CO-OP FINAL PRESENTATION Scott Rice September, 2014

Upload: scott-rice

Post on 12-Feb-2017

206 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Rice Co-Op Presentation

CO-OP FINAL PRESENTATION Scott RiceSeptember, 2014

Page 2: Rice Co-Op Presentation

INTRODUCTION

• Purpose:– To review with leaders the projects, tasks and support I provided

during my co-op period (start date to end date)– To share what I have learned from my experiences– To outline how this experience has shaped my future goals

• Objective/Desired outcome:– To enable leaders to have a better understanding of the co-op

experience

Page 3: Rice Co-Op Presentation

My Background

• 27 year old Air Force Veteran• UC Davis• Mechanical Engineering• Graduating June 2015

Page 4: Rice Co-Op Presentation

Projects, Tasks and Support Provided

• ME2 Planning and Scheduling• ME2 Parts Inventory Management• Uninterruptible Power Supply Site Agreement• Root Cause Investigation for Rupture Disc Failure TW 208766• RTOS Caustic Tank Improvements• RTOS FMECA

Page 5: Rice Co-Op Presentation

ME2 Planning and Scheduling

• Supported team with the revision of ~300 Job Plans– Updated duration allows for accurate maintenance scheduling– MAXIMO experience

Job Plan Description Duration Supervisor

VVM-LCT006S OROS\PM\MISSION CONTROLS\LCT6\SEMI ANNUAL 0:00OROSVVM-LCT006PTCS OROS\PM\TABLET CONVEYOR\LCT6\SEMI ANNUAL 0:00OROSVVM-TEK TMG\PM\TEKMAR\5 YEAR 0:00TMGVVM-SPT25S SEMI ANNUAL MAINTENANCE FOR MIXING TANK 0:00  VVM-SPT25A ANNUAL MAINTENANCE FOR MIXING TANK 0:00  VVM-HF5Y FAC\HEPAFILTERS\PM\5 YEAR 0:00  VVM-SP6Y PM\FAC\SOLAR PANELS\ 6YEARS 0:00FACVVM-MST FAC\PM\MST\SEMI ANNUAL 0:00FACVVM-SPTS OROS\SOLUTION PREPARATION TANK\PM\

SEMI ANNUAL0:00OROS

VVSPTT OROS\SOLUTION PREPARATION TANK\PM\TRI ANNUAL 0:00OROS

Page 6: Rice Co-Op Presentation

ME2 Parts Inventory Management

• Lead parts inventory management sub-pillar – Lead weekly team meetings– Parts categorization reduced managed inventory by 78%

• Cycle counting reduction saves 780 hr/yr, $23,375.10

Category # Parts Total OH OH Value # Issues % Inventory % Inventory Issues % Total QuantityA 95 6249 $62,045.94 46040 5.0 84.8 0.79B 569 7841 $345,532.75 6199 30.0 11.4 4.7C 1232 5387 $603,122.66 2044 65.0 3.8 10.3

Total Inventory

1896 19477 $1,010,701.35 54283 100 100 15.8

Insurance 10109 68098 $3,125,989.51 N/A N/A N/A 84.2Total Parts 12005 87575 $4,136,690.86 54283 N/A 100 100

Page 7: Rice Co-Op Presentation

ME2 Parts Inventory Management

• Created Spare Parts Procedure– Greatest improvement across maintenance pillar – 14% increase

Page 8: Rice Co-Op Presentation

ME2 Parts Inventory Management

• Consolidated facilities spares into controlled parts crib– V2-2804 Facilities Maintenance Parts Room

Page 9: Rice Co-Op Presentation

V2-2804 Before

Page 10: Rice Co-Op Presentation

V2-2804 Before

Page 11: Rice Co-Op Presentation

V2-2804 After

Page 12: Rice Co-Op Presentation

V2-2804 After

Page 13: Rice Co-Op Presentation

ME2 Parts Inventory Management• Worked with Alison Ang to develop mass data entry method

– 500+ parts entered into MAXIMO directly from Excel spreadsheet

• Developed algorithm for automating stocking levels– Given basic asset criteria algorithm delivers critical order values

• Developed method for asset-parts assignment in MAXIMO– Bill of Materials with in use quantities and historical parts issue

Page 14: Rice Co-Op Presentation

Uninterruptible Power Supply Site Agreement

• Site assessment– Determination of critical and failing units

• Project management and competitive bidding experience– Determination of coverage levels and consolidation projects

CMMS # MANUFACTURER SERIAL # MODEL # LOCATION RATING CRITICALITY BATTERIES28041 APC ED0451000289 Symmetra SYPM4KP V3/190 4kVA, 208V 1 1

19860 APC ED0526000002Symmetra

SYA16K16RMP V2/1210 16kVA, 208/240V, sp 2 427864 APC JS0835007359 Smart SUA3000RMXL3U V4/TRAA 3kVA, 120V 2 127866 APC QS0049210759 Smart SU1400 NET V2/1216 30kVA 2 427861 APC IS0385001824 Smart SUA5000RMT5U V2/106 5kVA, 208V 1 2

28039 APC JS0749005878Smart

SURTA2200RMXL2U V3/136 2.2kVA, 120V 2 1

28042 APC JS0749005779Smart

SURTA2200RMXL2U V3/136 2.2kVA, 120V 2 1

21777 Liebert0509002004BU6L

4 N108S0412600 V2/Mezzanine 16kVA, 208/240V 2 4

Page 15: Rice Co-Op Presentation

Root Cause Investigation TW 208766

• Rupture disc failure on Loop 2 of PWS• Lead investigation to determine mode of failure

– Incorrect installation found to have broken electrical connection

• Facilitated mechanic training to prevent future failures

Page 16: Rice Co-Op Presentation

RTOS Caustic Tank Improvements• Financial project management experience

– SLT capital appropriation request

Page 17: Rice Co-Op Presentation

RTOS Failure Modes Effects and Criticality Assessment

• Built system function groups and failure modes for discussion• Facilitated analysis through failure effects• Made recommendations based on RCM decision tree

Page 18: Rice Co-Op Presentation

What I have learned from my experiences

• Parts management and CMMS challenges• Abatement systems• Technical writing• Project management• Managing school and work• Family challenges

Page 19: Rice Co-Op Presentation

How this experience has shaped my future goals

• Impact of pharmaceutical industry• J&J Operations nationwide• Next for me

Page 20: Rice Co-Op Presentation

Feedback and Recommendations

• Autonomy and direction during projects• Limited technical exposure• Co-op mentoring