    A12Impulse tubing shall be made with metallurgy compatible to process and

    ambient conditions. Threaded fittings shall be used.

    34-SAMSS-831,

    Sec. 8.1.1

    A11 Impulse lines shall be as short as possible.34-SAMSS-831,

    Sec. 8.1.1

    34-SAMSS-831

    Sec 8.1.1

    A10Mounting : All instruments shall be mounted as close to the process

    connection as possible.

    34-SAMSS-831,

    Sec. 8.1.1

    A9

    Cables between skid mounted instruments and junction boxes shall be

    routed in conduits. The conduit installation shall be in accordance with

    NFPA 70 and 17-SAMSS-515.

    A8

    Pressure and D/P instruments in gas service shall be self-draining (i.e.,

    mounted above the process connections) with all lines sloping downward

    approximately 1:10 minimum toward the process connection.

    34-SAMSS-831

    Sec 8.1.1

    A7

    Pressure and D/P instruments in liquid or condensable vapor service

    shall be self-venting (i.e., mounted below the process connections) with

    all impulse lines sloping downward approximately 1:10 minimum toward

    the instrument.

    34-SAMSS-831

    Sec 8.1.1

    34-SAMSS-831

    Sec 8.1.1

    A6

    Pressure transmitters in gas service may be mounted on panels below

    their process connections provided that the process connections are

    located on the top of the process lines, low point drains are provided, and

    the impulse lines slope toward the low point.

    34-SAMSS-831

    Sec 8.1.1

    A5

    The location of instruments shall be so that direct drainage of

    condensate, water or process fluids from adjacent equipment has no

    adverse effect.

    A13

    Cables between skid mounted instruments and junction boxes shall be

    routed in conduits. The conduit installation shall be in accordance withNFPA 70 and 17-SAMSS-515 . Refer to SATIP-P-104-05.

    34-SAMSS-831,

    Sec. 8.1.1

    A. Instrumentation work space Requirements

    34-SAMSS-831

    Sec 8.1.1

    A1All local instrumentation and associated control equipment shall be

    readily accessible from grade, platform, fixed walkway, or fixed ladder.

    34-SAMSS-831

    Sec 8.1.1

    A2Local indicating instruments shall be visible from where related

    equipment is operated or primary instruments are tested or calibrated.

    A3 All instruments shall be mounted as close to the process connection aspossible.

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    EQPT CODE SYSTEM ID.

    SAUDI ARAMCO INSPECTION LEVEL

    LAYOUT DRAWING NUMBER

    PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION

    SCHEDULED INSPECTION DATE & TIME TRAVEL TIMQUANTITY INSP.

    WORK PERMIT REQUI

    ACTUAL INSPECTION DATE & TIME

    SAUDI ARAMCO USE ONLYMH's SPENT

    CONTRACTOR INSPECTION LEVEL

    SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

    RE-INSP DAITEM

    No.ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A

    EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER

    A4 Instruments shall be mounted in locations where vibration is negligible.34-SAMSS-831

    Sec 8.1.1

    34-SAMSS-831Sec 8.1.1

    Page 1 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    2/13

    A17

    Orifice Runs, Venturi Tubes and Flow Nozzles The minimum required

    lengths of straight and unobstructed pipe upstream and downstream of

    the primary element shall be based on a beta ratio of 0.7, and be in

    accordance with Standard Drawing AA-036197(Attachment -7)

    34-SAMSS-831,

    Sec. 8.1.1.3

    A16

    Level Gauge Glasses Refer to Library Drawing DB-950046 (Attachment-

    6) for typical liquid level gauge glasses installations. Weld pad type level

    gauges are acceptable for lube oil tanks. Refer to SATIP-J-300-01 for

    different types of installations

    34-SAMSS-831,

    Sec. 8.1.1.2

    A15

    Tagging Instruments shall have permanently attached engraved

    phoenolic / laminate or plastic nameplates, showing instrument tag

    numbers. Phoenolic nameplates shall be installed with two stainless

    steel screws.

    34-SAMSS-831,

    Sec. 8.1.2

    B4

    Explosion proof Equipment . Conduit seals shall be provided for each

    conduit entering explosion proof equipment according to (a), (b), and (c).

    (a) In each conduit entry into an explosion proof enclosure where either

    (1) the enclosure contains apparatus,(2) the entry is metric designator 53

    (trade size 2) or larger and the enclosure contains terminals, splices, or

    taps.

    (b) Conduit seals shall be installed within 450 mm (18 in.) from the

    enclosure. Only explosion proof unions, that are not larger than the trade

    size of the conduit shall be permitted between the sealing fitting and the

    explosion proof enclosure(c) Where two or more explosion proof enclosures for which conduit

    seals are required , are connected by nipples or by runs of conduit not

    more than 900 mm (36 in.) long.

    NEC Article

    505.16 (B)(2)

    A14 Different instruments signals shall be segregated from each other andfrom power wiring. 34-SAMSS-831,Sec. 8.1.1

    B. Conduit and Cable sealing work space Requirements

    B5

    Pressurized Enclosures. Conduit seals shall be provided in each

    conduit entry into a pressurized enclosure where the conduit is not

    pressurized as part of the protection system. Conduit seals shall be

    installed within 450 mm (18 in.) from the pressurized enclosure.

    NEC Article

    505.16 (B)(3)

    B3

    In Class I, Zone 1 locations , seals shall be located in accordance with

    the following:

    (1) Type of Protection d or e Enclosures. Conduit seals shall be

    provided for each conduit entering enclosures having type of protection

    d or e. Exception: Where the enclosure having type of protection

    d is marked to indicate that a seal is not required.

    NEC Article

    505.16 (B)(1)

    NEC Article

    505.16 (A)(2)

    B1

    In Class I, Zone 0 locations , (1) Conduit Seals. Seals shall be provided

    within 3.05 m (10 ft) of where a conduit leaves a Zone 0 location. There

    shall be no unions, couplings, boxes, or fittings, except listed reducers at

    the seal, in the conduit run between the seal and the point at which the

    conduit leaves the location. Exception: A rigid unbroken conduit that

    passes completely through the Zone 0 location with no fittings less than

    300 mm (12 in.) beyond each boundary shall not be required to be

    sealed if the termination points of the unbroken conduit are in

    unclassified locations.

    NEC Article

    505.16 (A)(1)

    B2Cable Seals. Seals shall be provided on cables at the first point of

    termination after entry into the Zone 0 location.

    RE-INSP DAITEM

    No.ACCEPTANCE CRITERIA REFERENCE

    CONTRACTOR / SUBCONTRACTOR

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    PROJECT TITLE WBS / BI / JO NUMBER

    PASS FAIL N/A

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    Page 2 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    3/13

    RE-INSP DAITEM

    No.ACCEPTANCE CRITERIA REFERENCE

    CONTRACTOR / SUBCONTRACTOR

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    PROJECT TITLE WBS / BI / JO NUMBER

    PASS FAIL N/A

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    B7

    Equipment which is not enclosed or hermetically sealed, but is situated

    offshore or near shore, shall be protected against corrosion and

    operational failure due to wind-borne sea water spray and the

    accumulation of wetted salt (NaCl).

    34-SAMSS-831,

    Sec. 5.3.2

    Class I, Zone 1 Boundary. Conduit seals shall be provided in eachconduit run leaving a Class I, Zone 1 location. The sealing fitting shall be

    permitted on either side of the boundary of such location within 3.05 m

    (10 ft) of the boundary and shall be designed and installed so as to

    minimize the amount of gas or vapor within the Zone 1 portion of the

    conduit from being communicated to the conduit beyond the seal. Except

    for listed explosion proof reducers at the conduit seal, there shall be no

    union, coupling, box, or fitting between the conduit seal and the point at

    which the conduit leaves the Zone 1 location.

    B8

    B6NEC Article

    505.16 (B)(4)

    The field junction box, in a Class I, Zone 2 location and in non-

    hazardous areas, shall be a single doorNEMA Type 4X or IEC 60529

    Type IP 66 box. The box construction shall meet the following

    requirements: 7.2.1 Type 316 stainless steel body, door and hardware.

    7.2.2 Continuously welded seams, finished smooth.

    7.2.3 Continuous stainless steel hinge with removable pin.

    7.2.4 Stainless steel captive clamps.

    7.2.5 Data/Print pocket on inside of door.

    7.2.6 External mounting brackets.

    7.2.7 Collar studs for mounting inside panel.

    7.2.8 Ground stud for terminating A/C safety ground wire.

    7.2.9 Painted steel panel (back-pan); in 'severe corrosive environments'

    a stainless-steel panel shall be used.

    SAES-J-902,

    Sec. 7.2

    SAES-J-902,Sec. 7.4

    B11

    All piping, tubing and valves shall be adequately supported and fastened

    in a manner which facilitates replacement, and prevents vibration. Refer

    to Drawing AB-036521 for valve bracing. Attachment 2)

    01-SAMSS-017,

    Sec. 5.1.4

    B15

    All piping systems shall be provided with vent valves at high points and

    drain valves at low points. Horizontal runs in pressure piping shall slope

    gradually towards drain points. The minimum slope of drain lines shall be

    1:50.

    01-SAMSS-017,

    Sec. 5.1.9

    B9

    Instrument enclosures and junction boxes having an internal volume

    exceeding 2,000 cm shall be provided with Type 300 Series stainlesssteel breather and drain fittings, or a combination breather and drain

    fitting.

    B10

    Instrument enclosures and junction boxes having an internal volume

    exceeding 2,000 cm shall be provided with Type 300 Series stainless

    steel breather and drain fittings, or a combination breather and drain

    fitting.

    SAES-J-902,

    Sec. 7.4

    B12

    The minimum size of auxiliary piping and tubing for mechanical

    equipment shall be 1/2-inch NPS with the exception of air compressor

    packages which shall be 3/8-inch NPS.

    01-SAMSS-017,

    Sec. 5.1.3

    B13

    All piping, tubing and valves shall be adequately supported and fastened

    in a manner which facilitates replacement, and prevents vibration. Refer

    to Drawing AB-036521 for valve bracing. (Attachment 2)

    01-SAMSS-017,

    Sec. 5.1.4

    B14

    Unions are not permitted in pressurized lines carrying flammable or toxic

    fluids unless they are required for removal or assembly of the equipment

    and cannot otherwise be substituted by flanges.

    01-SAMSS-017,

    Sec. 5.1.8

    Page 3 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    4/13

    RE-INSP DAITEM

    No.ACCEPTANCE CRITERIA REFERENCE

    CONTRACTOR / SUBCONTRACTOR

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    PROJECT TITLE WBS / BI / JO NUMBER

    PASS FAIL N/A

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    C. Enclosures & Associated workspace Requirements

    C2

    Spaces About Electrical Equipment. Sufficient access and working space

    shall be provided and maintained about all electric equipment to permit

    ready and safe operation and maintenance of such equipment.

    NEC Article

    110.26

    34-SAMSS-831,

    Sec. 7.1.1

    C5

    Terminals Wiring connections shall be made to channel (rail) mounted

    terminal blocks. These terminal blocks shall have tubular box clamp

    connector and compression bar or yoke for wire termination. More thantwo connections per terminal point are not allowed. If open screw type

    terminals are used, terminal lugs shall be ring tongue, compression type,

    with insulated sleeves.

    C7Splices are not permitted in wiring. When wiring must be extended,

    connections shall be made via terminal blocks.

    34-SAMSS-831,

    Sec. 7.1.1

    C6 Cables carrying analog signals shall also be shielded.

    34-SAMSS-831,Sec. 7.1.2

    C4

    Flexible hoses shall be stainless steel armored, with integral connectors.

    The hose length shall not exceed 600 mm. The hose lining shall be

    suitable for the process and operating conditions.

    34-SAMSS-831,

    Sec. 9.2.2.2

    C3

    Depth of Working Space. The depth of the working space in the direction

    of live parts shall not be less than that specified in Table 110.26(A)(1)

    (Attachment 2) unless the requirements of110.26(A)(1)(a), (b), or (c) aremet. (a) Dead-Front Assemblies where all connections and al l renewable

    or adjustable parts, are accessible. (b) Low Voltage. By special

    permission, smaller working spaces shall be permitted where all un-

    insulated parts operate at not greater than 30 volts rms, 42 volts peak, or

    60 volts dc.

    (c) Existing Buildings. In existing buildings where electrical equipment is

    being replaced,

    NEC Article

    110.26(A)(1)

    C1

    Class I, Division 2.In Class I, Division 2 locations, meters, instruments,

    and relays shall comply with 501.3(B)(1) through (B)(6).

    That is all meters, instruments, and relays, including kilowatt-hourmeters, instrument transformers, resistors, rectifiers, and

    thermionic tubes, shall be provided with enclosures identified for Class I,

    Division 1 locations. Enclosures for ClassI, Division 1

    locations include explosion proof enclosures and purged and pressurized

    enclosures.

    Alternatively, equipment shall be permitted to be marked to indicate the

    temperature class for which it is suitable, using the

    temperature class (T Code) of Table 500.8(B).- See Attachment 3

    NEC Article

    501.3(B)

    B17

    Pipe may be bent where necessary to achieve the desired configuration.

    Bending of the pipe shall conform to the following: Pipe bends shall have

    surfaces free of cracks and buckles. Flattening of the cross section of

    bends shall not exceed 8 percent of the nominal pipe diameter. Bending

    procedures and required heat treatment shall be in accordance with

    ASME B31.3.

    01-SAMSS-017,

    Sec. 5.1.11 and

    Sec 6.2

    B16

    A block valve, 3/4-inch NPS minimum, shall be installed in each

    instrument take-off connection and shall be located as close as feasible

    to the line, vessel, or mechanical equipment. Thermocouples and

    thermometers are excluded from the 3/4-inch NPS minimum

    requirement.

    01-SAMSS-017,

    Sec. 5.1.10

    Page 4 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    5/13

    RE-INSP DAITEM

    No.ACCEPTANCE CRITERIA REFERENCE

    CONTRACTOR / SUBCONTRACTOR

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    PROJECT TITLE WBS / BI / JO NUMBER

    PASS FAIL N/A

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    D. Cable tray & Associated workspace Requirements

    C8

    Terminals Wiring connections shall be made to channel (rail) mountedterminal blocks. These terminal blocks shall have tubular box clamp

    connector and compression bar or yoke for wire termination. More than

    two connections per terminal point are not allowed. If open screw type

    terminals are used, terminal lugs shall be ring tongue, compression type,

    with insulated sleeves.

    34-SAMSS-831,

    Sec. 7.1.2

    SAES-J-902 Sec

    13.3.1

    SAES-J-902 Sec

    12.3.2D2

    Primary and backup data link cables shall preferentially enter cabinets or

    consoles from opposite sides. Data link cables shall not be routed in the

    same conduit, duct, or tray with other instrument cables.

    D3Instrumentation cables installed beneath raised computer-type floors in

    control rooms shall be placed in ladder, trough or solid bottom cable tray.

    D1

    Cable tray supporting armored cables extending between field

    instruments and junction boxes shall be NEMA VE 1, Class C, ventilated

    bottom, channel cable tray.

    SAES-J-902 Sec

    9.6

    C16

    In new grass root projects, cable trays extending between the process

    area and the control room or process interface building, or trays installed

    beneath raised computer floors, in control rooms or PIB shall be sized for

    a minimum of 20% spare space for future expansions. This spare

    capacity is in addition to the installed 20% spare cabling.

    SAES-J-902 Sec

    9.6

    C15

    Flexible conduit shall be used at the instrument end of the conduit to

    provide isolation from vibration, protection against thermal expansion of

    the rigid conduit systems and for ease of maintenance.

    SAES-J-902 Sec

    8.4

    C14

    The new transmitters and digital valve controllers have very small

    connection heads compared to previous models. Therefore, a conduit

    outlet box is being mandated within 18" of the device to allow for a spare

    loop of cable. This can potentially prevent maintenance from having to re-

    pull cable if the cable end has been damaged.

    SAES-J-902 Sec

    8.3

    C12

    All incoming and outgoing interconnection lines shall terminate in

    bulkhead fittings. The lines shall be marked with the tag numbers of the

    corresponding instruments. Bulkhead fittings shall be installed with

    adequate spacing to ensure that any connection can be removed without

    the need to remove other fittings.

    34-SAMSS-831,

    Sec. 8.3

    34-SAMSS-831,

    Sec. 8.2.1

    C11

    Instrument tubing shall be adequately supported to eliminate any

    vibration transmission to the instruments or excessive load to the piping

    connection, process line or vessel. Tubing to and from non-indicating

    instruments shall have a plugged tee or equivalent test point for

    calibration and testing purposes. All threaded connections shall be

    tapered per ASME B1.20.1.

    34-SAMSS-831,

    Sec. 8.3

    C13

    A conduit outlet box (e.g., GUAT) shall be installed within eighteen (18)

    inches of the field device. The cable to the instrument shall be looped

    one or more times within this fitting; the sizing of the conduit outlet box

    Process Connections:Threaded All threaded process connections

    shall be tapered per ASME B1.20.1. All threaded process connections to

    vessels, standpipes and lines, except thermowells, shall have heavy

    welding bosses per Standard Drawing AE-036175, and threaded gate

    type block valves as close to the vessel, standpipe or line as possible.

    (Attachment-5)

    SAES-J-902 Sec

    8.3

    C9

    C10

    Instrument Piping and Tubing The instrument piping and tubing

    installationshall ensure It is possible to test all alarm and shutdown

    initiating devices, without interfering with the process operation of the

    packaged unit.

    34-SAMSS-831,

    Sec. 8.3

    Page 5 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    6/13

    RE-INSP DAITEM

    No.ACCEPTANCE CRITERIA REFERENCE

    CONTRACTOR / SUBCONTRACTOR

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    PROJECT TITLE WBS / BI / JO NUMBER

    PASS FAIL N/A

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    5. 34-SAMSS-820, Instrumentation Control Cabinets- indoor, 29 May 2002

    34-SAMSS-820,

    Sec.6.3.12D15

    Rotating Equipment cabinets or other cabinets, which require diagnostic

    equipment to be connected for long periods of time, shall have hand

    removable doors unless otherwise stated in the Purchase Order.

    D14All doors must be capable of swinging at least 90-degrees open at the

    installed location.

    34-SAMSS-820,

    Sec.6.3.11

    D13

    The marshalling cabinets, from the front surface to the surface of rear

    terminal blocks, shall not be more than 46 cm (18 inches) deep to

    provide for safe access. The preferred design is to divide a 76 cm (30

    inch) deep cabinet into 38 cm (15 inch) sections with front and rear

    access.

    34-SAMSS-820,

    Sec.6.3.10

    D11 Minimum separation requirements between various instrumentation

    D12

    Instrument control cabinets(indoor):Cabinet doors shall be full-height.

    All doors shall be dust-tight and reinforced against buckling. The

    maximum door width shall be 900 mm (36 inches) unless otherwise

    specified in the Purchase Order.

    34-SAMSS-820,

    Sec.6.3.9

    SAES-J-902 Sec

    14.2.8

    SAES-J-902 Sec

    14.2.1

    SAES-J-902 Sec12.3.2

    D4

    Minimum separation requirements between various instrumentation

    cables and data link cables (copper or fiber optic) shall be per the

    manufacturer's recommendation.

    D5

    Tray Spacing: Table 3 indicates the minimum distance in millimeters

    between the top of one tray and the bottom of the tray above, or between

    the sides of adjacent trays. This also applies to the distance between

    trays and power equipment of less than 100 kVA. (Attachment -1)

    4. 34-SAMSS-831, Instrumentation for Packaged Units, 29 September, 2004

    D6

    Tray-Conduit Spacing: Table 4 indicates the minimum distance in

    millimeters between trays and conduits. This also applies to the distance

    between trays or conduits and power equipment of less than 100 kVA.

    (Attachment -1)

    D10

    When entering terminal equipment (e.g., motor control center) and the

    spacing listed in tables 3, 4, or 5 cannot be maintained, parallel runs

    shall not exceed 5 ft in the overall run.

    SAES-J-902 Sec

    14.2.7

    D8

    When routing instrumentation and control signal cabling (level 1 or 2)

    near sources of strong electromagnetic fields, such as large

    transformers, motors and generators, defined for purposes of this

    standard as greater than 100 kVA, a minimum spacing of 2 meters shall

    be maintained between the cables and the devices.

    For direct buried cable, cable spacing shall be as shown in Table 3.SAES-J-902 Sec

    14.2.6

    SAES-J-902 Sec

    14.2.5

    SAES-J-902 Sec

    14.2.2

    6. 01-SAMSS-017, Auxiliary Piping For Mechanical Equipment, 30 November, 1998

    7. NEC 2002- National Electric Code 2002

    D9

    D7

    Conduit Spacing: Table 5 indicates the minimum distance in millimeters

    between the outside surfaces of conduits being run in banks. This also

    applies to the distance between conduits and power equipment of less

    than 100 kVA.

    SAES-J-902 Sec

    14.2.3

    1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), July 1993

    2. Schedule Q -- Quality Requirements (Pro Forma Contract), November 2003

    REFERENCE DOCUMENTS:

    3. SAES-J-902, Electrical Systems for Instrumentation, 31 July 2004

    Page 6 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    7/13

    RE-INSP DAITEM

    No.ACCEPTANCE CRITERIA REFERENCE

    CONTRACTOR / SUBCONTRACTOR

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    PROJECT TITLE WBS / BI / JO NUMBER

    PASS FAIL N/A

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    2. Identified- Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).

    2. Attachment 2 -Work space requirements Minimum distance in mm

    3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products

    or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listin

    1. Attachment 1 Minimum distance in mm between top of one tray and the bottom of the tray above- Table 3

    3. Attachment 3 -Electrical Equipment Temperature class NEC table 500.8(B)

    4. Attachment 4 - Valve bracings std DWG AB-036521 sht 1 rev 08

    5. Attachment 5 -- Details of heavy welding boss for threaded connections to vessels.

    6. Attachment 6 -- Liquid level gauge glasses, instrument piping details lib. Dwg DB950046

    7. Attachment 7 -- Straight pipe requirements for Orifice , Venturi and flow nozzles Std. Dwg AA-036197

    NOTES:

    Work is Complete and Ready for Inspection:

    Name, Initials and Date:

    that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified

    Contractor / Third-Party Saudi Aramco

    indicates compliance with appropriate standards or performance in a specified manner.

    with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the

    4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization

    5. Remarks - (Does not apply for Custom engineered Package units but only for pre-engineered, pre-assembled and

    pre- wired skid mounted packaged units)

    PID Representative

    T&I Witnessed QC Record Reviewed Work Verified

    Construction Representative* PMT Representative

    Name, Initials and Date:

    ATTACHMENTS:

    *Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FA

    1. Approved- Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).

    QC Inspector

    Work Verified

    Name, Initials and Date:

    Performed Inspection Work / Rework May Proceed Work Verified

    QC Superviso rT&I Wi tnessed QC Record Reviewed

    Name, Initials and Date:

    QC Record ReviewedT&I Witnessed

    Name, Sign and Date:

    Quality Record Approved:Name, Organization,

    Initials and Date:

    Proponent and Others

    Page 7 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    8/13

    Attachment 2 -Work space requirements Minimum distance in mm

    At tach ment 1 -- Minimum distance in mm between top of one tray and the bot tom of the tray above- Table 3

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    Page 8 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    9/13

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    Attachment 3 -Electrical E ui ment Tem erature class NEC table 500.8 B

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    Page 9 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    10/13

    INST

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    Attachment 4 -- Valve bracings std DWG AB-036521 sht 1 rev 08

    General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05

    Page 10 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    11/13

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    At tach ment 4 -- Elect rical Equipment Temperatu re c lass NEC table 500.8(B)

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    Attachment 5 -- Details of heavy welding boss for threaded connections to vessels.

    Page 11 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    12/13

    Attachment 6 -- Liquid level guage glasses, instrument piping details l ib. Dwg DB950046

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    Page 12 of 13

  • 8/12/2019 SAIC-J- 6022- Rev 0

    13/13

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    Attachment 7 -- Straight pipe requirements for Orifice , Venturi and f low nozzles Std. Dwg A

    General - Instrumentat ion Workspace Clearances. SAIC-J-6022 1-Oct-05 INST

    Page 13 of 13