboveourliabilityunderthisguaranteeis limitedto anditshallremaininforceuptoandincludingandshallbeextendedfromtimetotimeforsuchperiod(notexceedingoneyear),asmaybe desiredbyM/s._ onwhosebehalfthisguaranteehasbeengiven.

Datedthis dayof201at

WITNESS:

1.

(signature)

2.

(Signature)

Page 118: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

118

(Name)

(Name)

(OfficialAddress) Designation(with Bankstamp)

Attorneyas perPowerof

AttorneyNo.

Dated

Strikeout,whicheverisnotapplicable.

Note1:Thestamppapersofappropriatevalueshallbepurchasedinthenameofbankwho

issuesthe"BankGuarantee”.

Note2:Thebankguarantee shallbefromaNationalized IndianBankorreputedforeign commercial Bank acceptable to client for Foreign Consultant with counter guarantee from Nationalized Bank. Bank guarantee furnished by Foreignconsultant shall be confirmedbyanyNationalizedBankinIndia.

Page 119: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

119

AppendixK

Letterofinvitation

Page 120: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

120

AppendixL

LetterofAward

Page 121: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

121

AppendixM

Minutesofpre-bidmeeting

Page 122: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

122

Appendix-N

MinutesofNegotiationmeeting

Page 123: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

123

Appendix-O

MemorandumofUnderstanding

between

_

And

_ _

WhereasNationalHighwaysAuthorityofIndia(hereinaftercalledNHAI)has invited proposal

forappointment ofIndependent Engineer Services during Operation & Maintenance

Period for 4 laning of Moradabad - Bareilly Section of NH-24 from Km 149.250 to Km

271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III

Ahereinafter calledthe Project.

AndWhereas _ (Lead Partner) and _ JV

partner/shaveagreedtoformaJointVenturetoprovidethesaidservicestoNHAIas

IndependentEngineer; and

Now,therefore,itisherebyagreedby andonbehalfofthepartnersasfollows:

(i)_ will be the lead partner and _ _ will be the other JV

partner/s.

(ii)__(leadpartner)shallbetheinchargeofoveralladministrationof contract and shall be

authorisedrepresentative of all JV partners for conductingallbusinessfor

andonbehalfof theJV duringthebiddingprocess andsubsequently,representthe

jointventurefor andon behalfoftheJVfor all contractualmattersfordealingwiththeNHAI/Concessionaireif Consultancy

workisawardedtoJV.

(iii) AllJVpartnersdoherebyundertaketobejointlyandseverelyresponsiblefor alltheobligationandliabilitiesrelatingto theconsultancyworkandin accordance withtheTermsofReferenceoftheRequest forProposal forthe Consultancywork is awarded to JV.

Page 124: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

124

(iv) Subsequently,iftheJVisselectedtoprovidethedesiredconsultancyservices, a detailed MOU indicating the specific project inputs and role of each

partner/salongwithpercentagesharingofcostofservicesshallbesubmitted toNHAI(Consultant maysubmitthedetailed MOUalong withpercentage sharingofcostatthetimeofbiddingalso).

For (NameofLeadpartner)

_

ManagingDirector/HeadoftheFirm Address

For (NameofJVpartner/s)

_

ManagingDirector/HeadoftheFirm Address

Page 125: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

125

PROCEDUREUNDERE-TENDERING

Sub:-Independent Engineer Services during Operation & Maintenance Period for 4

laning of Moradabad - Bareilly Section of NH-24 from Km 149.250 to Km 271.050 in

the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A

INSTRUCTIONSTOAPPLICANTS

DEFINITIONS

a) CIIndiaLimited:Aservice providertodevelopandcustomize thesoftware and facilitate the process of e-tendering on application service providermodel.(ReferGlossaryintheRFP).

b) NHAI e-Procurement Portal : An e-tendering portal of National Highways Authorityof

India(“NHAI”)introducedfortheprocessof e- tenderingwhichcanbeaccessedonhttps://nhai.eproc.in

Wordsincapitalandnotdefinedinthisdocumentshallhavethesamemeaning asintheRequestforProposal(“RFP”).

(1) ACCESSING/PURCHASING OFBIDDOCUMENTS:

(i) Itismandatory foralltheApplicants tohave Class-III digital signature certificate

(with both Signing and Encryption certificate)(in thename of personwhowillsigntheApplication)fromany ofthe licensedcertifying

agency(“CA”)[ApplicantscanseethelistoflicensedCAsfromthe link

www.cca.gov.in]toparticipateine-tenderingof NHAI.Theauthorized

signatoryholdingPowerofAttorneyshallonlybe theDigitalsignatory.In

caseauthorizedsignatoryholdingPowerof AttorneyandDigitalSignatory arenotthesame,thebidshallbeconsiderednon-responsive.

(ii) Toparticipateinthesubmission oftheApplicationagainsttheRFP,itis

mandatoryfortheApplicantstogetregisteredtheirfirm/Consortiumwith e-

tendering portal https://nhai.eproc.into have user ID and password whichhastobeobtainedbysubmittinganannualregistrationchargesof

INR2,300/-(inclusive ofall taxes to M/sC1 India PvtLtd.) through e-

payment gateway. Validity of online registrationis1 year. Henceforth

therewillbenoneedofphysicalsubmissionofDemandDraftforthesame.

Page 126: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III ..

126

(iii) RFP canbe viewed/downloaded, free of cost from 21.09.2016to20.10.2016 up to 17:00hours.

(Followingmaybenoted: (a) Applications can be submitted only during the validity of

registrationwiththehttps://nhai.eproc.in. (b) Theamendments/clarifications totheRFP,ifany,willbepostedon

theNHAIwebsite.

(iv) To participatein bidding, Applicants have to pay a sumofRs. 5,000/-

(RsFivethousandonly) as acostoftheRFP(non-refundable)to“National

HighwaysAuthorityofIndia,Lucknow” throughDD.ToParticipatein

bidding,Applicantshavealsotopayasumof Rs.1,295/-(OneThousand

TwoHundredNinetyFiveOnly)inclusiveof alltaxestowardsTender Processingfee(Non-Refundable)infavourof “M/sC1 IndiaPvtLimited”

throughe-paymentgatewayon e-tenderportalhttps://nhai.eproc.in.

Henceforththerewillbenophysicalsubmissionof DemandDraftforthe same.

(v) IftheApplicanthasalreadyregisteredwiththehttps://nhai.eproc.inand validity

of registration has not expired, then such Applicant does not

requirefreshregistration.

Page 127: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

127

(2) PREPARATIONANDSUBMISSIONOFAPPLICATIONS:

i. DetailedRFPmaybedownloadedfromhttps://nhai.eproc.inandtheBidmaybe submitted onlinefollowingtheinstructionsappearing onthescreen.AVendor manualcontainingthedetailedguidelinesfore-tenderingsystemisalsoavailable

onhttps://nhai.eproc.in.

ii. ThefollowingshallbetheformofvariousdocumentsintheApplication:

A.

OnlyElectronicForm(tobeuploadedonthehttps://nhai.eproc.in)[RefertoClause4.1(preparationandsubmissionof Application)oftheRFP]

(a) Technicalproposalasindicatedin para‘B’below (b) Financialproposalasperformatprescribedin SECTION-5

ofRFP.

B. Original (in Envelope) [Refer to Clause 4.1 (preparation

andsubmissionofApplication)oftheRFP]

(I) TechnicalProposalinHardBoundforincluding:

(a) PowerofAttorneyforsigningtheApplication

(b) Ifapplicable,thePowerofAttorneyforLeadMemberofJV; (c) CopyofMemorandumofUnderstandingbetweenJVpartners,if

applicable;

(d) Copy ofMemorandum of Understanding with Associate, if applicable

(g) Firms credentialsas per format prescribed in SECTION-3 OF RFP.

(h) Technical proposalasperformat asprescribed inSECTION-4 OFRFP.

(II) Receipt of payment towards cost of RFP of Rs5,000/-

(RupeesFivethousandonly)in favourofNationalHighwaysAuthorityofIndia;

(III) Online Receiptof payment of Application processing feeof Rs.

1,295/- (One thousand TwoHundred Ninety Five Only) inclusive of all taxes in favourofM/sC1IndiaPrivateLimited,NewDelhielectronically.

(IV) Dulyexecutedon

Page 128: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

128

plainpaper‘IntegrityPact’asperenclosedformat[neednottobeuploadonthehttps://nhai.eproc.ininelectronicform].

iii. The Applicant shall submitthe original documents specifiedabove in point

no.2(ii)Btogetherwiththeirrespectiveenclosuresandsealitinanenvelopeand marktheenvelopeas“TechnicalProposal”fortheProjectforwhichproposalis submittedandnameandaddressoftheApplicant.Theenvelopemustbeclearly marked “DO NOT OPEN, EXCEPT IN THE PRESENCE OF THE EVALUATIONCOMMITTEE”. Inaddition,theApplicationduedateshouldbe indicated onthe right hand corner of

the envelope. The original documents shouldbesubmittedbefore11:00hoursIndianStandardTimeon 12.03.2015atthe below mentioned address in the manner and form as detailed inthe RFP. A

receiptthereofshouldbeobtainedfromthebelowmentionedperson.

ATTN.OF: DESIGNATION Dy. GeneralManager(T)

AuthorisedRepresentative

ADRESS Chief GeneralManager(Tech)-cum-R.O.,

National Highways Authority Of India,

Regional Office,

3/248, Vishal Khand, Gomti Nagar,

Lucknow , Pin – 226010.

Ph.0522-2391287/97

E mail- [email protected]

iv. TheApplicantshalluploadscannedcopiesofthedocumentsasspecifiedin pointnos. 2

(ii) (A) &(B) above on the https://nhai.eproc.inbefore11:00 hoursIndianStandard

Timeon2 1 . 1 0 . 2 0 1 5 .Nohardcopyofthedocumentsasspecifiedinpointnos.2(ii)(A)(

b) aboveisrequiredtobe submitted. Intheeventofanydiscrepancy

betweentheoriginalandthe copy(inelectronicform),theoriginalshallprevail.

v.

Itmaybenotedthatthescannedcopiescanbepreparedinfileformati.e.PDFand/orZIPonly.TheApplicantscanuploadasinglefileofsizeof10MBonlybutcanuploadmultiplefiles.

3. Modification/Substitution/Withdrawalof bids:

(i) The Biddermaymodify,substituteorwithdrawits e-bid aftersubmission,priorto

Page 129: RFP for IC for O&M of NH-24 MBD Final PD › WriteReadData › consultant... · National Highways Authorityof India Request for Proposal Independent Engineer Services during Operation

National Highways Authorityof India Request for Proposal

Independent Engineer Services during Operation & Maintenance Period for 4 laning of Moradabad - Bareilly Section of NH-24

from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT(Toll) basis under NHDP Phase-III A.

129

theBidDueDate. NoBidshallbemodified, substituted orwithdrawn bythe

BidderonoraftertheBidDueDate.

(ii) Any alteration/modification in the Bid or additional information supplied subsequenttotheBidDueDate,unlessthesamehasbeenexpresslysoughtforby theAuthority,shallbedisregarded.

(iii) Formodificationofe-bid,bidderhastodetachitsoldbidfrome-tenderingportal

andupload/resubmitdigitallysignedmodifiedbid.

(iv) For withdrawal of bid, bidder has to click on withdrawal icon at e-tendering portal

andcanwithdrawitse-bid.

(v) Beforewithdrawalofabid,itmayspecificallybenotedthatafterwithdrawalofa

bidforanyreason,biddercannotre-submite-bidagain.

4. OPENINGANDEVALUATIONOFAPPLICATIONS:

(i) OpeningofProposalswillbedonethroughonlineforFinancialProposal andbothon-

lineandmanuallyforTechnicalProposal.

(ii) Forparticipatingin thetender,theauthorizedsignatoryholdingPowerof Attorney

shallbetheDigital Signatory. Incasetheauthorized signatory holdingPowerof

Attorney andDigitalSignatoryarenotthesame,thebid shallbeconsiderednon-

responsive.

TheAuthorityshall open EnvelopecontainingTechnicalProposalreceivedas

mentionedinpointnos.2(ii)Bat 11:30hoursIndianStandardTimeon21.10.2016inthepresenceoftheApplicantswhochooseto attend.ThisAuthoritywill subsequently opentheTechnical Proposal asmentioned inpointno.2(ii)A(a)

aboveandevaluatetheApplicationsinaccordancewiththeprovisionssetoutin theRFP.

(iii) TheFinancialProposal2(ii)A(b)willbeopenedonlineoftheshortlisted

applicantswhoqualifyforfinancialopeningas perRFP.Thedate ofopeningof

FinancialProposalwillbenotifiedlateron. DISCLAIMER TheApplicantmustreadalltheinstructionsintheRFPandsubmit the same accordingly.