  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    1/81

    Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Determining When To Repair AgingEquipment or Upgrade to New

    Technology PRESENTED BY

    Darryl Jacobs Schaedler YescoThomas House Rockwell Automation

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    2/81

    Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    What well cover today

    Evaluating Existing Equipment

    Understanding Your Migration Options

    Justifying and Prioritizing Migration Resources

    Products and Services to Make it Easier to Upgrade

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    3/81

    Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Market Challenges

    3

    Companies are increasing looking at migration as a solution

    ImprovePRODUCTIVITYwith betterasset utilization and systemperformance

    PromoteGLOBALIZATIONwith easyaccess to actionable, plant-wideinformation

    CultivateINNOVATIONwithincreased system flexibility andtechnical risk mitigation

    SupportSUSTAINABILITYwithextended product lifecycles andbetter asset utilization

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    4/81

    Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Typical Concerns

    Cost Loss ofFunctionality Too BusyTechnology Acceptance

    Reluctantto Change

    Companies also quote similar reasons for lack of migration

    To get from there to here not so bad

    To get from there to here is a muchwider gap and pain

    Migration - ChallengesPLC2 phone

    http://www.google.com/url?sa=t&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&ved=0CAQQjRw&url=http://howtogetreal.com/blog/?p=28&ei=C1wnU9WXPIfg0gH3q4D4DA&usg=AFQjCNHcRM540CnjA9Qs3-5isf6ov0Zvfghttp://www.google.com/url?sa=t&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&ved=0CAQQjRw&url=http://howtogetreal.com/blog/?p=28&ei=C1wnU9WXPIfg0gH3q4D4DA&usg=AFQjCNHcRM540CnjA9Qs3-5isf6ov0Zvfg
  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    5/81

    Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Companies View of Migration(the misconceptions and fables)

    5Migration can reduce risk & improve productivity !!!

    Migration is

    Costly

    Migration will result

    in loss of Production

    Migration

    is risky

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    6/81

    Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Benefits of Migration

    Productivity gains through increased capacity,repeatability, throughput and quality

    Product / Process Innovation: make it future ready

    Reduce maintenance and parts costs

    Reduce downtime

    Meet global standards

    Gain a competitive advantage

    Build a data ready system

    6

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    7/81

    Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    *Evaluating Existing Equipment*

    How do I determine what our situation really is?- A great first step is knowing what you have in house- SYD/RA offers installed base evaluation services- Compare this to the product life cycle stage

    - This is the beginning at looking at an overall strategy for longterm cost controls and superior productivity

    While its not as simple as looking at obsolete parts it is an obviousexample toward justification and sense of urgency

    1785-L26BRepair OnlyLast$13,400

    1785-L86BIn rackreplacement$38,100

    1756-L71MigrationOption$5,570

    16KB 100KB 2MB

    While we offer best in class repair services as a viable option tomaintain the operational life cycle this still locks you in time for support

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    8/81

    Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Repair or Replace (Migration)?

    8

    Practical Answer:Repair part services is a very cost effective strategy where the commitment to maintain

    shelf stock is closely monitored and you have a reliable repair center.

    On discontinued or soon to be obsolete parts its really kicking the can down the road

    that will create real high drama eventually without a plan in place. (see Murphy's law )The Bottom Line

    *If you plan to run the machine application for years to come..*Unless you can afford 1 day to 1 week outages*Dont mind repeating unexpected high service call costs*Have copies of known good programs and resources to get in operation*Have a known obsolete part that will require some engineering to replace*Have 1, 2 or more critical little time bombs that can stop production

    You should have started your migration upgrade plan yesterday .

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    9/81

    Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    StepForward Program

    Rockwell Automation Product Lifecycle Map

    9

    Active Silver Series Discontinued Obsolete

    Active -Current, in-stock product, Full support (consulting, repair, training, transactional, and contract services)

    Silver Series -Low inventory, support through forecasted date, Well-defined migration path with incentives

    Discontinued -No new product; repair services available

    StepForward Program - Promotional incentives, tools & utilities to upgrade/migrate.

    Obsolete - Product and repair services unavailable

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    10/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Silver Series TM

    TheSilver Series Program is part of our communicationprogram to help you navigate through the transition phase.

    The Silver Date is the forecasted date Rockwell Automation will notaccept orders for new product shipments. After a products SilverDate, it officially enters the Discontinued phase.

    The Silver phase is typically a 0 - 24 month timeframe during whichyou can still order new products before they become discontinued.

    In some situations, the Silver Series timeframe is shorter, due tocircumstances beyond Rockwell Automations control (e.g., when a

    third-party supplier stops making an essential element for a Rockwell Automation product).

    10

    Silver Series Website Link:

    http://www.rockwellautomation.com/rockwellautomation/legacy/overview.page

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    11/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Rockwells Commitment

    We offer migration solutions to Rockwell & from competitors products !!11

    Exceptional Product Longevity & Lifecycle CommunicationRockwell Automation has a strong track record of keeping products viable, resulting in long product lifecyclerelative to our competition. As our products age, we provide options to help customers extend product life as as possible, and enough advance notification to allow them to transition as seamlessly as possible to the nextgeneration of products.

    Phased Migration Strategy and Extensive Migrations ToolkitRockwell Automation provides the broadest portfolio of upgrade and replacement options, along with a phasemigration approach that minimizes risk and protects customers investments as they move to new technology.

    Global Partners Network with Domain ExpertiseWe have a large number of global partners who offer migrations options for various industries and disciplines

    Global Solutions and ServicesRockwell Automation provides project management, domain expertise, and global execution to help optimizecustomers experience during every phase of the automation lifecycle.

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    12/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    A Word About Longevity

    Rockwell Automation has a great track record of long term life cyclesupport on products.

    Example: Standard Panelview had a 23 year run before entering thdiscontinued stage in 2012Letters of product longevity expectations are available on line and the Knowledgebase

    12

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    13/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    *Understanding Your MigrationOptions*

    How do I get this accomplished?- Migrations are not all rip and replace. Phased migration

    approach affords the most flexibility with a security blanket- Rockwell Automation has a whole toolbox of hardware and

    software migration solutions How do I justify a budget for this?

    - Developing a plan regardless of scale is key to predicting cost versusend goal benefits.

    - Phased migration plans are fit to budget and your paceShow results to justify the next phase

    - Get the right advice and assistance.Schaedler -Yesco, Rockwell Automation and our partners have theexperience to assist you in this process.

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    14/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Product Migration Options (the Help)

    Let us help you develop the right migration plan for your company14

    Caution:

    Often a the machine builder/OEM will offer upgradepackages. Does this accomplish real modernizationand productivity goals or a band aid?

    Get the information on what is being proposed to becertain they are not putting you in another box inreducing parts and maintenance cost goals.

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    15/81

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    16/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Migration Plan

    16

    Assess & document your control systemUnderstand your current & future needsIdentify reliability and longevity issuesDetermine scope of projectUnderstand your cost and availability time

    Assess

    Work with Rockwell Automation &Work with your partners to review your optionsDevelop migration plan to meet your needsDocument the benefits of the new system

    Develop A Plan

    Engage the right partner Execute developed planDocument benefits of migration

    Implement

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    17/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Migration Tools

    Lets look some common examples in what is available today in hardwareand software migration tools. This is the how part of the implementationplan.

    PLC5 to Controllogix

    SLC500 to CompactlogixPanelview Standard to Panelview Plus 61336 series to Powerflex 750 series AC drives

    17

    Time will run out before we look at all of thisbut it will be on the presentation copy.

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    18/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.Rev 5058-CO900C

    PLC-5 Migration

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    19/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    PLC-5 Silver Series Update

    Key PLC-5 products that are obsolete NOW ! !1785-KE, 1771-ACN, 1771-ACNR, 1771-ACR15, 1771-ACNR151785-L40L, L30B, L20C15, L11BServo/Stepper modules 1771-QA, QB, QCEncoder/TTL modules 1771-IG, IJ, IK

    Key PLC-5 products that are in the silver series 1771Chassis (A1, A2, A3 & A4) -3/31/20131771-IAN, IBN, OAN, & OWNA (32 pt modules) - 12/31/2013.

    1771-SDN - 12/31/20131785-L60B, L40C & L40C15 - 12/31/20131785-L20B, L20E, L40B, L40E, & L60L -12/31/2014.

    PLC-5 were introduced in 1985 - 25+ years ago!!!

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    20/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    PLC-5 Migration Tools, Utilities &Programs

    PLC-5 program conversion tool (Installed with RSLogix 5000)Free utility Translate PLC-5/SLC 2.0 to convert the program.

    1771 to 1756 Swing arm conversion systemReplace 1771 with 1756 IO while using the current swing arm.

    DH+ Network migration optionsUse 1756-DHRIO ModuleUse Prosoft Ethernet to DH+ Gateway

    RIO Network migration optionsUse 1756-DHRIO ModuleUse 1756-RIO ModuleUse Prosoft Ethernet to RIO Gateway

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    21/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    PLC-5 to Logix Code Conversion

    Please review the log file after conversion.Please refer to publication 1756-RM085C-EN-P on how to use this tool.

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    22/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    Easily layout existing 1771 chassis and have1756 chassis created automatically

    IAB automatically prompts for items thatmay not have a direct cross

    IAB ensures correct modules and quantitiesare selected.

    1771 to 1756 Chassis

    1771 Wiring Conversion Systemcomponents can be automaticallyincluded (optional, butrecommended for ease of

    installation) Installation video anddocumentation available

    Full BOM and Report showing aconverted chassis and anyApplication Considerations that mayapply.

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    23/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    1771 to 1756 Chassis

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    24/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.24

    1771 to 1756 Conversion Wizard in IABDrag and drop modules onto 1771 chassis to populate 1756 chassis with corresponding modules.

    Press OK

    when finished

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    25/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    IAB Report FeaturesFull BOM includedGraphic representation of populated chassisCross reference table including 1771 module to 1756 equivalentApplication Considerations for each 1756 module is also included.

    Please refer to publication 1492-SG121B-EN-P for more details

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    26/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    DH+ & DH485 Migration - Logix Gateway

    26

    Multiple Communication Modules in a Logix Chassis Bridge between Ethernet, DH+ and DH485 Reusable Solution once everything is converted to Ethernet

    Ethernet/IP 1756-DHRIO 1756-DH485

    DH+ Network RIO Network

    DH-485 NetworkEthernet Network

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    27/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.

    1756-RIO Module for Phased Migrations

    The 1756-RIO provides a Logix solution for communications over RIOKey Features include

    Provides one RIO network connection at 57.6K, 115K or 230K baud Acts as a scanner on a remote I/O network Acts as an adapter that exchanges data on a RIO network

    Supports native RIO 16-bit words for data, control and status bitsSupports discrete data and block transfers in either modeSupports as many as 10 produced/consumed data with 248input/output words per connectionMaps all discrete and block transfer data into the produced/consumedconnections

    This module eliminates the need for any message instructions to implementBlock Transfer Read (BTR) and Block Transfer Write (BTW) on RIO network.

    The module is configured with an external configuration software (providedwith the module) and requires activated version of RSLinx.

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    28/81

    Migr ting from PLC 5 / 1771 IO

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    29/81

    29

    Migrating from PLC-5 / 1771 IOPhase I: Monitor Mode

    DH+

    Human Machine Interfacesand Programming Panels (IDT)

    Remote I/O Network

    HMI / EOI*

    *Making the decision to keep or replaceHMI before performing controller codeconversion will save time and money

    Phase I

    Check your converted logic beforeimplementing: Run Logix in monitormode, reading inputs & outputsdisabled . Learn More

    1756-RIO Module used in Monitor Mode allows you checkyour program before going live. The module reads the inputsbut outputs are disabled. Learn More

    Migrating from PLC 5 / 1771 IO

    http://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.doc
  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    30/81

    30

    Migrating from PLC-5 / 1771 IOPhase II: Controller Replacement

    DH+

    Human Machine Interfacesand Programming Panels (IDT)

    Remote I/O Network

    HMI / EOI*

    *Making the decision to keep or replaceHMI before performing controller codeconversion will save time and money

    Phase IIPhase I

    The 1771 to 1756 Swing Arm conversionallows replacement using existing wiring andmounting holes. Learn More

    1756-DHRIO allows communicationover the existing DH+ network

    1756-RIO moduleconfigure d as ascanner whichallows ControlLogixcommunications toRIO Adaptorslocated in remoteracks. Learn More

    Migrating from PLC 5 / 1771 IO

    http://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.doc
  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    31/81

    31

    Migrating from PLC-5 / 1771 IOPhase III: HMI Conversion

    EtherNet/IP

    Remote I/O Network

    Phase II Phase IIIPhase I

    Replace legacy HMI/EOI w/ Engineering Servicesgraphicutilities to assist conversion Panelview Standard and other third

    party products. Learn More

    DH+

    Migrating from PLC 5 / 1771 IO

    http://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.doc
  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    32/81

    32

    Migrating from PLC-5 / 1771 IOPhase IV: Remote I/O Rack Replacement

    EtherNet/IP

    Remote I/O Network

    Phase II Phase III Phase IVPhase I

    DH+

    1756-RIO modulesconfigured asadaptors in theremote racks.

    With the 1771 to 1756 Swing-Arm Interface 1771I/O rackscan quickly be replaced with1756 I/O without disturbingthe I/O field wiringonerack at a time if necessary.Learn More

    http://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.doc
  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    33/81

    Migrating from PLC-5 / 1771 IO

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    34/81

    34

    Migrating from PLC-5 / 1771 IOPhase IV: Remote I/O Rack Replacement

    EtherNet/IP

    Phase II Phase III Phase IVPhase I

    EtherNet/IP

    Other RIO NodesDrivesScales

    ProSoftAN-X-ABRIO

    Module

    http://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.doc
  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    35/81

    Copyright 2009 Rockwell Automation, Inc. All rights reserved.

    SLC500 Migration

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    36/81

    SLC Silver Series Update

    Key SLC products that are obsolete NOW !! 1747-L20x, L30x, L40x Fixed SLC controllers. 1746-HSRV IMC110 Servo module

    Key SLC products that are in the silver series

    SLC were introduced almost 20 years ago!!!

    1747-DCM DIRECT COMMUNICATION MODULE 12/1/2013

    1747-KE DH-485/RS-232C INTERFACE MODULE 12/1/2013

    1746-BAS SLC Basic Module 12/1/2013

    1746-BAS T SLC Basic Turbo Module 10/1/2013

    1746-IM4 AC INPUT MODULE FOR PROGRAMMABLE CONTROLLER 8/30/2013

    1747-M2 SLC EEPROM Memory Module 4/30/2013

    1746-OB6EI ELECTRONICALLY PROTECTED ISOLATED SOURCING DC OUTPUTMODULE

    4/2/2013

    1747-ASB SLC 500 REMOTE I/O ADAPTER MODULE 11/1/2013

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    37/81

    Small networked migration using an

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    38/81

    Small networked migration using anEthernet adaptor

    38

    SLC 5/04

    PV Std

    Serial

    SLC 5/04

    PV Std

    Serial

    SLC 5/04

    PV Std

    Serial

    DH+

    Serial

    PanelView Std

    SLC 5/04

    SLC 5/05

    Ethernet

    SLC 5/05 SLC 5/05 SLC 5/05

    PV Std

    Serial

    PV Std

    Serial

    PV Std

    InformationPV +

    Serial

    Ethernet

    Information

    PV +

    CompactLogix

    PV + PV + PV +

    1747-AENTR

    1747-AENTR

    1747-AENTR1747-AENTR

    S i C L i

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    39/81

    Steps to migrate to CompactLogix

    39

    Publication - MIGRAT-PP004-EN-E September 2011

    Migration Tools: SLC 500 Ethernet/IP Adaptor

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    40/81

    Migration Tools: SLC 500 Ethernet/IP Adaptor(1747-AENTR)

    40

    The SLC Ethernet Adaptor (1747-AENTR) allows SLC I/O racks to be controlled by anLogix Programmable Automation Controller (PAC): Must be located in the first slot (slot 0) of an SLC rack

    Replaces SLC controller in local rack Replaces the existing RIO adaptor (1747-ASB) in remote racks Replaces ControlNet adaptor (1747-ACN15, 1747-ACNR15) in remote racks

    Supports SLC 500 extended rack Performance depends on module configuration

    Requires RSLogix 5000 v20 or greater Utilizes electronic data sheet add on profile capability in v20

    Supports various Ethernet network topologies Device Level Ring (DLR) Star Linear

    StepForward incentives available for migrating to AENTR

    While providing a way to reuse existing rack I/Oit also sets up the possibility of consolidating

    processors.

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    41/81

    Mi ti T l L i G t

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    42/81

    Migration Tools Logix Gateway

    42

    Multiple Communication Modules in a Logix Chassis Bridge between Ethernet, DH+ and DH485 Reusable Solution once everything is converted to Ethernet

    Ethernet/IP 1756-DHRIO 1756-DH485

    DH+ Network RIO Network

    DH-485 NetworkEthernet Network

    P S ft DH485 G t

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    43/81

    ProSoft DH485 Gateway

    43

    EtherNet/IP to DH-485 Gateway - 5201-DFNT-DH485 Helps to connect DH485 network to an EtherNet/IP network. Supports DH485 Master & Salve modes. In Slave mode, the module accepts commands from one or more

    Masters to read/write data stored in the module's internal datamemory. In this mode, the ProLinx unit is answering DH-485

    commands and has the appearance of an SLC processor to thenetwork In Master mode, the ProLinx DH-485 driver will actively gather data

    from other devices on the network, controlling the read/write datatransfer between the gateway and other DH-485 devices, such asSLC processors. Data transfer can be initiated and executed with

    other devices without any ladder logic being required in the Rockwell Automation slave hardware

    Migration Tools:

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    44/81

    Migration Tools:Integrated Architecture Builder (IAB)

    44

    IAB includes a Migration Wizard specifically created for SLC to Logix (CompactLogControlLogix) migrations Minimize cost and risk to convert SLC systems to Logix systems Enter current SLC BOM into IAB and select a conversion option to quickly conve

    the BOM to an equivalent Logix system

    IAB will automatically select system components, size power supplies, etc. Convert system in 30 minutes or less with minimal training Helps you determine any critical application considerations

    Convert

    Migration Tools: Logic Code Translation Tool

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    45/81

    Migration Tools: Logic Code Translation Toolin RSLogix 5000

    45

    Updated and updateablecontroller list

    Wizard-style step-by-step dialogs guide theuser through the translation process

    Migration & Conversion Services

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    46/81

    Migration & Conversion Services

    46

    Complete turnkey services delivered through Rockwell Automation

    CSM that focuses on one-for-one replacement :

    Upgrade your operator interface withcurrent technologyReplace an AC or DC drive with currenttechnologyReplace a PLC with current technologyUpdate automation software andcommunication/HMI technology

    Convert an analog drive to its digitalcounterpartImplement or convert a network for yourautomation assets

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    47/81

    Experience the Difference!

    Electrical Lighting Automation DataComm

    ENJOY th e EXPO!

    Please complete your survey!

    Schaedler Yesco Expo 2014The Premier Electrical Tradeshow in Central PA!

    A Two-day, Jam-Packed Schedule!Over 100 Booths from Leading Manufacturers !

    http://www.sydist.com/Portals/0/Expo2014/exhibitorlist.htmlhttp://www.sydist.com/Portals/0/Expo2014/exhibitorlist.html
  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    48/81

    Copyright 2009 Rockwell Automation, Inc. All rights reserved.

    Electronic Operator Interface Migration

    PanelView Standard obsolete

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    49/81

    PanelView Standard - obsolete

    PanelView 300 & MicroPanelView 550PanelView 600

    PanelView 1000 Announced Silver Series in January 2011 End of life December 31, 2012 Repairs will be made 5-7 years after 2012

    or as long as parts are available

    PanelView Standard was introduced in 1993 - 21 years ago!

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    50/81

    Additional EOIs Status

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    51/81

    Additional EOI s Status

    DTAM limited availability from Spectrum Controls

    Dataliners - obsolete InView taken over by Spectrum Controls

    51

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    52/81

    Copyright 2009 Rockwell Automation, Inc. All rights reserved.

    PanelView Standard Migration toPanelView Plus

    Value in Moving to an Integrated Architecture

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    53/81

    g gSolution

    Reduce development time Shared tag database with Logix Faceplates Global Objects Macros

    Connectivity Single database in managing tag changes Direct tag browsing

    Multi-Application Support (PVP 6) PDF, MPEG, Word, Excel, PPT and Image Viewer

    Support

    ActiveX Support (pre-installed) Internet Explorer Remote Connectivity - VNC, RDP, ViewPoint, FTP

    53

    Manage inventory and upgrades withmodular units: Logic module Display module Communication modules

    Additional Enhancements Utilization of digital photographs and

    animation with bitmap support Runtime RAM Usage FactoryTalk Security Recipe Plus Historical Trending Data Logging

    As easy as one two

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    54/81

    As easy as one, two

    1. Open your PanelView Standard application in FactoryTalk View Stud2. Save it as a PanelView Plus compatible application.

    80% of the time, no further modificationis required

    Conversion log in FTView Studio identifiesany features not supported by PanelView Plus 6

    Typically may want to take advantageof the enhanced features and graphicsavailable in PanelView Plus 6.

    54

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    55/81

    55

    PanelBuilder32 Migration Guide

    Migrating PanelBuilder32Applications(Publication: 2711P-AP001A-EN-P)

    PanelBuilder32 Migrationto FactoryTalk View ME

    This document provides guidelines and procedures for migrating aPanelView Standard terminal and applications to the PanelView Plusterminal platform.

    PanelViewStandard

    PV Std to PVP Hardware Migration

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    56/81

    PV Std to PVP Hardware Migration

    56

    PV Plus 600 KeypadPV Plus 600 Keypad/Touch

    PV 550 KeypadPV 550 Keypad/Touch

    PV 1000 KeypadPV 1000 Touch

    PV Plus 400PV 550 TouchPV 600 Touch

    Cutout Compatible

    PV Plus 600 Touch

    PV Plus 6 700 KeypadPV Plus 6 700 Keypad/Touch

    PV 600 KeypadPV 600 Keypad/Touch

    PV Plus 6 1250 Keypad or Keypad/TouchPV Plus 6 1250 Touch

    PanelView Conversion Services

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    57/81

    .

    PanelView Conversion Services

    Application Migration toFactoryTalk View ME

    PanelView Standard toPanelView Plus Migration

    A bundled service offering for migrating

    Includes all necessary: Project supervision Hardware Conversion Engineering Services

    Leverage past experiences to: Reduce overall price points Improve turn around times

    Start-up & Acceptance Services Delivered Onsite by local RA engineers

    Standardized service bundle Delivered for a fixed price predictable budget For further information on services go to:

    www.rockwellautomation.com/services/onsite

    Need to upgrade your RIO PanelView?

    http://www.rockwellautomation.com/services/onsitehttp://www.rockwellautomation.com/services/onsite
  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    58/81

    Need to upgrade your RIO PanelView?

    58

    PanelView

    StandardPanelView Plus 6

    PLC 5

    ProSoft Part Number: AN-X2-AB-DHRIORemote I/O Adapter to Ethernet/IP HMIUpgrade your HMIs without replacing your Control System

    RIO

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    59/81

    Communication Module Compatibility

    Terminal

    Communications Compatibility

    ENET CNET DH+ DH485 DNET RIO

    PanelView Plus 6 700, 1000, 1250, 1500(CE6.0-based)

    2

    PanelView Plus & CE 700, 1000, 1250, 1500

    (CE4.1-based) 1 1

    PanelView Plus 400, 6003(CE4.1-based)

    4 4

    PanelView Plus Compact 400, 600, 1000(CE4.1-based)3

    59

    1 Will be supported with new sales while parts last (5 years)2 ProSoft provides an Ethernet to RIO gateway device (AN-X-ABRIO)3 PVP 400/600 and PVP Compact in redesign for release in CY2013.4 Future Support will be based on 3rd party gateway

    Migration Guides

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    60/81

    Migration Guides

    Migrating PanelView Standard Applications http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdf

    Migrating PanelView Enhanced Applications http://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdf

    Legacy PanelViews to PanelView Plus Catalog Conversion http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdf

    PanelView Plus to PanelView Plus 6 Catalog Conversions http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdf

    60

    l i l l i l 6

    http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdf
  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    61/81

    PanelView Plus to PanelView Plus 6

    61

    PanelView Plus 6 700-1500

    PanelView Plus 700-1500

    Obsolete 12-31-2012

    MigrationPVP 700 1500 t PVP6 700 1500

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    62/81

    PVP 700-1500 to PVP6 700-1500

    62

    Migration to PanelView Plus 6 700 to 1500 isMechanically compatible Application compatibleMore performance for less!

    Silver Series since January 2011End-of-Life before December 1, 20125 year support (warranty/repair) after December 1, 2012

    PanelView Plus 700 to 1500 with RIO and DNETNew catalog numbers to support installed baseExpected EOL by end of 2015

    PVP RIO & DNET - Configured Units

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    63/81

    PVP RIO & DNET Configured Units

    New Remote IO Catalog Numbers2711P-T7C1D2 PVP 7 Touch, DC, 128 MB, & RIO Card

    2711P-T7C1D6 PVP CE 7 Touch, DC, 128 MB, & RIO Card

    2711P-B7C1D2 PVP 7 Combo, DC, 128 MB, & RIO Card

    2711P-B7C1D6 PVP CE 7 Combo, DC, 128 MB, & RIO Card

    2711P-T10C1D2 PVP 10 Touch, DC, 128 MB, & RIO Card2711P-T10C1D6 PVP CE 10 Touch, DC, 128 MB, & RIO Card

    2711P-B10C1D2 PVP 10 Combo, DC, 128 MB, & RIO Card

    2711P-B10C1D6 PVP CE 10 Combo, DC, 128 MB, & RIO Card

    2711P-T12C1D2 PVP 12 Touch, DC, 128 MB, & RIO Card

    2711P-T12C1D6 PVP CE 12 Touch, DC, 128 MB, & RIO Card

    2711P-B12C1D2 PVP 12 Combo, DC, 128 MB, & RIO Card

    2711P-B12C1D6 PVP CE 12 Combo, DC, 128 MB, & RIO Card

    2711P-T15C1D2 PVP 15 Touch, DC, 128 MB, & RIO Card

    2711P-T15C1D6 PVP CE 15 Touch, DC, 128 MB, & RIO Card

    2711P-B15C1D2 PVP 15 Combo, DC, 128 MB, & RIO Card

    2711P-B15C1D6 PVP CE 15 Combo, DC, 128 MB, & RIO Card

    16 new configured RIO catalogsunits DC Only 128 MB Only (PVP and PVP CE) Pre-assembled

    16 new configured DNET units

    DC Only 128 MB Only (PVP and PVP CE) Pre-assembled Similar catalog - replaceC1 with C10 2711P-T7C1D2 changes to 2711P-T7C10D2

    E l PVP PVP 6 Cl T f

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    64/81

    Example: PVP to PVP 6 Clean Transfer

    64

    Legacy PVP

    2711P T7C15D1

    CNET

    Current PVP62711P T7C4D1 ENET and RS232

    2711P T7C4D8 2711P RN15S

    PVP6 Platform Comm Card

    2711P T7C4D8

    PVP6 Platform

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    65/81

    Allen-Bradley PanelView Plus 6D l NIC A C d 2711P RN20

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    66/81

    Dual NIC Accessory Card - 2711P-RN20

    The PanelView Plus 6 logic module contains 1 Ethernet adapter. Addinga 2nd Ethernet adapter allows connection to an additional subnet.

    Perform non-production critical, value-added networking communication: ViewPoint: Remote user access to a ViewPoint service running on the

    PVP terminal VNC: Live video feed of the terminal to multiple remote users Web Browser: Terminal user access to web material stored in a remote

    location on the enterprise network SMTP (E-mail): Connect the terminal unit to the enterprise network to permit

    the terminal to send notifications to recipients via e-mail (e.g., when an alarmoccurs)

    FTP: Interface terminal through an FTP connection to read/write filesremotely

    Data Logging: The terminal can be configured to store productiondata to a remote network location (file server)

    Requires PVP6 700-1500 running Firmware Version >= v6.10 or higher

    PVP6

    NIC1:192.168.1.20

    NIC2:10.10.10.20

    Cell/Area Zones

    Manufacturing Zone

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    67/81

    Design Time Productivity

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    68/81

    Faceplates can save 50% to 90% of complex screen development time

    Tie predefined images to Add-On-Instruction sets

    PowerFlex 700 Faceplate

    g y

    Setup multiple languages without font linking MS Arial Unicode font means one runtime file can configure up to 20 languages

    Including Chinese, Russian, Japanese and Korean in one runtime file

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    69/81

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    70/81

    FactoryTalk ViewPoint Benefits

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    71/81

    y

    Web HMI for PanelView Plus 6

    Single license included with each PV+6 Extends visualization & real-time decision

    capabilities to browser-based remote users Plant managers & supervisors

    Mobile personnel Provides on-demand access from anywhere

    In the office At Home

    On the road Lowers Total Cost of Ownership No client software to install & maintain

    Supports multiple browsers / client devices Internet Explorer, Firefox

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    72/81

    Runtime MER Compatibility

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    73/81

    Runtime MER Compatibility

    Terminal

    MER Compatibility

    V6.x V5.1 V5.0 V4.0 V3.2

    PanelView Plus 6 700, 1000, 1250, 1500(CE6.0-based)

    PanelView Plus & CE 700, 1000, 1250, 1500

    (CE4.1-based)

    PanelView Plus 400, 600(CE4.1-based)

    PanelView Plus Compact 400, 600, 1000(CE4.1-based)

    73

    Please be aware that there are new Kepware drivers for PV+ 6

    N d t d RIO P lVi ?

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    74/81

    Need to upgrade your RIO PanelView?

    74

    PanelView

    StandardPanelView Plus 6

    PLC 5

    ProSoft Part Number: AN-X-AB-DHRIORemote I/O Adapter to Ethernet/IP HMIUpgrade your HMIs without replacing your Control System

    RIO

    Communication Module Compatibility

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    75/81

    Communication Module Compatibility

    Terminal

    Communications Compatibility

    ENET CNET DH+ DH485 DNET RIO

    PanelView Plus 6 700, 1000, 1250, 1500(CE6.0-based)

    2

    PanelView Plus & CE 700, 1000, 1250, 1500

    (CE4.1-based) 1 1

    PanelView Plus 400, 6003(CE4.1-based)

    4 4

    PanelView Plus Compact 400, 600, 1000(CE4.1-based)3

    75

    1 Will be supported with new sales while parts last (5 years)2 ProSoft provides an Ethernet to RIO gateway device (AN-X-ABRIO)3 PVP 400/600 and PVP Compact in redesign for release in CY2013.4 Future Support will be based on 3rd party gateway

    Migration Guides

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    76/81

    Migrating PanelView Standard Applications http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdf

    Migrating PanelView Enhanced Applications http://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdf

    Legacy PanelViews to PanelView Plus Catalog Conversion http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdf

    PanelView Plus to PanelView Plus 6 Catalog Conversions http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdf

    76

    http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdf
  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    77/81

    Copyright 2009 Rockwell Automation, Inc. All rights reserved.

    Legacy AC drive Migration Tools

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    78/81

    LSC FasTrac Packaged Drives and MotorsLegacy Product Upgrades

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology

    79/81

    79

    Legacy Product Upgrades

    Legacy 1336 Drive Upgrades

    Same panel, and mountingdimensionsReplicate termination locationsFlange and panel-mount designsRoll-in installations

    Rockwell Automation Drive Center offering

  • 8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology