Page 1: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

41015SW001B 2.4580 RANEY 010

MAtt

MINING LANDS SECTION

REPORT ON VLF AND MAGNETOMETER SURVEYS

RANEY TOWNSHIP

PORCUPINE MINING DIVISION

CHAPLEAU, ONTARIO.

J-DEX MINING AND EXPLORATION LTD.

and

INGAMAR RESOURCES LIMITED

and

DONALD O. BAKER

REPORT DATE: FEBRUARY 2*4-, 1982.

Page 2: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

41015SW0818 2.4580 RANEY 010C

CONTENTS

Page

1. Summary l

2. Introduction 2

3. Method and Instrumentation 3

4. Presentation of Results b

5. Conclution and Recommendations 5

EXHIBITS

1. Profile of VLF Survey

2. Profile of Magnetometer Survey

Page 3: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Page l

SUMMARY

Access to the survey area is by fixed wing aircraft from the

town of Chapleau.

A VLF survey was instituted over the claim group using Cutler

Maine as the transmitting station.

A Magnetometer survey was also completed over the claim group,

A background of 500 gammas was established as background.

Page 4: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Page 2

INTRODUCTION

The survey was conducted over the following mining claims

53727^ 467^83, 537277, 501022, 537282, 537278, 537279,

537280, 537281, 537275, 551785, 551786, 537283, 53?2?6,

55178?', 551791, 551788, 551790, 551789, 5^2769.

NOTE: Mining claim 5^2769 has lapsed and is not within the

time period for relief from forfieture, althought the survey

was conducted on this claim also.

The general geology of the area consists of rhyolite and

andesite. Numerous fledspar porphry dikes are noted along

various contact zones.

The survey and line cutting began September l, 1981 and

ended October28, 1981.

Page 5: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Page 3

METHOD AND INSTRUMENTATION

Base line was constructed running east and west with the

survey lines running north and south. The lines were

compassed, brushed out and chained with a peg placed every

25 meters and marked. Readings were taken at 25 meter

intervals and the interline spacing was 100 meters.

A Geonics VLF EM l6 was used.

S' A Cientrix MF-2 Magnetometer was used,

Page 6: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Page k

PRESENTATION of RESULTS

As seen by reviewing exhibits l and 2 the surveys are

coincident and resulted in the detection of two large zones

of interest. One zone is located in the south east corner of

the claim group whereas the other zone is located south west

of the south east zone, several hundred meters away.

Page 7: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Page 5

CONCLUTIONS AND RECOMMENDATIONS

As soon as weather permits (spring of 1982) a complete

geological mapping program should be completed over the claim

group based on information obtained and along with the

geophysical surveys a diamond drilling program should be

instituted on the zones of interest.

Respectfully Submitted;

J-DEX Mining 8c Exploration Ltd,

Do/iald 0. Baker

Page 8: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

4101SSW0818 2. 4588 RANEY 90(7)

1983 06 06 2.4580

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioP4N 2S7

Dear Sir:

RE: Geophysical (Electromagnetic and Magnetometer) Survey on Mining Claims P467483 et al 1n the Township of Raney

The Geophysical (Electromagnetic and Magnetometer) Survey assessment work credits as listed with my Notice of Intent dated May 12, 1983 have been approved as of the above date.

Please Inform the recorded holder of these mining claims and so Indicate on your records.

Yours very truly.

E.F. AndersonDirectorLand Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1380

R. P1chette:mc

Cc: J-Dex Mining a Exploration Ltd. Chapleau, Ontario

cc: Mr. G.H. FergusonMining It Lands Commissioner Toronto, Ontario

cc: Resident Geologist Timmins, Ontario

Page 9: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Ontario

9 "5.

Ministry ofNaturalResources

Notification of recording

of assessment work credits

Lands Administration Branch

Mining Lands Section

Ministry of Natural Resources

Room 1617, Whitney Block

Queen's Park, Toronto

M7A 1W3

b l 3 1982

MINING LANDS SECTION

Date of recording of work: December 29, 1981

Recorded holden.

Address:.

Township or Area:.

J-Dex Mining Se Exploration Ltd.P.O. Box: 1270Chapleau, Ontario POM 1KO———

RANF.Y TOMNSHTP________________

Type of survey and number of Assessment days credit per claim

Geophysical

Flpntrnmagnptir V.L.F. 20 -days

Magnetometer.

Radiometric _

40 -days

-days

Induced polarization.

77 IfSection 95(9)—

-days

Jays

Geological. -days

Geochemical. .days

Man days EH

Special provision S

Airborne Lj

Ground 09

Mining claims

P-467483P-501022P-537275 to 537283 incl.P-551785 to 551791 incl.

Notice to recorded holder:

tS Survey reports and maps in duplicate be submitted to the Lands Administration Branch, Toronto with in 60 days from the date of recording of this work. c.c. J-Dex Mining 8c Exploration Ltd

to the Lands

Page 10: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Ministry ofNaturalResources

Technical Assessment Work Credits

Ontario

File

2.4580

1983 05 12Recorded Holder

J-DEX MINING S EXPLORATION LIMITEDTownship or Area

RANEY TOWNSHIP

Type of survey and number of Assessment days credit per claim Mining Claims Assessed

GeophysicalElectromagnetic

Magnetometer

Radiometric

18

Induced polarization .

Section 86 (18) _

Geological ———

Geochemical

.days

.days

.days

.days

.days

.days

.days

P 467483 501022537275 to 537283 incl. 551785 to 551791 incl.

Man days L~H

Special provision 0

Airborne CH

Ground

H Credits have been reduced because of partial coverage of claims.

l l Credits have been reduced because of corrections

to work dates and figures of applicant.

Special credits under section 86 (15a) for the following mining claims

No credits have been allowed for the following mining claims

l_l not sufficiently covered by the survey Insufficient technical data filed

assessment davs recorded on

Page 11: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Ministry of NaturalResources -p- ^

Ontario J O Nc 3f

Your file:

1983 05 12 our me: 2 .4580

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioPAN 2S7

Dear Sir:

Enclosed are two copies of a Notice of Intent with state ments listing a reduced rate of assessment work credits to be allowed for a technical survey. Please forward one copy to the recorded holder of the claims and retain the other. In approximately fifteen days from the above date, a final letter of approval of these credits will be sent to you. On receipt of the approval letter, you may then change the work entries on the claim record sheets.

Yours very truly,

For further Information, 1f required, please contact Mr. F.W. Matthews at

E.F. Anderson 416/965-1380.DirectorLands Administration BranchWhitney Block, Room 6450Queen's ParkToronto, OntarioM?A 1W3Phone: 416/965-1316

R. P1chette:sc

cc: J-Dex Mining 4 Exploration Ltd Chapleau, Ontario

cc: Mr. G.H. FergusonMining ft Lands Commissioner Toronto, Ontario

Page 12: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Ministryof Notice of Intent NaturalResources for Technical Reports

Ontario

1983 05 12

2.4580

An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.

If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.

If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.

If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Lands Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.

Page 13: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

February 16, 1983 2.4580

J-Dex Mining 4 Exploration Ltd. P.O. Box 1270 Chapleau* Ontario POM 1KO

Attention: Donald 0. Baker

Dear Sir:

Re: Geophysical (Electromagnetic and Magnetometer) Survey submitted on Mining Claims P 467483 et al In the Township of Raney.

Enclosed 1s a copy of our letter dated December 29, 1982 requesting additional Information for the above mentioned survey.

Unless you can provide the required data by February 26, 1983, the mining recorder will be directed to cancel the work credits recorded on December 29, 1981.

For further Information, please contact Mr. F.W. Matthews at 416/965-1380.

Yours very truly.

E.F. AndersonDirectorLand Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1316

D.Mice

End.

cc: Mining Recorder Porcupine

Page 14: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

1982 12 29 2.4580

Donald 0. Baker P.O. Box 1270 Chapleau, Ontario POM 1KO

Dear Sir:

I an returning herewith your magnetometer and electromagnetic survey maps covering mining claims P 467483 et al 1n the Township of Raney.

Please date and sign these maps* show the claim limits and claim numbers and return them to this office.

Yours very truly.

E.F. Anderson For further Information, 1f Director required, please contact Land Management Branch Mr. F.W. Matthews at

416/965-1380/ whitney Block, Room 6450 Queen's Park Toronto, Ontario M7A 1W3 Phone: 416/965-1380

F.W. Matthews:se

Encls:

cc: Mining Recorder Timmins, Ontario

Page 15: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Ministryof GeotechnicalSoles Report

Ontario Approval

File

o

Mining Lands Comments

To: Geophysics

Comments

t-~*-Vr -TSa——*-^-l^-——*^"^

S

oproved [ | Wish to see again with corrections

D

Date Signature

To: Geology - Expenditures

Comments

|| Approved | | Wish to see again with correctionsDate Signature

To: Geochemistry

Comments

l j Approved | Wish to see again with correctionsDate Signature

j j To: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)

Page 16: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

1982 03 04 2.4580

Mining RecorderMinistry of Natural Resources60 Wilson Avenuetimmins, OntarioPAN 2S7

Dear Sir:

We have received reports and maps for a Geophysical (Electro magnetic and Magnetomer) Survey submitted under Special Provisions (credit for Performance and Coverage) on Mining Claims P 467483 et al in the Township of Raney.

This material will be examined and assessed and a stat of assessment work credits will be Issued.

Yours very truly,

8.F. AndersonDirectorLand Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phones 416/965-1316

J. Skura/amc

cc: J-DEZ Mining S Exploration Ltd. Chapleau, Ontario Attnt Mr. Donald O. Baker

Page 17: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Ministry ofNaturalResources

Ontario

RECEIVED

MAR - 11982

MINING LANDS SECTION

THE MINING ACT REPORT OF WORK

A seporote form is required for each

type of work to b*

recorded.

To the Recorder of...........................

. J-DEX Mining Se Exploration Ltd..Mining Di vi sion

name of Recorded Holder Prospector's Licence

..............P^Q....Box..127Q,...Chapleau.,...Ontario.... ...POM.. IRQ.................................Post Office Address

do hereby report the performance of ................T.P.9.................. days of ...Line ..Cutting.

Claim No.

5Q102.2.

53.727^

5^2.7.6.9.53.7.2.7.7.. 537282

All the work

Days

?.9....2020

20...

20...

the following

Claim No.

53.7.2.7.853727953.7.28.Q537281

5372*355.1.7.85.

3 C.lai m t s) .

contiguous claims

Days

2.02020

.20..202020

Claim No.

55.7786...551787551788551789

551790551791

over entire

type of work

Days

20

202020

2020

claim group

OeaOfOI-zUJ

Ka.2Q... 20

was performed on Mining (In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach a schedule)

READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations Names and

addresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address of

owner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical Equipment

Type of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours of their employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which

work was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relation to the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate. For Geophysical, Geological, Geochemical Surveys and Expenditure Credits - the name of author of report. Covering dates of survey (linecutting 8. office). Type of instrument used. Total amount of expenditure. Technical reports, maps, expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording. For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is as Follows: (Attach a list if this space is insufficient)

Ingamar Resources Limited Connaught, Ontario.

Donald O. Baker P.O. Box 1270 Chapleau,' Ontario.

POM IKO

- Work was performed during Sept.1/81 to Oct.28/81.

- Instruments used were Geonics VLF Barringer Magnetometer

- Costs 358,200.00

Maps b Reports forwarded to Toronto

xt/)Ofooo in v*

—ut

Ofut uOf.ooz

Of.oa.UJoc

iu*. ut

DateDecember 15, 1981.

UJl/*

Signature of Recorded Holder or Agent

The Mining Act Certificate Verifying Report of Work

i Donald O. Baker•. .•••....••••••••••••..••••••....••-•••••••••••••i

P.O. Box 1270, Chapleau, Ontario. POM IKO(Post Office Address)"""""""""""

Of.o

hereby certify:

1. That l have a personal and intimate knowledge of the facts set forth in the report of work annexed here to, having performed the work or witnessed same during and/or after its completion.

2. That the annexed report is true.

r. , December 15 10 81.Dated........................rT........... IV ..........................................................~..........................................Signature

a.UJX

LA 041

Page 18: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Oniurio

Ministry ofNaturalResources MR - l

THE

A leporate form is required for each

type of work to b* recorded.

To the Recorder of...............................9^.^5.-?.?.......................................................Mining Division

.Ltd....................................T-.;name of Recorded Holder Prospector's Licence.P.:.?.-.. B.? 3C .f. 2.??* c a?^ eau '.9.^ar. i. 0 ' Pp.M IKO

Post Office Address

do hereby report the performance of ..................8.0.0............... days of ......Qe.Qphy.S.iGSl.........type of work

not before reported to be applied on the following contiguous claims

Claim No.

5.01022.^67^8353727^5^.2769..517.277.537282537275All the work(In the case

Days

bobobobobobobo

of geological and/

Claim No.

5.3.7.2Z8537279537280

53.7.281-537.283551785537276

or geophysical survey

Days

bobobo

.b.Q..bobobo

(s) where

Claim No.

55.7.7.86..551787551788

5517.89..5517.90..55.1.7.9.1...

over entiremore than 18 claims are

Days

bQ....bO

bO

bo....bobo

claim groupinvolved attach a schedule)

OCO

Of.o

Ul3 z ovt OHo.

READ CAREFULLY: THE FOLLOWING INFORMATION is REQUIRED BY THE MINING RECORDER. xt/i

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations Names and o

addresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address of

owner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical Equipment

Type of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours oftheir employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which

work was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.For Geophysical, Geological, Geochemical Surveys and Expenditure Credits - the name of author of report. Covering dates of survey (linecutting 8, office). Type of instrument used. Total amount of expenditure. Technical reports, maps, expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording.For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is os Follows: (Attach a list if this space is insufficient) ac.O

Donald 0. Baker ~ ^Or* ^l^l^T^ /of ing P O Box 1270 Sept. 1/81 to Oct. 28/81. Chapleau, Ontario. - Instruments used were

POM IKO Geonics VLFBarranger Magnetometer

- Cost $8 > 200.00 ~ *

Maps d: Reports forwarded to Toronto

Date December 15, 1981.Signature of Recorded Holder or Agent

The Mining Act Z Certificate Verifying Report of Work S

i Donald 0. Bakeri, ................................................................................................................................................... ^P.O. Box 1270, Chapleau, Ontario. POMIKO o..^.^..-..^ ~~^.^..................... . ................................ ^

hereby certify:

1. That l have a personal and intimate knowledge of the facts set forth in the report of work annexed here to, having performed the work or witnessed same during and/or after its completion.

2. That the annexed report is true.

Signature

LA 041

Page 19: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Ministry ofNaturalResources

W-82-06 5

-C l - tt ^ tOntario

THE MINING ACT REPORT OF WORK

P or cup. in e. Explp.r a t ion. Ltd

A separate form is required for each type of work to be recorded.

To the Recorder of...............................f.^P.HP.l.1?.6.......................................................Mining Division

name of Recorded Holder Prospector's LicenceP.O. Box 1270, Chapleau, Ontario. POM IKO

Post Office Address

do hereby report the performance of ................/1&&...7.2..Q..... days of ......Gfi.QPtoS.iCSl.J....'.'type of work

not before reported to be applied on the following contiguous claims

1 Claim N o. 5.01022.46?483

Days

4p... 40

-40-

53.7.277. 40

4.0 4"0

Claim No.

.5.27.2.7.8537279537280

.5.3.7.28.1 5372835.5.1783537276

Claim ( s) ......

Days

404040

404040

Claim No.

55t.7.8.6.551787551788

551739.. 5J5.1.7.9.9...55.1.7.9.1...

over entire

Days

4.0... .4040

4040

claim group

oCD

Of O

Ofo.

537275All the work v*(In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach a schedule)

READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations Names and

addresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical EquipmentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours oftheir employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which

work was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.For Geophysical, Geological, Geochemical Surveys and Expenditure Credits - the name of author of report. Covering dates of survey (linecutting 8, office). Type of instrument used. Total amount of expenditure. Technical reports, maps, expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording. For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is os Follows:

Donald 0. Baker P.O. Box 1270

, Ontario. -- POM IKO ,

(Attach a list if this space is insufficient)

- Work was performed during Sept.1/81 to Oct.28/81.

- Instruments used were Geonics VLF Barranger Magnetometer

- Cost $8,200.00

Maps 8c Reports forwarded to Toronto

/j

xvoOfo

m vt—uii- < yu.i-Ofui U

oz

Of O O- UJ Of

Date

The Mining Act Certificate Verifying Report of Work

l Donald O. BakerP.O. Box 1270, Chapleau, Ontario. POMIKO

JAN - 51982

UJ

*nUI

oz

(Post Office Address)

hereby certify: RECORDEDLl. That l have a personal and intimate knowledge of the facts set forth in the repor of work annexed here- J

'or after its completion.to, having performed the work or witnessed same during a

2. That the annexed report is true.

Date)lSignature

.A 041

Page 20: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

- Ministry of Natural

61 . 06- 7-t? 3

vJL*X Resources ^ Ontario

To the Recorder of..................

, J-DEX Mining Se

t --'i'

THE MINING

Exploration

- O b'' '

ACT REPORT OF WORK

ine

Ltd.name of Recorded Holder

do hereby report the performance

not before reported to be applied

Claim No. Days

501022 20

1+67 ii-83 2 0.53727^" -20"

-5^76^- 2tr

537.2.7.7.. 20... 537282 2Q537275 20All the work was performed on M

of "^Post Office Address

Q^.J3.t?.P...... davs of

on the following contiguous claims

Claim No. Days

532.2.78 .2.0... 537279 20

532.280 ^37281

5372,8.3

55.1.7.83.

20

.2Q..

20

20

20 over

A separate form is required for each type of work to be recorded.

Prospector's Licence

..Ai--

Claim No.r* r^rtorjQ f2 ~)M { Q O

55.12.8.7... 5512.8.8... 5517S9

55X29.Q... 551791...

^^I 1C^.A Ltype of work

Days

20

20

20

20

20

20

claim group(In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach a schedule)

READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.

SDf O

W

Ofa.

t/*X

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations Names andaddresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical EquipmentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours of their employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which work was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relation to the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate. For Geophysical, Geological, Geochemical Surveys and Expenditure Credits - the name of author of report. Covering dates of survey (linecutting 8. office). Type of instrument used. Total amount of expenditure. Technical reports, maps, expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording. For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is os Follows: (Attach a list if this space is insufficient)

Ofo

Ingamar Resources Limited Connaught, Ontario.

Donald 0. Baker p.o.:-Bqx; ; ;l;27o; Chapleau, Ontario , IKO'

- Work was performed during Sept.1/81 to Oct.28/81.

- Instruments used were Geonics VLF Barringer Magnetometer

- Costs ?8,200.00

Maps Se Reports forwarded ' to Toronto

n De'cerofrer- T5v 7 f 98 i .UO T C * . * .- . * t I^U.**.M*- n-rvrrVfT*"; ,". ...........

fer or Agent

RECEIVEDJAN - 51982

u

Of. IUuOf5ozI- ofoa.

UJ

utt-

felil l/)-l < u.

oz

Ofo

The Mining Act Certificate Verifying Report of Work

(Post Office Address)hereby certify:

1. That l have a personal and intimate knowledge of the facts set forth in the rep to, having performed the work or witnessed same during and/or after its completion.

2. That the annexed report is true. l

DatedDecember 15 1 9 81.

DEC z yReceipt No. ....

zUJo.

Signature"

-A 041

Page 21: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

oJr

C*jt(

r*C

r-r-

fr-ito

K

r-O

3bo O

o6

0O(T

(To

LOU1

d

Uri

00

Page 22: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Q.

fO)

lo

Hellyer Twp.(M.926)

s M 2 M l M

Halcrow Twp. (M. 906)

l i i V\ H J WCATTY O L.S

Denyes Twp.( M.7^8)

THE TOWNSHIP OF

RANEYDISTRICT OFSUDBURY

PORCUPINEMINING DIVISION

SCALE: 1-INCH ^ 40 CHAINS

DISPOSITION OF CROWN LANDSj1 - ~ --" 1 - ; -'rr " r li m -.L .. .. -:- ..-1111.

PATENT, SURFACE AND MINING RIGHTS SURFACE RIGHTS ONLY ....1........ 6MINING RIGHTS ONLY.. - O

LEASE, SURFACE AND MINING RIGHTS.- B H , SURFACE RIGHTS ONLY._.___.. B " , MINING RIGHTS ONLY ____^.... B

LICENCE OF OCCUPATION .._______l_ W

ROADSIMPROVED ROADS KING'S HIGHWAYS RAILWAYS POWER LINES MARSH OR MUSKEG

CANCELLED

irc

r x NOTES400* surface rights reservation along the shores of oil lakes and rivers

\

PORCUPINE MINING DIVI SION

l 1981AM~ o

. P J.PlANxNO M. 1069

ONTARIO

MINISTRY OF NATURAL RESOURCESSURVEYS AND MAPBJNG BRANCH_____

\41015SW0018 2 4580 RANEY 200

Page 23: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

Hellyer Twp.(M.926)

_____CD———J

4~"~~"

l 537282 f -?-•~ " "p- - Tff ————17 ~ -|

! J l l/ ' |X/ l U l ' l— l II W49B l M***/**! K ft l T* l l m. m Aft l6l 5917*1 9f90 l

1542773 1942770 y

619094 *ltl 6362771636287

290 6,909* 6,9095 -~ "—~ -- J —407050 407048 407047 634S 63634663335^ 5636365H636366 [636306 1636301 .649667 — j— — — — --—i— — —i— — -t- —— ——

-X —1~ —p T p" T p" ""

1 ! i6036(636037 1636036 1636039

Denyes Twp.( M.758)41015SWeei8 2.4580 RANEY

210

THP TOWNSHIP OF

RANEYDISTRICT OFSUDBURY

PORCUPINE'MINING DIVISION

SCALE: 1-INCH = 40 CHAINS

DISPOSITION OF CROWN LANDSPATENT, SURFACE AND MINING RIGHTS ___ 9

•' , SURFACE RIGHTS ONLY ............. C" , MINING RIGHTS ONLY _...____ 9

LEASE, SURFACE AND MINING RIGHTS—— Pi•' , SURFACE RIGHTS ONLY.^.___.. H" , MINING RIGHTS ONLY__.___.. B

LICENCE OF OCCUPATION ________Jl__ T

ROADSIMPROVED ROADS KING'S HIGHWAYS RAILWAYS POWER LINES MARSH OR MUSKFG MINES CANCELLED

(T*?U.. J ^fXr

^ N OTES

400* sur^ce rights reservation along the shores of all lakes and rnvers

DATE OF ISSUE

DEC-9

Minisiryof Natural Resources TORONTO

PLAN NO M |069

ONTARIO

MINISTRY OF NATURAL RESOURCESSURVEYS AND MAPPING BRANCH

Page 24: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

lX•JLlJi033A3NVU egg ve

en/n/.ln

Page 25: RPT VLF AND MAG SUR · 2017-01-17 · Conclution and Recommendations 5 EXHIBITS 1. Profile of VLF Survey 2. Profile of Magnetometer Survey. Page l ... The survey and line cutting

LIOIM

LU0N

L800N

L70DN

L 100W

L 1/00 k)

L340N

Lil

70(95

80 OS

LO LI L3 Lfc LI L8\ L? LI0 Lil LU LI3

41015SW0ei8 a .4580 RANEY 230

T