rhic machine/detector planning meeting 21 feb 07

11
1 RHIC Machine/Detector Planning Meeting 21 Feb 07 Questions of the day Machine: (Angelika or designee) What is planned that could lead to more luminosity/smaller vertex that was not discussed in the 1 June 2006 "RHIC Collider Projections" document? (Improved BTA Stripping Foils, AGS Bunch Merge, Stochastic cooling in Yellow…) Experiment: (Bill and Mike) Approximately how much access time is required for your experiment to be ready for physics data collection? anning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM_07/rhic_planning.

Upload: keiran

Post on 19-Jan-2016

40 views

Category:

Documents


2 download

DESCRIPTION

RHIC Machine/Detector Planning Meeting 21 Feb 07. Questions of the day Machine: (Angelika or designee) What is planned that could lead to more luminosity/smaller vertex that was not discussed in the 1 June 2006 "RHIC Collider Projections" document? - PowerPoint PPT Presentation

TRANSCRIPT

  • RHIC Machine/Detector Planning Meeting21 Feb 07Questions of the day Machine: (Angelika or designee)What is planned that could lead to more luminosity/smaller vertexthat was not discussed in the 1 June 2006 "RHIC Collider Projections" document?(Improved BTA Stripping Foils, AGS Bunch Merge, Stochastic cooling in Yellow)Experiment: (Bill and Mike)Approximately how much access time is required for your experiment to be ready for physics data collection?

    Planning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM_07/rhic_planning.htm

  • RHIC Machine/Detector Planning Meeting21 Feb 07Usual Agenda Scheduling Physicist Issues (Gardner) Machine Issues - (Drees) Experiment IssuesPHENIX (Leitch)STAR (Christie) RHIC Beam Experiments - (Pilat)

    RCF Issues - (Throwe)

    Planning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM_07/rhic_planning.htm

  • RHIC Run 7 as run/planned12 Feb cool-down begins17 Feb blue cold20 Feb 1st beam in blue ring25 Feb yellow cold26 Feb 1st beam in yellow, begin setup mode28 Feb last day for daytime experiment accesses8 Mar begin ramp-up mode, overnight stores for experiments15 Mar physics mode, 100 x 100 GeV/n Au-Au

    26 Jun end physics (14.7 weeks), begin warm-up to LN230 Jun RHIC Cryo switch to LN2 complete, end 19.7 weeks of cryo operation

    21 Feb 07

  • RHIC Machine/Detector Planning Meeting21 Feb 07Answer to Questions from the 6 Feb meeting (to be revisited) (1) Experiments What are your luminosity goals for the Au-Au run, Delivered and Sampled? PHENIX goals for 100 x 100 GeV/n Au-AuDelivered Luminosity = 2700 mb-1Sampled Luminosity = 1100 mb-1Assumes 68% live time, 60% vertex cut = 40.5% efficientHowever, Run5 efficiency factor was 25% (if so, the Run7 requirement is 4400 mb-1 delivered)

    STAR goals for 100 x 100 GeV/n Au-AuDelivered Luminosity = 1800 mb-1Sampled Luminosity = 300 mb-1 with 60M usable min-bias events~50% live time

  • RHIC Machine/Detector Planning Meeting21 Feb 07Answer to Questions from the 6 Feb meeting (to be revisited) (2) Experiments and Machine - If the Au-Au run goes well and luminosity goals are met with a week or two left to go, what should we do? PHENIXProbably need 15 weeks to achieve Au-Au goals highest prioritypp development if well motivated/justifiedStudies to maximize Run8 figure of merit500 GeV development

    STARLow energy Au-Au development, collider issues, triggering Machine1-2 days low energy Au-Au development at 0.5 injection energypp development 1st priority new RHIC working point (needs ~2 weeks)2nd priority 500 GeV development

  • PHENIX GoalSTAR GoalPHENIX Goal (with Run 5 efficiency) 15Delivered Integrated Luminosity [nb-1]Run-7 Au-Au luminosity projections 100 GeV/n

  • RHIC Machine/Detector Planning Meeting21 Feb 07

    Next Meeting usual time

    Tuesday, February 27, after Time Meeting

    Planning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM_07/rhic_planning.htm

  • RHIC-AGS FY07, 1 Feb 07

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Other (TBD)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY07

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    15 Feb 07

    U.S. Department of EnergyBrookhaven Science Associates

    setup

    Plan, subject to change

    19.7 weeks

    Sep

    concurrent with RHIC

    ramp up luminosity

    26 June

    ~15 weeks

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY07, 28 Dec 06

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Other (TBD)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY07

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    28 Dec 06

    U.S. Department of EnergyBrookhaven Science Associates

    setup

    Draft Plan (awaiting final budget)

    21.3 weeks

    Sep

    concurrent with RHIC

    16.8 weeks

    ramp up luminosity

    schedule TBD

    28 June

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY07, 5 Oct 06

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Other (TBD)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY07

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    17 Oct 06

    U.S. Department of EnergyBrookhaven Science Associates

    setup

    30 week Draft Plan (awaiting final budget)

    30 weeks

    Sep

    concurrent with RHIC

    1 Dec

    28 June

    25.5 weeks

    ramp up luminosity

    schedule and second beam species TBD

    schedule TBD

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY07, 25 Sep 06

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Setup (no colliding beams)

    RHIC 250x250 GeV pp development

    NSRL (NASA Radiobiology)

    (NASA Schedule to be determined)

    Shutdown (RHIC)

    C-A Operations-FY07

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    25 Sep 06

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    30 week Draft Plan

    30 weeks

    Sep

    concurrent with RHIC

    1 Nov

    30 May

    25.5 weeks

    Commissioning

    Contingency

    schedule TBD

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY07, 5 Sep 06

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Setup (no colliding beams)

    RHIC Research with HI

    RHIC Research with pp

    RHIC 250x250 GeV pp development

    NSRL (NASA Radiobiology)

    (NASA Schedule to be determined)

    Shutdown (RHIC)

    C-A Operations-FY07

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    5 Sep 06

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    30 week Draft Plan

    30 weeks

    Sep

    concurrent with RHIC

    1 Nov

    30 May

    25.5 weeks

    Commissioning

    Contingency

    species, energy and/or schedule TBD

    schedule TBD

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, 19 Sep 06

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC Colliding Beams

    RHIC Research with 100x100 GeV pp

    RHIC Research with 31x31 GeV pp

    RHIC Beam Development 11 x 11 GeV pp

    RHIC 250x250 GeV pp development

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    19 Sep 06

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    AS Run

    21.2 weeks

    Sep

    schedule to be determined

    1 Feb

    30 Jun

    Commissioning

    Unscheduled Shutdown

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, 13 Mar 06

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC Colliding Beams

    RHIC Research with HI

    RHIC Research with pp

    RHIC 250x250 GeV pp development

    NSRL (NASA Radiobiology)

    (NASA Schedule to be determined)

    Shutdown (RHIC)

    C-A Operations-FY07

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    14 Mar 06

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    34 week Draft Plan

    34 weeks

    Sep

    concurrent with RHIC

    16 Oct

    11 Jun

    28.5 weeks

    Commissioning

    Contingency

    species, energy and/or schedule TBD

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, 30 Jan 06

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC Colliding Beams

    RHIC Research with 100x100 GeV pp

    RHIC Research with 31x31 GeV pp

    RHIC 250x250 GeV pp development

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    30 Jan 06

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    The Plan

    20 weeks

    Sep

    schedule to be determined

    1 Feb

    21 Jun

    14.5 weeks

    Commissioning

    Contingency

    0.5 Week Cont'when to use TBD

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, 3 Jan 06

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC Colliding Beams

    RHIC Research with 100x100 GeV/ pp

    RHIC Research with ?

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    3 Jan 06

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    proposed

    18 weeks

    Sep

    schedule to be determined

    1 Feb

    7 Jun

    12.5 weeks

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, 18 Nov 05 (2)

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with ?

    RHIC Research with ?

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    18 Nov 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    RHIC Schedule - on hold - SERIOUS BUDGET ISSUES

    27.4 weeks

    Sep

    schedule to be determined

    5 Dec

    15 Jun, actual end dateto be determined

    3 Oct

    ~ 7 weeks

    ?

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, 18 Nov 05

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC Research with 200 GeV pp

    RHIC Research with 62.4 GeV pp

    RHIC beam development with 500 GeV pp

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    18 Nov 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    ON HOLD - Serious Budget ISSUES!!!!

    20 weeks

    Sep

    schedule to be determined

    5 Dec

    3 Oct

    ~ 7 weeks

    4

    1

    PHENIX-FY06, 2 Nov 05

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC Research with 200 GeV AuAu

    RHIC Research with 200 GeV pp

    RHIC Research with 62.4 GeV pp

    RHIC Research with 22.5 GeV pp

    RHIC Research with 500 GeV pp

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    2 Nov 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    DRAFT - DRAFT

    29.6 weeks

    Sep

    schedule to be determined

    5 Dec

    3 Oct

    ~ 7 weeks

    PHENIX Proposal

    Senate Budget and $100/MWhr("best case")

    20 weeks

    13

    4

    2

    .5

    1

    BRAHMS Request2-3- weeks @ 62.4 GeV

    STAR-FY06, 2 Nov 05

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC Research with 200 GeV pp

    RHIC Research with 19.6 GeV Au-Au

    RHIC Research with 31 GeV Au-Au

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    2 Nov 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    DRAFT - DRAFT

    29.6 weeks

    Sep

    schedule to be determined

    5 Dec

    3 Oct

    ~ 7 weeks

    STAR Proposal

    Senate Budget and $100/MWhr("best case")

    20 weeks

    20

    1

    1

    RHIC-AGS FY05, as run

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cool-down/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Cu-Cu (100x100 GeV/n)

    RHIC Research with Cu-Cu (31x31 GeV/n)

    RHIC Research with Cu-Cu (11x11 GeV/n)

    RHIC Research with p-p (100x100 GeV)

    RHIC Research with p-p (205x205 GeV)

    NSRL (NASA Radiobiology)

    AGS (NASA)

    Shutdown (RHIC)

    C-A Operations-FY05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2005

    3 Aug 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - As Run

    32 weeks

    p,O(2),Si,Fe(2),Ti

    Sep

    schedule to be determined

    pending funding

    p,C,O,Si,Fe(2)

    p,Ti,,Si,Fe(2)

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, 8 Aug 05

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Cooldow/Warm-up

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with ?

    RHIC Research with ?

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    3 Aug 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - subject to change

    27.4 weeks

    Sep

    schedule to be determined

    5 Dec

    15 Jun, actual end dateto be determined

    3 Oct

    ~ 7 weeks

    ?

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, STAR (3)

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with ?

    RHIC Research with ?

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    25 July 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - subject to change

    27.4 weeks

    Sep

    schedule to be determined

    pending funding

    DRAFT - Not publishedSTAR/PHENIX Proposal

    5 Dec

    15 Jun

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, STAR (2)

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with ?

    RHIC Research with ?

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    25 July 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - subject to change

    29.4 weeks

    Sep

    schedule to be determined

    pending funding

    DRAFT - Not publishedSTAR Proposal (2)

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, STAR

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with ?

    RHIC Research with ?

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    25 July 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - subject to change

    27.4 weeks

    Sep

    schedule to be determined

    pending funding

    DRAFT - Not publishedSTAR Proposal (1)

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, PHENIX

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with ?

    RHIC Research with ?

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    25 July 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - subject to change

    26.0 weeks

    Sep

    schedule to be determined

    pending funding

    DRAFT - Not publishedPHENIX Proposal

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY06, 6-14-05

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with ?

    RHIC Research with ?

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY06

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2006

    25 July 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - subject to change

    32 weeks

    Sep

    schedule to be determined

    pending funding

    DRAFT - Not published

    http://www.c-ad.bnl.gov/esfd

    Sheet2

    RHIC-AGS FY05, 6-14-05

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Cu-Cu (100x100 GeV/n)

    RHIC Research with Cu-Cu (31x31 GeV/n)

    RHIC Research with Cu-Cu (11x11 GeV/n)

    RHIC Research with p-p (100x100 GeV)

    RHIC Research with p-p (205x205 GeV)

    NSRL (NASA Radiobiology)

    AGS (NASA)

    Shutdown (RHIC)

    C-A Operations-FY05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2005

    14 Jun 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - as run

    32 weeks

    p,O(2),Si,Fe(2),Ti

    Sep

    schedule to be determined

    pending funding

    p,C,O,Si,Fe(2)

    p,Ti,,Si,Fe(2)

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY05, 2-7-05

    http://www.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem/Linac Startup

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Cu-Cu (100x100 GeV/n)

    RHIC Research with Cu-Cu (31x31 GeV/n)

    RHIC Research with Cu-Cu (11x11 GeV/n)

    RHIC Research with p-p (100x100 GeV)

    NSRL (NASA Radiobiology)

    AGS (NASA)

    Shutdown (RHIC)

    C-A Operations-FY05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2005

    10 Feb 05

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - subject to change

    32 weeks

    p,O(2),Si,Fe(2),Ti

    Sep

    schedule to be determined

    pending approval/funding

    p,C,O,Si,Fe(2)

    To be finalized

    http://www.c-ad.bnl.gov/esfd

    RHIC-AGS FY05, 11-9-04

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Cu-Cu (100x100 GeV/n)

    RHIC Research with Cu-Cu (31x31 GeV/n)

    RHIC Research with p-p (100x100 GeV)

    NSRL (NASA Radiobiology)

    AGS (NASA)

    Shutdown (RHIC)

    C-A Operations-FY05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2005

    9 Nov 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - assumes presidential budget, subject to change

    27 weeks

    p,O(2),Si,Fe(2),Ti

    Sep

    schedule to be determined

    pending proposal/funding

    RHIC-AGS FY04-05, 11-9-04 ( (3)

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Au-Au (100x100 GeV/n)

    RHIC Research with Au-Au (31x31 GeV/n)

    RHIC p-p (100x100 GeV) Development Run

    AGS 22 GeV/c Protons (RSVP-K0PI0 tests)

    AGS 22 GeV/c Protons (US Atlas)

    NSRL (NASA Radiobiology)

    AGS (NASA)

    Shutdown (RHIC)

    C-A Operations-FY04-05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2004

    9 Nov 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2005

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    26.7 weeks

    27 weeks, FY05presidential budget

    pending proposal/funding

    Schedule - As Run/planned

    RUN 5 Plan A (2)

    PLAN A (Assumes Presidential Budget)

    RHIC RUN5 Plan as of 9/29/05

    Week #DatesActivity

    Week Beginning

    14-OctNitrogen Cooldown Resumes (all sectors)

    116-NovCryo On, Cu in AGS/ATR

    223-NovCryo On, Cu in AGS/ATR

    20-NovContinuing resolution ends - Budget known??

    330-NovCu-Cu Setup in RHIC

    47-DecCu-Cu Setup in RHIC

    514-DecCu-Cu Setup in RHIC

    621-DecCu-Cu Setup in RHIC

    728-DecCu-Cu Physics week 1

    84-JanCu-Cu Physics week 2

    911-JanCu-Cu Physics week 3

    1018-JanCu-Cu Physics week 4

    1125-JanCu-Cu Physics week 5

    121-FebCu-Cu Physics week 6

    138-FebCu-Cu Physics week 7

    1415-FebCu-Cu Physics week 8

    1522-Febpp Setup

    161-Marpp Setup

    1728-Febpp Setup

    188-Marpp Physics week 1

    1922-Marpp Physics week 2

    2029-Marpp Physics week 3

    215-Aprpp Physics week 4

    2212-Aprpp Physics week 5

    2319-Aprpp Physics week 6

    2426-Aprpp Physics week 7

    253-Maypp Physics week 8

    2610-Maypp Physics week 9

    2717-MayWarmup

    2824-MayPossible Run Extension with added $'s

    2931-MayPossible Run Extension with added $'s

    308-JunPossible Run Extension with added $'s

    3114-JunPossible Run Extension with added $'s

    15-JunNYPA/LIPA Energy Curtailment Program Begins

    RHIC-AGS FY04-05, 11-9-04

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Au-Au (100x100 GeV/n)

    RHIC Research with Au-Au (31x31 GeV/n)

    RHIC p-p (100x100 GeV) Development Run

    AGS 22 GeV/c Protons (RSVP-K0PI0 tests)

    AGS 22 GeV/c Protons (US Atlas)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY04-05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2004

    9 Nov 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2005

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    26.7 weeks

    27 weeks, FY05presidential budget

    pending funding

    Schedule - As Run/planned

    RUN 5 Plan C

    PLAN C (Assumes Presidential Budget)

    RHIC RUN5 Yet Another Proposed Plan

    Week #DatesActivity

    17-NovNitrogen Cooldown Resumes (all sectors)

    20-NovContinuing resolution ends - Budget known??

    24-Nov(Wednesday) Decide on strategy for the run

    16-Dec12-DecCryo On, Cu in AGS/ATR

    213-Dec19-DecCryo On, Cu in AGS/ATR

    320-Dec26-DecCu-Cu Setup in RHIC

    427-Dec2-JanCu-Cu Setup in RHIC

    53-Jan9-JanCu-Cu Setup in RHIC

    610-Jan16-JanCu-Cu Setup in RHIC

    717-Jan23-JanCu-Cu Physics week 1

    824-Jan30-JanCu-Cu Physics week 2

    931-Jan6-FebCu-Cu Physics week 3

    107-Feb13-FebCu-Cu Physics week 4

    1114-Feb20-FebCu-Cu Physics week 5

    1221-Feb27-FebCu-Cu Physics week 6

    1328-Feb6-MarCu-Cu Physics week 7

    147-Mar13-Marpp Setup

    1514-Mar20-Marpp Setup

    1621-Mar27-Marpp Setup

    1728-Mar3-Aprpp Physics week 1

    184-Apr10-Aprpp Physics week 2

    1911-Apr17-Aprpp Physics week 3

    2018-Apr24-Aprpp Physics week 4

    2125-Apr1-Maypp Physics week 5

    222-May8-Maypp Physics week 6

    239-May15-Maypp Physics week 7

    2416-May22-Maypp Physics week 8

    2523-May29-MayWarmup

    2630-May5-JunPossible Run Extension with added $'s

    276-Jun12-JunPossible Run Extension with added $'s

    2813-Jun14-Jun

    2815-JunNYPA/LIPA Energy Curtailment Program Begins

    RUN 5 Plan A

    PLAN A (Assumes Presidential Budget)

    RHIC RUN5 Plan as of 9/29/05

    Week #DatesActivity

    14-OctNitrogen Cooldown Resumes (all sectors)

    18-Nov14-NovCryo On, Cu in AGS/ATR

    215-Nov21-NovCryo On, Cu in AGS/ATR

    20-NovContinuing resolution ends - Budget known??

    322-Nov28-NovCu-Cu Setup in RHIC

    429-Nov5-DecCu-Cu Setup in RHIC

    56-Dec12-DecCu-Cu Setup in RHIC

    613-Dec19-DecCu-Cu Setup in RHIC

    720-Dec26-DecCu-Cu Physics week 1

    827-Dec2-JanCu-Cu Physics week 2

    93-Jan9-JanCu-Cu Physics week 3

    1010-Jan16-JanCu-Cu Physics week 4

    1117-Jan23-JanCu-Cu Physics week 5

    1224-Jan30-JanCu-Cu Physics week 6

    1331-Jan6-FebCu-Cu Physics week 7

    147-Feb13-Febpp Setup

    1514-Feb20-Febpp Setup

    1621-Feb27-Febpp Setup

    1728-Feb6-Marpp Physics week 1

    187-Mar13-Marpp Physics week 2

    1914-Mar20-Marpp Physics week 3

    2021-Mar27-Marpp Physics week 4

    2128-Mar3-Aprpp Physics week 5

    224-Apr10-Aprpp Physics week 6

    2311-Apr17-Aprpp Physics week 7

    2418-Apr24-Aprpp Physics week 8

    2525-Apr1-MayWarmup

    262-May8-MayPossible Run Extension with added $'s

    279-May15-MayPossible Run Extension with added $'s

    2816-May22-MayPossible Run Extension with added $'s

    2923-May29-MayPossible Run Extension with added $'s

    3030-May5-JunPossible Run Extension with added $'s

    316-Jun12-JunPossible Run Extension with added $'s

    13-Jun14-Jun

    15-JunNYPA/LIPA Energy Curtailment Program Begins

    RUN 5 Plan B

    PLAN B

    RHIC RUN5 Plan - Proposed (Assumes Presidential Budget)

    Week #DatesActivity

    12-NovNitrogen Cooldown Resumes (all sectors)

    20-NovContinuing resolution ends - Budget known??

    24-Nov(Wednesday) Decide on strategy for the run

    11-Dec7-DecCryo On, Cu in AGS/ATR

    28-Dec14-DecCryo On, Cu in AGS/ATR

    315-Dec21-DecCu-Cu Setup in RHIC

    422-Dec28-DecCu-Cu Setup in RHIC

    529-Dec4-JanCu-Cu Setup in RHIC

    65-Jan11-JanCu-Cu Setup in RHIC

    712-Jan18-JanCu-Cu Physics week 1

    819-Jan25-JanCu-Cu Physics week 2

    926-Jan1-FebCu-Cu Physics week 3

    102-Feb8-FebCu-Cu Physics week 4

    119-Feb15-FebCu-Cu Physics week 5

    1216-Feb22-FebCu-Cu Physics week 6

    1323-Feb1-MarCu-Cu Physics week 7

    142-Mar8-Marpp Setup

    159-Mar15-Marpp Setup

    1616-Mar22-Marpp Setup

    1723-Mar30-Marpp Physics week 1

    1831-Mar5-Aprpp Physics week 2

    196-Apr12-Aprpp Physics week 3

    2013-Apr20-Aprpp Physics week 4

    2120-Apr6-Maypp Physics week 5

    2227-Apr3-Maypp Physics week 6

    234-May10-Maypp Physics week 7

    2411-May17-Maypp Physics week 8

    2518-May24-MayWarm-up

    2625-May31-MayPossible Run Extension with added $'s

    271-Jun7-JunPossible Run Extension with added $'s

    288-Jun14-JunPossible Run Extension with added $'s

    2915-JunNYPA/LIPA Energy Curtailment Program Begins

    30

    31

    RHIC-AGS FY04, 9-31-04

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Au-Au (100x100 GeV/n)

    RHIC Research with Au-Au (31x31 GeV/n)

    RHIC p-p (100x100 GeV) Development Run

    AGS 22 GeV/c Protons (RSVP-K0PI0 tests)

    AGS 22 GeV/c Protons (US Atlas)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY04

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2004

    31 Sep 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Schedule - As Run

    26.7 weeks

    O(2),Fe(2),Si,Ti,p

    p & Fe(2)

    C,Si,Fe(2),Ti

    C,Fe(2),Ti

    RHIC-AGS FY04-05, 9-17-04

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Au-Au (100x100 GeV/n)

    RHIC Research with Au-Au (31x31 GeV/n)

    RHIC p-p (100x100 GeV) Development Run

    AGS 22 GeV/c Protons (RSVP-K0PI0 tests)

    AGS 22 GeV/c Protons (US Atlas)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY04-05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2004

    17 Sep 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2005

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    26.7 weeks

    25 weeks, FY05presidential budget

    pending funding

    Schedule - As Run/planned

    RHIC-AGS FY04-05, 8-31-04

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Au-Au (100x100 GeV/n)

    RHIC Research with Au-Au (31x31 GeV/n)

    RHIC p-p (100x100 GeV) Development Run

    AGS 22 GeV/c Protons (RSVP-K0PI0 tests)

    AGS 22 GeV/c Protons (US Atlas)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY04-05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2004

    31 Aug 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2005

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    26.7 weeks

    25 weeks, FY05presidential budget

    pending funding

    Schedule - As Run/planned

    RHIC-AGS FY04-05, 6-17-04

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Au-Au (100x100 GeV/n)

    RHIC Research with Au-Au (31x31 GeV/n)

    RHIC p-p (100x100 GeV) Development Run

    AGS 22 GeV/c Protons (RSVP-K0PI0 tests)

    AGS 22 GeV/c Protons (US Atlas)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY04-05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2004

    17 Jun 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2005

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    26.7 weeks

    31 weeks, FY05presidential budget

    pending funding

    Schedule - As Run/planned

    RHIC-AGS FY04, 5-24-04 (2)

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo off

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Au-Au (100x100 GeV/n)

    RHIC Research with Au-Au (31x31 GeV/n)

    RHIC p-p (100x100 GeV) Development Run

    AGS 22 GeV/c Protons (RSVP-K0PI0 tests)

    AGS 22 GeV/c Protons (US Atlas)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY04

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2004

    7 Jun 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Commissioning

    schedule to be determined

    Schedule - As Run/planned

    NSRL-1

    26.7 weeks

    pending funding

    O(3),Fe(2),Si,p

    p & Fe(2)

    C,Si,Fe(2),Ti

    C,Fe(2),Ti

    NSRL-2

    NSRL-3

    NSRL-4

    RHIC-AGS FY05, 6-4-04

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC with colliding beams

    RHIC Research with Fe-Fe(?) (100x100 GeV/n)

    RHIC Research with pp (100x100 GeV/n)

    AGS 22 GeV/c Protons (RSVP-tests)

    RSVP Construction Start (earliest)

    NSRL (NASA Radiobiology)

    AGS (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY05

    Program Element

    Sep

    4 Jun 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2005

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    31 weeks, FY05presidential budget

    pending funding

    Schedule - possible

    O(3),Fe(2),Si,p

    RHIC-AGS FY04-05, 5-10-04

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC Research with colliding beams

    RHIC Research with Au-Au (100x100 GeV/n)

    RHIC Research with Au-Au (31x31 GeV/n)

    RHIC p-p (100x100 GeV) Development Run

    AGS 24 GeV/c Protons (RSVP-K0PI0 tests)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY04-05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2004

    10 May 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2005

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    subject to funding etc.

    26 weeks, FY04actual budget

    31 weeks, FY05presidential budget

    pending funding

    RHIC-AGS FY03, 9-31-03

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC Research with colliding beams

    RHIC Research with d-Au (100x100 GeV/n)

    RHIC Research with p-p (100x100 GeV)

    AGS 7.5 & 24 GeV/c Protons (NNSA - proton radiography)

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY03

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2003

    31 Sept 03

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Commissioning

    schedule to be determined

    Schedule - As Run

    31 weeks

    pending funding

    RHIC-AGS FY03-04, 9-28-03

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC Research with colliding beams

    RHIC Research with d-Au (100x100 GeV/n)

    RHIC Research with p-p (100x100 GeV)

    AGS 7.5 & 24 GeV/c Protons (NNSA - proton radiography)

    AGS 24 GeV/c Protons (RSVP tests)

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY03-04

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2003

    28 Sept 03

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2004

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    FY 2004 subject to funding etc.

    31 weeks

    27 weeks, FY04presidential budget

    pending funding

    RHIC-AGS FY04-05, 2-17-04

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC Research with colliding beams

    RHIC Research with Au-Au (100x100 GeV/n)

    RHIC p-p (100x100 GeV) Development Run

    AGS 24 GeV/c Protons (RSVP-K0PI0 tests)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY04-05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2004

    17 Feb 04

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2005

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    subject to funding etc.

    25 weeks, FY04actual budget

    31 weeks, FY05presidential budget

    pending funding

    RHIC-AGS FY04-05, 9-28-03

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC Research with colliding beams

    RHIC Research with d-Au (100x100 GeV/n)

    RHIC Research with p-p (100x100 GeV)

    AGS 7.5 & 24 GeV/c Protons (NNSA - proton radiography)

    AGS 24 GeV/c Protons (RSVP tests)

    NSRL (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY04-05

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2004

    28 Sept 03

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2005

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    subject to funding etc.

    27 weeks, FY04presidential budget

    37 weeks, FY05budget request

    pending funding

    RHIC-AGS FY03-04, 4-8-03

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC Research with colliding beams

    RHIC Research with d-Au (100x100 GeV/n)

    RHIC Research with p-p (100x100 GeV)

    AGS 25 GeV/c Protons (HEP, NP & Other)

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    NSRL 25 (NASA Radiobiology)

    Shutdown (RHIC)

    C-A Operations-FY03-04

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2003

    9 Apr 03

    U.S. Department of EnergyBrookhaven Science Associates

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2004

    Commissioning

    Jun

    May

    schedule to be determined

    Jul

    Sep

    Aug

    subject to funding etc.

    29 weeks

    27 weeks, FY04presidential budget

    150 hrs NSRL initial run

    250 hrs

    250 hrs

    RHIC-AGS FY03-04, 3-12-03

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC Research with colliding beams

    RHIC Research with d-Au (100x100 GeV/n)

    RHIC Research with p-p (100x100 GeV)

    AGS 25 GeV/c Protons (HEP, NP & Other)

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    NSRL 25 (NASA Radiobiology)

    Shutdown (AGS/RHIC)

    C-A Operations-FY03-04

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2003

    12 Mar 03

    U.S. Department of EnergyBrookhaven Science Associates

    Concurrent with RHIC operations

    No BAF/SEB/FEB operation

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2004

    Commissioning

    Jun

    May

    Oct

    with additional funds

    Jul

    Sep

    Aug

    subject to funding etc.

    NSRL Project Complete

    500 hrs NSRL, schedule to be determined

    29 weeks

    26 weeks, FY04presidential budget

    150 hrs NSRL initial run

    RHIC-AGS FY03-04, 3-10-03

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC Research with colliding beams

    RHIC Research with d-Au (100x100 GeV/n)

    RHIC Research with p-p (100x100 GeV)

    AGS 25 GeV/c Protons (HEP, NP & Other)

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    NSRL 25 (NASA Radiobiology)

    Shutdown (AGS/RHIC)

    C-A Operations-FY03-04

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2003

    10 Mar 03

    U.S. Department of EnergyBrookhaven Science Associates

    Concurrent with RHIC operations

    No BAF/SEB/FEB operation

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2004

    Commissioning

    Jun

    May

    Oct

    with additional funds

    Jul

    Sep

    Aug

    subject to funding etc.

    NSRL Project Complete

    500 hrs NSRL, schedule to be determined

    29 weeks, FY03presidential budget

    25 weeks, FY04presidential budget

    100 hrs NSRL initial run

    RHIC-AGS FY03-04, 7-15-02

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC Research with colliding beams

    AGS 25 GeV/c Protons (FEB-HEP,E962)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (SEB-HEP,E952)

    AGS 25 GeV/c Protons (SEB-NP,E930)

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    BAF 25 (NASA Radiobiology)

    Shutdown (AGS/RHIC)

    C-A Operations-FY03-04

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2003

    15 July 02

    to be determined

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    Concurrent with RHIC operations

    No BAF/SEB/FEB operation

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2004

    Commissioning

    Jun

    May

    Oct

    As Required

    Pulse on demand

    Jul

    Sep

    Aug

    subject to funding etc. AGS fixed target experiments (FEB and SEB)are contingent upon restoration of operations funds, currently no such funds are included in the FY 2003 presidential budget request

    ?

    BAF Project Complete, followed by 100 hr initial run

    500 hrs BAF, schedule to be determined

    29 weekspresidential budget

    37 weeks optimumRHIC schedule

    RHIC-AGS FY01-02, 6-19-02 )

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    BLIP

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E913/E927/953)

    AGS 25 GeV/c Protons (FEB-NNSA,E955/P963)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    19 June 02

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    FY 2002

    AGS cycle on demand

    Jun

    Aug

    Jul

    Sep

    Commissioning/tests

    agreement with NYPAto reduce BNL powerto < 31 MW15 June-15 Sep

    pending funding

    RHIC-AGS FY03-04, 6-19-02

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Cryo Standby(or off)

    RHIC Systems Test (no colliding beams)

    RHIC Research with colliding beams

    AGS 25 GeV/c Protons (FEB-HEP,E962)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    BAF 25 (NASA Radiobiology)

    Shutdown (AGS/RHIC)

    C-A Operations-FY03-04

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2003

    19 Jun 02

    to be determined

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    Concurrent with RHIC operations

    No BAF/SEB/FEB operation

    setup/ramp up luminosity

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2004

    Commissioning

    Jun

    May

    Oct

    As Required

    Pulse on demand

    Jul

    Sep

    Aug

    subject to funding etc. AGS fixed target experiments (FEB and SEB)are contingent upon restoration of operations funds, currently no such funds are included in the FY 2003 presidential budget request

    ?

    BAF Project Complete, followed by 100 hr initial run

    500 hrs BAF, schedule to be determined

    29 weekspresidential budget

    37 weeks optimumRHIC schedule

    RHIC-AGS FY01-02, 5-13-02

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    BLIP

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E913/E927)

    AGS 25 GeV/c Protons (FEB-DP,E955/P963)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    BAF Booster extraction commissioning

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    13 May 02

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    FY 2002

    AGS cycle on demand

    Jun

    Aug

    Jul

    Sep

    Commissioning/tests

    agreement with NYPAto reduce BNL powerto < 31 MW15 June-15 Sep

    probable extension

    7 June

    pending funding

    17 May

    RHIC-AGS FY01-02, 5-7-02

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    BLIP

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E913/E927)

    AGS 25 GeV/c Protons (FEB-DP,E955/P963)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    BAF Booster extraction commissioning

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    7 May 02

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    FY 2002

    AGS cycle on demand

    Jun

    Aug

    Jul

    Sep

    Commissioning/tests

    agreement with NYPAto reduce BNL powerto < 31 MW15 June-15 Sep

    probable extensions

    7 June

    pending funding

    17 May

    RHIC-AGS FY01-02, 2-21-02

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E913/E927)

    AGS 25 GeV/c Protons (FEB-DP,E955/963)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    BAF Booster extraction commissioning

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    21 Feb 02

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    FY 2002

    AGS cycle on demand

    Jun

    Aug

    Jul

    Sep

    Commissioning/tests

    9~19 Apr

    agreement with NYPAto reduce BNL powerto < 31 MW15 June-15 Sep

    possible extension (1-2 weeks?)is so, the schedule slips accordingly

    RHIC-AGS FY03-04, 3-4-02

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)

    RHIC Cryo Standby

    RHIC Research with colliding HI/pp beams

    RHIC Research with colliding pp beams

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    AGS 25 GeV/c Protons (FEB-HEP,E962)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (FEB-NNSA,P963)

    AGS 25 GeV/c Protons (SEB - NSF, RSVP)

    BAF 25 (NASA Radiobiology)

    Shutdown (AGS/RHIC)

    C-A Operations-FY03-04

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2003

    4 Mar 02

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    Concurrent with RHIC operations

    BAF/SEB/FEB operation blackout

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    FY 2004

    Commissioning

    Jun

    May

    Oct

    As Required

    Pulse on demand

    Jul

    29 weekspresidential budget

    37 weeks optimumRHIC schedule

    Sep

    Aug

    600 hrs BAF in 30 weeks

    subject to funding etc. AGS fixed target experiments (FEB and SEB)are contingent upon restoration of operations funds, currently no such funds are included in the FY 2003 presidential budget request

    available for BAF operationsif $'s made available

    ?

    ?

    BAF Project Complete

    ?

    RHIC-AGS FY01-02, 2-14-02

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E913/E927)

    AGS 25 GeV/c Protons (FEB-DP,E955/963)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    BAF Booster extraction commissioning

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    14 Feb 02

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Oct

    FY 2002

    AGS cycle on demand

    Jun

    Aug

    Jul

    Sep

    Commissioning/tests

    9-19 Apr

    agreement with NYPAto reduce BNL powerto < 31 MW15 June-15 Sep

    fixed at 5 months for BAFBooster work

    possible extension (1-2-3 weeks?)is so, the schedule slips accordingly

    RHIC-AGS FY01-02, 10-22-01

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E927/953/958)

    AGS 25 GeV/c Protons (FEB-DP,E955)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    22 Oct 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    AGS cycle on demand

    ~Current RHIC Budget Limit

    ?

    SEB ends when AGS pp studies begin

    ?

    ?

    ?

    8 Nov

    26 Nov

    26-29 Nov

    ~20 Dec

    ~24 Jan

    RISK Zone

    NOT FOR DISTRIBUTION, FOR DISCUSSION ONLY

    RHIC-AGS FY01-02, 10-3-01

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E927/953/958)

    AGS 25 GeV/c Protons (FEB-DP,E955)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    3 Oct 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    AGS cycle on demand

    ~Current RHIC Budget Limit

    ?

    SEB ends when AGS pp studies begin

    ?

    ?

    ?

    8 Nov

    26 Nov

    26-29 Nov

    ~20 Dec

    ~24 Jan

    RISK Zone

    Preliminary schedule, subject to funding and other issues

    RHIC-AGS FY01-02, 8-21-01

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E927/953/958)

    AGS 25 GeV/c Protons (FEB-DP,E955)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    21 Aug 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    AGS cycle on demand

    ~Current RHIC Budget Limit

    ?

    SEB ends when AGS pp studies begin

    pp start date to be determined

    ?

    ?

    ?

    RHIC-AGS FY01-02, 8-6-01

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E927/953/958)

    AGS 25 GeV/c Protons (FEB-DP,E955)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    6 Aug 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    AGS cycle on demand

    ~Current RHIC Budget Limit

    ?

    SEB ends when AGS pp studies begin

    pp start date to be determined

    ?

    ?

    ?

    RHIC-AGS FY01-02, 7-17-01

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E927/953/958)

    AGS 25 GeV/c Protons (FEB-DP,E955)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    18 July 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    AGS cycle on demand

    ~Current RHIC Budget Limit

    ?

    SEB ends when AGS pp studies begin

    pp start date to be determined

    ?

    ?

    ?

    RHIC-AGS FY01-02, 6-29-01

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E927/953/958)

    AGS 25 GeV/c Protons (FEB-DP,E955)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    29 June 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    AGS cycle on demand

    ~Current RHIC Budget Limit

    ?

    SEB ends when AGS pp studies begin

    pp start date to be determined

    ?

    ?

    ?

    RHIC-AGS FY01-02, 6-8-01

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fixed Target Experiments

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E927/953/958)

    AGS 25 GeV/c Protons (FEB-DP,E955)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    8 June 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    AGS cycle on demand

    ~Current RHIC Budget Limit

    ?

    SEB ends when AGS pp studies begin

    pp start date to be determined

    FY 2002 SEB/FEB schedule to be determined

    RHIC-AGS FY01-02, 6-7-01

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E927/953/958)

    AGS 25 GeV/c Protons (FEB-DP,E955)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    7 June 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    AGS cycle on demand

    ~Current RHIC Budget Limit

    ?

    ?

    ?

    SEB ends when AGS pp studies begin

    pp start date to be determined

    RHIC-AGS FY01-02 detailed

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown/Warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)

    AGS 25 GeV/c Protons (FEB-HEP,E821)

    AGS 25 GeV/c Protons (SEB-HEP,E949)

    AGS 25 GeV/c Protons (FEB-HEP,E951)

    AGS 25 GeV/c Protons (SEB-NP,E930/931)

    AGS 25 GeV/c Protons (SEB-NP,E927/953/958)

    AGS 25 GeV/c Protons (FEB-DP,E955)

    AGS 25 GeV/c Protons (FEB-BES,E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    1 May 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    AGS cycle on demand

    Current RHIC Budget Limit

    ?

    ?

    ?

    ?

    RHIC-AGS FY01-02 fwp

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-HEP/NP)

    AGS 25 GeV/c Protons (FEB-E955)

    AGS 25 GeV/c Protons (FEB-E951/E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    22 Feb 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    C-Line Only

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    End Date To Be Determined

    C-AD FY00-01 Run (FWP)

    AGS-Booster-Tandem Startup

    RHIC Maintenance

    RHIC Cryo Cooldow/tests/warmup

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Studies/Polarized Beam Commissioning

    RHIC Research with colliding beams

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS Protons (FEB-955,956,951)

    AGS 25 GeV/c Protons (SEB-HE/NP)

    Shutdown

    C-A Operations-FY00-01

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Schedule - As Run/planned

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    FY 2000

    12 Jan 01

    RHIC Shield Walls Up

    standby

    U.S. Department of EnergyBrookhaven Science Associates

    g=30 Au beam collisins observed

    g=70 Au beam collisins observed

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    RHIC-AGS FY01 post PAC (2)

    http://server.c-ad.bnl.gov/esfd

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-HEP/NP)

    AGS 25 GeV/c Protons (FEB-E955)

    AGS 25 GeV/c Protons (FEB-E951/E956)

    Shutdown

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    11 Jan 01

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    C-Line Only

    setup

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    FY 2002

    End Date To Be Determined

    RHIC-AGS FY01 post PAC

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding HI beams

    RHIC Research with colliding pp beams

    AGS Polarized Proton Studies (No SEB)

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-E949/E930/E931)

    AGS 25 GeV/c Protons (FEB-E955)

    AGS 25 GeV/c Protons (FEB-E951/E956)

    Shutdown

    C-A Operations-FY01

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    FY 2001

    4 Dec 00

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    C-Line Only

    setup

    RHIC-AGS FY01-02 (2)

    PLAN A

    RHIC Cryo Cooldow/Operation/Warmup

    RHIC Research with HI beams

    RHIC Research with polarized protons

    Shutdown(RHIC Experiments)

    PLAN B

    RHIC Cryo Cooldow/Operation/Warmup

    RHIC Research with HI beams

    RHIC Research with polarized protons

    Shutdown (RHIC Experiments)

    PLAN C

    RHIC Cryo Cooldow/Operation/Warmup

    RHIC Research with HI beams

    RHIC Research with polarized protons

    Shutdown (RHIC Experiments)

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    for discussion only

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    28 Nov 00

    FY 2002

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    RHIC-AGS FY01-02

    PLAN A

    RHIC Cryo Cooldow/Operation

    RHIC Research with HI beams

    RHIC Research with polarized protons

    Shutdown(RHIC Experiments)

    PLAN B

    RHIC Cryo Cooldow/Operation

    RHIC Research with HI beams

    RHIC Research with polarized protons

    Shutdown (RHIC Experiments)

    C-A Operations-FY01-02

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    for discussion only

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    27 Nov 00

    U.S. Department of EnergyBrookhaven Science Associates

    FY 2002

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    RHIC-AGS FY01 (7)

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding beams

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-E949/E930/E931)

    AGS 25 GeV/c Protons (FEB-E955)

    AGS 25 GeV/c Protons (FEB-E951/E956)

    Shutdown

    C-A Operations-FY01

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    FY 2001

    28 Nov 00

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    End g-2 start SEB??

    RHIC-AGS FY01 (power)

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding beams

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-E949/E930/E931)

    AGS 25 GeV/c Protons (FEB-E933')

    AGS 25 GeV/c Protons (FEB-E951/E938)

    Shutdown

    C-A Operations-FY01

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    FY 2001

    9 Sep 00

    U.S. Department of EnergyBrookhaven Science Associates

    DRAFT

    ?

    ?

    g-2 cryo startup

    proposed

    subject to conditions

    concurrent with RHIC operations

    6 MW

    15 MW

    12 MW

    6 MW

    RHIC-AGS FY01 (6)

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding beams

    AGS Fe 0.6-1 GeV/n (SEB-NASA, E957)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-E949/E930/E931)

    AGS 25 GeV/c Protons (FEB-E955)

    AGS 25 GeV/c Protons (FEB-E951/E956)

    Shutdown

    C-A Operations-FY01

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    FY 2001

    14 Nov 00

    U.S. Department of EnergyBrookhaven Science Associates

    g-2 cryo startup

    concurrent with RHIC operations

    to be determined

    RHIC-AGS FY01 (5)

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding beams

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-E949/E930/E931)

    AGS 25 GeV/c Protons (FEB-E955)

    AGS 25 GeV/c Protons (FEB-E951/E938)

    Shutdown

    C-A Operations-FY01

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    FY 2001

    9 Sep 00

    U.S. Department of EnergyBrookhaven Science Associates

    DRAFT

    ?

    ?

    g-2 cryo startup

    subject to conditions

    concurrent with RHIC operations

    RHIC-AGS FY01 (4)

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding beams

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-E949/E930/E931)

    AGS 25 GeV/c Protons (FEB-E933')

    AGS 25 GeV/c Protons (FEB-E951/E938)

    Shutdown

    C-A Operations-FY01

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    FY 2001

    27 Jul 00

    U.S. Department of EnergyBrookhaven Science Associates

    DRAFT

    ?

    ?

    g-2 cryo startup

    to be proposed

    subject to conditions

    concurrent with RHIC operations

    RHIC-AGS FY01-03-other (2)

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding beams

    RHIC Research with polarized protons

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-E949/E930/E931)

    AGS 25 GeV/c Protons (FEB-E933)

    AGS 25 GeV/c Protons (FEB-E951/E938)

    Shutdown

    C-A Operations-FY01-03

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    FY 2001

    25 Jul 00

    U.S. Department of EnergyBrookhaven Science Associates

    DRAFT- No PHENIX Consideration

    FY 2002

    FY 2003

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    BAF Construction in Booster

    RHIC-AGS FY01 (3)

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)As Required

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding beams

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-E949/E930/E931)

    AGS 25 GeV/c Protons (FEB-E933)

    AGS 25 GeV/c Protons (FEB-E951/E938)

    Shutdown

    C-A Operations-FY01

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    FY 2001

    19 Jul 00

    U.S. Department of EnergyBrookhaven Science Associates

    OR

    OR

    OR

    DRAFT

    RHIC-AGS FY01 (2)

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding beams

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-E949/E930/E931)

    AGS 25 GeV/c Protons (FEB-E933)

    AGS 25 GeV/c Protons (FEB-E951/E938)

    Shutdown

    AGS-Booster-Tandem Startup

    C-A Operations-FY01

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    FY 2001

    20 Mar 00

    depends on $'s

    standby

    U.S. Department of EnergyBrookhaven Science Associates

    RHIC-AGS FY01

    AGS-Booster-Tandem Startup

    RHIC Cryo Cooldown

    RHIC Cryo Operation

    RHIC Systems Test (Ramping etc, no beam)

    RHIC Cryo Standby(or off)

    RHIC Startup with beams

    RHIC Research with colliding beams

    AGS Fe 0.6-1 GeV/n (SEB-NASA)

    AGS 25 GeV/c Protons (FEB-E821)

    AGS 25 GeV/c Protons (SEB-E949/E930/E931)

    AGS 25 GeV/c Protons (FEB-E933)

    AGS 25 GeV/c Protons (FEB-E951/E938)

    Shutdown

    AGS-Booster-Tandem Startup

    C-A Operations-FY01

    Program Element

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    Preliminary schedule, subject to funding and other issues

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    FY 2001

    10 Mar 00

  • As of 20 Feb

    Chart6

    0.37655112180.0397867621

    0.375582190.0388783886

    0.33724882550.039241738

    0.36637733790.0387572721

    0.36492394010.0385755974

    0.36559008080.0400289951

    0.36801241030.0399684369

    0.36722515320.0749710982

    0.72706220140.0388783886

    2.05431709620.0385755974

    2.09246878590.0386967139

    1.92605474880.0391206215

    1.46605437550.0396050874

    1.56016187690.0381516897

    1.37043291830.0405740192

    1.29091995220.0399684369

    1.28837650630.038212248

    1.01919513980.0396050874

    1.03996661540.0393628545

    1.01695448510.0389389468

    1.03778651880.0386967139

    1.04826309390.0395445292

    0.82389482340.0393628545

    0.36286496010.0389389468

    0.36425779950.0395445292

    0.3669223620.2614904702

    0.36595343020.4231809648

    0.3643789160.4036812123

    0.36480282370.6445213234

    1.10343164841.8062099965

    2.17240565962.024461885

    4.96153683223.1234727821

    6.56312054365.7893073828

    6.91326827385.9448814953

    7.40251827586.7308063037

    6.93276802637.9341590443

    6.79318128857.4907516281

    7.20485618816.1654345969

    7.87184461776.4750083078

    8.05376156366.4622305197

    7.894130049238758

    7.481667892438759

    6.884260877938760

    6.601877815738761

    6.202617354838762

    6.255605392238763

    6.385078904338764

    6.467014620438765

    6.414510207838766

    6.461140471438767

    6.473857701338768

    6.425289574138769

    6.381869317738770

    6.366790737138771

    6.319131404138772

    6.316587958138773

    6.313681162738774

    6.221148175538775

    6.112567255438776

    6.122680060538777

    6.126556208338778

    6.117411914438779

    6.15883374938780

    6.110508275338781

    6.113536187238782

    6.114323444338783

    6.108509853538784

    6.118441404438785

    6.12698011638786

    6.135094919838787

    6.105239708638788

    6.119713127438789

    6.119046986838790

    6.095005366538791

    6.115292376138792

    6.123225505238793

    6.110447717138794

    6.096095414738795

    6.110326600638796

    6.106814222838797

    6.118017496838798

    6.124376111738799

    6.125890067738800

    6.137940736438801

    6.14115032338802

    6.131279330338803

    6.135639523438804

    6.141453534838805

    6.140060274738806

    6.14139255638807

    6.361824541138808

    5.905215849638809

    6.155684720638810

    6.20776480538811

    6.137698503538812

    6.142482604338813

    6.143088607238814

    6.156411419538815

    6.150294616938816

    6.13121877238817

    6.134488916938818

    6.143875864338819

    6.164102315638820

    6.142361908338821

    6.120924292238822

    6.116503540838823

    6.117411914438824

    6.144965912538825

    6.081319204838826

    6.12698011638827

    6.079684132338828

    6.098820535438829

    6.101424539738830

    6.100213374938831

    6.113051721338832

    6.107540921738833

    6.114626235538834

    6.126192858938835

    6.122377689938836

    6.116382424438837

    6.124800019438838

    6.127827510738839

    6.122680060538840

    6.127040253738841

    6.13273272838842

    6.133096077438843

    6.132066587438844

    6.128009185538845

    6.120136614638846

    6.099062347938847

    6.122680060538848

    6.118319867438849

    6.119773265138850

    6.110628