RTVISC Working Group 9. Update and Status. WG Mission. Define and catalog data elements and data structures for data communications within and between passenger rail basic operating units (BOU) and between trains and the wayside. WG Work Plan. Current Focus. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: RTVISC Working Group 9

RTVISC Working Group 9

Update and Status

Page 2: RTVISC Working Group 9

WG MissionDefine and catalog data elements and

data structures for data communications within and between passenger rail basic operating units (BOU) and between trains and the wayside.

Page 3: RTVISC Working Group 9

WG Work Plan

IEEE 1544 (This Standard)

IEEE 1544.1 (Proposed)

IEEE 1544.2 (Proposed)

IEEE 1544.3 (Proposed)

IEEE 1544.4 (Proposed)

Data Elements & WTB Telegrams

TWC Data Structures

Monitoring & Diagnostic Data Structures

Vehicle Network Data Structures (Type T)

Vehicle & Train Network Data Structures (Type L)

IEEE 1473

Type L and Type T network definitions

IEEE 1475 Propulsion &

Braking Control

IEEE ???? Monitoring and

Diagnostics

IEEE ???? TWC

UIC 556, 2nd Edition

LonMar k Inter operability

Associati on

......

Page 4: RTVISC Working Group 9

Current Focus Definition and cataloging of data elements for

BOU interoperability. Data elements and data structures are based

on those defined in UIC 556 for TCN WTB (IEEE 1473-T train network).

Data elements defined by WG9 will be used by LonMark Transportation Group in defining functional profiles and SNVTs.

Page 5: RTVISC Working Group 9

Current Status Third internal draft of IEEE P1544 is in

development. Relevant sections of UIC 556 are either

referred to or duplicated (with extensions in some cases); this requires consent of UIC.

Draft will be released as P1544/D1 and distributed by 2/5/2002.

Next meeting to review P1544 scheduled for 2/25/2002.

Revised PAR needs to be submitted.

Page 6: RTVISC Working Group 9

Coordination RequirementsWG3- UIC 556 defines certain

mechanisms for diagnostics; this needs to be coordinated with WG3.

LonMark- First joint meeting held with LonMark on 1/8/2002 at Echelon in San Jose.

TWC working group.

Page 7: RTVISC Working Group 9

More InformationRefer to the following web sites:

http://www.tsd.org RTVISC site and official site for WG9

http://ieee.fwsbcon.com WG9 working site ftp://fwsbcon.com/wg9 In-process and

reference documents for WG9