route 46 corridor - caltrans |} 41 jack ranch cafe rest stop ... esri, digitalglobe, geoeye,...

1
! . ! . ! . ! . ! " # 5 | } 33 £ ¤ 101 | } 41 | } 46 | } 41 Jack Ranch Cafe Rest Stop McMi llan Cyn Rd Bro wn Ma teria l Rd | } 58 Paso Robles Bakersfield Shandon to A n te l o p e G r ad e KERN FRESNO MONTEREY KINGS SAN LUIS OBISPO Seg m ent I II U n i o n S e g m e n t I S eg ment II S e g I V - B W h it le y 2 A Cho l am e Whitley 1 W h i t l e y 2 B Wy e S e g I V - A Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community J COMPLETED CONSTRUCTION DESIGN / ROW UNPROGRAMMED ROUTE 46 CORRIDOR ROUTE 46 CORRIDOR (US 101 TO INTERSTATE 5) (US 101 TO INTERSTATE 5) May 2016 Source: CIP Report 3-30-2016 * unescalated S:\slo\05-3307a\gis\gisproj\2016\PM SEGMENT LENGTH (MILES) PHASE CONSTR. COST (MILLIONS) Union 5.0 COMPLETED $33.3 (actual) Whitley 1 4.0 COMPLETED $52.1 (actual) Whitley 2A 5.1 COMPLETED $38.1 (allocated) Whitley 2B 4.0 CONSTRUCTION $45.7 (allocated) Cholame 4.4 DESIGN / ROW $46.0 (programmed) Wye 3.2 UNPROGRAMMED $90.0 (unfunded need)* Antelope Gr 3.1 UNPROGRAMMED $43.2 (unfunded need)* Segment II 7.3 COMPLETED $24.3 (actual) Segment III 12.5 COMPLETED $45.3 (actual) Segment I 7.7 COMPLETED $24.2 (actual) Segment IVA 3.0 DESIGN / ROW $17.5 (programmed) Segment IVB 3.0 UNPROGRAMMED $50.0 (unfunded need)

Upload: dohanh

Post on 16-Mar-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

!.

!.

!.

!. !"#5

|}33£¤101

|}41

|}46

|}41

JackRanch Cafe

Rest Stop

McM

illan

Cyn

Rd

Brown M

ateria

l Rd

|}58

PasoRobles

Bakersfield

Shandon

to

Antelope Grade

KERN

FRESNO

MONTEREYKINGS

SAN LUIS OBISPO

Segment III

Union

Segment I

Segment II

Seg IV-B

Whitley 2A

Cholame

Whitley 1 Whitley 2B

Wye

Seg IV-A

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS UserCommunity

J

COMPLETED

CONSTRUCTION

DESIGN / ROW

UNPROGRAMMED

ROUTE 46 CORRIDORROUTE 46 CORRIDOR(US 101 TO INTERSTATE 5)(US 101 TO INTERSTATE 5)

May 2016Source: CIP Report 3-30-2016 * unescalatedS:\slo\05-3307a\gis\gisproj\2016\PM

SEGMENT LENGTH (MILES) PHASE CONSTR. COST (MILLIONS)

Union 5.0 COMPLETED  $33.3 (actual)Whitley 1 4.0 COMPLETED  $52.1 (actual)Whitley 2A 5.1 COMPLETED  $38.1 (allocated)Whitley 2B 4.0 CONSTRUCTION  $45.7 (allocated)Cholame 4.4 DESIGN / ROW  $46.0 (programmed)Wye 3.2 UNPROGRAMMED  $90.0 (unfunded need)*Antelope Gr 3.1 UNPROGRAMMED  $43.2 (unfunded need)*Segment II 7.3 COMPLETED  $24.3 (actual)Segment III 12.5 COMPLETED  $45.3 (actual)Segment I 7.7 COMPLETED  $24.2 (actual)Segment IV‐A 3.0 DESIGN / ROW  $17.5 (programmed)Segment IV‐B 3.0 UNPROGRAMMED  $50.0 (unfunded need)