FAIL N/A RE-INSP DATE REFERENCE PASS SAES-W-011, Para. 17 .1.1 (See Remarks) Project Docum ent Control Procedure Construction Representative* / Third Party PMT Representative Name, Initials and Date: Work is Complete and Ready for Inspection: Name, Initials and Date:  T&I Wit ne ssed QC Reco rd Revi ewed Wor k Ver if ied ACCEP TANCE CRITER IA is inc lud ed in t he pr oce du re. SAES-W-011, Para. 17 .1.1 REFERENCE DOCUMENTS: 1. SAES- W-011, Welding Requirement s for On-P lot Piping, (30 October, 2002) 2. SAES- W-012, Welding Requirement s for Pipelines, (31 December , 2002) Cont r act or / Thir d-Part y Saudi Ar amco  Th e procedure is id en t if ied and t raceable t o t he pr ojec t 's upda t ed list of quality documents.  A Gener al Req ui remen ts :  A3  A2  Th e wri t ten Radio gr aphi c Tes t ing pr ocedure was subm it ted to Insp ec t ion Department and approved for use in the Project. (NOTE:  A letter of approval from NDT/OID of Saudi Aramco Inspection Dept is attached to the RT Procedure .) ITEM No.  ACCEPTANCE CRITERIA  A1 WORK PERMIT REQUIRED? CONTRACTOR INSPECTION LEVEL SAUDI ARAMCO INSPECTION LEVEL SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER EC / PMCC / MCC NO. REV. NO. PURCHASE ORDER NUMBER SCHEDULED INSPECTION DATE & TIME MH's SPENT QUANTITY INSP. ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO USE ONLY  TRAVEL TIME LAYOUT DRAWING NUMBER PLANT NO. EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR Review of Radi ographic Test ing Procedure SAIC-RT-2001 25-May-05 NDE- SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARA MCO INSPE CTION CHE CKL IS SAIC NUMBER DATE APPROVED QR NUMBER QC Inspector PID Repr esentati ve Name, Initials and Date: Per fo rm ed In spec ti on Wo rk / Re wo rk May Pro ce ed Name, Initials and Date:  T&I Wit ne ssed QC Reco rd Revi ewed Wor k Ver if ied N/A QC Super vi sor Proponent and Other s Name, Sign and Date: Quality Record Approved: Name, Organization, Initials and Date:  T&I Wit ne ssed QC Record Revi ewed Wor k Ver ified N/A *Person Responsibl e for Completion of Qualit y Work / Test Y =YES N =NO F =FAILED RMARKS:  Thi s c he ck li st is ap p li ca bl e t o In -Pla nt Pipi ng In st al la t io n an d Pipe li ne in st al la t io ns un de r t he ir re sp ec t iv e Sau di Ar amco Eng in ee ri ng Sta nd ar ds , as follows: a. SAES -W-011, Para. 17.1 .1 ( Weld ing Requirem ent s for On-Plot Pipin g) b. SAES -W-012, Para. 16.1.1 (Weldin g Requ irem ent s for Pipelines) Page 1 of 1

Upload: philipyap

Post on 02-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Saic Rt 2001rev 0

7/27/2019 Saic Rt 2001rev 0

http://slidepdf.com/reader/full/saic-rt-2001rev-0 1/1

FAIL N/A RE-INSP DAREFERENCE PASS

SAES-W-011,

Para. 17.1.1

(See Remarks)

Project Document

Control

Procedure

Construction Representative* / Third Party PMT Representative

Name, Initials and Date:

Work is Complete and Ready for Inspection:

Name, Initials and Date:

 T&I Witnessed QC Record Reviewed Work Verified

ACCEPTANCE CRITERIA is included in the procedure.SAES-W-011,

Para. 17.1.1

REFERENCE DOCUMENTS:

1. SAES-W-011, Welding Requirements for On-P lot Piping, (30 October, 2002)

2. SAES-W-012, Welding Requirements for Pipelines, (31 December, 2002)

Contractor / Third-Party Saudi Aramco

 The procedure is identified and traceable to the project's updated list of 

quality documents.

 A General Requi remen ts:

 A3

 A2

 The written Radiographic Testing procedure was submitted to Inspection

Department and approved for use in the Project.

(NOTE:  A letter of approval from NDT/OID of Saudi Aramco Inspection

Dept is attached to the RT Procedure .)

ITEM

No. ACCEPTANCE CRITERIA

 A1

WORK PERMIT REQUI

CONTRACTOR INSPECTION LEVELSAUDI ARAMCO INSPECTION LEVEL

SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER

SCHEDULED INSPECTION DATE & TIME MH's SPENTQUANTITY INSP.ACTUAL INSPECTION DATE & TIME

SAUDI ARAMCO USE ONLY

 TRAVEL TIM

LAYOUT DRAWING NUMBER

PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

Review of Radiographic Testing Procedure SAIC-RT-2001 25-May-05 NDE-

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

QC Inspector PID Representative

Name, Initials and Date:

Performed Inspection Work / Rework May Proceed

Name, Initials and Date:

 T&I Witnessed QC Record Reviewed Work Verified

N/A

QC Supervisor Proponent and Others

Name, Sign and Date:

Quality Record Approved:Name, Organization,

Initials and Date:

 T&I Witnessed QC Record Reviewed Work Verified

N/A

*Person Responsible for Completion of Quality Work / Test Y =YES N =NO F =FA

RMARKS:

 This checklist is applicable to In-Plant Piping Installation and Pipeline installations under their respective Saudi Aramco Engineering Standards, as

follows:

a. SAES-W-011, Para. 17.1.1 ( Welding Requirements for On-Plot Piping)

b. SAES-W-012, Para. 16.1.1 (Welding Requirements for Pipelines)

Page 1 of 1