route 46 corridor - caltrans |} 41 jack ranch cafe rest stop ... esri, digitalglobe, geoeye,...
TRANSCRIPT
!.
!.
!.
!. !"#5
|}33£¤101
|}41
|}46
|}41
JackRanch Cafe
Rest Stop
McM
illan
Cyn
Rd
Brown M
ateria
l Rd
|}58
PasoRobles
Bakersfield
Shandon
to
Antelope Grade
KERN
FRESNO
MONTEREYKINGS
SAN LUIS OBISPO
Segment III
Union
Segment I
Segment II
Seg IV-B
Whitley 2A
Cholame
Whitley 1 Whitley 2B
Wye
Seg IV-A
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS UserCommunity
J
COMPLETED
CONSTRUCTION
DESIGN / ROW
UNPROGRAMMED
ROUTE 46 CORRIDORROUTE 46 CORRIDOR(US 101 TO INTERSTATE 5)(US 101 TO INTERSTATE 5)
May 2016Source: CIP Report 3-30-2016 * unescalatedS:\slo\05-3307a\gis\gisproj\2016\PM
SEGMENT LENGTH (MILES) PHASE CONSTR. COST (MILLIONS)
Union 5.0 COMPLETED $33.3 (actual)Whitley 1 4.0 COMPLETED $52.1 (actual)Whitley 2A 5.1 COMPLETED $38.1 (allocated)Whitley 2B 4.0 CONSTRUCTION $45.7 (allocated)Cholame 4.4 DESIGN / ROW $46.0 (programmed)Wye 3.2 UNPROGRAMMED $90.0 (unfunded need)*Antelope Gr 3.1 UNPROGRAMMED $43.2 (unfunded need)*Segment II 7.3 COMPLETED $24.3 (actual)Segment III 12.5 COMPLETED $45.3 (actual)Segment I 7.7 COMPLETED $24.2 (actual)Segment IV‐A 3.0 DESIGN / ROW $17.5 (programmed)Segment IV‐B 3.0 UNPROGRAMMED $50.0 (unfunded need)