Page 1: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PRESENTATIONon

Road Infrastructure

As on

3 June, 2019

ROAD CONSTRUCTION DEPARTMENT, BIHAR

Page 2: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

State Highways

STATUS Good Fair Bad Total

Length (Km) 3382.74 531.79 91.03 4005.56

%(Length wise)

84.45 13.28 2.27*

Length maintained under OPRMC - 3129.52 Km

Length under different ongoing schemes - 830.42 Km(under ADB, CMBD, CRF, NABARD, LWE, etc.)

* Stretches are missing link, under construction stretch and are to be maintained inOPRMC-II

Page 3: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Major District Roads

Length maintained under OPRMC - 10376.94 Km

Length under different ongoing schemes - 2401.60 Km(under CMBD, CRF, NABARD, LWE, etc.)

Good

(Km)

Fair

(Km)

Bad

(Km)

Total

(Km)

Length (Km) 9833.65 1754.45 1209.03 12797.13

% 76.84 13.71 9.45*

* Stretches are either under construction in different heads or are to be maintained inOPRMC-II

Page 4: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

NATIONAL HIGHWAYS

Status Good Fair Bad Total

NHs with RCD

Length (km) 1517.00 635.00 352.00 2504.00

% 60.58 25.36 14.06

NHs with

NHAI Length (km) 1332.00 764.00 317.00 2413

% 55.20 31.66 13.14

Page 5: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Output & Performance based Road Maintenance

Contract (OPRMC) Phase 2 at a Glance

Description Present Status

Road network length

covered13064.00 Kms

Total No. of packages 72

AA Amount 6654.77 Crores

Date of Start Feb ’ 2019

Contract Period 7 Years

Tender Invited 13064.00 Km

Tender Finalized11873.00 Km

Tender under finalization 1191.00 km

Page 6: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Present Road Condition

Total Length – 13064 Km

Road Length having excellent Riding Quality -9692 Km

Remaining length is in process of improvement under

Initial Rectification component.

Entire length is likely to be in Excellent Status by

October -2019

Page 7: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

FEATURES OF OPRMC PHASE-II

Maintenance period 7 years.

All roads Included in OPRMC-2 (13064 Km) :

Roads under construction.

Roads under DLP after construction.

Roads already under maintenance for 5 years under CMBD.

Provision of future inclusion on completion of any new road.

Page 8: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Surface renewal frequency 4 years

PM as per latest MORTH spec. (30 mm/ 40

mm BC)

Penal deduction for non compliance made more

severe & effective.

Separate Provision for Contingency &

Emergency Work under provisional sum.

Provisions for street lighting

Page 9: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Integrated software for contract management,

Online monitoring and PMU Tracking on the

anvil.

Risk & Cost clause introduced in the contract.

focus on road safety.

Provision of Road Safety Ambulance for each

Package.

Page 10: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

SURFACE ROUGHNESS INDEX CRITERIA

MORE STRINGENT:

Changed to 2500 From 3500mm/Km

after periodic maintenance Work.

Page 11: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

• Online OPRMC Monitoring System.• Tracking of PMU.

• Real Time video monitoring system (To be adopted).

• Third Party Videography of Roads at quarterly interval .(To

be adopted)

• Real time automatic defect identification system using AI. (To

be adopted).

• Mass Inspection Drive .

Quality control using latest testing Equipment such as

Automatic asphalt content tester, Reflect meter for

road marking and signages, laser profilometer for IRI

measurement.

Effective Monitoring System

Page 12: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PUBLIC GRIEVANCE REDRESSAL SYSTEM

Facility to file complaint through various modes

• Toll free No-18003456233,

• Whatsapp No.-9470001346,

• Email [email protected]

• URL -www.rcdbihar.in

Call recording and SMS integrated into RMPGRS. Voice

recording for improving quality of Grievance Handling.

Now complainants can also upload photographs of road

defects on WhatsApp number 9470001346.

Page 13: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PUBLIC GRIEVANCE REDRESSAL

STATUS

Description Total

Complaint

Disposal Pending Percent

disposal

OPRMC 23 23 0 100.00 %

RCD

(excluding

OPRMC)

516 335 181 64.92 %

Page 14: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

DEDICATED ROAD MAINTENANCE CELL.

• Manned by 1- CE , 3-SE, 6-EE

and 12 AE

• Call center running 8am to 8 pm.

• PMU control room for tracking .

Page 15: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

IR work under progress in Siwan – Hisua Road in Siwan

Page 16: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Shekhpura – Sahpur Road in

SheikhpuraIR work in progress

Page 17: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

IR work in progress IR work in progress

Page 18: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

IR work in Karanpur-Rajanpur

Road in SaharsaIR work under progress in Siwan

Page 19: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

IR work in progress

Page 20: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

THANK YOU

Page 21: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

NH WITH RCD/NHAI WHICH NEEDS

ATTENTION

Details

Page 22: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Road Network under RCD (in Km)

Category Total

Length

Single

lane

Intermediate

Lane

2-Lane More

than 2

lane

National

Highways

4917.19 508.085 584.20 1995.78 1829.13

% 10.33 11.88 40.59 37.20

State

Highways

4005.56 645.02 497.08 2741.42 122.05

% 16.10 12.41 68.44 3.05

Major District

Roads

12797.13 6792.11 4208.34 1618.57 178.11

% 53.08 32.89 12.65 1.39

Total 21719.90 7966.76 5289.79 6433.87 2029.49

Overall % 36.68 24.35 29.62 9.34

Page 23: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Sl. No. Name of Scheme Outlay (Crores)Expenditure

(Crores)

1 Training 1.7218 0.37297

2 Machine and equipment 0.2000 0.04343

3 State Plan (Bridge) 372.4584 353.36860

4 RIDF (NABARD) 1136.7100 1124.62180

5 State Plan (Major Roads) 1222.0000 1151.11390

6 Mukhya Mantri Setu Nirman Yojana 1.5000 0.86370

7 Central Road Fund (Central Share) 259.0000 237.37370

8 ADB (Externally Funded Scheme) 1500.0000 1500.00000

9 Indo-Nepal Border Road 1.3901 1.39004

10 Major Roads (SC Component) 944.7296 913.35620

11 Central Road Fund (State Share) 0.0001 0.00000

12 LWE (Central Share) 232.9450 232.94500

13 LWE (State Share) 152.0000 151.96330

Total 5824.655 5667.4126

Performance during 2018-19

% Expenditure – 97.30%

Page 24: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Sl. No. Name of Scheme Outlay (Crores)

1 Training 0.5000

2 State Plan (Road Sector) 1094.1600

3 State Plan (SC Component) 949.9100

4 Mukhya Mantri Setu Nirman Yojana 5.4300

5 State Plan (Bridge Sector) 300.0000

6 LWE (State Share) 180.0000

7 LWE (Central Share) 270.2100

8 Central Road Fund (Central Share) 400.0000

9 RIDF (NABARD) 1136.7100

10 ADB (Externally Funded Scheme) 1600.0000

Total 5936.9200

Outlay for 2019-20

Page 25: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Abstract of PM PackageABSTRACT OF PM PACKAGEItem NHAI RCD Total

Total Cost (Rs. Cr.) As in PMPKG Aug, 2015 30200 24500 54700

Total Cost (Rs. Cr.) As Per Revised PMPKG Jan, 2019 29742 20969 50711

Total nos. of Projects 24 51 75

Work Completed No. ^^^1 **8 9

Amount (Cr.) 421 519 940

Work in progressNo. 13 24 37

Amount (Cr.) 11825 6354 18179

Awarded Not startedNo. *2 ##3 5

Amount (Cr.) 1344 290 1634

In Bidding stage No. 0 ^3 3

Amount (Cr.) 0 251 251

In Sanction stage No. $4 ***12 16

Amount (Cr.) 11360 13105 24465

Total No. 20 50 70

Amount (Cr.) 24950 20519 45469

In DPR stage No. #4 ^^1 5

Amount (Cr.) 4729 450 5242

* Sl. No.64, 66 ** Sl. No.6, 8, 10, 12, 13, 16, 17,19 *** Sl. No. 21, 22, 23, 30, 32 to 39

# Sl. No.53, 67, 71, 72 ## SL No. 41, 44, 46 ^-29, 50, 51

$ Sl. No. 69, 73, 74, 75 $$ SL No.50, 51 ^^-31 ^^^-60

LIST

Page 26: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

• Total 125 schemes sanctioned out of which 83 schemes have

been completed and 42 schemes are in progress.

• Total amount of schemes sanctioned till date - 2751.90 Cr

• Amount released till 31.03.2019 - 835.63 Cr

• Amount utilized till 31.03.2019 - 889.22 Cr

• Amount is to be released in 2019-20 - 453.59 Cr

Central Road Fund

Page 27: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Status of ROB

• Under Tripartite Agreement between Railway, State Govt. and

IRCON, IRCON has taken up construction of 34 ROBs, out of

which 32 have been completed and 2 are under progress.

• State Government has conveyed its consent for construction of

65 ROBs.

• Consent of State Government for 50% cost share. Feasibility

Report of 9 level crossing is under process in RCD.

• MOU has been signed between GoB and Railways for

construction of ROB by Bihar Govt. on 50:50 cost sharing

basis.

MOUROB

Page 28: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Construction of ROB in lieu of LC No. 79 at Mithapur (Patna –

Gaya Rail Section)• Estimated Cost – Rs. 188.13 Crores

• State Govt. share – Rs. 138.48 Crores

• Railway share – Rs. 49.65 Crores

• Name of leg: (i) Budha Marg leg

(ii) R. Block leg

(iii) Karbigahiya leg

(iv) Mithapur leg

(v) Punpun leg

• Date of start - 01.06.2006

• Date of completion - 30.11.2018 (Target)

• Expenditure - Rs. 124.42 Crores

• Work of Budha Marg leg, R. Block leg and Karbigahiya leg is completed and open for

traffic. Work of Mithapur leg is in progress.

• Work in Punpun leg has been done in about 80 feet length. Now work is stopped due to

land acquisition. 3.09 Acres land is required for this leg. The notification for this land

acquisition has been quashed by the Hon'ble Patna High Court on dated 18.08.2018 and

order for fresh notification.

Fresh LA status:-

• Land required – 0.77 acre,

• Total cost including SIA & contingency – Rs. 18.94 Cr.

• A/A in process

Page 29: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

• TOTAL PROJECTS SANCTIONED : 340nos.

(RIDF-XIV to XXIV)

Bridge Projects : 259 nos.

Road Projects : 81 nos.

• TOTAL PROJECTS COMPLETED : 238 nos.

Bridge Projects : 206 nos.

Road Projects : 32 nos.

• TOTAL ONGOING PROJECTS : 92 nos.

Bridge Projects : 48 nos.

Road Projects : 44 nos.

• PROJECTS SUBMITTED TO NABARD IN 2019-20

UNDER RIDF-XXV:

No. of Road Schemes : 29 + 33 = 62 nos (424+456 = 880 Km)

Estimated Cost : 1074 + 1253 = 2327.00 Cr.

Status of Approval : Approval awaited from NABARD

Status of Projects funded under RIDF

Page 30: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Indo-Nepal Border Road Project

Total Length - 552.293 Km

Cost of construction shared by GOI - 1702.000 Cr

Cost of construction sanctioned by HLEC - 1655.987 Cr

Revised Cost to sanction (Civil work) - 2461.704 Cr

Share of State Govt. - 3262.383 Cr

[LA 2278.573 Cr+ 121 no's Bridges 983.81 Cr]

Original A/A (1702.00+896.30556) - 2552.863 Cr

1st Revised A/A amount (2278.573 Cr + 1702.000)

LA+AA GOI - 3935.1304 Cr

Note:- Rs. 983.81 Crore for construction 121 bridges sanctioned

under NABARD of State Plan

Page 31: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Physical and Financial status

• Status of Execution :Total Contract - 8 nos.

Under Litigation– 4 nos.

Under progress – 4 nos.

(1 package substantially completed in Araria)

Physical Status

Total length - 552.29 Km

Working front - 500.00 Km

Surface done - 226.700 Km

Black top done - 102.480 Km

Land to be acquired - 52.290 Km

Financial Status

• Fund released by MHA - Rs 643.3405776 Cr

• Expenditure till 22.05.2019 - Rs 585.0488 Cr

• Unutilized fund as on 22.05.2019 - Rs 58.2918 Cr

Page 32: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Details of Contracts Under progress

Sl.

no

Contractor’s

Name

District / Division Cumulative

Length ( In

Km)

Formation

( In Km)

Surfa

cing

(In

Km)

Remarks

1 M/S AARPEE

Infra

(i) Sitamarhi/

Sitamarhi

24.05 13.0 0.0 In 64th TC meeting estimate work

Rs. 161 Cr. has been decided to

sanction.

Tender for Phulwariyaghat to Bahar

village road 24.05 km under

evaluation.

Rest L/A in 1 Mauza NOC from

railway awaited.

2 M/S ASIP-

AMR(JV)

(i) Supaul/

Pipara

(ii) Araria/

Araria

85.318 76.85 72.20 work is under Progress .

In 64th TC meeting estimate work

Rs. 376.41 Cr. Has been decided

sanction supplementary agreement to

sign.

Total L/A is final Supaul District.

Work under Progress.

Rest L/A in 5 Mauza in under

progress Araria District.

3 M/S Bhartia

Project

(i) Araria/Araria 45.80 28.07 19.10 Work under progress, Revision

proposal sanctioned . Rest l/A in 27

mauza in progress.

4 M/S Singh

Construction

(i) Araria/Araria

(ii) Kishanganj/

Araria

24.20 23.28 23.28 Work completed

Page 33: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

LA Status free from encumbrance

• Total length - 179.368 Km

• Working front as on - 161.916 Km

• LA under progress - 17.452* Km

• Target to acquire - 30.09.2019

• Balance length includes 5 km under alignment

approval with MHA. HLEC meeting on 29th

oct.2018

• Target to complete construction –Dec 2019

Page 34: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Details of Contracts (continued..) Under Litigation

S.N Contractor’

s Name

District / Division Cumulative

Length

( In Km)

Formation

( In Km)

Surfacing

(In Km)

Remarks

5 M/S NKC

Projects

(i) West

Champaran/ Bettiah

111.098 8.00 0.0 1. Proposal for closure of agreement under contract

clause 3A is in process. Department has already

obtained concurrence of finance department and

law department. The Contractor has to submit draft

affidavit for withdrawal of cases from Patna High

Court.

2. Earlier M/S NKC has appealed in Hon'ble Patna

High Court (CR-41/2018) against the order of

Tribunal. The Contractor has denied to execute the

work and for foreclosure of contact moved to

Arbitration Tribunal vide - reference case no.

179/2015 for foreclosure of the agreement. reference

case no. 180/2015 for other reliefs

3. Retender in four groups. Opened on 11.02.2019.

1st group 10% below and 2nd group 2.73% below

and 3rd & 4th group has sent to tender committee

for approval.

4. Revised estimate submitted earliar to MHA vide

this office letter No.-4313 dt. 27.04.2019 Querry

made by CPWD has been replied vide letter No.- 123

(E), dt.- 27.02.2019.

5. Out of 111.098 km LA has been completed in

96.05 km rest is process, which includes 2 No.

villages in alignment approval from GOI.

6 M/S JKM Infra i)East Champaran/

Motihari

77.242 20.00 0.0 1. E/W 20.00 km, GSB-10.00 km, WMM-03.00 km

(single layer), CD-3 nos. under progress.

2. Earlier Tribunal has rejected the writ petition on

13th February 2018

3. M/S JKM Contractor has appealed tin Hon'ble

High Court (CR-49/2018) department has submitted

statement of fact.

4. Dhutaha River to Lalbakiya River road length-

77.242 km, revised estimate has been submitted to

SE.

5. The Revised estimate on present SOR is Rs.

335.529 Cr.

6. Out of 77.242 km LA has been Completed in

65.452 km rest is process. Which includes 3 No.

villages alignment approval from GOI.

Page 35: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

S.N

o

Contractor’

s Name

District / Division Cumulative

Length ( In

Km)

Formatio

n ( In

Km)

Surfaci

ng (In

Km)

Remarks

7 M/S JKM Infra (i)Sitamarhi

/Sitamarhi

(ii) Madhubani

/Madhubani

105.085 17.50 0.0 1. Retender for Bahar gram to kanhauli- 10.925 km,

Knahauli to Sursand- 49.150 km, Bhitta More to Parsa-

5.8 km has been invited Bid due date (BDD)- 16/03/2019

and 18/03/2019.

M/s JKM Contractor is not interested in execution of

work due to extra cost over & above on this location.

Informed his denied to execute the work.

2. Earlier tribunal has rejected the writ petition on 13th

February 2018.

3. M/S JKM Contractor has appealed in Hon'ble High

Court (CR 50/2018) department has submitted statement

of fact.

4.(A) Bahar Village to Kanhauli road length-10.925 km

revised T.S cost- 51.62 Cr. sanction of C.E, North Bihar

(B) Kanhauli to Sursand road length-49.15 km revised

T.S cost-225.61 Cr. sanction of C.E North Bihar

(C) Bhitta More to Parsa road length-5.80 km revised T.S

cost-25.44Cr. sanction of C.E C.E North Bihar

5. Above estimates has been submitted toRCD Head

Quarter sending it to MHA.

Total L/A is completed.

Bihar (Madhubani)

1. Retender for Parsa to Akhrar Ghat-10.61 km, km,

Laukahi (Jhori Chowk) to Bhutaha chowk-28.60 km

2. BDD- 16/03/2019 and 18/03/2019.

M/s JKM Contractor is not interested in execution of

work due to extra cost over & above on this location.

Informed his denied to execute the work.

3. Earlier tribunal has rejected the writ petition on 13th

February 2018.

4. M/S JKM Contractor has appealed in Hon'ble High

Court (CR 50/2018) department has submitted statement

of fact.

5.(A) Parsa to Akharar Ghat of length-10.61 km has been

submitted to C.E office for revised estimate for T.S.

(B) Laukahi (Jhori Chowk) to Bhutaha Chowk of length

28.60 km has been submitted to S.E office for revised

estimate for T.S.

Total L/A is completed.

Page 36: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Details of Contracts (continued..) Under Litigation

S.no Contractor’s

Name

District / Division Cumulative

Length ( In

Km)

Formation

( In Km)

Surfacing

(In Km)

Remarks

8 M/S JKM Infra (i) Kishanganj/

Kishanganj

79.500 40.00 0.0 1. E/W-40 km, GSB-13 km, WMM-

5.7(in one layer) of length 3 No.

major bridge restarted.

2. Earlier Contractor has moved to

Arbitration Tribunal Vide-

Reference Case No. 183/2015 for

foreclosure of the agreement

reference case No. 186/2015 for

other reliefs.

3. Hon'ble Tribunal has rejected

the writ petition on 13th February

2018.

4. M/S JKM Contractor has

appealed in Hon'ble High Court

(CR 51/2018) Department has

submitted statement of fact.

5. Fatehpur to Piltola & Piltola-

Galgalia of length-79.50 km has

been submitted to C.E office for

revised estimate for T.S.

6.The Revised estimate on

present SOR is Rs. 380.15 Cr. But

checking of revised estimate.

7. out of 79.50 km LA has been

completed in 71.50 km. Rest in

process.

Total 552.293 226.700 102.480

Page 37: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

LA Status under encumbrance

• Total length - 372.925 Km

• Working front available - 338.087 Km

• LA under progress - 34.838* Km

• Target to acquire of LA - Dec 2019

• Target to complete - Dec 2022

Page 38: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Revised cost at current SOR

S.No District/ Divison Name of Road Length( In

KM)

AA( In Crore) Revised cost

(In Crore)

Remarks

1 West Champaran/ Bettiah i) Madanpur

to Bhangha

ii) Bhangha tio

Dhuataha

i) 80.10

ii) 30.998

i) 237.96

ii) 93.44

i) 374.92

ii) 147.23

381.48

143.04

2 East champaran / Motihari i) Dhutaha River

to Lalbakiya

River

i) 77.242 i) 238.34 i) 333.53

3 i)Sitamarhi/ Sitamarhi

ii)Madhubani/ madhubani

i)Phulwariya

ghat at

Lalbakiya River

to Bahar village

ii)Bahar Village

to Knahauli

iii)Knhauli to

sursand

iv)Bhitta more tp

parsa

v) Parsa to

Akhrar ghat

vi)Laukahi(Jhori

chowk) to

Bhutaha chowk

i) 24.05

ii) 10.925

iii) 49.15

iv) 5.8

v) 10.61

vi) 28.60

i) 70.56

ii) 36.71

iii) 147.75

iv) 16.81

v) 31.52

vi) 85.11

i) 161.00

ii) 51.62

iii) 225.61

iv) 25.44

v) 41.42

vi) 102.34

Sanctioned

Page 39: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Revised cost at current SOR Continued..S.No District/

Divison

Name of

Road

Length( In

KM)

AA( In Crore) Revised cost

In Crore)

Remarks

4 i) Supaual/

Pipra

ii)Araria/Araria

iii)Kishanganj/

Araia

i) Saraigarh

to Refugee

colony

ii) Refugee

Colony to

Mirganj

chowk

iii) Mirganj Rly

crossing to

Dhabbely

iv) Kuari

Bypass to

sikti

v) Dhabeli to

Fathepur

(i) 40.99

(ii) 44.328

iii) 45.80

iv) 12

v) 12.20

i) 117.70

ii) 128.03

iii) 134.007

iv) 30.08

v) 29.20

i) 190.44

ii) 128.034

Iii) 200.00

iv) 30.08

v) 29.20

i) Sanctioned

ii) Sanctioned

iii)-

iv) Work

completed

v) Work

completed

5 Kishanganj/

Kishanganj

i) Fathepur

to Piltola

via

Galgalia

i) 79.50 i) 258.77 i) 420.84

Total 552.293 1655.987 2461.704

Page 40: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Indo-Nepal Border Road Project

District

To b

e A

cqu

ired

(Mau

za) To be

Acquired

(Acre) Acq

uir

ed

(Mau

za)

Acquired

(Acre)

Amt.

deposited

with DLAO

Balance Mauza/ Area to

be Acquired Balance Amt.

with DLAO

(6-15-16)Mauza

(Nos)

(2-4)

Area

(Acre)

(3-5)1 2 3 4 5 6 7 8 9

1 Bettiah 94 694.140 86 581.2635 301.2156 8 112.88 96.4276

2 Motihari 47 570.350 43 428.8403 267.9792 4-1 141.51 42.3137

3 Sitamarhi 61 558.513 60 557.9262 587.5274 1 0.59 105.2746

4 Madhubani 17 103.374 17 103.3740 124.4697 0 0.00 7.5885

5 Supaul 7 42.007 7 42.0070 106.5960 0 0.00 81.3604

6 Araria 64 455.962 32 245.7770 592.3714 32 210.19 275.1203

7 Kishanganj 65 414.326 56 337.9788 217.8799 9 76.35 125.6699

8 Kishanganj

(Araria

Portion)

10 47.700 10 47.7000 28.9715 0 0.00 11.3319

Total 365 2886.371 311 2344.8668 2227.0107 54-1 541.50 745.0869

Status of LA :

Total amount required for LA deposited to DLAOs.

Page 41: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Decision

• Existing Contractor are asking current SOR or carriage

of aggregates from Sheikhpura/Mirjachauki by road.

• As per practise Rail cum Road transportation with

minimum cost of carriage are allowed in estimate.

• Revised cost approval of estimates submitted to BFR

cell CPWD.

• Use of innovative technology for construction of Road

crust in place of earlier sanctioned specifications.

Page 42: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

RCPLWEA- Status of Projects sanctioned in 2017-18 & 2018-19

Sl No District Roads Bridges

Status of Tender

Awarded and work in

Progress

No Length (km) No Length (m) Road / Bridge

1 Aurangabad 14 253.037 7 410.240 10 / 0

2 Jamui 7 103.141 0 6 / 0

3 Gaya 15 213.043 3 512.00 8 / 0

4 Banka 8 122.075 15 933.130 6 / 0

5 Muzaffarpur 26 358.548 16 1019.94 22 / 1

Total 70 1049.844 41 2875.31 52 / 1

*Note: 1. Physical Progress: Completed Length-135 KM, Financial Progress : Rs.121.16 cr.

up to 30.05.2019

2.18 Nos.Roads & 40 Nos.Bridge Sanctioned in 2018-19 is in Tender Stage

Additional Proposal of Roads / Bridges approved by MORD in Jan,2019

Sl. No District No of Roads / Bridges Length ( km)

1 Kaimur 10 112.00

2 Rohtas 32 159.85

3 Jamui 11 286.00

4 Nawada 22 /9 294.10

Total 75 / 9 851.95

Page 43: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Status of Mega Projects implemented by

Bihar Rajya Pul Nirman Nigam Ltd.

Page 44: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Name of ProjectConstruction of Northern Approach (Sonpur Side) of Rail–

cum–Road Bridge over river Ganga near Digha Ghat Patna.

Description of Project

RCC / Composite Elevated structure with Approach Road.

Length : 2.56 Km (1st Phase) + 3.142 Km (2nd Phase) = Total 5.703

Km.

Administrative Approval Rs. 244.99 Cr. Vide RCD Letter No 7175 (S) Dated 05.08.15

Agreement Amount Rs. 131.78 Cr. (1st Phase)

Date of Start 12.12.2015

Date of Completion (1st

Phase) 11.06.2017

Expected Date of

Completion

1st Phase Inaugurated on 11.06.2017 and Traffic opened

2nd Phase to be completed by Feb, 2020

Contractor M/s S.P. Singla Construction Pvt. Ltd.

Remarks 2nd Phase : Work and Land Acquisition in Progress.

Physical Progress (2nd Phase) Issues

Foundation Sub StructureSuper

StructureApproach

Expenditure

(Rs in Cr.)L.A. for 2nd

phase in Saran

Distt.32% 30% 10% 50% 63.25

Page 45: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are
Page 46: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are
Page 47: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Name of Project

Construction of 2x2 Lane Bridge with footpath across river

Ganga between Sultanganj (Bhagalpur District) and Aguwani

Ghat (Khagaria District) including navigational span of cable

stayed and approaches (Connecting NH31 and NH80) in the state

of Bihar on EPC mode

Description of ProjectRCC HL Bridge, Bridge length – 3.160 Km, width – 8.5mX2, Footpath –

2X1.5m, Approach – 4Km Sultanganj Side & 16Km Aguani Side.

Administrative Approval Rs. 1710.77 Cr. Vide RCD Letter No 8797 (S) Dated 14.11.13

Agreement Amount Rs. 859.00 Cr.

Date of Start 02.05.2015

Date of Completion ( as

per Agreement)01.11.2019

Expected Date of

Completion31.03.2020

EPC Contractor M/S S.P. Singla Construction Pvt. Ltd.

Supervision Consultant Studio De Miranda in JV with Rodic Consultant Pvt Ltd

Physical Progress Issues

Foundation Sub StructureSuper

StructureApproach

Expenditure

(Rs. in Cr.) L.A. in Khagaria

and Bhagalpur

Distt.98.58%

Main bridge

78.00%

Main bridge

20.50%

Main bridge- 855.37

Page 48: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Curing of cable stayed segments

P22-P28 SUPERSTRUCTURE

Page 49: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Name of ProjectConstruction of H.L P.S.C cast in situ bridge over river Gandak in

between Sattarghat and Faizullahpur in District Motihari (Bihar)

Description of ProjectRCC HL Bridge, Bridge Length – 1.440 Km, Width – 12m,

Approach-9.071 Km.

Span Arrangment &

Free Board24x60M & Free Board- 3.05M

Administrative

ApprovalRs. 263.48 Cr. Vide RCD Letter No 4156 (S) Dated 13.04.12

Agreement Amount Rs. 209.18 Cr.

Date of Start 20.10.2012

Date of Completion

(As per Schedule)19.04.2016

Expected Date of

Completion31.07.2019

Contractor Vasishta Construction Pvt Ltd. Hydrabad

Supervision

ConsultantVKS Infratech, New Delhi

Physical Progress Issues

FoundationSub

Structure

Super

StructureApproach

Expenditure

(Rs in Cr.)LA Issue in East

Champaran and

Gopalganj Distt100% 100% 87.50% 70% 219.91

Page 50: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

District – East Champaran (Motihari)Land required : 94.17 Acre (187 raiyat)No of Mauja : 5 (Dhekhan Chadar – 3 & 4, Sundarpur Chadar – 1 & 7,

Manjaria chadar - 05)No of Mauja in which L/A completed : Payment Started.

: Rs. 2000.00 Lakh deposited to DLAO Status of L/A : Payment Started (in Progress)Where is pending : DLAO, East Champaran, Payment in ProgressWhen L/A Completed : May be 1 months

District – GopalganjLand required : 9.045 AcreNo. of Mouja : 2 ( Narwar & Khobharipur) L/A completed : Payment StartedCompensation : Rs. 450.00 Lakh deposited to DLAOStatus of L/A : Payment Started (in progress)Where is pending : DLAO, Goplaganj, L.A. in Progress

: ( Unsurveyed Land 4 mouja (pakaha, Sitalpur, Ahiapur

and Karnapura total area – 32.195 Acre) in Gopalganj tobe settle by D.M., Goplaganj, how ever work is in Progress.

When L/A Completed : May be 1 months.

Page 51: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are
Page 52: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Name of Project

Construction of High Level Bridge across river Gandak at

Bangra ghat including 19 Km. length of Approach Road

connecting Muzaffarpur & Saran District of North Bihar

Description of ProjectRCC HL Bridge, Bridge Length – 1.506 Km, Width – 14.80 m, Length

of Guide Bund – 2.225 Km, Approach Road -19 Km,

Span Arrangment &

Free Board35x43M & Free Board- 2.78M

Administrative Approval Rs. 508.98 Cr. Vide RCD Letter No 8795 (S) Dated 14.11.13

Agreement Amount Rs. 299.51 Cr.

Date of Start 11.04.2014

Date of Completion (as

per EOT)09.04.2019

Expected date of

completion31.10.2019

Contractor M/s S.P. Singla Construction Pvt. Ltd.

Supervision Consultant AECOM-VIS (JV)

Physical Progress Issues

Foundation Sub StructureSuper

StructureApproach

Expenditure

(Rs in Cr.)

LA Issue in

Mujaffarpur,

Gopalganj &

Saran Distt.96.28% 87.45% 72.35% 32.50% 322.52

Page 53: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

53

District- Muzaffarpur

Land required - 45.9715 Acre , No. of Mouja - 07

No of Mouja in which LA completed - Registry in seven mauja (292/449)

Compensation - Rs.1594.00 Paid to Raiyats by Registry

Status of L/A - 29.77 Acre Registered. Rest in progress.

where is pending - DLAO, Muzaffarpur for LPC.

When L/A to be Completed - 06/2019

District- Saran

Land required - 35.528 Acre, No. of Mouja- 09

No of mauja in which L/A completed- Nill

Compensation - Rs. 12,41,52,426.00 Deposited to DLAO Saran, vide letter

No. 1347 dated 03.09.2016 & Rs. 20,00,00,000.00 Deposite to DLAO, Saran, vide

letter no-262, dated 28.02.2019

Status of L/A- 5 Mauza Award decleard and payment of compensation is under

progress. 2 Mauza award is under process. 02 Mauza- Sec.-19 under process.

where is pending - DLAO, Saran, which is under progress..

When L/A to be Completed - 06/2019.

District- Gopalganj

Land required -46.90 Acre (22.15 Acre Surveyed + 24.75 Acre Unsurveyed )

No. of Mouja - 05 (3 Surveyed+2 Unsurveyed)

No of Mouja in which LA completed - NIL

Amount deposited to DLAO - Rs. 21,67,15,524.00 Deposited to D.M.Gopalganj

vide letter No 670, dated 10.10.2017 & 813 dated 18.12.17

Status of L/A- Award declared in all three Mauza, payment of compensation is in

progress.

where is pending- DLAO, Gopalganj.

When L/A to be Completed - 32.20 Acre by 6/19 for Survey mauja.

Note:- Detail of work:-

(a) Foundation A-1 to P-27, P-30 to P-33 & A2 completed.

(b) sub-structure A-1 to P-26, P-30 to P-33 and A2 completed.

(c) Girder launching- Span S-1 to S-25, S-32 & S-33 completed and S-26 & S-31 is

in progress.

(d) Deck Slab- Span S-1 to S-24 completed and S-25 is under progress from A-1

(Muzaffarpur side) and span S-32 completed & S-33 is under progress from A-2

(Gopalganj side).

(e) Approach Road-

(i) Earth work 6.56 km Muzaffarpur side & 8.70 km in chapra side.

(ii) GSB- 7.85 km Chhapra side & 4.00 km Muzaffarpur.

(iii) WMM- Muzaffarpur side - 0.965 km. Chapra side 3.000 km.

(iv) DBM- Saran Side- 2.20 km

Page 54: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

P-03

Deck Slab P-24 is completed dt. 30.04.2019

Page 55: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Name of Project

Construction of “Lohia Path Chakra” with Swap and grade

separated U-Turn based multi sectional interchange, multiple

Underpasses, Flyover, elevated section using U-Girders & extra

dosed cable stayed structures at Bailey Road, Patna

Description of ProjectExtra Dosed Cable Stayed Bridge at Daroga Rai Path

Integral Spine Beam Bridge Near Lalit Bhawan Junction

Extra Dosed Cable Stayed Bridge Near BPSC Office

Administrative Approval Rs. 391.48 Cr. Vide RCD Letter No 7192 (S) Dated 05.08.15

Agreement Amount Rs. 381.60 Cr.

Date of Start 19.12.2015

Date of Completion

(as per Agreement)18.12.2017

Date of Completion

(as per EOT)31.03.2019

Contractor M/S S.P. Singla Construction Pvt. Ltd.

Concept, Design &

Supervision Foundation for Innovation & Technology Transfer, IIT, Delhi

Physical Progress

Foundation Sub StructureSuper

StructureApproach

Expenditure

(Rs in Cr.)

81% 56% 17% - 121.58

Page 56: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

P3 Staging Work is in Progress for Super-Structure SWAP-01 (BPSC

Bhawan)

R03-P2 RCC Wall shuttering work is in progress SWAP-01 Retaining Wall work is in progress near BPSC Bhawan

Page 57: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Name of Project

CONSTRUCTION OF FLYOVER CONNECTING MITHAPUR

FLYOVER TO BHIKHARI THAKUR (YARPUR) FLYOVER VIA R-

BLOCK JUNCTION

Description of Project RCC Fly Over.

Administrative

Approval166.15 Crore {RCD, Lt No.-7109 (S) dated-31.07.2015}

Agreement Amount 104.21 Crore (Agreement No.-SBD/02/2015-16) .

Date of Start 12 -11-2015

Schedule Date of

Completion11 -11-2018

Date of Completion

(as per EOT)31.03.2020

Contractor Rachana Construction Company, Gujarat

Physical Progress Issues

FoundationSub

Structure

Super

StructureApproach

Expenditure

(Rs in Cr.)

87.19% 76.86% 12.50% - 71.55

Page 58: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are
Page 59: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Name of Project

Construction of Flyover connecting Mithapur flyover to

Chiraiyatand Flyover via Karbigahiya including Approach

Road, Service Road and side drain etc in Patna Town

Description of Project RCC Fly Over.

Administrative

Approval121.86 Crore {RCD, Lt No.-6976 (S) dated-29.07.2015}

Agreement Amount 101.75 Crore (Agreement No.-SBD/01/2015-16) .

Date of Start 12 -11-2015

Schedule Date of

Completion11 -11-2018

Date of Completion (as

per EOT)31.03.2020

Contractor Rachana Construction Company, Gujarat

Physical Progress Issues

FoundationSub

Structure

Super

StructureApproach

Expenditure

(Rs. in Cr.)

• Drawing after redesign issued to

contractor vide letter no.-1098 (EN)

dated-04-10-2017.

• 0.5736 acre land acquired by Land

acquisition office,patna and written

possession given to RCD,New capital

Division patna.actual possession and

demarcation under process.

60.80% 31% 4% 15% 40.92

Page 60: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are
Page 61: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Name of Project

Construction of Double Deck Flyover from Gandhi

Chowk to Nagarpalika Chowk at Chhapra Town in

Chhapra District.

Description of ProjectBridge Length – 6620.00 m (Lower deck 3100.00 m & Upper deck

3520.00 m), Carriage Width – 7.5 m

Administrative Approval Rs. 411.3133 Cr. Vide RCD Letter No 8796 (S) Dated 10.10.17

Agreement Amount Rs. 370.61 Cr.

Date of Start 07.06.2018

Date of Completion 06.06.2022

Contractor NCC. Ltd. Hyderabad

D.P.R Consultant Park Projects Consultancy (p) Ltd. Delhi

Supervision Consultant -

Physical Progress Remarks

FoundationSub

Structure

Super

StructureApproach

Expenditure

(in cr.)

Mobilization advance

given to contractor

Rs.22.53 Crore Rs.

67.26 Lakhs

Transferred to IIT

Roorkee for Vetting of

Design.Piling work is

in progress. 121 piles

completed.

8% - - - 32.48

Page 62: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are
Page 63: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Bihar Rajya Pul Nirman Nigam Ltd

Mukhya Mantri Setu Nirman Yojna

Total Sanctioned

SchemesCompleted Schemes Ongoing Schemes

Nos Amount in Cr. Nos Amount in Cr. Nos Amount in Cr.

1156 2691.78 1143 2640.39 13 51.39

Page 64: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Construction of Cable Suspension Bridge

(Laxman Jhula) at Pind-Daan Asthal over river

Punpun near Railway Bridge Punpun in the

District of Patna

• A/A Cost :- Rs. 46.7729 Crore

• Tender Received on 17.05.2019

• Technical Bid Finalised.

Page 65: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Status of Mega Projects implemented by

Bihar State Road Development Corporation

Page 66: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

SL.

No.

Project Loan

No.

Loan

Amount

Closed

Loan

Amount

Loan

period/

Loan

Expiry

Date

Share

State ADB

1 BSHP-I 2443

IND

$420 M $352.52 M 2009-12/

31.07.2012

10% 90%

2 BSHP-II 2663

IND

$274.64M $246.27M 2011-18/

30.06.2018

29.25% 70.75%

3 AFBSHP-II 2894

IND

$300 M 2013-19/

30.09.2019

20% 80%

4 BIHAR 6- LANE NEW GANGA BRIDGE PROJECT

3396

IND

$500 M 2016-21/

30.06.2021

30.07% 69.93%

5 BSHP-III $200 M 2018-23/

30.06.2023

34% 66%

Page 67: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

NH-30

PATNA

SITE FACILITY-1

SITE FACILITY-2

SITE FACILITY-3

PATNA SIDE – MAIN OFFICE, VIADUCTCASTING, STAFF CAMP

BIDUPUR SIDE – VIADUCT CASTING RAGHOPUR ISLAND – MAIN BRIDGE

CASTING , STAFF CAMP

Page 68: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PROJECT DETAILS:

PROJECT : CONSTRUCTION OF GREENFIELD SIX- LANE EXTRA DOSED

CABLE BRIDGE OVER RIVER GANGA FROM NEW NH-30

(SABALPUR) TO NH-103 BIDUPUR (ADB FUNDED: LOAN NO.3396

-IND)

PROJECT LENGTH : 22.76KM

MAIN BRIDGE : 9.76KM (6 LANE EXTRA DOSED) SPAN 150 M

APPROACHES : 13KM

(PATNA SIDE-1.4KM, BIDUPUR- 11.6KM

CONTRACTOR : DAEWOO - L&T JV (50:50)

CONTRACT VALUE : RS.3,115 CRORE

DURATION : 4 YEARS (FROM THE APPOINTED DATE)

AGREEMENT DATE : 10-FEB-2016

APPOINTED DATE : 16-JAN-2017

AUTHORITY ENGINEERS : AECOM-RODIC (JV)

UPTODATE FINANCIAL

PROGRESS

: Rs 784.66 Cr. INCLUDING MOB. ADV. AND LA.

PAYMENT FOR CIVIL

WORKS

: Rs. 343.00 Cr. upto 15.05.2019

Page 69: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

MAIN BRIDGE ITEM PROVISION UPTO DATE

PROGRESS

PROGRESS

WELL

FOUNDATION

WELL CURB 67 No. 55 No 82.09%

STEINING 1196 LIFT

1 LIFT = 2.55 M

794 LIFT 66.381%

BOTTOM PLUGGING 67 No. 26 COMPLETED

INTERMEDIATE PLUGGING 67 No. 26 COMPLETED

SUB STRUCTURE LOWER PYLON 67 No. 05 completed and 08 in progress

SUPER

STRUCTURE

PIER TABLE 65 No. 03 in progress

SEGMENT CASTING 2976 No. 14 casted

SOUTH APPROACH (PATNA SIDE)

PILE FOUNDATION PILE 390 No. 219 No. 56.15%

PILE CAP 81 No. 26 No. 32.09%

SUB STRUCTURE PIER 81 No. 15 No. 18.51%

NORTH APPROACH

PILE

FOUNDATION

• BATCH MIX PLANT INSTALED AND OPERATIONAL.

• PILE LOAD TEST COMPLETED.

• PILE WORK SHALL START FROM NEXT WEEK..

EARTHWORK • EARTH WORK IN PROGRESS IN LAST 4 KM STRETCH EXCLUDING BRIDGE AND

VIADUCT PORTION.

Page 70: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

WELL MP-10 WELL MP-56

WELL MP-57,58,59WELL MP-11

Page 71: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PYLON MP 16

SEGMENTSEGMENT YARD

PIER TABLE MP 15

Page 72: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PIER – PATNA SIDE APPROACH SITE FACILITIES RAGHOPUR

PILE LOAD TEST- NORTH APPROACHEARTH WORK- NORTH APPROACH

Page 73: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

ALIGNMNET OF SH-78 & IT’S CONNECTIVITY

Bihta

Naubatpur

Dumri

BeldarichakDaniyanwan

Mahuli

Bhaganbigha

Proposed Airport

Page 74: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Total Length of the Project : 46.70 Km 2nd Revised A/A Amount (For both Pkg) : Rs. 1915.69 Cr.

(Vide Letter No. 5796 (s) dt. 27.07.2018 of RCD, Bihar)

Contract Value : Rs. 393.34 Cr. Date of Completion : 30.06.2019/31.12.19(Exp.)

PHYSICAL & FINANCIAL PROGRESS:

S. NO.

ITEM TOTAL LENGTH AS PER

CONTRACT

PHYSICAL ACIEVEMENT

(IN KM)

BALANCE WORK(IN KM) OVERALL

PHYSICAL PROGRESS

47.85%

1 Clearing & Grubbing 35.63 30.26 5.37

2 EMBANKMENT 35.63 23.83 11.80

3 SUB-GRADE 35.63 20.83 14.80

4 GSB 35.63 20.68 14.95 OVERALLFINANCIAL PROGRESS

Rs. 178.54 Crore(42.02%)

5 WMM 35.63 18.68 16.95

6 DBM 35.63 17.76 17.87

7 DBM ( over Ramky bed) 10.22 4.73 5.49

8 BC 46.70 6.00 40.70

Note – From Dumri to Daniyawan work up to DBM completed.

Page 75: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

5.37 km Land (in between km7 to 16; Gonwa, Lodipur, Dariyapuretc.) yet to be handed over. Judgment has come on 2nd April, 19.Poor Financial condition of Contractor delaying project.

Note – (i). The payment order against Arbitral award tobe utilised in this project has already been issuedbut contractor has yet to submit required B.G. toavail it.

Page 76: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Total Length of the Project : 47.50 Km 2nd Revised A/A Amount (For both Pkg ) : Rs. 1915.69 Cr.

(Vide Letter No. 5796 (s) dt. 27.07.2018 of RCD, Bihar)

Contract Value : Rs. 287.16 Cr. Date of Completion : 30.6.2019

PHYSICAL & FINANCIAL PROGRESS:

S. NO.

ITEM TOTAL LENGTH AS PER

CONTRACT

PHYSICAL ACIEVEMENT

(IN KM)

BALANCE WORK(IN KM)

OVERALL PHYSICAL PROGRESS

71.58%1 EMBANKMENT 26.20 25.80 0.40

2 SUB-GRADE 26.20 25.40 0.80

3 GSB 26.20 24.5 1.25

4 WMM 29.14 27.32 1.82 OVERALLFINANCIAL PROGRESS

Rs. 173.23 Crore(58.42%)

5 DBM 33.30 30.65 2.65

6 DBM (Over Ramky) 14.85 4.96 9.89

7 BC 47.50 7.00 40.50

Note – Most of the remaining work is at approach of ROB Bhaganbigha and one bridge.

Page 77: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

BC laying Work at Ch 36+100,PKG-1

BIHTA - DANIYAWAN – CHANDI – SARMERA, SH-78

Page 78: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

S.NO.

SOURCE OF FUND AMOUNT (` in Crore)

RELEASED AMOUNT

(` in Crore)

BALANCE(` in Crore)

1 VGFGOVT. OF BIHAR 307.50 187.665 119.835

GOVT. OF INDIA 277.50 145.830 131.670

SUB-TOTAL 585.00 333.495 251.505

2 CONCESSIONAIRE CONTRIBUTION 294.57 294.570 00.000

3 LENDERS’ CONTRIBUTION 720.00 493.835 226.165

TOTAL 1599.57 1121.900 477.670

SOURCE OF FUND

A/A : Rs.1602.74 Cr. Concessionaire : M/s Navayuga Jahnavi Toll Bridge Pvt. Ltd. Concession Period : 30 Yr. including (4.5 years + EOT) Const. period Bridge Length : 5.525 km Approach Road : 45.745 km Appointed Date : 30.11.2011 Completion Date : 29.05.2016 (As per Contract) Extended Completion Date : 31.05.2020 (Second EOT) Total Financial Package : ` 1599.57 Cr.

Page 79: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PROJECT ALIGNMENT WITH MAJOR STRUCTURES

Page 80: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PHYSICAL PROGRESS W.R.T. TOTAL VALUE OF CIVIL WORKRs. 1235.94 CR.

43.23%

(Rs. 534.71 Cr.)

PROGRESS W.R.T. EPC CONTRACT VALUE INCLUDING PRE-CONSTRUCTION ACTIVITIES OF Rs. 1450.00 CR.

51.64 %

(Rs. 748.77 Cr.)

FINANCIAL PROGRESS W.R.T. FINANCIAL PKG. OF Rs.

1599.57 CR. (EPC CONTRACT VALUE INCLUDING PRE-CONSTRUCTION ACTIVITIES + IDC)

56.16%

(Rs. 898.34 Cr.)

Target for Civil Work(vide Concessionaire revised

Programme effective from Sept. 2018)

62.51%( Rs. 772.61 Cr.)

Achievement43.23 %

(Rs. 534.71 Cr.)

Slippage Rs. 237.90 Cr.

Page 81: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Structures Highway

Description Status Description Status

Main Ganga

Bridge(5.525

KM)

01 No. Foundation - 100%

Sub-Str. - 70%

Super Str. - 5.5%[Piles: 272 done out of total 272,

Pile caps: 45 done out of total 46,

Piers: 32.35 out of total 46,

Segments: casted 398, Launched 212 out of

total 1722]

C&G – 45.39

Km

33.373 Kms.

Grade

Separators

03 Nos. In Progress - 2 E/W - 45.39 Km 27.168 Kms. in

Progress

Major Bridges 03 Nos. Completed – 2

In Progress – 1

Sub Grade 3.875 Kms. in

Progress

Minor Bridge 01 No. (converted into Major Bridge,

COS)

GSB 0.870 Km in

Progress

ROB’s 02 Nos. In Progress – 1 WMM Not Started

VUP’s 10 Nos. Completed – 5 DBM Not Started

PUP’s 06 Nos. Completed – 3

In Progress – 1

BC Not Started

Toll Plazas 02 Nos. …………...

Page 82: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

MAIN ISSUES

Poor financial condition of the concessionaire.

Collapse of launching gantry in May 2017 and Delay in fabricationof new launching gantry led to cessation of Superstructure Workfor a year. Meanwhile Launching is being done by Crane. Earlier theConcessionaire had assured to mobilize the new gantry by March2019 but till date only about 1249 / 2100 MT (59%) of fabricatedelements have been delivered to site.

Issues related to Land Acquisition Total length of the project is 51.27 Km

Acquired length of ROW and handed over to Concessionaire is 46.400Km i.e. 90.80% of total length

Physical possession with the concessionaire: 43.201 km i.e. 83.70%

Hindrances to be settled 3.199 km (1.789 km in Patna & 1.410 km inSamastipur)

Land to be acquired under New LA Act SamastipurDistrict, SIA evaluation report by expert committeesubmitted to DM Samastipur on 14.5.19.

4.870 Km.

Page 83: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

1. The progress of the work was discussed which is merely about 1.8%

in last one year. MD, BSRDCL highlighted the need to review the

position particularly as to how the funds could be ploughed into the

project by the Lender, Concessionaire and BSRDCL.

2. The Concessionaire made a request with the Lenders to help by

providing a revolving funds (Advance) to help kick-start the project.

3. The Lenders, after due deliberation agreed to put in Rs.25.00 Cr. after

approval from the consortium as an advance provided the

Concessionaire first puts in Rs.5.00 Cr. from their resources within 10

days from the date of meeting. However, no infusion has been made

till date either by the Concessionaire or the Lenders.

4. Option for reviving the project by one time fund infusion by GoB is

being explored.

MEETING WITH CONCESSIONAIRE, REPRESENTATIVE OF LEAD

BANKER, INDEPENDENT ENGINEER AND BSRDCL on 07th May 2019

Page 84: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Location Map of Gangapath from Digha to Didarganj (20.5km) on EPC Mode

Page 85: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PROJECT DETAILs:

Administrative Approval : Rs. 3390 Crore

State Fund : Rs. 1390 Crore

HUDCO Loan : Rs. 2000 Crore

Length (Km) : 8.80 (Embankment) + 11.70 (Elevated)=20.50

Agreement Amount : Rs.1777.3715 Cr./ Rs. 1847.45 Cr. ( with COS)

Contractor : M/s Navayuga Engineering Co. Ltd.

Agreement Date : 23.08.2013

Appointed Date : 09.09.2013

Completion Date : 24.12.2019 ( from Digha to Nauzar Ghat i.e;Km. 0.00 to Km. 13.500)

Target Date : December 2020

0.0 (DIGHA) TO 5.9 (A.N SINHA INST.) 5.9KM HIGH EMBANKMENT

5.9 (A.N SINHA INST.) TO 17.0(NURUDDIN GHAT i.e. EAST OF PATNA GHAT)

11.1KM ELEVATED STRUCTURE

17.0 (NURUDDIN GHAT) TO 19.9 (GOPE GHAT) 2.9KM HIGH EMBANKMENT

19.9 (GOPE GHAT) TO 20.5(OLD NH 30, DEEDARGANJ)

0.6KM ELEVATED STRUCTURE

Page 86: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Section-wise Completion Target

Sl.

No

Section Chainage Completion

Date

1 Digha to LCT Ghat: Ch. 0+0 to Ch. 3+250 April 2019

2 LCT Ghat to

A.N.Sinha Institute:

Ch. 3+250 to Ch. 5+400 April 2019

3 A.N.Sinha Institute

to Krishnaghat:

Ch. 5+400 to Ch. 8+400 May 2019

4 Krishnaghat to

Nauzar Ghat:

Ch. 8+400 to Ch. 13+500 December

2019

Page 87: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

SL. NO.

ACTIVITY UNIT SCOPE EXECUTED%

COMPLETION

1 PILE No. 901 501 56%

2 PILE CAP No. 180 108 60%

3 PIER No. 180 86 48%

4 PIER CAP No. 180 86 48%

5 SEGMENT CASTING No. 2431 1065 44%

6 SEGMENT LAUNCHING No. 143 47 33%

7 ROAD WORK No. 8.8 0In 5.9 Km., work

in progress

UPTO DATE PHYSICAL & FINANCIAL PROGRESS – 34.44%

TOTAL EXPENDITURE – Rs. 915.43 Cr. (INCLUDING OF AGENCY, CONTINGENCY, LA)

PHYSICAL & FINANCIAL PROGRESS ( upto Ch. 13 + 500 km) on 29.05.2019

Page 88: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

ISSUES

COS for km 13.5 to 17.00 and 19.90 to 20.5 has been issued on 13.05.2019 withchanges in connectivity at Kangan Ghat and Patna Ghat (same as PMCH). COS underprocess.

Sanjay Singh MJC case-

EOT and Milestone shifting as proposed by Contractor

Very slow progress by Contractor

CONNECTIVITY ISSUES

LCT Ghat DLAO has given instruction (Letter no. -599 dated – 03.04.2019) to DCLR to verify

the CO report. As no decision has been made regarding Private/Govt. Land issuetherefore fund has not been refunded by DM, Patna.

KRISHNA GHAT

Transfer of Govt. Land – NOC from Patna University and Nagar Nigam is still to begiven for 1.648 Acre.

GAI GHAT

Transfer of Govt. Land (1.6 acre) and rehabilitation/transfer of Govt. Buildings (6Nos). LA (2 acre) private land for which SIA started.

Page 89: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Digha – Ganga Path

Patliputra Railway Station

Bailey Road

Jagjeevan Stadium

AIIMS

Ganga Path

NH-98

Page 90: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Length : 12.27 Km A/A : 1231.06 Crore [Including NHAI Leftover Portion]

Agreement Amount : Rs. 882.96 Crore (Civil Work) Name of the Contractor : M/s Gammon Engineers & Contractors Pvt. Ltd.

Major Crossings : Khagaul Road,Bailey Road, Ashok Rajpath Connectivity : With NH-30, NH-98, Ganga Path & NH-19 Agreement Date : 11.10.2013 Appointed Date : 21.10.2013 Completion Date : 31.10.2018 Expected Completion date: 31st July’ 2019 (One lane) Physical Progress : 94.98 % Financial Progress : 1029.40 Crore (Civil Cost- 838.64 Cr.) MAIN BRIDGE : 8.45 km-4 Lane, (12x2)m wide 25m span c/c APPROACH : 3.5 km long, 8.5m wide (including1.5m

Paved Shoulder on one side) OTHER : Interchange at Digha-1 No, ROB-1 No, Minor

Bridge-1 No.

Page 91: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Status of Elevated Road Corridor from AIIMS to Digha

Financial Progress:Total Expenditure - Rs. 1029.40 Cr. (Including of Agency/ Contingency Charge)

Total Work Done - Rs. 838.64 Crores

Physical Progress

Sl.

No.Item of Work Unit

Total Qty

(Approx.)

Work Done upto 31.05.2019

Remaining

Cum. Achievement

(%)

1 Pile No 3046 3046 0 100

2 Pile Cap No 670 670 0 100

3 Pier No 670 670 0 100

4 Pier cap No 668 668 0 100

5 Casting of I girder No 3937 3937 0 100

6Erection of I

girderNo 3997 3997 0 100

7 Deck Slab No 668 664 4 99.40

8 Road work In Km. 3.45 2.8 0.65 82.60

Page 92: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are
Page 93: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

LENGTH : 10.694 Km A/A : 1231.06 Crore [Including Elevated

Corridor and NHAI left over portion AGREEMENT AMOUNT : Rs.157.14 Crore NAME OF THE CONTRACTOR : Gammon Engineers & Contractors Pvt. Ltd. CONNECTIVITY : Bankipur-Danapur Road & South Side of

Rail-cum- Road Bridge AGREEMENT DATE : 20.10.2016 COMPLETION DATE : 26.04.2018 Expected date of completion : 30th June’ 2019 (EOT in process)

PHYSICAL PROGRESS : 87.05 %

FINANCIAL PROGRESS : 169.26 Cr. (Civil Cost- 136.80 Cr.) Work to be completion : Elevated portion connecting Ashok raj path

to ROTARY

Page 94: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Physical Progress ( Road work in NHAI Left over portion)

Sl.

No.

Item of work Unit Total Qty

(approx.)

Work Done

upto 31.05.19

Remaining

work

Cum. achievement of

the Total Work (%)

1 Pier No 3 3 0 100

2 Earthwork m 9205 9205 0 100

3 GSB m 9205 9205 0 100

4 WMM m 9205 9067 138 98.5

5 DBM m 9205 8890 315 96.58

6 B.C m 9205 8890 315 96.58

Physical Progress ( Box Girder Fly Over portion on Ashok raj path ch:10+490 to ch:11+160)

Sl.

No.

Item of work Unit Total Qty

(approx.)Work Done

upto 31.05.19

Remaining

work

Cum. achievement of

the Total Work (%)

1 Foundation No 16 16 0 100

2 Substructure No 16 16 0 100

3 Box girder No. 15 12 3 80

4 Deck Slab No. 15 11 4 73.33

Physical Progress (Connectivity portion on J.P.Setu)

Sl.

No.

Item of work Unit Total Qty

(approx.)Work Done

upto 31.05.19

Remaining

work

Cum. achievement of

the Total Work (%)

1 Pier No 3 3 0 100

2 Pier caps No 3 3 0 100

3 Girder erection No. Completed

4 Launching of girder No. Completed

Page 95: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are
Page 96: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Abnormal delay in approval of Launching Scheme of ROB girderover Railway Track near Khagaul ROB. Revised Methodology likelyto be submitted on 03.06.2019 to the Railway as per discussionheld in meeting dated 24.04.2019 under chairmanship of ChiefSecretary, Bihar.

Cash Flow problem of Contractor due to:

i. Slow in procurement of steel.

ii. Slow in procurement of structural steel of 2nd span of ROB.

iii. Inadequate deployment of manpower.

iv. Slow in Earthwork & VUP at Rotary.

v. Slow in wearing course work in Elevated Corridor.

Page 97: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

6 /4 LANE ALONG R’BLOCK – DIGHA ROAD (Phase-1)

Page 98: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

R’Block Digha Road (Phase-1)

Length : 6.3 km

Contractor : M/s LR BLC – GAWAR (JV)

Authority Engineer : M/s Rodic-Spectrum (JV)

EPC Agreement Date : 01.03.2019

EPC Agreement Amt. : Rs. 297.51 Cr

Administrative Amt. : Rs. 379.57 Cr.

Appointed Date : 08.03.2019

Completion Period : 18 Month

Carriageway

6-Lane : km 0 to 0.7, km 1.8 to 2.23, km 2.87 to 3.8, km 4.8 to 6.34-Lane : km 0.7 to 1.8, km 2.23 to 2.87, km 3.8 to 4.8

Major Structure

Over JLN Marg : 100m (1 x 25 + 1 x 50 + 1 x 25) : Extra DoseShivpuri : 40m (1 x 12 + 1 x 16 + 1 x 12) : RCC Br.Rajiv Nagar : 40m (1 x 12 + 1 x 16 + 1 x 12) : RCC Br.

Service Road2-Lane Both Sides : km 0.7 to 4.8Single-Lane Both Sides : km 4.8 to 6.3

Page 99: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

FEATURES

SERVICE ROAD

2-LANE BOTH SIDES : KM 0.7 TO 4.8

SINGLE-LANE BOTH SIDES : KM 4.8 TO 6.3

METRO CORRIDOR : Min 4m

ROADSIDE DRAINAGE

Sewage cum Utility Drains shall be constructed on both sides of the projectHighway.

Roadside drain of RCC Box type capable of bearing load for service roadrequirement shall also be provided.

CULVERTS

9 Nos.@ every 500m

Page 100: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

FEATURES

BRIDGE

Existing Bridge to be dismantled as per Site.

NEW BRIDGE

S. No. Location (km) Total length (m) Remarks, if any

1 2+000 1 x 16 Minor Bridge at Punaichak

2 2+930 1 x 8 Minor Bridge near Pani Tanki

3 5+000 1 x 8 Minor Bridge across Kurji Nala

ROADSIDE FURNITURE

Full width Overhead signs: 3 nos.

Cantilever Overhead signs: 6 nos.

Six nos. of Gantry mounted, variable message signboard (5mX2m each)(VMS) with fully SMS application and parking system automated andsystem integrated intelligent transport system which helps users withreal time traffic information from cloud to display on road in perfect co-ordination

Smart Cameras

Page 101: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

FEATURES ROAD SIDE & MEDIAN SAFETY BARRIER

PEDESTRIAN FACILITY

Footpath: Over proposed Drain 12.6 km

Pedestrian Guard Rail (MS Grill): Along Service Road 11.2 km

Pedestrian Crossing

Tree Plantation by Forest & Environment Dept., GoB

BUS BAYS WITH BUS SHELTERS

8 Nos. Bus Bays with Bus Shelter, Toilet Block, Drinking Water facility

STREET/HIGHWAY LIGHTING

Grid Interactive Solar lights with AC Backup, Double Sided Grid InteractiveSolar lights @ 30m interval on median, Single Sided Grid on each side of serviceroad @ 30m interval.

NOISE BARRIER

Anti Glare Screen

Page 102: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

R’Block Digha Road (Phase-1)

S.

no.

Item Scope

(Km)

Completed

(Km)

Balance

(Km)

1 Emb. (Main carriageway) 12.6 4.59 8.01

2 Emb. ( Service Road) 10.0 2.02 7.98

3 Sub-grade (Main

carriageway)

12.6 3.87 8.73

4 Sub-grade ( Service Road) 10.0 2.01 7.99

5 GSB (Main carriageway) 12.6 3.57 9.03

6 GSB ( Service Road) 10.0 1.56 8.44

Culverts/ Bridges/Storm water drain

1 Major Bridge 03 Work in progress.

2 Minor Bridge 04

3 Culverts 08

4 Storm Water drain 10.0 Km

Physical Progress as on 01.6.2019

Page 103: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Issue

• Out of 36 nos. of Temple 34 relocated – 2 in progress.

• Boundary wall of 4 buildings of BCD to be shifted - NOC

obtained.

• Boundary wall of SBPDCL building to be shifted – Work

order received. Estimate under preparation in SBPDCL.

• Out of 3 Police Cooperative buildings 2 demolished, 1 is

to be shifted.

• A few private buildings/boundary within ROW, marking

done, verification is being done by CO. After verification it

will be demolished.

• Primary school at Mushahari Digha is to be shifted.

Page 104: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PROPOSED

CONSTRUCTION OF 6/4 LANE R’BLOCK –

DIGHA ROAD - PHASE-II

(FROM B.D. ROAD TO GANGAPATH

Page 105: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

SUMMARY OF PROPOSAL

• THE DPR FOR THE FIRST PHASE WAS PREPARED FOR THISROAD FROM R’BLOCK TO BANKIPORE DANAPUR ROADJUNCTION (CHAINAGE 6+300) WHERE THE PROPOSEDALIGNMENT WAS MEETING AT-GRADE TO BANKIPOREDANAPUR ROAD.

• THE SITUATION OF FUTURE TRAFFIC CONGESTION ATBANKIPORE DANAPUR ROAD JUNCTION WAS DISCUSSEDAND IT WAS DECIDED TO PROVIDE A GRADE SEPARATOR ATTHIS JUNCTION.

• A 4-LANE ELEVATED/ VUP STRUCTURE OVER BANKIPOREDANAPUR ROAD JUNCTION HAS BEEN PROPOSED TOFACILITATE SMOOTH MOVEMENT (CONFLICT FREE) OFTHROUGH & OTHER INTERMEDIATE TRAFFIC FROM R-BLOCK /HARTALI MORE TO GANGA PATH, DIDARGANJ, JP SETU, AIIMSETC CONSIDERING THE FUTURE TRAFFIC GROWTH.

Page 106: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

• IT HAS ALSO BEEN PROPOSED TO PROVIDE 2-LANE/INTERMEDIATESERVICE ROAD ON EACH SIDE OF ELEVATED/VUP FOR LOCALTRAFFIC MOVEMENT UP-TO BANKIPORE DANAPUR ROADJUNCTION. IN ADDITION ONE SIDE SERVICE LANE ON LEFT HANDSIDE (WESTERN SIDE) FROM THIS JUNCTION TO CHAINAGE 6+500HAS ALSO BEEN PROPOSED.

• THE PROPOSED ROAD WILL MEET GANGAPATH AT GRADE INROTARY. ROATARY IS IN SCOPE OF GANGA PATH PROJECT.

• LAP FOR LAND TRANSFER FROM FCI IS UNDER PROCESS.

• PPR BE FINALIZED BY 07.06.2019.

• PROPOPOSAL FOR A/A BE SENT BY 10.06.2019.

SUMMARY OF PROPOSAL

Page 107: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

GENERAL ABSTRACT OF COST

S.N. Description in Rs. In Crore

A. ROAD WORKS:

1 Construction of Main Carriageway 5,44,11,144

Minor Road shifting Near Under Pass 1,48,40,000

2 Road Safety, Traffic Signs, Marking and Road Appurtenances 1,57,99,005

TOTAL (A) 8.51

B. FLYOVERS, CULVERTS & OTHER STRUCTURES:

3 Flyover 8,66,63,273

4 RE Walls 21,18,75,916

5 Underpass, Splayed Wing wall and Boulder Protection 2,64,16,375

TOTAL (B) 32.49

C. MISCELLANEOUS:

6 Solar Lighting 99,09,640

7 Backup Arrangement for AC lighting (L.S) 50,00,000

8 Shifting of Utilities 50,00,000

9 Relocation of Religious and other structures 50,00,000

TOTAL (C) 2.49

D. TOTAL COST (A + B + C) 43.49

E. OVERHEADS:

5% up to 100 crores 1,98,70,030

Supervision @ 3% on (D) 1,19,22,018

TOTAL (E) 3.18

F. GRAND TOTAL (A+B+C+D+E) in Crore 46.67 Cr

Page 108: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PLAN OF PHASE –2 R’BLOCK-DIGHA ROAD

Page 109: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PLAN OF PHASE –2 R’BLOCK-DIGHA ROAD

Page 110: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

LENGTH : 92.935 Km.

PROJECT SANCTIONED AMOUNT- : INR 2138.16 Cr. ( Revised)

JICA FINANCE PORTION (PROJECT COSTAND CONSULTANCY COST)

: INR 1203.19 Cr.

BALANCE AMOUNT TO BE BUDGETED BYMORTH, GOI(R&R, LA, Utility shifting & Local Taxes.)

: INR 934.97 Cr.

NAME OF CIVIL CONTRACTOR : GAYATRI PROJECTS LTD., HYDERABAD

DATE OF COMPLETION : 06.11.2019 DATE OF COMMENCEMENT : 20.10.2016 UPTO DATE PHYSICAL PROGRESS : 41.00% FINANCIAL PROGRESS : 40.74%

Page 111: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Item Total Length (Km) Cumulative Achievement

C & G 168.07 86.15

Embankment 168.07 77.25

Subgrade 168.07 68.63

GSB 168.07 64.95

WMM 164.07 61.75

DBM 169.97 60.78

BC 181.87 15.39

PQC 2.00 0.75

Structure workHP Culvert-60( C )/105, Box-98( C )/118, Minor Bridge-29 ( C )

/33, Major Bridge-1( C )/6, ROB-2(P)/4

Page 112: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

With E.C. Railway (Total 4 no. of ROBs)

• GAD of ROB Ch. 10+923 and Ch. 43+961is pending with EC

Railway Hajipur.

• Structural design of ROB Ch. 48+596 is pending with EC

Railway Hajipur.

Land Issues

Slow disbursement due to higher rate demand and new

introduced online payment system PFMS.

Page 113: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

CONTRACTOR DETAILS

Contractor : M/s M.G Contractors Pvt. Ltd., Haryana Contract Amount : 32.74 Cr. Date of Commencement : 09.10.2017 Date of Completion : 08.1.2019 (EOT granted upto

31.05.2019) Physical Progress : 65.00% Financial Progress : 59.00 %

Status of ROB (SH-83)● Pile - All 56 completed● Pile Cap – All 4 completed● Pier and Abutment Shaft and Cap – All 4 completed● Steel Girder Fabrication – All 45 Nos. Completed and shifted to project site● Steel Girder launching – 2 span completed out of 3 spans, balance (01) for

main ROB Span is awaited for TAD approval and block from Railways● Box Culvert – All 5 completed● VUP – completed● Construction of RE wall and services road are in progress. 100% of RE wall

panel have been casted & 68% RE wall has been erected.● TAD approval in process.

Page 114: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Project: Manuapul-Yogapati-Nawalpur-Ratwal Chowk Road

( Under CRF)

Page 115: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Manuapul-Yogapati-Nawalpur-Ratwal Chowk Road

Page 116: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Project Details

1Name of Road

Improvement/up gradation of Manuapul -

Yogapati-Nawalpur - Ratwal Chowk Road

2 Connecting Highway

Starting Point NH-28B ( 30th Km of NH 727 ) ( West

Champaran District)

End Point Ratwal Chowk ( Gautam Budh Mahasetu near

Gandak River) Link Road

3 Length 37.008 Km

4 ClientBihar State Road Development Corporation Limited,

Patna, (A Govt. of Bihar undertaking)

5 Name of ContractorM/s. Tribhuvan Narayan Singh, Chandshekhar Nager,

Gazipur, (UP)

6 Contract Commencement Date 01.11.2018

7 Contract Period 730 days

8 Contract Completion 31.10.2020

9 Administrative Approval Amount (Cr.) 132.44 Cr.

10 Technical Sanction Amount (Cr.) 142.65 Cr.

11 Rigid Pavement Lengh 1.904 Km.

12 Flexible Pavement Length 35.104 Km

13 Pavement Width 7 m Carriageway and 2.5 m earthen shoulder

14 Drain 2.904 Km

Page 117: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Improvement/up gradation of Manuapul - Yogapati-Nawalpur - Ratwal Chowk RoadName of Contractor : M/s. Tribhuvan Narayan Singh, Contract Length : 37.008 Km

Administrative Approval Amount (Cr.) : 132.44 Cr. Commencement Date : 01.11.2018

Technical Sanction Amount (Cr.) : 142.65 Cr. Contract Award Amt. : 110.212 Cr.

Physical Progress upto March 2019 :-Highway Work Structure

Item

Total

Length

(Km)

Completed

(Km)

In Progress

(Km)Remarks Structure Total (Nos.)

Completed

(Nos.)

In Progress

(Nos.)

OGL 37.008 20.00 2.00 Minor Bridge 3 - -

C & G 37.008 20.00 2.00 Box Culvert 19 - 4

Embankment 37.008 14.00 1.00 Hume Pipe

Culvert43 - 10

Subgrade 37.008 9.00 1.00

GSB 37.008 4.00 5.50

WMM 35.104 - -

DBM 35.104 - -

BC 35.104 - -

DLC 1.904 - -

PQC 1.904 - -

Drain 2.904 - -

Financial Progress (up to April. 19) :- 12.12 %

Particulars March19 April 19 May 19 June 19Cum. Up to

April.19

Cum. Prog. In

%

Target (In Cr.) 5.5 6.5 6.5 5.00 12.00 7.86

Achievement (In Cr.) 3.63 4.92 13.36 12.12

Slippage in % 34 1.7

Page 118: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

SH-58 ( Udakishanganj- Bhatgama Road) Package no.-1

CONTRACT DETAILS Contractor : M/s M.G. Contractors Contract Length : 29.48 km Contract Amount : 146.02 Cr. Date of Start : 13.03.2019 Completion Period : 27 Month Physical Progress : Embankment – 0.75 Km

Page 119: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

SH-84 (Ghogha–Panjwara Road) Ch: 0.0 km to 43.35 Km

CONTRACT DETAILS Contractor : M/s M.G. Contractors Contract Length : 43.35 km Contract Amount : 258.517 Cr. Date of Agreement : 16.11.2018 Completion Period : 27 Month Physical Progress : Emb. – 20.7 Km

Subgrade – 19.4 KmGSB – 13.2 KmWMM- 4.75 Km

Ghogha

Panjwara

Dhoraiya

BarahatBanka

Bazar

Bhagalpur

SH-

84

Sultanganj

Page 120: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

SH-102 (Bihia –Jagdishpur-Piro- Bihta Road) Ch: 0.0 Km to 54.519 Km

CONTRACT DETAILS Contractor : M/s M.G. Contractors Contract Length : 54.519 km Contract Amount : 334.599 Cr. Date of Agreement : 23.11.2018 Completion Period : 27 Month Physical Progress : Emb.- 5.6 Km

: Subgrade-1.85 Km: Box Culvert:-10: H.P Culvert : 36

Bihia

Jagdishpur

Piro

Bihta

NH-922NH-922

Page 121: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

SH-82 (Kadirganj- Khaira Road) From Km.0 to Km. 75.10

CONTRACT DETAILS Contractor : M/s Gayatri Projects Limited Contract Length : 75.10 km Contract Amount : 403.95 Cr. Date of Agreement : 21.11.2018 Completion Period : 27 Month Physical Progress : Emb. – 28.6 Km

: Subgrade – 21.7 Km: GSB – 11.8 Km( 1st Layer)

Dewangar

h

Badaldih27.00

54.00

Khaira

Kadirganj

75.10

Jamui

Nawada

Page 122: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

SH-85 ( Akbarnagar - Amarpur Road) Package no.-4

CONTRACT DETAILS Contractor : M/s Barbarik – RCPL (JV) Contract Length : 29.30 km Contract Amount : 155.72 Cr. Date of Start : 11.03.2019 Completion Period : 27 Month Physical Progress : Emb. – 2.25 Km

: Subgrade – 1.75 Km

Ghogha

Panjwara

Dhoraiya

BarahatBanka

Bazar

Bhagalpur

SH

-

84

Akbarnagar

Amarpur

Sultanganj

Page 123: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

UP-GRADATION & STRENGTHENING OF 8 SHsBSHP-III (Phase-II)

S. NO.

NAME OF ROAD LENGTH (KM)PROJECT COST IN CRORE

STATUS

1BHABUA-ADHAURAROAD (SH-80)

15.40 64.85Revised DPR for A/A to besubmitted based on currentSOR effective from 01.04.19

2BETTIAH-NARKATIAGANJ-BIKHNATHORI ROAD (SH-105)

61.48 600.02Revised DPR submitted to RCDfor A/A. ref. Letter no.-604 dt.14.02.19

3MANSI-HARDI-CHUGRAHA ROAD (SH-95)

75.20 1353.76

DPR for A/A submitted vide letterno 4249 dt. 31.12.18.Railway Land

requirement Proposal in Samastipur

Zone submitted to Railway

Department vide HQ letter no.-

1043(we) dated-20.03.2019.

4KATIHAR-BALRAMPURROAD (SH-98)

62. 88 803.01Revised DPR submitted to RCDfor A/A vide letter no. 568 dt.12.09.19.

5BAISI-BAHADURGANJ-DIGHALBANK ROAD (SH-99)

66.72 795.04

Revised DPR submitted to RCDfor A/A. vide T.O letter no. 579dt. 12.02.19.

TOTAL 281.68 3616.68

Page 124: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Proposal for widening of SHs and MDR in 2-Lane with paved shoulder/ 4-Lane

Meeting held on 18.01.2019 under the Chairmanship of Hon’ble Minister,RCD to prepare widening proposal for those SHs/MDRs requiring LaneCapacity to be increased based on Traffic Studies/Counts.

16 SH/MDR were identified on which traffic is more and traffic study isconducted.

Based on MoRT&H guidelines on capacity augmentation dated 26.05.2016

and traffic counts (PCU), 13 SH/MDR selected as under :-

S.

NoRoad Name

Length

(km)

Traffic

(PCUs)

Existing Lane Proposed

Lane

1SH-49 Hajipur-Mahua-

Tajpur-Samastipur Road

62.959546

2 Lane Earthen

Shoulder

Four Lane

2SH-93 Hajipur-

Bachwara Road

13.0012382

2 Lane Earthen

Shoulder

Four Lane

3SH-73 Sitalpur-

Mashrakh Road

50.0029215

2 Lane Earthen

Shoulder

Four Lane

4SH-04 Daniawan-

Islampur-Gaya Road

80.009551

2 Lane Earthen

Shoulder

Four Lane

5

SH-02 Bihta-Bikram-

Paliganj-

Mahabalipuram Road

37.70

21654

2 Lane Earthen

Shoulder

Four Lane

Page 125: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

S.

NoRoad Name

Length

(km)Traffic

(PCUs)

Existing Lane Proposed Lane

6

SH-25 Bhagalpur-

Amarpur-Banka-Deoghar

Road

44.31

13853

2 Lane Earthen

Shoulder

Four Lane

7SH-08 Hisua-Nawada-

Sikandra-Lakhisarai Road

93.3513276

2 Lane Earthen

Shoulder

Four Lane

8SH-18 Lakhisarai-Jamui

Road

45.3115785

2 Lane Earthen

Shoulder

Four Lane

9SH-74 Hajipur-Lalganj-

Manikpur Road

37.2019870

2 Lane Earthen

Shoulder

Four Lane

10Sakri-Pandaul-Madhubani

Road

13.8014418

2 Lane Earthen

Shoulder

Four Lane

11Madhubani-Rajnagar-

Khutauna Road

38.2017668

2 Lane Earthen

Shoulder

Four Lane

12Kishanganj-Bahadurganj

Road

25.8010564

2 Lane Earthen

Shoulder

Four Lane

13Bakhtiarpur-Mokama Left

Over Portion

6.0027425

2 Lane Earthen

Shoulder

Four Lane

Page 126: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Widening to 2 Lane with Paved Shoulder as a stageconstruction being considered only.

Within the limited resources detailed proposal is in processconsidering the following points :

Finished road level needs not to be increased.

Widening within the available ROW.

No Widening of Major/Minor Bridge.

Extension of existing culvert of the same type to beconsidered.

Utility shifting and tree cutting kept minimised.

Proposal along with estimate for all 16 SHs will besubmitted by the end of July 2019.

Proposal:-

Page 127: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PEOJECTs ON ANVILPROPOSED ELEVATED STRUCTUREs IN PATNA

SAIDPUR NALA:Saidpur Nala originates from north of Moinul Haq Stadium and passesthrough Saidpur, Sandalpur, Sultanganj, Sardar Patel Colony, Alka Colony,Shitla Colony, Choti Pahari, Laxmi Nagar and terminates at NH-30 (BadiPahadi).

• Preparation of DPR under progress

• Draft feasibility report received by BSRDCL.

PROPOSED STRUCTURE:-(i) Elevated road on Portal Frame over Nala .(ii) Rajendra Nagar to Sanichara at grade road on North of Nala.(iii) Sanichara to Gaighat at grade Road on South of Nala.(iv) After Railway Gumti at grade road on Embankment.

Length - 5.77 km

Lane Configuration - 4 Lane

As per instruction given by the Principal Secretary on 23.04.19 in the review meeting with BSRDCL, a proposal along with DPR report may be sent to Urban development Department for execution of the Nala construction work.

Page 128: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PEOJECTs ON ANVILPROPOSED ELEVATED STRUCTUREs IN PATNA

BADSHAHI NALA:

Badshahi Nala originates at Adhpa- Ishopur-Phulwarisharif Road and passes throughGonpura, Hinduni, Vidyanagar, Gayatrinagar, Etwarpur, Isarpur, Sheikhpura, Laxminagar,Ramkrishnanagar, Pahari Village, Elahibagh, Karanpura, Mahuli & terminates at Madhopur.

Preparation of DPR under progress.

Draft feasibility report received by BSRDCL

PROPOSES ELEVATED STRUCTURE – 1: NH-30 (NANDLAL CHHAPRA) TO SH-01 (ELAHIBAGH) –Elevated Road up to SH-1 and at grade Road up to Pahari only.

Length - 2.70 kmLane Configuration - 2x 2 LaneEstimated Cost - 425 Crore

PROPOSES ELEVATED STRUCTURE – 2: ELAHIBAGH (SH-01) TO MAHULI - At Grade Road alongNala.

Length - 9.3 kmLane Configuration - 4 LaneEstimated Cost - 370 Crore

As per instruction given by the Principal Secretary on 23.04.19 in the review meeting with BSRDCL, only at grade 4 lane road is to be constructed on the Nalla, and elevated structure is to be excluded from the proposal. The same proposal may be vetted by UDHD.

Page 129: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PEOJECTs ON ANVILPROPOSED ELEVATED STRUCTUREs IN PATNA

KURJI NALA (Length-4.4 Km.)• This Nala runs from Ashiana-Digha Road to Ashok Rajpath and

traverses through major habitancy of the capital town namely KeshriNagar, Rajiv Nagar, Indrapuri, Patliputra Industrial area and otherimportant localities.

• Preparation of DPR under progress.• Draft feasibility report received by BSRDCL.

PROPOSED STRUCTURE: At grade Road along both side of nala to be terminatedon proposed R-Block-Digha 4/6 Lane Road.

Length - 4.4 kmLane Configuration - 2 Lane Road either side of Nala

As per instruction given by the Principal Secretary on 23.04.19 in the review meeting with BSRDCL, only at grade 4 lane road is to be constructed on the Nalla, and elevated structure is to be excluded from the proposal. The same proposal may be vetted by UDHD.

Page 130: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

PEOJECTs ON ANVILPROPOSED ELEVATED STRUCTUREs IN PATNA

MITHAPUR MAHULI CONNECTIVITY: Mithapur Mahuli Connectivity starts from Mithapur Level Crossing flyover andterminates near Ramgobind Halt to join new alignment of NH-83. It runs parallelto Patna – Gaya Rail Line (eastern side) from start to beginning and passes NH-30bypass through VUP at Sipara Bazar, Parsa Bazar and terminates near Mahuli atNH-83 proposed ROB.

Preparation of DPR under progress ( Likely to be submitted by 04.06.19).

Presentation has also been made before Hon’ ble Chief Minister, GOB.

Intermediate connectivity with existing road alignment has to be provided.

Existing Road from Sipara Gumti to Mahuli is also to be up-graded up to 4-Lane.

PROPOSED STRUCTURE : Elevated Road cum at Grade connectivityLength - 8.800 kmLane Configuration - 4 -Lane

Page 131: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

About the project• Main objective of project is to provide Access Control Facility for traffic between

Patna & Gaya – for this elevated / at-grade road is to be provided starting nearPatna Railway Station (Mithapur ROB) and up to Mahuli halt (NH-83 bypass).Approximate length of this project is 8.8 km.

• Facility shall be 4-lane divided elevated carriageway for uninterruptedmovement of traffic from Ch: km 2+000 to Ch: km 6+900 with entry exit pointsat required locations.

• From Sipara Flyover to Parsa Bazar development of existing road (5.5 mtr.) to(2+2 lane for up and down traffic) facility for local traffic for better movementsand segregation from through highway traffic.

• There is provision of a right limb (2 lane of 400 mtr. Length approx.) nearChankya National Law University for traffic movement coming from Gayatowards Patna and ends on existing Mithapur road.

• From Ch: km 1+800 to Ch: km 3+800, proposed metro superimposed with thiselevated alignment and running on a single pier two tier system in whichelevated road running on 1st tier and metro will run on 2nd tier.

• There is a provision of ROB for Gaya to Patna traffic near Sipara railway crossingfor better movement of local traffic.

• There is a provision of slip road both side on existing NH-30 and left side of thisalignment at Ch: km 1+650 for connectivity to existing Mithapur road to thisproposed road.

Page 132: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are
Page 133: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

• At present 68 nos. Quality Control Laboratories functional under

RCD divisions and circles.

• 4 Flying Squad teams at HQ level to ensure Quality Assurance

through surprise inspection in addition to attended complaints (if

any).

– No. of schemes inspected in 2017-18 - 369 nos.

– No. of schemes inspected in 2018-19 - 325 nos.

– No. of schemes inspected in 2019-20 till date - 40 nos

• Before releasing the allotment to any schemes, its update quality

control reports are verified.

• Quality Control Report are being uploaded on Departmental

PMIS.

Quality Assurance

Page 134: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

• Special Inspection Drive for On-going Projects of SHs

& MDRs to ensure Quality Control as Third Party

Independent Quality Monitor.

• Special Inspection Drive teams comprising of one SE/EE

and one AE carry out Inspection in their designated Road

Division.

• Online entry of Inspection data through PMIS is being done

by each team after field inspection.

Quality Assurance

Page 135: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Road Safety under RCD Roads

(a) Black Spot Clander Year (2017) :

(b) Activities under RCD for Road Safety:

(i) Road Safety Audit done (SH)

Design Stage Construction

Stage

Operational Stage Total

414 Km 525 Km 922 Km 1861 Km

(a) Black Spot:

Road CategoryNo. of identified

black spots

Status Report

Rectified Under Rectification

NH

RCD 3 1 2

NHAI 9Direction has been given to

rectify

Total 12

Page 136: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Road Safety under RCD Roads

(b) Activities under RCD for Road Safety:

(ii) Road Safety Audit of SHs is started by CRRI, New

Delhi - about 2500 Km

(iii) Capacity Building of Engineers on the subject “Road

Safety Audit and other Road Safety related aspects”

- 245 Engineers.

(iv) Mandatory Provision of Road Safety Audit in new

projects (5 km or above) at DPR stage.

(v) Social awakening in children and students through

arranging workshops in schools situated besides

RCD roads – 119 schools.

(vi) Provision of Zebra Crossing and Rumble Strips near

schools on SHs and construction of Foot over

Bridges / Under Pass as required.

Page 137: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

New Proposed Initiatives

1. Provision of Street Lights in Urban stretches for Road Safety.

2. Policy for development of way side amenities.

3. Land pooling policy for Ring Road / Bypass Roads

4. Planning for development of road infrastructure in Patna

Metropolitan area.

5. Policy for extraction of soil from public water bodies for

utilization in road embankment.

6. Online Project Monitoring System (PMIS).

7. Comprehensive financial management system.

8. Bihar Road Research Institute (BRRI).

9. Revenue generation methodology developed through

providing accessibility to Petrol Pump, Hospital & other

commercial institutes.

Page 138: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Status of NHs (Bad)

Sl. No. NH No. Length (Km)

(Bad Condition)

1 104 [Chakiya – Sheohar – Narahiya) 137.00

2 106 [Birpur – Bihpur] 109.00

3 103 [Hajipur – Musrigharari] 29.00

4 333A [Barbigha – Banka- Bheramore] 24.00

5 28B [ Chhapwa – Bagha -UP Border] 12.80

6 30A [Fatuha – Harnaut - Barh] 04.00

7 110 [Biharsharif – Jehanabad – Arwal] 21.40

8 131A [ Amdabad – Manihari – Purnea] 11.00

9 727A [UP Border - Guthani] 04.00

Total 352.20 say 352.00

NHs with RCD:

BackMAP

Page 139: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Status of NHs (Bad)

Sl.

No.

NH No. Length (Km)

(Bad Condition)

1 107 [ Maheshkhunt – Purnea] 127.42

2 83 [ Patna – Gaya – Dobhi] 99.00

3 19 [ Hajipur – Chapra] 22.00

4 30 [Mohania – Ara – Patna – Bakhtiyarpur] 27.00

5 80 [Mokama – Munger – Mirza Chauki] 11.00

6 57A [Forbesganj – Jogbani] 08.00

7 02 [Durgawati – Aurangabad – Chauparan] 04.50

8 28A [Piprakothi – Raxaul] 07.00

9 82 [ Gaya – Hisua – Rajgir – Sarmera – Mokama] 07.00

10 85 [ Chapra – Siwan – Gopalganj] 04.00

Total 316.92 say 317.00

NHs with NHAI:

Back

Page 140: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Status of Poor Maintained NH & Proposed Plan of Action (Maintenance Proposal from State Plan)

Due to non sanction of schemes under NHO by MoRTH during previous

Financial Year 2018-19 & 2019-20, these NHs have deteriorated. To keep the

road in good condition, these NHs (under RCD) need to be maintained by State

Plan:

Sl.

No.

NH No. Stretch (in bad

condition)

Schemes proposed but could not be

sanctioned by MoRTH

1 103

(Hajipur –

Musarigharari)

Km 5.00 to

20.00

& Km 45.00 to

59.00

Km 0.00 to 44 (W&S to 2 lane with Paved

Shoulder) was included in Action Plan 2018-19

& Km 45 to 59 (W&S to 2 lane with Paved

Shoulder) was proposed in PM Package during

FY-2017-18. DPR was submitted to MoRTH for

approval.

Sanction was not granted by MoRTH.

2 110

(Biharsharif-

Arwal)

Km 0.00 to

14.00 , 44, 70,

73, 77 & 81

Km 0.00 to 36.00 (W&S to 2 lane with Paved

Shoulder) was included in Action Plan 2018-19

and DPR was submitted to MoRTH for approval.

Sanction was not granted by MoRTH. Km 0.00 to

36.00 is deteriorating and needs immediate action

for keeping the road in traffic worthy condition.

Back

Page 141: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Sl.

No.

NH No. Stretch (in bad

condition)

Schemes proposed but could not be

sanctioned by MoRTH

3 333A

(Barbigha –

Bhera more

Bihar-

Jharkhand

border)

Km 11, 21-29, 33-36,

49-52, 56-59

Km 0.00 to 198.00 [total stretch of NH-333A] is

under PM Package-2015. Ministry has sanctioned

Widening & Strengthening to 2L+PS in km

178.00 to 198.00. DPR for km 0.00 to 178.00 for

W&S to 2L+PS has been submitted to MoRTH

during the previous Financial Year, but no

sanction has been granted. Km 0.00 to 64.00 is

deteriorating and needs immediate action for

keeping the road in traffic worthy condition.

4 80

(Munger –

Mirzachowki

-Jharkhand

border)

Km 132-134 & Km 181

to 190

RCD has submitted estimate for Rs. 180 Cr.

under OTM as the almost whole old alignment is

being by-passed. Sanction is still to be received.

Stretch of Km 132-134 & Km 181 to 190

has deteriorated and needs immediate attention.

Contd...

Status of Poor Maintained NH & Proposed Plan of Action (Maintenance Proposal from State Plan)

Back

Page 142: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Sl.

No.

NH No. Stretch (in bad

condition)

Remarks

1 83

(Patna – Dobhi)

NHAI

Km 0.00 to 15.00, Km

18-21, Km 23-27, Km

40-80, Km 81-105 &

Km 117-124

Due to poor performance of civil work contractor M/s

IL&FS, NHAI has foreclosed the contract. The existing

alignment has deteriorated.

However maintenance work is being taken up in 2

Parts. One work is in progress and other in finalization

stage.

2 19

(Chapra –

Hajipur)

NHAI

Km 143.2 to 207.2 Concessionaire of the project is facing liquidity

problem. Although NHAI has agreed for infusion of

money in the project, it is expected that rest 30 kms of

the project will be completed by end of the year.

NHAI has sanctioned the estimates for construction of

drain in the by-passed stretches .

3 30

(Ara - Mohania)

NHAI

Km 10 – 17 & Km 168-

177

This road has been recently entrusted to NHAI by

MoRTH. NHAI is preparing DPR for 4-laning of the

stretch. Maintenance work is being taken up and it is

expected that road will improve after completion of

work by June-2019. However, bridge over Dharmawati

river is in poor condition. Height restrictions may be

imposed for heavy vehicles.

Contd...

Status of Poor Maintained NH & Proposed Plan of Action (Maintenance as part of NH/ NHAI Schemes)

Back

Page 143: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

Sl.

No.

NH No. Stretch

(in bad condition)

Remarks

4 28B

(Bagaha –

UP Border)

Km 97 to km 110 MoRTH has sanctioned the work for

Strengthening of existing surface in this

stretch. Tender is being received.

5 104

(Sheohar –

Narahiya)

Km 35.00 to 55.30, km

67.00 to 79.40, km

79.40 to 176.00

This stretch of road is being upgraded to two

lane configuration with World Bank assistance.

Civil work contractor of Lot-I (km 40 to 79) &

Lot-II (km 80 to 156) is not performing and RCD

has recommended for termination of Lot-I and

issue cure period notice to Lot-II.

However subletting is being considered at

MoRTH, Hence work is expected to resume soon.

6 106

(Birpur –

Bihpur)

Km 0.00 to 106.00 &

Km 130 - 133

This stretch of road is being upgraded to two

lane configuration with World Bank assistance.

Civil work contractor M/s IL&FS was not

performing and RCD has recommended for

foreclosure.

However, MoRTH is finalizing revised work

schedule with IL&FS.

Status of Poor Maintained NH & Proposed Plan of Action (Maintenance as part of NH/ NHAI Schemes)

Back

Page 144: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

S. NO.PM PACKAGE

PPT NO.PROJECT NAME

A AWARDED NOT STARTED

1 64Development to 2-lane with paved shoulder of Maheshkhunt-

Saharsa- Purnia section of NH-107 NHAI

2 66 Development of Manjholi -Chirot section of NH-527 C

3 41Construction of 2-lane ROB of km 100 of NH-327E (Job no. NH-

327E/Bihar(2)/15-16/014-S&R(B))

RCD4 44Construction of 2-lane ROB of km 135 of NH-19 (Job no. NH-19-

Bihar(17)-2015-16-012-S&R(B))

5 46Construction of 4-lane ROB of km 12 of NH-103 (Job no. NH-

103/Bihar (5)/15-16/019-S&R(B))

B IN BIDDING STAGE

6 29Widening to 2 lane with paved shoulder from 19.00 to 38.00 of NH-

219

RCD7 50Construction of 2-lane ROB of km 91 of NH-28B (job no. NH-

28B/Bihar(7)/15-16-020-S&R(B))

8 51Construction of 2-lane ROB of km 94 of NH-28B (job no. NH-

28B/Bihar(8)/15-16-018-S&R(B))

Back

Page 145: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

S. NO.PM PACKAGE

PPT NO.PROJECT NAME

C IN SANCTION STAGE

9 69 4-laning of Munger- Mirzachowki section of NH-80

NHAI

10 73Development of Rampur - Khajuriya - Kesariya end of NH-722 to 4 lane standard(In

principle 'NH' )

11 74

Development of Umgaon -Basopatti-Benipatti-Rahua-Madhubani-Rampatti-Awam-

Laufa-Bheja-Supaul - mehsi - Saharasa which connects Uchchait Bhagwatisthan to

Mehsi - Tarasthaan to 2 lane with paved shulder or 4-lane Standard with a Bridge

over Kosi.(In principle 'NH' )

12 75

Development of Ram-Janki Marg, as already declared recently part of which falls in

Bihar from UP Bihar Border to Siwan-Madhubani- Sitamarhi-Indo-Nepal Border to 4

lane standard

13 21Construction of bridge across Kosi river at Phulaut including rehabilitation of NH-106

from 106 to Km 136 to 2-lane with paved shoulders.

RCD

14 22Construction of parallel Bridge to the Vikramshila Setu across Ganga River after

declaration of New NH. 131B

15 23New 4-laned bridge on river Ganga parallel to existing MG Setu, NH-19(New NH no.

31)

16 30 Widening to 2 lane with paved shoulder from 0.00 to km 178.00 of NH-333A

17 32 Bikramganj to Dumraon of NH-120

18 33Road starting from junction of Musarigharari NH-122 & NH-32- Samstipur -

Darbhanga up to Juntion of NH-27 (For 4 laning) NEW NH-322

19 34Stretch from Bhagalpur at NH 33 - Dhaka more- Hansdiha (Jharkhand) on NH-333A

(For 4 laning)NEW NH-133E

20 35Junction of NH 22 near Hazipur to junction of NH 122 Bachwada via Mahanar and

Mohiuddin Nagar NEW NH- 122B

21 36Stretch from Jamui-Kharagdiha-Chatro-Sarwan-Chakai Road (Length in JH=42km,

In Bihar=18 km) NEW NH-333C

22 37 Roseda - Baheri - Darbhanga NEW NH-527E

23 38 Saraigarh (on NH-327A)- Lalganj- Ganpatganj upto NH- 106 (New NH-327AD

24 39New National Highway connecting Buxar on NH-84-Chausa- Ramgarh- Mohania on

NH-2 NEW NH-319A Back

Page 146: ROAD CONSTRUCTION DEPARTMENT, BIHARrcd.bih.nic.in/Reports/PPT/PR-01-03-06-2019.pdfLIST • Total 125 schemes sanctioned out of which 83 schemes have been completed and 42 schemes are

S. NO.PM PACKAGE

PPT NO.PROJECT NAME

D IN DPR STAGE

25 53 4-laning of Patna – Koilwar Section of NH-30

NHAI

26 67 4/6 laning of Patna Ring Road

27 71Roads connecting Raxaul and Sonebarsa (Parallel to Indo Nepal Border) (Inprinciple

NH)

28 72 Chakia – Bargainia Connectivity (NH-227F)

29 31 NH-131A - Stretch from Amdabad (0.0 km) to Narenpur (34.6 km) single lane RCD

E WORK COMPLETED

30 6Widening & strengthening to 2-lane with paved shoulder & geometric improvement

Betiah - Khushinagar Section from km 25.00 to km 40.00 of NH-28B.

RCD

31 8Strengthening and Widening to 2-lane with paved shoulder from km 0.00 to 10.903 of

NH-133

32 10Strengthening & Widening work of existing 2-lane to two lane with paved shoulder

from km 93.612 to km 98.00 of NH-327E

33 12 Widening to 2-lane with paved shoulder from km 0.00 to 11.400 of NH-99 (Dobhi to

Jharkhand Border)

34 13 Widening & strengthening from km 167 to 180 of NH-80 (Ramjanipur – Pirpainti)

35 16Widening to 2-lane with paved shoulder of NH-333 from km 62 to 75 (Gidhaur -

Section)

36 17 Widening to 2-lane with paved shoulder of NH-327E from km 56 to 68

37 19Widening to 2-lane with paved shoulder of NH-327E:- from km 0 to 39 (Galgalia –

Bahadurganj section)

38 60

Two Lane with Paved Shoulder from Km 1.300 to Km 74.379 (Existing Chainage from

Km.1.300 to Km.74.200) of Chhapra-Rewagaht-Muzzaffarpur of NH 102 in the state of

Bihar under NHDP Phase IV