risk assessment flinders island waste management · 2017-04-09 · june 2016. furneaux group waste...
TRANSCRIPT
Date: 12-October-2016
Rev: 0
Physical Site: Flinders Island, Tasmania
Operation: Waste Management
Client Flinders Council
Area: Furneaux Group, Tasmania
Risk Assessment Title / Description: Current Operations Risk Assesssment
Risk Assessment Scope:
(Boundary of assessment/Subject) Safety and Environmental considerations risk assessment
Risk Assessment type:
(Work place risk assessment, Construction risk
assessment, Corporate risk assessment)
Risk Assessment in compliance with AS/NZS ISO 31000: 2009 Risk
Management Principles and Guidelines.
Other References:
Documents/Photographs:
Review of Environment Management& Remedial Site Works
June 2016.
Furneaux Group Waste Management Strategy 2014-2016.
Landfill Sustainability Guide 2004.
Risk Assessment Team Details:
Name Position Company
Adrian Mythen Principal QC³Consulting
Approved By:
Date:
Signature:
FLINDERS ISLAND WASTE MANAGEMENT
RISK ASSESSMENT
Annexure 10 - C1 - October 2016
12-Oct-16
Unauthorised personel entering site
Damage to plant and
equipment
Accidents to personnel
Unauthorised personel
entering siteMajor Possible High
Area fenced with locked gate and
signageModerate Rare Low
Monitor for
unauthorised access
Limited access - unauthorised
dumping
Uncotrolled waste
management
Unauthorised dumping
through limited access to waste
management facility
Moderate Possible Moderate
Facility openat regular times.
Opening times well advertised.
Transfer stations at Killiecrankie &
Lady Barron
Minor Rare Low
Increased opening times
to account for removal
of bins at Whitemark
facility.
Non compliance with waste
management hierarchyPoor waste management
Poor waste management
Poor community consultation
and engagement with waste
management hierarchy
Moderate Likely High
Develop and comply with Operations
Management Plan.
Comply with Waste Management
Hierarchy
Community engagement including
advice and guidance
Community consultation
Moderate Rare Low
DevelopOperations
Management Paln
Design and implement
Community
Consultation
Non compliance with waste
management hierarchyPoor waste management
Poor waste management
Poor community consultation
and engagement with waste
management hierarchy
Moderate Likely High
Develop and comply with Operations
Management Plan.
Comply with Waste Management
Hierarchy
Community engagement including
advice and guidance
Community consultation
Minor Rare Low
DevelopOperations
Management Paln
Design and implement
Community
Consultation
DiseaseIllness to visitors and
employees
Poor waste managementMajor Possible High
Develop and comply with
Operations Management plan and
EMP.
Minimise presence and transfer of
pathogens
Major Rare Moderate
Consideration in
Operations
Management Plan to be
developed
Uncontrolled access to waste
management sitesAccidents and Incidents
Poor traffic controls, signage
and managementMajor Possible High
Develop and comply with
Operations Management Plan.
Ensure traffic guidance scheme
maintained
Minor Rare Low
Consideration in
Operations
Management Plan to be
developed
Uncontrolled access to waste
management sites
Unauthorised dumping
Unauthorised access
Poor community
engagement
Poor site controlsand
informationModerate Possible Moderate
Develop and comply with
Operations Management Plan.
Ensure direction signage installed
and maintained
Minor Rare Low
Consideration in
Operations
Management Plan to be
developed
Exposure to poor safety
managementAccidents and Incidents
Non compliance with Safety
Management PlanModerate Possible Moderate
Comply with Tasmanian Safety
legislation
Comply with Safety Management
Plan
Minor Rare Low Safety Management
Plan to be reviewed
Poor fire prevention and managementFire DammageNon compliance with fire
management planMajor Unlikely Moderate
Comply with Fire management
Plan
Comply with Operations
Management Plan
Moderate Rare Low Fire Management Plan
tobe reviewed
Waste minimisation
Assessment Date:
Task/Activity
1.General
Signage
FLINDERS ISLAND WASTE MANAGEMENT RISK
ASSESSMENT
CauseHazard
Waste Management
Facility access
Resource conservation
Final
Risk
Level
CommentsRisk Management StrategyUnwanted Event
Consequence
Consequence
Level
Likelihood
LevelResidual
Risk Level
Waste Management
Facility Site Security
Health Impacts
Consequence
Level
Likelihood
Level
Traffic Management
Safety Management
Fire Management
Annexure 10 - C1 - October 2016
00-Jan-00
2. Environment
Non compliance with
legislation and specific
Environmental Protection
Notices
Compliance Breach
Fines & Penalties
Brand Damage
Management and operational
delivery practicesMajor Possible High
Manage facilities to compliance
Upgrade non conforming areas
Meet regulatory reporting
requirements
Continue monitoring and measuring
operations
Compley with
environmentalmanagement plam
Reviewand update EMP as required
Major Unlikely Moderate Improvement works
underway
Non compliance with Flinders
Council Environmental
Management Plan
Compliance Breach
Fines & Penalties
Brand Damage
Management and operational
delivery practicesMajor Possible High
Manage facilities to compliance
Upgrade non conforming areas
Meet regulatory reporting
requirements
Continue monitoring and measuring
operations
Compley with
environmentalmanagement plam
Reviewand update EMP as required
Major Unlikely Moderate Reviews completed
Permeable soils at waste
management facility
Ground water
contamination
Poor grade/subgrade
managementMajor Possible High
Groundwater monitoring utilising
existing three bores (Six monthly)Major Unlikely Moderate
Permeable soils at waste
management facility
Ground water
contamination
Poor grade/subgrade
managementModerate Possible Moderate
Minimise grade/subgrade
disturbanceModerate Rare Low
Permeable soils at waste
management facility
Ground water
contamination
Poor grade/subgrade
managementMinor Possible Moderate
1. Upgrade putrescible cell as per
D.Jolly report 29/03/2016.
2. Only use cellwhen integrity of
celllining is confirmed.
3. Reshape batters to optimise cell
functionality.
4. Monitor
Moderate Rare Low Works tobe undertaken
2016/2017
Permeable soils at waste
management facility
Ground water
contamination
Inadequate leachate
managementModerate Possible Moderate
Ensure operationalintegrity of
leachate managementMinor Rare Low
Works tobe undertaken
2016/2017
Permeable soils at waste
management facility
Ground water
contamination
Inadequate leachate
managementModerate Possible Moderate
1. Review leachate management
across site.
2. Ensure all leachate is captured
across site.
3. Ensure leachate system design fit
for purpose.
4. Reuse as irrigation where
practicable.
5. Evaporation
Minor Rare Low Works tobe undertaken
2016/2017
Uncontrolled surafce water
management
Waterways /land
contaminationInadequate drainage controls Moderate Possible Moderate
With respect to leachate
1. Review leachate management
across site.
2. Ensure all leachate is captured
across site.
3. Ensure leachate system design fit
for purpose.
4. Reuse as irrigation where
practicable.
5. Evaporation
Minor Rare Low Works tobe undertaken
2016/2017
Uncontrolled surafce water
management
Waterways /land
contaminationInadequate drainage controls Moderate Possible Moderate
1. Ensure good drainage channels
2. Ensure stormwater/surface water
captured and directed to storage
ponds (cut off drains/sediment
traps/ponds
3. Ensure storwater/leachayte
systems adequately capture and
manage all potential water
contaminants
Minor Rare Low Works tobe undertaken
2016/2017
Waterways/land
contamination
Waterways/land
contaminationPoorly managred controls Moderate Possible Moderate
Ensure operations and maintenance
plan compliance with regular
inspections and maintenance of
allwater management infrastructure
and processes
Minor Rare Low Works tobe undertaken
2016/2017
DustLand/water
contaminationDry roads, exposed soil Moderate Possible Moderate
Irrigate roads in dry periods if
practicable to do soMinor Rare Low
Managed as required
No adjacent properties
affected
No complaints
Wind blown debrisLand/water
contamination
Loose, unconstrained waste
materialModerate Possible Moderate
1. Contain all waste materials
2. Install wind barriers/fencing as
appropriate
Minor Rare Low Works tobe undertaken
2016/2017
Poor air quality Methane production
Waste decomposition
Poor waste controls and
management
Moderate Possible Moderate
Improve overall waste management
Low gas production
Climatic conditions promote dispersalMinor Rare Low
Managed as required
No adjacent properties
affected
No complaints
Poor air quality Unpleasant Odours
Waste decomposition
General odours generated
through storage of waste
Moderate Possible Moderate
Improve overall waste management
Low gas production
Climatic conditions promote dispersalMinor Rare Low
Managed as required
No adjacent properties
affected
No complaints
Mis-management of
hazardous materials
Environmental
impact/damage
Poor handling and storage of
hazardous materialsMajor Possible High
Comply with waste facility
management requirements
Comply with relevant Australian
Standards for hazardous materials.
Comply with Landfill Sustainability
Guidelines (2004)
Minor Rare Low Operations plan to be
developed
Poor land management and
land rehabilitation
Non sustainable use of
land
Non compliance with site
rehabilitation plansModerate Possible Moderate Rehabilitation Plan Minor Rare Low
Rehabilitation plan to be
developed
Poor management of
Controlled WastesEnvironmental Damage
Non compliance with legislative
requirementsMajor Possible High
Comply with requirements of
Operations Management Plan and
EnvironmentalManagement Plan
Moderate Rare Low Management Plans to
be developed
Containment of
undesirable/invasive species
plus controlled weeds.
Spread of disease
Poor management
Poor weed suppressant and
management
Moderate Possible Moderate Comply with Environmental
Management PlanMinor Rare Low
Management Plans to
be developed
Containment of disease
vectors and pathogensSpread of disease
Poor control of fauna
Inadequate site securityModerate Possible Moderate
Comply with Environmental
Management PlanMinor Rare Low
Management Plans to
be developed
3. Stakeholder Engagement
Not engaging with key
stakeholders including local
community
Disengaged community
members
Proceeding with change to
meet waste strategy objectives
with stakeholder engagement.
Major Possible High
Flinders Council through its Waste
Management Strategy to work with
and involve stakeholders to ensure
objective "1. Waste management
systems which provide the best
outcomes both environmentally,
socially and economically"
Develop stakeholder engagement
plan
Moderate Rare Low Engagement plan to be
developed
Not engaging with key
stakeholders including local
community
Disengaged community
members
Not providing key stakeholders
including interested
community members ability to
participate in
offering/proposing solutions to
some aspects of waste
management.
Major Possible High
Flinders Island Council to identify and
engage with interested parties.
Develop stakeholder engagement
plan.
Moderate Rare Low Engagement plan to be
developed
Consequence
Level
Likelihood
LevelFinal
Risk
Level
Comments
FLINDERS ISLAND WASTE MANAGEMENT RISK
ASSESSMENTAssessment Date:
Task/Activity Hazard Unwanted Event
Consequence
Cause Consequence
Level
Likelihood
LevelResidual
Risk Level
Risk Management Strategy
Surface Water
Management
Ground Water
Management
Ground Water
Management
Surface Water
Management
Ground Water
Management
Ground Water
Management
Ground Water
Management
Stakeholder
Engagement
Stakeholder
Engagement
Fauna
Air Quality
Air Quality
Controlled Wastes
Environmental
Compliance
Environmental
Compliance
Hazardous Materials
Management
Land Management
All site water
management
Strong Winds
Strong Winds
Flora
Annexure 10 - C1 - October 2016
00-Jan-00
2. Environment Continued
Waterways/land
contamination
Waterways/land
contaminationPoorly managred controls Moderate Possible Moderate
Ensure operations and maintenance
plan compliance with regular
inspections and maintenance of
allwater management infrastructure
and processes
Minor Rare Low Works tobe undertaken
2016/2017
DustLand/water
contaminationDry roads, exposed soil Moderate Possible Moderate
Irrigate roads in dry periods if
practicable to do soMinor Rare Low
Managed as required
No adjacent properties
affected
No complaints
Wind blown debrisLand/water
contamination
Loose, unconstrained waste
materialModerate Possible Moderate
1. Contain all waste materials
2. Install wind barriers/fencing as
appropriate
Minor Rare Low Works tobe undertaken
2016/2017
Poor air quality Methane production
Waste decomposition
Poor waste controls and
management
Moderate Possible Moderate
Improve overall waste management
Low gas production
Climatic conditions promote dispersalMinor Rare Low
Managed as required
No adjacent properties
affected
No complaints
Poor air quality Unpleasant Odours
Waste decomposition
General odours generated
through storage of waste
Moderate Possible Moderate
Improve overall waste management
Low gas production
Climatic conditions promote dispersalMinor Rare Low
Managed as required
No adjacent properties
affected
No complaints
Mis-management of
hazardous materials
Environmental
impact/damage
Poor handling and storage of
hazardous materialsMajor Possible High
Comply with waste facility
management requirements
Comply with relevant Australian
Standards for hazardous materials.
Comply with Landfill Sustainability
Guidelines (2004)
Minor Rare Low Operations plan to be
developed
Poor land management and
land rehabilitation
Non sustainable use of
land
Non compliance with site
rehabilitation plansModerate Possible Moderate Rehabilitation Plan Minor Rare Low
Rehabilitation plan to be
developed
Poor management of
Controlled WastesEnvironmental Damage
Non compliance with legislative
requirementsMajor Possible High
Comply with requirements of
Operations Management Plan and
EnvironmentalManagement Plan
Moderate Rare Low Management Plans to
be developed
Containment of
undesirable/invasive species
plus controlled weeds.
Spread of disease
Poor management
Poor weed suppressant and
management
Moderate Possible Moderate Comply with Environmental
Management PlanMinor Rare Low
Management Plans to
be developed
Containment of disease
vectors and pathogensSpread of disease
Poor control of fauna
Inadequate site securityModerate Possible Moderate
Comply with Environmental
Management PlanMinor Rare Low
Management Plans to
be developed
3. Stakeholder Engagement
Not engaging with key
stakeholders including local
community
Disengaged community
members
Proceeding with change to
meet waste strategy objectives
with stakeholder engagement.
Major Possible High
Flinders Council through its Waste
Management Strategy to work with
and involve stakeholders to ensure
objective "1. Waste management
systems which provide the best
outcomes both environmentally,
socially and economically"
Develop stakeholder engagement
plan
Moderate Rare Low Engagement plan to be
developed
Not engaging with key
stakeholders including local
community
Disengaged community
members
Not providing key stakeholders
including interested
community members ability to
participate in
offering/proposing solutions to
some aspects of waste
management.
Major Possible High
Flinders Island Council to identify and
engage with interested parties.
Develop stakeholder engagement
plan.
Moderate Rare Low Engagement plan to be
developed
Likelihood
LevelFinal
Risk
Level
CommentsConsequence
Level
Likelihood
LevelResidual
Risk Level
Risk Management Strategy Consequence
Level
Assessment Date:
Task/Activity Hazard Unwanted Event
Consequence
Cause
FLINDERS ISLAND WASTE MANAGEMENT RISK
ASSESSMENT
Stakeholder
Engagement
Stakeholder
Engagement
Fauna
Air Quality
Air Quality
Controlled Wastes
Hazardous Materials
Management
Land Management
All site water
management
Strong Winds
Strong Winds
Flora
Annexure 10 - C1 - October 2016
RISK ASSESSMENT WORKBOOK
LIKELIHOOD AND CONSEQUENCE TABLES
Almost Certain
Likely
Possible
Unlikely
Rare
Insignificant
Minor
Moderate
Major
Severe
RISK MATRIX
Likelihood Insignificant Minor Moderate Major Severe
Almost Certain Moderate High Extreme Extreme Extreme
Likely Moderate Moderate High Extreme Extreme
Possible Low Moderate Moderate High Extreme
Unlikely Low Low Moderate Moderate High
Rare Low Low Low Moderate High
Risk Level Control Level
Extreme GM
High GM/Works Manager
Moderate Management Supervision
Low Procedural control
Insignificant Minor Moderate Major Severe
Health and safetyFirst-aid treatment Minor medical treatment injury Medical treatment injury, no disability Major Injury, and/or temporary disability Severe injury, irreversible disability to one or
more persons
Natural environment
Minor incidental impacts on flora and fauna in a
locally affected environmental setting.
Small reduction of the abundance or biomass
of flora and fauna. No changes to biodiversity
or ecological system.
Reduction of abundance or biomass of flora
and fauna. Limited impact to local biodiversity
without loss of pre-incident conditions.
Significant reduction of abundance or biomass
of flora and fauna. Impact to biodiversity and
ecological functioning. Recovery of ecological
systems to pre-incident conditions. Possible
prosecution.
Major reduction of abundance or biomass of
flora and fauna. Significant impact to
biodiversity and ecological functioning.
Eventual recovery of ecological systems, but
not necessarily to the same pre-incident
conditions. Prosecution likely.
Social/cultural heritage
Minor incidental impacts on social, cultural,
economic, recreational and/or aesthetic values
in local area.
Small change in quality of local social, cultural,
economic, recreational and/or aesthetic values
at local level. No impacts at regional level.
Change in quality of social, cultural, economic,
recreational and/or aesthetic values in local
area. Limited impacts felt at regional level.
Significant change in quality of social, cultural,
economic, recreational and/or aesthetic values
in local area. Limited impacts felt at regional
and state level.
Major change in quality of social, cultural,
economic, recreational and/or aesthetic values
in local area. Significant impacts felt at
regional and state levels. Limited impacts felt
at national level.
Community / Govt /
Reputation / Media
No stakeholder reaction. Minor irritation,
managed by business.
Stakeholder reaction simply managed.
Minimal short-term damage to corporate
reputation/brand - easily managed by
business.
Stakeholder reaction causing some (not
significant) disruption to business. Short-term
damage to corporate reputation/brand - can be
managed by business with possible external
assistance.
Stakeholder reaction causing significant
disruption to business. Significant damage to
corporate reputation/brand in short to medium
term. May require external assistance to
repair.
Extreme stakeholder reaction causing loss of
business control. Long-term damage to
corporate reputation/brand that will require
some level of external assistance to address.
Legal / Compliance
Low-level legal compliance issue dealt with in-
house. Negligible legal impact (contract or
tort).
Minor compliance breach. Operating licences
unaffected. Minor legal impact (contract or
tort) - $<$100K
Regulatory Compliance breach – no
prosecution. Breaches of operating licence
conditions - system changes needed.
Moderate legal impact (contract or tort) -
$100K<$<$10M
Regulatory compliance breach – possible
prosecution but not likely. Operating licences
restrictions on operations. Legal impact
(contract or tort) $10M<$<$50M.
Extreme regulatory compliance breach -
prosecution likely. Temporary suspension of
operating licences. Legal impact (contract or
tort) - $50M<$<$150M or loss of business
control.
Client Relationship
Minor project issues that can be managed
between client contact and PM with no lasting
effects to client relationship
Project issues that can be managed with the
aid of the Project Delivery Manager without
lasting negative perception by the client.
Project Issues that can be managed by the
Manager and the appropriate client contact
without any negative effects on reputation.
Project Issues that can be managed by the
Manager and the appropriate client contact
but has a minor negative effect on Flinders
Council's reputation.
Project issue that is managed by the Manager
and appropriate client contact. Moderate
negative effect on Flinders Council's
reputation.
Financial Negligible profit loss and/or out of budget
expense (< $1k)
Profit loss and/or out of budget expense ($1k
< $ $100k).
Profit loss and/or out of budget expense
(+$100K)
Profit loss and/or out of budget expense
(+$500k)
Profit loss and/or out of budget expense
(+$1M)
Strategic InitiativesInsignificant impact on the key business
strategies
Minor effect on the key business strategies Moderate effect on the key business
strategies
Threat to the sustainability of a key business
strategy
Devastation of a key business strategy
Project Cost Overrun< 1%, <$10k 1% to 5%, $10k to $50k 5% to 10%, $50k to $100k 10% to 50%, $100k to $1M 50% to 100%, $1M to $10M
Project Time Delays< 1 week 1 week to 1 month 1 to 3 months 3 to 6 months 6 to 12 months
Technical Compliance /
Quality
Refer to the associated cost and time impacts
resulting from technical or quality non-
compliance
Refer to the associated cost and time impacts
resulting from technical or quality non-
compliance
Refer to the associated cost and time impacts
resulting from technical or quality non-
compliance
Refer to the associated cost and time impacts
resulting from technical or quality non-
compliance
Refer to the associated cost and time impacts
resulting from technical or quality non-
compliance
Stakeholder Dissatisfied Staff / team member Client / Line Manager Residents / Land owners Local Government State Government
Undesirable
Tolerable but risk should be reduced if reasonably practicable
Likelihood Definitions (BASIC)
Consequence
Consequence Definitions(Detailed)
Broadly acceptable
Constant exposure to risk and there is a very high probability of an accident or incident occurring.
Frequent exposure to risk and there is a high probability of an accident or incident occurring.
Occasional exposure to risk and there is a possibility of an accident or incident occurring.
Infrequent exposure to risk and there is a low probability of accident or incident occurring.
Rare exposure to risk and an accident or incident is unlikely to occur.
No risk exposure to injury/accident/incident and/or no damage to vehicles/equipment/infrastructure
Consequence Definitions (BASIC)
Exposure to risk could cause minor injury and minor damage to vehicles, equipment and infrastructure
Exposure to risk could cause moderate injury and/or moderate damage to vehicles, equipment and infrastructure
Exposure to risk could cause significant injury and/or significant damage to vehicles, equipment and infrastructure
Exposure to risk could cause death and/or very serious injury and extreme damage to vehicles, equipment and infrastructure
Result
Unacceptable
Extreme Risk •threatens business sustainability •requires urgent attention
High Risk•poses significant threat to corporation business strategies and objectives •address immediately
Moderate Risk•poses moderate threat to corporation business strategies and objectives •address as soon as practicable
Low Risk•minimal threat to corporation business strategies and objectives.•attention as required
Annexure 10 - C1 - October 2016