Rosecrans/Marquardt Grade Separation ProjectCommunity Open House Meeting

October 17, 2017

Page 2: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Presentation Agenda

1. Welcome Remarks & Introductions2. Community Outreach3. Project Goals and Objectives

a) Safety, safety, safetyb) Improve mobility and access

4. Funding5. Project Overview

a) Environmentalb) ROW Acquisition Statusc) Preferred Alternative – Final Designd) Aesthetic Featurese) Project Schedule

6. Next Steps & Closing Remarks

Page 3: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Community Outreach

Three community outreach meetings:1. September 2015

a) Alternatives under evaluation

b) Environmental process review (CEQA)

2. March 2016 a) Locally Preferred Alternative was selected and

approved by City of Santa Fe Springs in December 2015 and approved by Metro Board in February 2016

b) Initial ROW efforts

3. October 2017 a) Status of the environmental and design process

b) Update on ROW acquisition

Page 4: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Goals and Objectives

1. Improve safety by separating pedestrians and vehicles from trains at the railroad crossing.

2. Enhance mobility and quality of life for the community.

3. Minimize disruption to residents, businesses, and community during construction.

4. Alleviate existing traffic congestion

Page 5: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Funding

Proposed Life of Project Budget($155.3 million)

1. TIGER Grant - $15 M2. Proposition 1A - $76.665 M3. Measure R 20% - $26.5 M4. California Freight Investment

Program - $8.135 M5. State Transportation Improvement

Program - $7 M6. BNSF Railway – Up to $7 M7. California Public Utilities Commission

(CPUC) Section 190 - $15 M TIGER Grant Prop 1A Measure R 20%Section 190 Railroad Share CFIPSTIP

Page 6: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Overview

1. Crossing Locationa) Rosecrans Ave / Marquardt Ave in Santa Fe

Springsb) Diagonal rail crossing at the intersection

2. Existing Traffic Conditionsa) Most hazardous grade crossing in California

(CPUC)b) Over 112 trains and 45,000 vehicles use this

crossing dailyc) 21 hours gate down time per week = 45 days

per year

3. Project Challenges & Opportunitiesa) Industrial area (SFS) with residential to the

North (LA Mirada)b) Constraints at Coyote Creekc) Does not preclude future High-Speed Rail &

BNSF third main track project

Page 7: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Environmental

1. The project was environmentally cleared under the California Environmental Quality Act (CEQA) with a Statutory Exemption (February of 2016).

2. Finalize environmental clearance under the National Environmental Policy Act (NEPA). Environmental Assessment (EA) will be completed by the end of 2017 to early 2018, along with an associated Finding of No Significant Impact (FONSI).

Page 8: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Right-of-Way Status

Timeline:

1. Right-of-way (ROW) acquisitions began in 2016.

2. However, the State experienced a delay in appropriating funding for

the project, resulting in a temporary hold on real estate acquisition

activities.3. CAHSR board approved funding in June 2017.4. Upon execution of the funding agreement with CAHSR, Right-of-Way

acquisition activities will resume in Winter 2017.

Page 9: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Existing Conditions

Existing Plan View

Page 10: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/MarquardtFinal Design - Offset Overpass

1. Raise Rosecrans Ave. (four lanes) over the tracks, with a realignment to the south.

2. Connect Marquardt Ave. (south of the crossing) to Rosecrans Ave. under the bridge.

3. Connect Marquardt Ave. (north of the crossing) to Stage Rd.

4. Access to Rosecrans Ave. on the east side is provided via Iseli Rd.

Page 11: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Existing Aerial View - Looking Westerly

Existing Aerial View

Page 12: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Final Design Offset Overpass – Looking Westerly

Photosimulation

Page 13: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Existing Aerial View - Looking Northerly

Existing Aerial View

Page 14: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Photosimulation - Looking Northerly

Photosimulation

Page 15: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Aesthetic Features

1. City Council forms Aesthetic Subcommittee

2. Subcommittee reviews and selects aesthetic features

3. Operated and maintained by City of Santa Fe Springs

Page 16: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Aesthetic Features

• River Rocks• Landscape Boulders• Decomposed

Granite Colors

• Groundcover• Variety of Trees

• Bailey Acacia• Palo Verde

• “Sunrise Yellow” Gazania

Page 17: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Aesthetic Features

Page 18: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Chain Link Railing Type 6 –I-5 Bridges

Aesthetic Features

Page 19: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Decorative Lighting on Bridge – I-5

Bridges

Aesthetic Features

Page 20: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Barrier Motif – I-5 Bridges

Aesthetic Features

Page 21: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Fractured Fin Texture –Valley View Ave

Aesthetic Features

Page 22: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Split State Texture –

I-5 Bridges

Aesthetic Features

Page 23: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Minimize Construction Impacts

1. Building off alignment to maintain existing traffic patterns

2. Maintain business access during construction

Page 24: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Schedule

Page 25: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Next Steps

1. Finalize environmental clearance under the National Environmental Policy Act (NEPA)

2. Continue right-of-way process3. Finalize Plans, Specifications, and Estimates (PS&E)4. Begin early utility relocations5. Bidding & Construction6. Pre-construction meeting occurs after contract award

Page 26: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans

Rosecrans/Marquardt Stay Connected