roadmap’2050’ · 2020. 11. 19. · electricity demand 2050 (eu-27 + norway & switzerland)...

19
PROPRIETARY Any use of this material without specific permission of the European Climate Foundation is strictly prohibited ROADMAP 2050 A prac/cal guide to a prosperous, lowcarbon Europe

Upload: others

Post on 08-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • PROPRIETARY Any use of this material without specific permission of the European Climate

    Foundation is strictly prohibited

    ROADMAP  2050  A  prac/cal  guide  to  a  prosperous,  low-‐carbon  Europe  

     

  • ROADMAP 2050 PARTNERS

  • Transmission System Operators

    NGOs

    Manufacturers

    Plus 40 more companies, NGOs and research institutes

    Core Working Group participants Further outreach

    Siemens

    WWF

    KEY STAKEHOLDERS WERE INVOLVED BY PROVIDING INPUT AND REVIEWING RESULTS

    Utilities

  • THE DECARBONIZATION PATHWAYS ANALYSED ARE SUSTAINABLE, TECHNICALLY FEASIBLE, AND HAVE A POSITIVE IMPACT ON THE ECONOMY

  • 1 Based on the McKinsey Global GHG Cost Curve 2 Large efficiency improvements already included in the baseline 3 CCS applied to 50% of industry (cement, chemistry, iron and steel, petroleum and gas, not applied to other industries) SOURCE: McKinsey Global GHG Abatement Cost Curve; IEA WEO 2009; US EPA; EEA; Roadmap 2050 Technical Analysis

    AT LEAST 80% CO2 EMISSION REDUCTION

  • ENERGY EFFICIENCY & FUEL SHIFT GIVE OVERALL DEMAND

  • ELECTRICITY DEMAND 2050 (EU-27 + Norway & Switzerland)

  • Energy production mix over the year, TWh per week

    40% RES 30% CCS

    30% nuclear

    60% RES 20% CCS

    20% nuclear

    80% RES 10% CCS

    10% nuclear

    THREE SPECIFIC PATHWAYS MODELED INCLUDING BOTH GENERATION AND GRID COSTS

  • RES DIVERSITY CONTRIBUTES TO CONSISTENT SUPPLY

  • COMBINING REGIONAL DEMAND CURVES REDUCES VOLATILITY

  • INTER-REGIONAL TRANSMISSION REQUIREMENTS

  • 13  13  

    3  

    2  

    2  

    1  

    2  

    2  

    The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

    0  

    20  

    0  

    20  

    0  

    20  

    0  

    Requirements  on  top  of  the  baseline  

    2050, GW

    CURTAILMENT IS KEPT LOW THROUGH GRID EXPANSION AND BACK-UP CAPACITY

    40%  RES    30%  CCS  30%  nuclear  

    80%  RES    10%  CCS  10%  nuclear  

    60%  RES    20%  CCS  20%  nuclear  

    Transmission  &  genera/on  capacity  requirements  

    Transmission   Back-‐up  and  balancing    RES  curtail-‐ment1,  %  DR,  %  Pathways  

    Baseline  

  • ANNUAL CAPEX DEVELOPMENT

  • COST OF ELECTRICITY

  • LONG TERM EU27 GDP

  • DECARBONIZING THE ECONOMY SAVES MONEY