s a | s - serena vaccari · 2016-09-18 · new colorbond metal cliplock roof 1.5° new timber stud...

9
LANGUAGES INTERESTS COMPUTER SKILLS autocad archicad illustrator photoshop inDesign sketchUp vectorworks revit rhinocerus 3dsMax architecture, landscape, urban design, sustainability, design, humanitarian architecture, competitions, art, photography, travels, different cultures, languages, music, theatre, movies, sports I like to design public and private spaces, indoor and outdoor where I can express my creativity, always with special attention to the sustainability of the project and the technological solutions used. I have a thorough experience in single residential projects being independent and responsible of the whole process from concept design to contract administration, dealing with clients, consultants, suppliers and builders. I am looking to develop my skills on larger projects. italian english german portuguese spanish EDUCATION [email protected] www.serenavaccari.com www.issuu.com/serena.vaccari june 2012 Registered Architect july 2011 Master Degree in Architecture at Politecnico di Milano. campus Leonardo | 110/110 PERSONAL STATEMENT SV Architect | Serena Vaccari

Upload: others

Post on 08-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: S A | S - Serena Vaccari · 2016-09-18 · new colorbond metal cliplock roof 1.5° new timber stud wall and window foilbacked insulation and batts to comply with BASIX balustrade

LANGUAGES INTERESTSCOMPUTER SKILLS

autocad

archicad

illustrator

photoshop

inDesign

sketchUp

vectorworks

revit

rhinocerus

3dsMax

architecture, landscape, urban

design, sustainability, design,

humanitarian architecture,

competitions, art, photography,

travels, different cultures,

languages, music, theatre,

movies, sports

I like to design public and private spaces, indoor and outdoor where I can express my creativity, always with special attention to the sustainability of the project and the technological solutions used.

I have a thorough experience in single residential projects being independent and responsible of the whole process from concept design to contract administration, dealing with clients, consultants, suppliers and builders.

I am looking to develop my skills on larger projects.

italian

english

german

portuguese

spanish

EDUCATION

[email protected] www.issuu.com/serena.vaccari

june 2012 Registered Architect

july 2011 Master Degree in Architecture at Politecnico di Milano. campus Leonardo | 110/110

PERSONAL STATEMENT

SV Architect|Serena Vaccari

Page 2: S A | S - Serena Vaccari · 2016-09-18 · new colorbond metal cliplock roof 1.5° new timber stud wall and window foilbacked insulation and batts to comply with BASIX balustrade

ResponsabilitiesDesign and construction of residential projects.

Concept design, contract administration, construction documentation, development applications, measurements, relation with clients, builders and project management

Sydney | www.dannybroearchitect.com

Roles: Contract Administration | Construction year: 2014 Gross Floor Area: 300 sqmStructure: Brick Veneer Walls, Concrete slab on concrete strip footing, steel frameFacade: Bricks, Blackbutt hardwood cladding, blueboard

Project Architectfeb 14 to may 16 at Danny Broe Architect

Turramurra House, Sydney, Australia1M Modern pavilion addition to an existing brick two story house

Page 3: S A | S - Serena Vaccari · 2016-09-18 · new colorbond metal cliplock roof 1.5° new timber stud wall and window foilbacked insulation and batts to comply with BASIX balustrade

Jannali House, Sydney, Australia0.7M Modern renovation and extension of an existing brick veneer house

Roles: house measuraments, concept design, interior and joinery design, council approval, documentation, contract administrationConstruction year: 2015Gross Floor Area: 200 sqmStructure: Timber Stud Walls, Concrete slab, steel frameFacade: Spotted Gum hardwood cladding, Render

Drawn ByDrawing

No.

2.4

Revision

ADrawing Name

Page Scale Date

Construction Issue

D. Broe, S. Vaccari, A. Pamment A3 20/11/2015

This drawing is for CDCpurposes only and is not tobe used for constructionpurposes

Proposed Second FloorPlan

Do not scale from this drawing.Verify all dimensions on sitebefore commencing work

This drawing is protected by copyrightand may not be used for any purposewithout the written approval of Danny Broe

Address:Phone/Fax:Mobile:Email:Web:

Danny Broe Architect

Applicant

Alterations and Additions to:Studio 1, Level 1 2-­12 Foveaux St, Surry Hills921130190407226667danny@dannybroearchitect.comwww.dannybroearchitect.com

37 Charles Place, Jannali

Narayan Rai

N

Owners Johanna and Narayan Rai

90 6,253 90

2,646

903,

169

4,67

590

1,483 4,174 7776,433

903,

822

889

1,30

31,

920

8,02

4

1,993 120 533

flue to comply with Australian Standard

903,

196

903,

050

1,48

312

2

903,

196

904,

565

90

90 2,550 90 4,887 1,366 90 2,486

8,03

1

9,07390 2,530 5,457 700 296 1,578 120

250

access door to the roof for maintainance

timber screen -­ 66x66mm painted pine

existingsandstone rocks

level this area

Replace existing stair with newtimber stair Hardwood treads onexisting steel frame

2 fixed glass, 1 sliding windowsingle toned glass to comply with Basix

1 panel sliding door and 1fixed glass

post to engineers drawings

fixed glass

new timber stud wall

new timber framed floor

new glassbalustrade

new glass balustrade

plasterboard balustrade

glass balustrade

post to engineersdrawings

transluncent film tocomply with privacyrequirements

smoke alarm accordingto AS 3786-­1993

new glass skylight

sandstone rocks

sandstone crazy pavingnote: assume that thepaving area is 9 m2

New barbeque cabinetusing the island benchceasar stone

barbeque

NEWLIVING AREA/ STUDY

H 2.40 m

NEWDECK

H 2.40 m

W.R.

BAR

VOID VOIDD10

W09

W10

W11

W12

W08

W13

W14

up

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

flat pan flashing D11

S1

Second Floor 1:500.5m 1m 2.5m

NOTE: All demolition to be carried out in accordance

with AS2601-2001 - demolition of structures

NOTE: Smoke alarm - The building is to be provided with either a smoke

alarm system that complies with AS 3786-1993 / Amendment 4 - 2004.

NOTE: Asbestos to be removed during demolition.

Builder to identify and remove any other asbestos on site.

Drawn ByDrawing

No.

3.3

Revision

ADrawing Name

Page Scale Date

Construction Issue

D. Broe, S. Vaccari, A. Pamment A3 20/11/2015

This drawing is for CDCpurposes only and is not tobe used for constructionpurposes

SectionsDo not scale from this drawing.Verify all dimensions on sitebefore commencing work

This drawing is protected by copyrightand may not be used for any purposewithout the written approval of Danny Broe

Address:Phone/Fax:Mobile:Email:Web:

Danny Broe Architect

Applicant

Alterations and Additions to:Studio 1, Level 1 2-12 Foveaux St, Surry Hills921130190407226667danny@dannybroearchitect.comwww.dannybroearchitect.com

37 Charles Place, Jannali

Narayan Rai

N

Owners Johanna and Narayan Rai

300

3,69

830

0

3,10

0

5,73

0

2,42

0

2,40

0new clerestory roof and window

new concrete slab

existing tiled roof to be demolishedshown dotted

plasterboard balustrade to double height void

existing floor and walls to bedemolished shown dotted

new colorbond metal roof 1.5° slope

new balustrade above rocks

new timber deck

new timber framed floor

new underfloor insulation and timber floorabove existing structure

new balustrade and posts

repair existing stairs

foilbacked insulation and batts

to comply with BASIX

change window to match new door height

replace window with fixed glass

foilbacked insulation and batts to comply with BASIX

plasterboard interior flat ceiling

keep existing interior ceilings

new colorbond metal kliplock roof 1.5° slope

entrance

kitchen new living/dining

new deck

RL 62.91New Roof 2 eave

RL 59.60New Roof 1 eave

RL 54.90Existing Ground Floor

RL 56.86Existing Terrace

RL 60.21New Second Floor

RL 56.97Existing First Floor

63.15New Roof 2 ridge

RL

existingbedroom 2

existingbedroom

terrace

existinggarage

entrancerainwatertank

2,40

02,

420

5,28

2

2,42

02,

472

demolish study to form double height entrance

repair existing stairs

replace window with a new sliding window

replace handrail

new timber weatherboard claddingnew clerestory windows and roof

demolish existing wall

new colorbond kliplok metal roof

foilbacked insulation and batts

to comply with BASIX

underfloor insulation

remove existing tiledroof shown dotted

RL 59.60New Roof 1

RL 62.91New Roof 2 eave

RL 54.90Existing Ground Floor

RL 56.97Existing First Floor

RL 54.24Existing Garage

RL 56.86Existing Terrace

RL 60.86Clerestory roof

eave

3,10

0

2,40

0

5,73

0

2,74

0

existing slab and walls to bedemolished shown dotted

new concrete slab

new timber framed floor

timber stud wall

clerestory window

fixed glass

existing tiled roof to be demolished shown dotted

new colorbond metal cliplock roof 1.5°

new timber stud walland window

foilbacked insulation and batts to comply with BASIX

balustrade to double height void

dressed timber fascias

maximum 70 mm deep metal cappings

newliving/study

newliving area

newdining

newensuite

RL 62.91New Roof 2

RL 59.60New Roof1

RL 56.97Existing First Floor

RL 60.21New Second Floor

A A

B

B

C

C

Section A 1:100

Section B 1:100 Section C 1:100

Key plan

Page 4: S A | S - Serena Vaccari · 2016-09-18 · new colorbond metal cliplock roof 1.5° new timber stud wall and window foilbacked insulation and batts to comply with BASIX balustrade

Lewisham House, Sydney, Australia0.5M Addition to an existing brick house

Roles: house measuraments, concept design, interior and joinery design, cladding customization, council approval, documentation, contract administrationConstruction year: 2016Gross Floor Area: 150 sqmStructure: Timber Stud Walls, Concrete slab, steel frameFacade: Treated pine cladding with custom design

Drawn ByDrawing

No.

6.1

Revision

ADrawing Name Drawing Status

Drawing Scale

DateConstruction Drawings

D. Broe, S. Vaccari A3

03/08/2015Proposed ExteriorPerspectives

Do not scale from this drawing.Verify all dimensions on sitebefore commencing work

This drawing is protected by copyrightand may not be used for any purposewithout the written approval of Danny Broe

Address:Phone/Fax:Mobile:Email:Web:

Danny Broe Architect

Owners

Alterations and Additions to:Studio 1, Level 1 2-12 Foveaux St, Surry Hills921130190407226667danny@dannybroearchitect.comwww.dannybroearchitect.com

68 Denison Road, Lewisham

Ashley & Tracy Jones

N

1m 2m 5m

3D IMAGES ARE FOR REFERENCE ONLY, 2D DRAWINGS TAKE PRECEDENCE

Drawn ByDrawing

No.

5.2

Revision

ADrawing Name Drawing Status

Drawing Scale

DateConstruction Drawings

D. Broe, S. Vaccari A3

03/08/2015Kitchen ElevationDo not scale from this drawing.Verify all dimensions on sitebefore commencing work

This drawing is protected by copyrightand may not be used for any purposewithout the written approval of Danny Broe

Address:Phone/Fax:Mobile:Email:Web:

Danny Broe Architect

Owners

Alterations and Additions to:Studio 1, Level 1 2-12 Foveaux St, Surry Hills921130190407226667danny@dannybroearchitect.comwww.dannybroearchitect.com

68 Denison Road, Lewisham

Ashley & Tracy Jones

N

1m 2m 5m

1,89

252

035

02,

762

110

350

350

150

401,

412

176

175

1,00

0

1,514

150

100

650

to ra

ngeh

ood

630

to fr

ont d

oor o

f cab

inet

melamine finishinside allcabinets

all shelves to beadjustable

light switch in gpo

Keep pipes depth to minimumand install outlet pipe at theback to create space fordrawer under sink.Model the drawer around thepipes if necessary

changepowerpoint toUSB charger

DISHWASHER

drawer

drawer

knife drawer

drawer

drawer

cutlery drawer

adjustableshelves

bulkhead

bulkhead toline up withbottom of

beam

bifolddoor

A/C outletA/C outlet

fixed panel

3700 LED striplight under cabinets

Installation, pleaserefer to manual from

manufacturer

tea towel rail

drawer

drawer

fixed panel

drawer

drawer

drawer

STN-1

K-FIT 2

K-FIT 1K-AP 1

K-AP 2

finger pullhandles on allcabinets

concealedrangehood,duct tooutside

HW-3 (tray) inside HW-2 (tray) inside

allow drainage connection for dishwasher

powerpoint for dishwasher

shadowline handles on all the drawers

STL-1

powerpoint for oven

powerpoint for rangehoodcontinuebenchtopinside

powerpoint for fridge

allow water connectionto the fridge

mitre joints

HW-5

finger pullhandles on all

cabinets

sewer pipe wrapped in sound laggingtoilet above

sewer pipe concealed in a 150x150 melamine boxA/C floor grille tostudy above

run A/C duct in the back ofthis cupboard

Centor fly screen box

K-AP 4

K-AP 3

POL-1POL-1

POL-1 POL-1 POL-1 POL-1 POL-1 POL-1 POL-1 POL-1 POL-1 POL-1 POL-1

POL-1

K-AP 5

POL-1POL-1

W02

POL-1

POL-1

POL-1

POL-1

HW-4inside

300

1,00

063

078

235

0

eq eq

Polyurethanefinish outside,

melamine finishinside all cabinets

finger pull handle

recessed LEDstrip light with

cover

20

650

K-FIT 2

K-FIT 1

POL 1

fixed panel

STN 1

STL 2

sewer pipe wrapped in sound lagging

POL 1

drainage pipe to beinstalled at the back of

the cupboard to allow thedrawers to fit.

Model the drawer aroundthe pipes if necessary

A/C duct

MEL-1

MEL-1

drawer

drawer

01 Kitchen Elevation 1:20 02 Kitchen Section 1:20

IMPORTANT : JOINER TO CHECK AND CONFIRM THAT THE INSTALLATION OF ALL APPLIANCES IS CORRECT

F

01/02/2016

- finger pull handle detail, rangehood clearance, window height, change of under cabinets to drawers, additional info about air con ducts, cabinet to the right changed with Centor screen- change double powerpoint on kitchen splashback to double USB charger

- updated Centor screen detail Drawn ByDrawing

No.

5.3

Revision

ADrawing Name Drawing Status

Drawing Scale

DateConstruction Drawings

D. Broe, S. Vaccari A3

03/08/2015Kitchen Island BenchDo not scale from this drawing.Verify all dimensions on sitebefore commencing work

This drawing is protected by copyrightand may not be used for any purposewithout the written approval of Danny Broe

Address:Phone/Fax:Mobile:Email:Web:

Danny Broe Architect

Owners

Alterations and Additions to:Studio 1, Level 1 2-12 Foveaux St, Surry Hills921130190407226667danny@dannybroearchitect.comwww.dannybroearchitect.com

68 Denison Road, Lewisham

Ashley & Tracy Jones

N

1m 2m 5m

100

800

100

2,000 200 900 500

740

260

315

315

150

1,00

0

drawer

drawer

drawer

HWD-1

mitre joints

shadowline handles on all the drawers

VNR-1

STN-2VNR-1

VNR-1

740

260

120 860

980

550

450

EQ EQ

power point onbench behind

STN-2

HWD-1

1,200 400 2,000

7401,

000

1,600

457 900 900 900 443

HWD-1

mitre joints

STN-2

100

700

200

364

336

EQ EQ

860 120

open shelves

open shelves

STN-2

VNR-1

VNR-1

06 Island Bench 1:20

04 Island 1:2003 Island Bench 1:20 05 Island 1:20

Revision D- just indication to centre pendants on island bench

D

06/01/2016Drawn ByDrawing

No.

4.5

Revision

ADrawing Name Drawing Status

Drawing Scale

DateConstruction Drawings

D. Broe, S. Vaccari A3

03/08/2015Detail - StairsDo not scale from this drawing.Verify all dimensions on sitebefore commencing work

This drawing is protected by copyrightand may not be used for any purposewithout the written approval of Danny Broe

Address:Phone/Fax:Mobile:Email:Web:

Danny Broe Architect

Owners

Alterations and Additions to:Studio 1, Level 1 2-12 Foveaux St, Surry Hills921130190407226667danny@dannybroearchitect.comwww.dannybroearchitect.com

68 Denison Road, Lewisham

Ashley & Tracy Jones

N

1m 2m 5m

hardwood timberrisers and treads to

match the timber floor

5x30 powdercoatedmetal flat bars with

square edge - welded

plasterboard

shadowline

shadowline

eqeq

eqeq

eqeq

eqeq

eq

250

187

1,00

0

max

125

20

20stringer

hardwood timber risersand treads to match thetimber floor

5x30 powdercoatedmetal flat bars withsquare edge - welded

distance between thebars and to the nosingline to be max 125mm tocompy with BCA 3.9.2.3

screw bars to the studwall behind

stringer

hardwood timber risersand treads to match thetimber floor

5x30 powdercoatedmetal flat bars withsquare edge - welded

screw bars to the studwall behind

screw barsinto the joistsbelow

plates to bewelded

screw barsinto the joists

Stairs Elevation 1:20 D-13 Stairs section 1:10

D-14 Stair section 2 1:10

D-16 on floor 1:10D-15connection1:10

A2

16/09/2015

F

F

existingwindow

existingwindow

existingwall

existingroof

existingflue

New Flat Roof

New First Floor

170

new timber stud wall withpainted vertical weatherboard

cladding on battens

new colorbond metalkliplok roof 1.5° slope

existing front of the house tobe retained

outline of existing building to bedemolished shown dotted

new verandah roof structure

metal capping maximum 50 mm high

existing gate to be relocated here

location of air conditioning external unit

existing hot water heater to be relocated here

min 100 mm exposed slabedge for termite exclusion

new timber stud wall with fibre cement sheet setplaster, painted to match weatherboards

new downpipe

replace existing gutter

replace existinggutters

new downpipe35x45 timber screen on 40x40 timber frame

awning

68 Denison Road

BOU

ND

ARY

BOU

ND

ARY

rear

set

back

Existing RidgeRL 31.20

RL 30.27

RL 27.24

RL 24.25New Ground

Floor

RL 25.56ExistingGround Floor

W02

D02

W03

W07

W08

kitchenexhaust vent

W10

glass size 1,181 approx

101

colorbond metal flat panflashing

painted plasterboard ceilingwith shadow line cornices

insulation batts

flashing90

482

new colorbond capping toneighbours roof

assumed height of theexisting brick party wall

colorbond box gutter withcorrect fall sump and

rainwaterhead

velux skylight on a 5°slopeon a hob

foil backed insulation blanket

new recycledsingle brick wall

beam to engineer's detail

rafter to engineer's detail

battens to enginee's detail

STL 1 - shadowline LEDstriplight with cover

brick ties between newbrick wall and existingparty wall to engineers

specification

new 1hour firerated stud wall

oversize skylightframe to make

plasterboard flushwith skylight frame

110approx 300

existing brick party wall

not painted exposedface concrete upturn

to engineer's detail

concrete footing toengineer's detail

new concrete slab toengineer's details

hardwood tongue and groovefloor on 40x40 mm hardwoodbattens on concrete slab

kordon termite barrierinstalled in accordance

with manufacturersinstructions

15x15 mm timber bead to match floor

waterproof membraneshown dotted

expansion joint

well compacted fill

concrete upturn to beflush with face brickwall above

all dimensions areapproximate

20

100m

m m

in fr

om s

lab

leve

l16

0mm

min

from

floo

r lev

el20mm painted timberweatherboard

wall insulation

tongue and groove hardwoodfloor on 40x40 mm hardwoodbattens on concrete slab

plasterboard50x15mm painted timberskirting flush with plasterboardwith shadowline

concrete footing to engineer'sdetail

37 X 70 timberbattens to sarking

cavity closer plate

150

50

painted timberweatherboard

shadowline cornice

aluminium window

painted plasterboard ceiling

turn plasterboard

70X35 battensto sarking

90X45 timber studs

colorbond metal capmaximum 50mm deep

sarking shown dotted

powdercoated 3mmaluminium flat plate

timber screen35x45 mmwith 50 mm gap

support timber screen

behind

powdercoatedaluminium angle

foil backed insulation blanket

battens to enginee's detail

rafters to enginee's detail

insulation batts

new colorbond capping toneighbours roof

flashingsilicone

Drawn ByDrawing

No.

4.5

Revision

ADrawing Name Drawing Status

Drawing Scale

DateConstruction Drawings

D. Broe, S. Vaccari A3

03/08/2015Detail - StairsDo not scale from this drawing.Verify all dimensions on sitebefore commencing work

This drawing is protected by copyrightand may not be used for any purposewithout the written approval of Danny Broe

Address:Phone/Fax:Mobile:Email:Web:

Danny Broe Architect

Owners

Alterations and Additions to:Studio 1, Level 1 2-12 Foveaux St, Surry Hills921130190407226667danny@dannybroearchitect.comwww.dannybroearchitect.com

68 Denison Road, Lewisham

Ashley & Tracy Jones

N

1m 2m 5m

hardwood timberrisers and treads to

match the timber floor

5x30 powdercoatedmetal flat bars with

square edge - welded

plasterboard

shadowline

shadowline

eqeq

eqeq

eqeq

eqeq

eq

250

187

1,00

0

max

125

20

20stringer

hardwood timber risersand treads to match thetimber floor

5x30 powdercoatedmetal flat bars withsquare edge - welded

distance between thebars and to the nosingline to be max 125mm tocompy with BCA 3.9.2.3

screw bars to the studwall behind

stringer

hardwood timber risersand treads to match thetimber floor

5x30 powdercoatedmetal flat bars withsquare edge - welded

screw bars to the studwall behind

screw barsinto the joistsbelow

plates to bewelded

screw barsinto the joists

Stairs Elevation 1:20 D-13 Stairs section 1:10

D-14 Stair section 2 1:10

D-16 on floor 1:10D-15connection1:10

A2

16/09/2015

BOU

ND

ARY

BOU

ND

ARY

New Flat Roof

new box gutter rainwater head

new sliding doors

new deck roof

new colorbond metalkliplok roof 1.5° slope

existing walls and roofs to bedemolished shown dotted

new suspended hardwoodtimber deck with 5mm gaps

on timber frame

new downpipe timber screens inaccordance with BASIXrequirements

metal capping maximum50 mm high

dog doornew louvres window

new downpipe

step for dog

new downpipe

new timber stud wall withpainted vertical weatherboardcladding on battens

new timber stud wall withfibre cement sheet setplaster, painted black

68 Denison Road66 Denison Road 70 Denison Road

RL 30.27

RL 27.26New First Floor

RL 24.25New GroundFloor

W04

W05

W06

D01

W01

Page 5: S A | S - Serena Vaccari · 2016-09-18 · new colorbond metal cliplock roof 1.5° new timber stud wall and window foilbacked insulation and batts to comply with BASIX balustrade

Responsabilities& ReferencesResponsible of design and graphic presentation of architecture,

urban and landscape project. Coordinator of the competitions teamMilan | Giorgio Ciarallo Architetto: [email protected]

Project architect0 7. 13 t o 12 . 13 w i t h G C A r c h i t e c t 4 apartments in Lainate, MilanRoles: concept and schematic design, council approval, developers brochure

Competition - requalification of the bridge “Bussa” in the earth of Milan Roles: concept design and graphic presentation

Page 6: S A | S - Serena Vaccari · 2016-09-18 · new colorbond metal cliplock roof 1.5° new timber stud wall and window foilbacked insulation and batts to comply with BASIX balustrade

Responsabilities & ReferencesWork in team on landscape architecture competitions. Design and

graphical tasks of the open space design of the Urania building in Berlin and the new schools in Hamburg. Berlin|www.treibhausberlin.de

Deniz Dizici: [email protected]

Landscape designerj a n 1 2 . m a r 1 2 w i t h T H T r e i b h a u s + L a v a l a n d

Responsabilities & ReferencesInterior design and documentation of new fitness studios.

Technical drawings, documentation, monitoring of construction worksMilan and Berlin | www.mcfit.com | Tilman Schmidt: [email protected]

Junior architectjul 12.apr 13 at McFit Italia

Page 7: S A | S - Serena Vaccari · 2016-09-18 · new colorbond metal cliplock roof 1.5° new timber stud wall and window foilbacked insulation and batts to comply with BASIX balustrade

Responsabilities & ReferencesMilan, Italy| Master in Architecture at Politecnico di Milano

Erase & Redraw - requalification project in Quarto Oggiaro, Milanow. assistance of Prof. Arch, Giovanni La Varra:

[email protected]

Urban designerjul 11 Master Thesis

Page 8: S A | S - Serena Vaccari · 2016-09-18 · new colorbond metal cliplock roof 1.5° new timber stud wall and window foilbacked insulation and batts to comply with BASIX balustrade

Competitionsmar10. ago10 Bruno Fioretti Marquez Architekten

New kindergarten and hotel for children in the university campus | Karlsruhe, Germany - 1st Prize

New neighborhood: supermarket, 30 rooms, garage, theater, library | Steinhausen, Swiss -4th Prize

Houses of the Bauhaus masters | Dessau, Germany - 1st Prize

Responsabilities & ReferencesTeam work, design, graphic representation and contstruction of

models for various competitionsBerlin | www.bfm-architekten.de

Donatella Fioretti: [email protected]

Page 9: S A | S - Serena Vaccari · 2016-09-18 · new colorbond metal cliplock roof 1.5° new timber stud wall and window foilbacked insulation and batts to comply with BASIX balustrade

2012 | MAGA Workshop - Construction of a minimal house in wood w. Arch. Rintala & Eggertsson, Mestriner and Spadoni

Experimental Workshops and competitions

2010 | Technische Universität Berlin - 1st prize in the competition Architecture Sommer Rugen, construction of the own project

2011 | Workshop SouthAfrica - Construction of an ecological house with earth,straw and garbage. w.Arch.Massimo Duroni:[email protected]