FAIL N/A RE-INSP DAREFERENCE PASS
SAES-W-011,
Para. 17.1.1
(See Remarks)
Project Document
Control
Procedure
Construction Representative* / Third Party PMT Representative
Name, Initials and Date:
Work is Complete and Ready for Inspection:
Name, Initials and Date:
T&I Witnessed QC Record Reviewed Work Verified
ACCEPTANCE CRITERIA is included in the procedure.SAES-W-011,
Para. 17.1.1
REFERENCE DOCUMENTS:
1. SAES-W-011, Welding Requirements for On-P lot Piping, (30 October, 2002)
2. SAES-W-012, Welding Requirements for Pipelines, (31 December, 2002)
Contractor / Third-Party Saudi Aramco
The procedure is identified and traceable to the project's updated list of
quality documents.
A General Requi remen ts:
A3
A2
The written Radiographic Testing procedure was submitted to Inspection
Department and approved for use in the Project.
(NOTE: A letter of approval from NDT/OID of Saudi Aramco Inspection
Dept is attached to the RT Procedure .)
ITEM
No. ACCEPTANCE CRITERIA
A1
WORK PERMIT REQUI
CONTRACTOR INSPECTION LEVELSAUDI ARAMCO INSPECTION LEVEL
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER
EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER
SCHEDULED INSPECTION DATE & TIME MH's SPENTQUANTITY INSP.ACTUAL INSPECTION DATE & TIME
SAUDI ARAMCO USE ONLY
TRAVEL TIM
LAYOUT DRAWING NUMBER
PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
Review of Radiographic Testing Procedure SAIC-RT-2001 25-May-05 NDE-
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER
QC Inspector PID Representative
Name, Initials and Date:
Performed Inspection Work / Rework May Proceed
Name, Initials and Date:
T&I Witnessed QC Record Reviewed Work Verified
N/A
QC Supervisor Proponent and Others
Name, Sign and Date:
Quality Record Approved:Name, Organization,
Initials and Date:
T&I Witnessed QC Record Reviewed Work Verified
N/A
*Person Responsible for Completion of Quality Work / Test Y =YES N =NO F =FA
RMARKS:
This checklist is applicable to In-Plant Piping Installation and Pipeline installations under their respective Saudi Aramco Engineering Standards, as
follows:
a. SAES-W-011, Para. 17.1.1 ( Welding Requirements for On-Plot Piping)
b. SAES-W-012, Para. 16.1.1 (Welding Requirements for Pipelines)
Page 1 of 1