Page 1: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sex

ans

Integrated Campus Planning System

ll Te

Planning System

Texas Higher Education

for

a Texas Higher EducationCoordinating Board

ege

f

Finance and Resource Planning

Col

le Roland Gilmore Jennifer Gonzales Program Directors

Page 2: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)T bl f C t t

exan

s Table of Contents

• Project Approval Process Overview..…………………………………………3

ll Te

j pp

• Introduction to ICPS……………………….………………………………………9

• Project Applications……………………………………………………….………12

• Tuition Revenue Bond Projects 35

for

a • Tuition Revenue Bond Projects……………………………………………….35

• ICPS Capital Expenditure Plan (MP1)………..……………………….…….39

• ICPS Deferred Maintenance Plan (MP2)……………………………………71

ege

f • ICPS Deferred Maintenance Report (MP4)..………………………………85

• ICPS Facilities Inventory Search………………………………………………93

Col

le

10/6/10 2

Page 3: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s The THECB Project Approval ProcessP j t R i i A l

exan

s Projects Requiring Approval

Which projects need approval from the THECB?

ll Te Texas Education Code, §61.058, authorizes the Board to approve or disapprove

projects, regardless of funding source, for:

• New construction and/or addition projects that cost more $4 million or more;

for

a • Repair and renovation projects that cost $4 million or more;

• Unimproved and improved real property purchases;

• Improved real property acquired by gift or lease-purchase if the institution

ege

f intends to include the improved real property in its E&G buildings and facilities inventory and the value of the improved property is more than $300,000;

• Auxiliary Enterprise projects;

ll hl

Col

le • Intercollegiate Athletic projects;

• Energy Savings Performance Contract projects; and

• Tuition Revenue Bond projects (evaluation of standards).

10/6/10 3

Page 4: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s The THECB Project Approval ProcessWh t Fi d th M t U t D t I f ti

exan

s Where to Find the Most Up-to-Date Information

Go to www.thecb.state.tx.us/PA/FinanceAndResourcePlanning and click on “Project Applications”.

ll Te

for

aeg

e f

Col

le

10/6/10 4

Page 5: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s The THECB Project Approval ProcessA l A th it

exan

s Approval Authority

To see which projects are eligible for each Approval Authority, click on “Approval Levels”.

ll Te

for

aeg

e f

Col

le

10/6/10 5

Page 6: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s The THECB Project Approval ProcessA l A th it

exan

s Approval Authority

Approval levels can be found for each project

ll Te

type.

The Commissioner and Asst Commissioner can approve a project

for

a can approve a project IF it meets all of the Board standards for that project type.

If th j t d t

ege

f If the project does not meet all the Board standards, it must go to the Committee, even if the dollar

Col

le threshold would have allowed for Commissioner or Asst Commissioner approval

10/6/10

approval.

6

Page 7: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s The THECB Project Approval Process A li ti P d

exan

s Application Procedures

• To submit a project for THECB approval, institutions must complete a project

ll Te

application through the Integrated Campus Planning System (ICPS) and submit a signed Certification Form from the institution’s Board of Regents.

• Projects to be considered by the Committee on Strategic Planning and Policy th B d h ll b b itt d t l t 80 d i t th l l

for

a or the Board shall be submitted at least 80 days prior to the regularly scheduled Board meeting.

• All information and requests for additional information to complete the Project Analysis are needed on or before the established

ege

f the Project Analysis are needed on or before the established deadline.

• Incomplete applications and those with unresolved issues pending after the submission deadline will be moved to the following Board

Col

le after the submission deadline will be moved to the following Board meeting.

10/6/10 7

Page 8: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sThe THECB Project Approval Process

Application Flowchartex

ans

ICPS Application

Board of Regents Certification

Assistant Commissioner

ReviewEligible for Asst

Commissioner Approval

ll Te Plan of Action

Property Appraisals

Certification

Commissioner Review

Eligible for Commissioner

for

a Property Appraisals

Institutional Response for Additional Data

Committee

ReviewApproval

Eligible for Committee

ege

f

Program Director Analysis Approval

Letter

Committee Review

Additional Data

Requested

gApproval

Col

le Board Review

Project Disapproved or Placed on Hold

Director Review

10/6/10 8

Page 9: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)O i

exan

s Overview

What is the Integrated Campus Planning System?

ll Te • The Coordinating Board’s web application that allows for the efficient

collection of institutional information related to facilities and resource planning such as:

for

a planning, such as:

• Project Applications

• Tuition Revenue Bond Applications

ege

f Tuition Revenue Bond Applications

• Capital Expenditure Plans (MP1)

• Deferred Maintenance Plans (MP2 and MP4)

h d d l

Col

le • Search Records and Facilities Inventories

10/6/10 9

Page 10: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)O i

exan

s Overview

ICPS can be accessed from the Project Application page or from the drop down box at http://www.thecb.state.tx.us/PA/FinanceAndResourcePlanning/

ll Te

p // / / g/

for

aeg

e f

Col

le

10/6/10 10

Page 11: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS) O i

exan

s Overview

• Log on with your ifi

ll Te

specific username and password (for help with this,

t t THECB)

for

a contact THECB). This gives you access to your particular i tit ti ( )

ege

f institution(s).

Col

le

10/6/10 11

Page 12: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Project Applications O i

exan

s Overview

All current and

ll Te previous project

applications can be accessed by clicking on “Project

for

a jApplication”.

ege

fC

olle

10/6/10 12

Page 13: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Project Applications Vi A li ti

exan

s View Applications

Note the drop

ll Te

pdown menu that appears.

To start, you can

for

a ysee the status of submitted project applications as well as “Pending”

ege

f project applications (not yet submitted to THECB), by

Col

le clicking on “View Project Applications”.

10/6/10 13

Page 14: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)Vi A li ti

exan

s View Applicationsll

Te

A screen similar to the one here will

for

a appear listing the Project ID, Project Name, and Status.

ege

f Click on the Project ID to edit the record (can only edit projects in a “Pending” status).

Col

le

10/6/10 14

Page 15: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)Vi A li ti

exan

s View Applications

Once you click on the j t ID it ill t k

ll Te

project ID, it will take you to this screen, with “Add Project Application” at the t Thi i th

for

a top. This is the same screen that will appear after importing or starting

li ti It

ege

f a new application. It is where the bulk of the detail is entered.

Col

le

(details on how to fill out the rest of the application will follow)

10/6/10 15

Page 16: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Project Applications S b it A li ti

exan

s Submit Applications

Looking in the drop

ll Te down menu, if a project

does not already have an application, there are a variety of ways to

b it U

for

a submit one. Users can:

•Start a new project application,

•Import MP1 MP2 or

ege

f •Import MP1, MP2, or TRB records into a project application, or

•Submit a project for re-approval

Col

le re-approval.

First, click on “Start a new Project Application”.

10/6/10 16

Page 17: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Project Applications St t N A li ti

exan

s Start a New Application

It will take you to the “Add P j t

ll Te

“Add Project Application” screen, just as clicking on an existing project did. All i f ti i

for

a All information is entered in this screen.

N ti th t th t

ege

f Notice that the system created a new Project ID. It will remain the same for the life of th j t

Col

le the project.

10/6/10 17

Page 18: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Project Applications I t A li ti

exan

s Import Applications

F i

ll Te

For convenience, a copy of the most recently submitted MP1, MP2, and TRB

d h b

for

a records have been placed here for easy import into a project application. Simply click on “Import

ege

f click on “Import Application”.

Col

le

10/6/10 18

Page 19: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t A li ti

exan

s Import Applications

You will be

ll Te

You will be directed to a screen that shows all the institution’s MP1

for

a institution s MP1, MP2, and TRB records. From here, choose the project to import

ege

f project to import into a project application by clicking in the far right column

Col

le right column.

10/6/10 19

Page 20: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t A li ti

exan

s Import Applications

The information f th d ill

ll Te

from the record will be pulled into the “Add Project Application” screen

h E t

for

a as shown. Enter data in all applicable fields that have not been auto-populated f th i t

ege

f from the import.

If you need assistance with a field, click on the

Col

le e d, c c o t ename (highlighted in blue) and a brief description will be provided.p

10/6/10 20

Page 21: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t A li ti

exan

s Import Applications

When importing a

ll Te

When importing a TRB record, the system will ask you to enter the Legislative Session

for

a Legislative Session and Bill number from which the project received authority.

ege

f

Hit “Save and Return to Application” when complete. It will take you back to the “Add

Col

le you back to the Add Project Application” screen.

10/6/10 21

Page 22: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)R A l

exan

s Re-Approval

Similarly, you can i t j t

ll Te

import a project application that has already been approved for re-

l Si l li k

for

a approval. Simply click on “Re-Approval” and a screen similar to the one here will

ege

f appear.

Find the project that needs to be re-

d d li k

Col

le approved and click on “Import this for Re-approval”.

10/6/10 22

Page 23: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)R A l

exan

s Re-Approval

A box will appear h th

ll Te

where the information on why the project needs to be re-approved h ld b t d

for

a should be entered.

Make other changes in the application as needed

ege

f needed.

Col

le

10/6/10 23

Page 24: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t D t i t A li ti

exan

s Input Data into Applications

All methods of sta ting/impo ting/ e

ll Te

starting/importing/re-approving an application will bring you to the “Add Project Application” screen

for

a Application screen where information will be entered.

Start by filling out the

ege

f y g“General Project Information” fields, beginning with the MP Type (whether it is a

l

Col

le capital project, deferred maintenance project, or neither).

10/6/10 24

Page 25: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t D t i t A li ti

exan

s Input Data into Applications

The project name field sho ld al a s sta t

ll Te

should always start with either “Construct, Repair, Renovate, or Purchase” (or a combination of these if

for

a combination of these if necessary) based on the purpose of the project.

ege

f Continue down the application, filling out the Closing the Gaps Goals and Institutional C f

Col

le Contact Information sections.

10/6/10 25

Page 26: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t D t i t A li ti

exan

s Input Data into Applications

Fill in the Approval Contact Info mation as

ll Te

Contact Information as well as the Compliance Questions.

If you are unsure what

for

a If you are unsure what to enter in a field, click on the blue highlighted field title to get more information. For

ege

f example, if you click on the first question, a pop up box will open with further explanation.

Col

le

10/6/10 26

Page 27: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t D t i t A li ti

exan

s Input Data into Applications

Fill out the “Project Specifics” section The methodology of

ll Te

section. The methodology of calculating the construction cost standard makes the accuracy of the “Estimated Start Date and End Date” fields

for

a very important.

If the item is addressing deferred maintenance items, make sure to enter the amount

ege

f make sure to enter the amount below the project dates.

Fill in the “Project Space” and “Real Property” section (if

li bl ) If

Col

le applicable). If you are removing space from the inventory, add the date of removal or demolition.

10/6/10 27

Page 28: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t D t i t A li ti

exan

s Input Data into Applications

Fill in the “Costs and

ll Te

Fill in the Costs and Fees”. Each category will automatically subtotal, as will the “Total Project Costs” box, once you hit th “U d t ” fi ld t th

for

a the “Update” field at the bottom of the application.

If there are values entered in the “Building Cost (New

ege

f g (Construction)” and/or “Building Cost (Repair & Renovation)” fields, there must be corresponding space entered in the

Col

le space entered in the “Project Space” section above.

10/6/10 28

Page 29: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t D t i t A li ti

exan

s Input Data into Applications

If the project is h d t th

ll Te

phased, enter the cost of all phases in the “Total Cost” box.

for

a Trick: Use the update button after entering

b d th

ege

f numbers and the total fields will auto-calculate.

Th li k

Col

le Then, click on “Add Financing Information”.

10/6/10 29

Page 30: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t D t i t A li ti

exan

s Input Data into Applications

For the financing, choose from drop down menus

ll Te

from drop down menus for the “Project Funding”, “Source”, and “Revenue Stream For Bonds”. Enter in the amount.

for

a

If only one financing type is used, click on “Save and Return to

ege

f Application”.

If you have more than one financing type, click

Col

le one financing type, click “Save and Add More” and repeat for each financing type.

10/6/10 30

Page 31: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t D t i t A li ti

exan

s Input Data into Applications

For Cash funding, only the Source field needs to be

ll Te

Source field needs to be filled. For Bond funding, the Source and Revenue Stream for Bonds need to be filled.

for

a The Donation funding drop down is only for use in an event that a building or land has been donated

ege

f or land has been donated. Donations of money should be reflected as either Cash or Bonds.

If h i i

Col

le If there in an error in a finance entry, click “Delete” and “Add Financing Information” to change it.change it.

10/6/10 31

Page 32: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I t D t i t A li ti

exan

s Input Data into Applications

Once all entries have been made, review the

ll Te information. If correct,

click “Update” to save the record.

To send the application

for

a To send the application for approval, click on “Send Project Application for Consideration”.

Select “Clear Changes” if

ege

f Select Clear Changes if you don’t want to save or “Delete” if you don’t want to keep this project application.

Col

le application.

To print a copy of the project application, click on the printer symbol.

10/6/10 32

Page 33: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)I D i A li i

exan

s Input Data into Applications

If there is a problem with the application a red error

ll Te

the application, a red error message will appear at the top of the application. Make changes as necessary and then click on “Send Project

for

a Application for Consideration” again.

If the project is sent successfully, the screen will

ege

f take you to the list of project applications and the project will be added at the bottom with the status of “Sent to System”. Once it is

Col

le Sent to System . Once it is approved by the System contact, the status will change to “Sent to THECB”.

10/6/10 33

Page 34: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)W k h E i

exan

s Workshop Exercisell

Tefo

r a

ege

fC

olle

10/6/10 34

Page 35: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Tuition Revenue Bond Projects

Tuition Revenue Bond Historyex

ans

• Tuition Revenue Bonds (TRB’s) are secured by a pledge of an institution’s " f d " d fi d i Ch t 55 f th T Ed ti C d

Tuition Revenue Bond Historyll

Te

"revenue funds" as defined in Chapter 55 of the Texas Education Code.

• The state has historically appropriated funds to institutions to cover the debt service on revenue bonds issued pursuant to certain specific

th i ti t i di id l i tit ti i Ch t 55 T Ed ti

for

a authorizations to individual institutions in Chapter 55, Texas Education Code ("Tuition Revenue Bonds").

• TRBs are used to acquire, purchase, construct, improve, renovate, enlarge, or equip property buildings structures facilities roads or related

ege

f or equip property, buildings, structures, facilities, roads, or related infrastructure on or for the campus.

• When requested by the Legislature, THECB will open the TRB module in ICPS to collect Applications to be ranked and forwarded to the Legislature

Col

le ICPS to collect Applications to be ranked and forwarded to the Legislature for consideration.

10/6/10 3535

Page 36: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Tuition Revenue Bond ProjectsO iex

ans Overview

For information online, click on the Tuition Revenue Bonds link at:http://www thecb state tx us/PA/FinanceAndResourcePlanning/

ll Te

http://www.thecb.state.tx.us/PA/FinanceAndResourcePlanning/

for

aeg

e f

Col

le

10/6/10 36

Page 37: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Tuition Revenue Bond ProjectsO iex

ans Overview

Previous TRB application submissions as well as the current evaluation criteria can be found on this page

ll Te

criteria can be found on this page.

for

aeg

e f

Col

le

10/6/10 37

Page 38: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Tuition Revenue Bond Projects

Evaluation Criteriaex

ans

Projects will be evaluated on the following measures:

Evaluation Criteriall

Te 1. Extraordinary Circumstances

2. Efficiency (NASF to GSF)

3. Space Need

for

a p

4. Planned Project (on MP1 or MP2)

5. Cost

6 Matching Funds

ege

f 6. Matching Funds

7. Deferred Maintenance

8. Space Usage Efficiency

Col

le 9. Closing the Gaps – Participation, Success, and Excellence

10. Closing the Gaps Indices– Participation, Success, and Excellence (using data from the accountability system)

10/6/10 3838

Page 39: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Capital Expenditure Plan (MP1)O i

exan

s Overview

Chapter 17 section 101 of THECB states that a Capital Expenditure Plan will be submitted on or before July 1 of every year, as required by Texas Education Code,

ll Te

y y y , q y ,§61.0582. The report shall include projects that are planned or may be submitted to the Board within the next five years, regardless of funding source for:

• new construction projects of $1 million or more,

for

a • repair & renovation projects of $1 million or more,• information resource projects that would total $1 million or more in one year,

and• property purchases that cumulatively would total $1 million or more in one

ege

f • property purchases that cumulatively would total $1 million or more in one year.

• History – Institutions were required to submit capital expenditure plan data to both the THECB (as the MP1), and to the BRB (as the Capital Expenditure

Col

le both the THECB (as the MP1), and to the BRB (as the Capital Expenditure Plan). The General Appropriations Act of the 77th Legislature eliminated this redundant reporting. The THECB now collects all capital planning data from institutions and state agencies and then shares the data with the BRB.

10/6/10 3939

Page 40: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Capital Expenditure Plan (MP1)Wh t U C D

exan

s What Users Can Do

1. Submit Records

ll Te • Edit Previous Year’s Data (educational institutions only)

• Enter Records• Upload Records

for

a • Upload Records

2. Prioritize Records

ege

f 3. View a Summary

4. Certify Records

Col

le 5. Troubleshooting Tips

10/6/10 40

Page 41: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Recordsex

ans

• From the left menu frame Click on

Submit Recordsll

Te

frame, Click on “MP1 (Capital Expenditure Plan)” to expand the menu item

for

a menu item.

ege

fC

olle

4110/6/10 41

Page 42: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Three Waysex

ans

• Note the expanded th t

Submit Records Three Waysll

Te

menu that appears. The system allows three means of submitting MP1

d

for

a records. • Use last year’s

records to submit records

ege

f for this fiscal year

• Start new MP1 records

Col

le • Upload MP1 records

4210/6/10 42

Page 43: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Edit Previousex

ans

• Select “View MP1 R d ” t i

Submit Records Edit Previousll

Te

Records” to review the records transferred from the previous year.

for

a • A copy of the previous year’s records are copied into the current

ege

f into the current year for your convenience.

• Update or delete h d

Col

le each record.

• Select the project’s name to update.

4310/6/10 43

Page 44: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Edit Previousex

ans

• Update the record’s i f ti d

Submit Records Edit Previousll

Te

information and select the “Update” button on the bottom of the form t SAVE

for

a to SAVE your updates.

• Note: Do not

ege

f include commas or punctuation when entering the number fields.

Col

le

4410/6/10 44

Page 45: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Edit Previousex

ans

• The “Financing and Debt Repayment Information”

Submit Records Edit Previousll

Te

Repayment Information” does NOT contain the previous year’s information.

• Add financing information

for

a to the record by clicking on the “Add Financing Information” button.

ege

fC

olle

4510/6/10 45

Page 46: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Edit Previousex

ans

On the “Financing Information” screen, enter the “Type of

Submit Records Edit Previousll

Te

enter the Type of Financing” and “Source of Funds” from the drop down menus.

If “Other” is selected,

for

a If Other is selected, specify. Enter in the expenditures.

If only one financing type is used, click on “S d R t t

ege

f “Save and Return to MP1”.

If you have more than one financing type, click on “Save and Add More”

Col

le on Save and Add More and repeat for each financing type.

To cancel this function, select “Cancel”.

4610/6/10 46

Page 47: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Edit Previousex

ans

Back on the main

Submit Records Edit Previousll

Te record input screen, input the Debt Repayment Information by

for

a yselecting the “Add Debt Repayment Information” button.

ege

fC

olle

4710/6/10 47

Page 48: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Edit Previousex

ans

Input the “Source of Funds”. You must specif if “Othe ” is

Submit Records Edit Previousll

Te

specify if “Other” is selected.Add the percent from General Revenue and Expenditures

for

a Expenditures. If only one source of funding type is used, click on the “Save and Return to MP1”

ege

f Return to MP1 . If you have more than one source of funding type, click on “Save and Add More” and repeat

Col

le Add More and repeat for each financing type. To cancel this function, select “Cancel”.

4810/6/10 48

Page 49: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Edit Previousex

ans

Back on the main record input

Submit Records Edit Previousll

Te

pscreen, select the “Update” button to save the record.

Select the “Mark

for

a Select the Mark Data Entry Completed” to return to the summary page

ege

f summary page.

Col

le

4910/6/10 49

Page 50: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Delete Previousex

ans

To delete a record l t th j t’

Submit Records Delete Previousll

Te

select the project’s name.

For example, to

for

a p ,delete the “Hardeman Student Service Center” MP1

ege

f Record, select and click on that title.

Col

le

5010/6/10 50

Page 51: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Delete Previousex

ans

Scroll to the bottom of the

Submit Records Delete Previousll

Te

bottom of the web page and click the DELETE button.

for

a

This will remove the MP1 Record from the current

ege

f from the current fiscal year MP1 records.

Col

le

5110/6/10 51

Page 52: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Enter Recordsex

ans

To start a new MP1 d t

Submit Records Enter Recordsll

Te

MP1 record to submit for the current fiscal year, click on th “St t N

for

a the “Start a New MP1” link.

ege

fC

olle

5210/6/10 52

Page 53: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Enter Recordsex

ans

Confirm you have read and

Submit Records Enter Recordsll

Te

read and understand the rules.

for

aeg

e f

Col

le

5310/6/10 53

Page 54: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Enter Recordsex

ans

Complete the mandatory fields listed below that

Submit Records Enter Recordsll

Te

fields listed below that appear on the form: • Name • Building Number L ti

for

a • Location • Description • Type • Total Cost

ege

f • Start Date • End Date • Subject Area CIP code • Cost of L&M

Col

le • Cost of L&M Requirements

• Useful Life

5410/6/10 54

Page 55: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Enter Recordsex

ans

• Enter information in the “Square

Submit Records Enter Recordsll

Te

the “Square Footage” Section and the “Project Details” Section.

for

aeg

e f

Col

le

10/6/10 55

Page 56: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Enter Recordsex

ans

Enter the Financing and Debt

Submit Records Enter Recordsll

Te

and Debt Repayment Information by selecting the “Add Financing

for

a Financing Information” button.

ege

fC

olle

5610/6/10 56

Page 57: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Enter Recordsex

ans

On the linked screen, enter in the “Type of

Submit Records Enter Recordsll

Te

enter in the Type of Financing” and “Source of Funds” using the drop down menu. You must specify if

for

a “Other” is selected. Enter in expenditures. If only one financing type is used, click on “Save

d R t t MP1”

ege

f and Return to MP1”. If you have more than one financing type, click on the “Save and Add More” and repeat for

Col

le More and repeat for each financing type. To cancel this function, select “Cancel”.

5710/6/10 57

Page 58: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Enter Recordsex

ans

Back at the main d i t

Submit Records Enter Recordsll

Te

record input screen, input the Debt Repayment Information by

l ti th “Add

for

a selecting the “Add Debt Repayment Information” button.

ege

fC

olle

5810/6/10 58

Page 59: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Enter Recordsex

ans

Input the “Source of Funds”. Please specify if

Submit Records Enter Recordsll

Te

p y“Other” is selected. Add the percent from General Revenue and Expenditures.

for

a If only one source of funding type is used, click on “Save and Return to MP1”. If there is more than

ege

f If there is more than one source of funding type, click on the “Save and Add More” button and repeat for

Col

le each financing type. To cancel this function, select the “Cancel” button.

5910/6/10 59

Page 60: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Submit Records – Enter Recordsex

ans

Back at the main record screen

Submit Records Enter Recordsll

Te

record screen, review the updated information and select the “Add” button to save the

for

a button to save the record.

Select the “Mark Data Entry C l t d” t

ege

f Completed” to return to the summary page.

Col

le

6010/6/10 60

Page 61: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Prioritize Recordsex

ans

• Note: These steps must be followed

Prioritize Recordsll

Te

must be followed each time a change is made to ensure the priorities are updated

for

a updated.

• Select and click the PRIORITIZE MP1 link.

ege

fC

olle

6110/6/10 61

Page 62: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Prioritize Recordsex

ans

Prioritize the MP1 Records by

Prioritize Recordsll

Te

Records by selecting a record and clicking the Move Up” or “Move Down”

for

a Move Down buttons.

After arranging the projects from

ege

f the projects from HIGHEST PRIORITY (top) to the LOWEST PRIORITY

Col

le PRIORITY (bottom), select “Update Priorities”.

6210/6/10 62

Page 63: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Prioritize Recordsex

ans

The resulting screen will appear

Prioritize Recordsll

Te

screen will appear showing all the current fiscal year MP1 Records (prioritized)

for

a (prioritized).

ege

fC

olle

6310/6/10 63

Page 64: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

View A Summaryex

ans

Select and click the SUMMARY REPORT

View A Summaryll

Te

SUMMARY REPORT link.

for

aeg

e f

Col

le

6410/6/10 64

Page 65: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

View A Summaryex

ans

A PDF file will download similar to

View A Summaryll

Te

download similar to the one below containing a summary of the current year MP1

for

a current year MP1 Records.

ege

fC

olle

6510/6/10 65

Page 66: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Certify Recordsex

ans

To certify the current year’s MP1

Certify Recordsll

Te

current year’s MP1 Records, select “Certify” from the drop down menu.

for

aeg

e f

Col

le

6610/6/10 66

Page 67: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Certify Recordsex

ans

• A screen similar to the one below will appear containing the certification form for the current fiscal year MP1 Records.

Certify Recordsll

Te • Fill in the Institution’s Contact Name, Title, Phone Number, and E-mail Address and Select the “Certify” button.

for

aeg

e f

Col

le

6710/6/10 67

Page 68: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Certify Recordsex

ans

Print out the certification form and return the signed form to the Higher Education Coordinating Board on or before July 1st.

Certify Recordsll

Tefo

r a

ege

fC

olle

6810/6/10 68

Page 69: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Troubleshooting Tipsex

ans

• To save your data, select ADD or UPDATE buttons to save inputs.

Troubleshooting Tipsll

Te • An error occurs after hitting ADD or UPDATE. • Make sure the totals add up and match in finance fields. • Make sure all fields are filled out.

• Do not include commas or punctuation in number fields

for

a • Do not include commas or punctuation in number fields. • Priorities are not in order or contain zeros as a priority rank.

• Click on PRIORITIZE MP1 and select UPDATE PRIORITIES. • An error occurs after uploading a file.

ege

f p g• Recheck fields to ensure a match with the file specifications. • Your changes are not saved. • Make sure you select the ADD or UPDATE button to save changes.

Col

le

6910/6/10 69

Page 70: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Capital Expenditure Plan (MP1)

Workshop Exerciseex

ans Workshop Exercise

ll Te

for

aeg

e f

Col

le

10/6/10 70

Page 71: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Deferred Maintenance Plan (MP2)O i

exan

s Overview

Texas Education Code, Sec 61.0582, gives the THECB the task of

ll Te

Texas Education Code, Sec 61.0582, gives the THECB the task of collecting information on deferred maintenance needs from public institutions. The Campus Deferred Maintenance Plan (MP2), identifies current accumulated deferred maintenance (ADM) needs and lists projects planned to address accumulated deferred maintenance needs

for

a projects planned to address accumulated deferred maintenance needs in the next five years. Any project that cost $10,000 or more should be included. Capital renewal projects should not be included. The data is collected annually by October 15th.

ege

fC

olle

10/6/10 71

Page 72: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Deferred Maintenance Plan (MP2)MP2 R d

exan

s MP2 Records

1. Submitting MP2 Records

ll Te • use the previous year’s records and either update, move, or delete

the records for the current fiscal year, or• start a new MP2 record.

for

a 2. Prioritizing the current fiscal year MP2 records

3. Viewing a summary of the current fiscal year MP2 records

ege

f

4. Certifying the MP2 records

5 T bl h ti

Col

le 5. Troubleshooting

10/6/10 72

Page 73: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

Submit Recordsex

ans

From the left menu frame Click

Submit Recordsll

Te

menu frame, Click on “MP2 (Def. Maint. Plan)” to expand the menu item

for

a item.

ege

fC

olle

7310/6/10 73

Page 74: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Deferred Maintenance Plan (MP2)S b it R d

exan

s Submit Records

Note the d d

ll Te

expanded menu that appears. The system allows two means f b itti

for

a of submitting MP2 records:

•Start a new MP2 record

ege

f record

•Use last year’s records to submit records for this

Col

le records for this fiscal year

10/6/10 74

Page 75: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

Submit Records – Edit Previousex

ans

Select “View MP2 R d ” t i

Submit Records Edit Previousll

Te

Records” to review the records transferred from the previous year.

for

a A copy of the previous year’s records are copied into the current year for your

ege

f current year for your convenience.

Update, delete, or move the record to

Col

le move the record to the MP4 by first selecting the project’s name.

7510/6/10 75

Page 76: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

Submit Records – Edit Previousex

ans

To update, the record, make changes as

Submit Records Edit Previousll

Te

make changes as needed and click the “Update” box. If you decide not to save the changes, use the

for

a changes, use the “Clear Changes” box.

To move the record to th MP4 fi t h

ege

f the MP4, first change the data if applicable and then click on “Move to MP4.”

Col

le

Use the “Delete” box to remove the record if desired.

7610/6/10 76

Page 77: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

Submit Records - Enter Recordsex

ans Submit Records Enter Records

To start a new MP2, clicking on “Start a New

2” d ill b

ll Te

MP2” and you will be directed to the following screen.

Enter data into all fields.

for

a Enter data into all fields. Do not include commas or punctuation when entering in number fields.

Th M i t

ege

f The Maintenance Expenses and Deferred Maintenance Plan sections Total Cost must

t h

Col

le match.

To add the record, click the “Add” button.

7710/6/10 77

Page 78: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

Prioritize Recordsex

ans Prioritize Records

Once all records have been entered

ll Te

have been entered, click on “Prioritize MP2” and you will be brought to the following screen

for

a following screen.

Order the records by clicking on a project and then use the

ege

f and then use the “MOVE UP” and “MOVE DOWN” buttons.

Col

le Once complete, click on “Update Priorities” box.

7810/6/10 78

Page 79: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

View MP2 Summaryex

ans View MP2 Summary

• The resulting screen

ll Te

The resulting screen will appear showing all the current MP2 Records (prioritized).

for

a • From here, you can view a summary of the projects by clicking on “Summary

ege

f g yReport-XXXX” (current fiscal year).

Col

le

10/6/10 79

Page 80: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

View MP2 Summaryex

ans View MP2 Summary

A PDF file will

ll Te

• A PDF file will download containing a summary of the current year MP2

for

a current year MP2 Records.

• You can print the report from here if d d

ege

f if needed.

• Use the “Back” button to return to the menu of

Col

le drop down choices.

10/6/10 80

Page 81: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

Certify Recordsex

ans Certify Records

• To Certify the records select the

ll Te

records, select the “Certify” link and a screen similar to the one here will appear.

for

a pp

• Fill in the Institutional Contact’s Name,

ege

f ,Title, Phone Number, and E-mail Address and Select the “Certify”

Col

le button.

10/6/10 81

Page 82: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

Certify Recordsex

ans Certify Records

Print out the

ll Te

Print out the PDF certification form, sign it, and the send

for

a it in to the THECB.

ege

fC

olle

10/6/10 82

Page 83: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

Troubleshooting Tipsex

ans Troubleshooting Tips

• To save your data, select ADD or UPDATE buttons to save inputs.

ll Te

y , p• An error occurs after hitting ADD or UPDATE.

• Make sure the totals add up and match in finance fields. • Make sure all fields are filled out.

for

a • Do not include commas or punctuation in number fields. • Priorities are not in order or contain zeros as a priority rank.

• Click on PRIORITIZE MP1 and select UPDATE PRIORITIES. • Recheck fields to ensure a match with the file specifications

ege

f • Recheck fields to ensure a match with the file specifications. • Your changes are not saved. • Make sure you select the ADD or UPDATE button to save changes.

Col

le

10/6/10 83

Page 84: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP2)

Workshop Exerciseex

ans Workshop Exercise

ll Te

for

aeg

e f

Col

le

10/6/10 84

Page 85: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Deferred Maintenance Report (MP4)O i

exan

s Overview

THECB collects actual expenditure data related to deferred maintenance in ti 61 0582 f th T Ed ti C d Th MP4 R t i

ll Te

response section 61.0582 of the Texas Education Code. The MP4 Report is due to the Board by October 15th each year.

• Submit MP4 Records

for

a • use the previous year’s records and either update, move, or delete the records for the current fiscal year, or

• start a new MP4 record.

ege

f

• View a summary of the current fiscal year MP4 records

Col

le • Certify the MP4 records

10/6/10 85

Page 86: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Deferred Maintenance Plan (MP4)S b it R d

exan

s Submit Records

Select the “MP4 (Def Maint E pendit es)”

ll Te

Maint. Expenditures)” option to expand the sub menu.To submit a record, choose to:

for

a choose to:• Start a new MP4

record, Select “Start a new MP4”

ege

f • Edit a copy of last year’s records, Select “View MP4 Records”

Col

le • Upload MP4 records, Select “Upload MP4”

10/6/10 86

Page 87: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP4)

Submit Recordsex

ans

Complete or update the N d D i ti

Submit Recordsll

Te

Name and Description fields.Associate the Building Number with the

for

a Expenditure.Use the drop down menus to categorize the record deferred or demolition,

ege

f ,critical or non-critical.Populate or update the cost fields.Select “Add” or “Update” to

Col

le Select Add or Update to save the record.Select the “Delete” button to remove a record.

8710/6/10 87

Page 88: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP4)

View MP4 Summaryex

ans View MP4 Summary

• View summary of the projects by selecting “Summary Report-XXXX” (current fiscal year).

ll Te

for

aeg

e f

Col

le

10/6/10 88

Page 89: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Deferred Maintenance Plan (MP4)

View MP4 Summaryex

ans View MP4 Summary

• A PDF file will download containing a summary of the current year MP4 Records.

ll Te • Use the “Back” button to return to the main menu.

for

aeg

e f

Col

le

10/6/10 89

Page 90: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Deferred Maintenance Plan (MP4)C tif R d

exan

s Certify Records

• To Certify the records select the

ll Te

records, select the “Certify” option.

• Fill in the Institutional Contact’s Name

for

a Contact’s Name, Title, Phone Number, and E-mail Address and Select the “Certify”

ege

f Select the Certify button.

Col

le

10/6/10 90

Page 91: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Deferred Maintenance Plan (MP4)C tif R d

exan

s Certify RecordsSend the signed PDF certification form to the THECB by October 15th.

ll Te

for

aeg

e f

Col

le

10/6/10 91

Page 92: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Deferred Maintenance Plan (MP4)W k h E i

exan

s Workshop Exercisell

Tefo

r a

ege

fC

olle

10/6/10 92

Page 93: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s ICPS Facilities Inventory Searchex

ans

Users can search the Facilities Inventory

ll Te

Facilities Inventory Building and Room records from the Facilities Inventory option

for

a option.

Select the “Facilities Inventory” option to expand.

ege

f

Choose the “Buildings” or “Rooms” Options.

Col

le

9310/6/10 93

Page 94: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

sICPS Facilities Inventory Search

Buildingsex

ans

Users are presented with a series of

Buildingsll

Te

with a series of choices to search by. Alter the drop down and text fields and select the “Search

for

a select the Search Facilities Inventory” button.

ege

fC

olle

9410/6/10 94

Page 95: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

s Integrated Campus Planning System (ICPS)ex

ans g p g y ( )

ll Te To view all Coordinating Board Rules currently in effect, go to:

http://www.thecb.state.tx.us/apps/Laws/default.cfm

for

a For up-to-date THECB Finance and Facilities information, such as reports, deadlines, and procedures, visit:

http://www.thecb.state.tx.us/PA/FinanceAndResourcePlanning/

ege

f

bl h

Col

le For questions or problems with ICPS, call Jennifer Gonzales at (512) 427-6125.

10/6/10 95

Page 96: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

ICPS Training Workshop Exercises

Go to https://www1.thecb.state.tx.us/Apps/ICPS & login with Username: train01, Password: train01

Project Application Exercise:

MP Type: MP1 Project Name: Construct RRHEC Nursing Building - (YOUR THREE INITIALS) Project Type: Construction Project Description: This building will provide a cornerstone for the future quad area and academic buildings of the RRHEC. The Nursing Building will provide state-of-the-art simulation labs, faculty and administrative space, research space, and student support areas.

Project Need/Justification: Current data shows that enrollment in nursing programs would have to increase by at least 40% annually to replace nurses expected to leave the workforce nationwide through retirement. Beginning fall 2010, the proposed School of Nursing plans to offer the BSN program with an expected enrollment of 100 students.

Participation: Yes Success: Yes Excellence: No Research: No How does this project meet or not meet the specified goals? Individuals interested in Nursing have a limited number of places to apply for admission. This new nursing program will add 100 new slots beginning fall 2010. Expected maximum enrollment is 650 students. Date of Governing Board Approval: June 2010 Date requested for consideration by the Coordinating Board: January 2011 Name: IMA Builder Phone: 555 555-5555 Title: VP of Projects Email: [email protected] Name: Ed U Cater Phone: 555 555-5556 Title: VP of Finance Email: [email protected] An environmental assessment was performed? No Will this acquisition break up a residential neighborhood? No Will eminent domain be exercised for this project? No Is this project located on the main campus? No Address/Legal Description:1555 University City: Round Rock Zip: 78665 Bldg Number: 862 Delivery Method: Construction Manager-at-Risk Construction Type: New Construction Facility Type: Classroom Medical/Healthcare Estimated Start Date: January 2011 Estimated Completion Date: August 2012 New Construction - GSF: 79,533 NASF: 49,947 E&G: 49,947 Building Cost (New Construction): $23,741,988 Fixed Equipment: $1,511,470

Furniture & Moveable Equipment: $2,781,647 Architectural/Design Services: $2,270,372 Project Management(System): $808,861 Administrative Costs: $895,091 Contingency: $3,990,571 Financing Information Project Funding: Bonds Source: Tuition Revenue Bond Proceeds Revenue Stream for Bonds: Legislative Appropriations Amount: $36,000,000 Legislative session: 80(R) – 2007

Page 97: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

Capital Expenditure Plan (MP1) Exercise:

Name: Energy Retrofits – (YOUR THREE INITIALS)

Building Number: All

Location: Austin, Tx

Description: The Texas Department of State Health Services plans to repair and renovate facilities to provide energy retrofits. This initial phase will focus on the HVAC systems in multiple structures in the Austin, Kerrville, San Antonio areas. The project will prevent the facilities continued excessive energy usage and higher utilities expense. It is anticipated the agency will save $869,642 annually after completed this modifications.

Type: Repair and Renovation Total Cost: $9,196,012 (remember not to input $ or commas)

Start Date: June 2010 End Date: January 2012 Subject Area CIP Code: 540000

Cost of L&M Requirements: $196,012 Useful Life: 20

Gross Square Footage: 1,661,910 Net Assignable Square Footage: 1,620,550

Education and General Square Footage: 0 Acres in Land Acquisition: 0

Legislative Authority: HB 1, 78th Legislature.

Potential Consequences of Postponing the Project: The project will prevent the facilities continued excessive energy usage and higher utilities expense.

Revenue/Cost Savings: It is anticipated the agency will save $869,642 annually after completing these modifications.

Other Financing Methods Considered: None Start Date: 6/1/2009 End Date: 2/1/2023

Financing Information:

Type of Financing (Part I): Bonds Type of Financing (Part II): General Obligation Bonds (GO)

Source of Funds: Legislative Appropriations (LA)

Through 8/31/2010: $3,188,095 Through 8/31/2011: $5,515,903 Through 8/31/2012: $492,014 Through 8/31/2013: $0 Through 8/31/2014: $0 9/1/2014 and Beyond: $0

Debt Repayment Information:

Source of Funds: Legislative Appropriations (LA) Percent from General Revenue: 100

Through 8/31/2011: $2,023,122 Through 8/31/2012: $2,023,122 Through 8/31/2013: $2,023,122 Through 8/31/2014: $2,023,122 Through 8/31/2015: $2,023,122 9/1/2015 and Beyond: $0

Page 98: s xan Integrated Campus Planning System e ll T or a Coordinating … · 2010-10-01 · s The THECB Project Approval Process i PitAl d e xan Application Procedures • To submit a

Deferred Maintenance Plan (MP2) Exercise:

Name: Electrical Switchgear Repair and Upgrade to Mesa Building - (YOUR THREE INITIALS) Building Number: 517 Description: This project will repair or replace the low voltage electrical switch gear serving Mesa Building. The Mesa Building serves in multiple roles as an academic classroom, administrative, and research laboratory hub for campus. This switch gear is nearing the end of its useful life. Its repair or replacement will lessen the possibility of outages. Type: Deferred Maintenance Critical: Non-Critical Architectural: $10,000 HVAC: $0 Plumbing/Electrical:$200,000 Safety: $0 L&M Requirement: $0 Other: $0 Total Cost: $210,000 YR1: $110,000 YR1: $100,000 YR1: $0 YR1: $0 YR1: $0 Total Plan: $210,000

Deferred Maintenance Report (MP4) Exercise:

Name: Repair Thermal Plant Roof Building Number: 0823 Description: Replaced roofing components in the Thermal Plant facility to address water leaks and prevent other damages to the interior of the building. Type: Deferred Maintenance Critical: Non-Critical Architectural: $500,255 HVAC: $0 Plumbing/Electrical:$0 Safety: $0 L&M Requirement: $0 Other: $0 Total Cost: $500,255