  • 8/12/2019 SAIC-E-2001 Rev 2

    1/7

    The Safety Instruction Sheets and the applicable design data sheetswere submitted to the Manager, Consulting Services Department forreview and concurrence by his designated representative(s) when CSDexpertise has been required.

    SAES-A-005Sec. 6

    The Safety Instruction Sheets been assigned Saudi Aramco drawingnumbers.

    SAES-A-005Para. 7

    The Safety Instruction Sheet has been completed in its entirety andapproved by the Project Manager. (SAES-E-004, Para. 14.3)2713-ENG & 2713-M-ENG, Shell and Tube Heat Exchangers, SeeAttachment E-1.

    SAES-A-005Para. 5.1

    A5

    A3

    PASS FAIL N/A

    A1Verify that the heat exchangers and coolers are within the scope of

    SAES-E-004 for the various types of exchangers.

    SAES-A-005

    Para. 4.2

    SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

    ITEMNo.

    ACCEPTANCE CRITERIA REFERENCE

    ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT

    SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERSAUDI ARAMCO USE

    SCHEDULED INSPECTION DATE & TIME

    EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

    LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

    EQUIPMENT ID NUMBER(S)

    SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05

    PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

    Review of SIS for Shell & Tube Heat Exchanger SAIC-E-2001

    QC Record Reviewed

    SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

    1-Dec-06 ME

    1. SAES-A-005 -- Safety Instruction Sheet, 28 February 2005

    2. SAES-E-004 -- Design Criteria of Shell and Tube Heat Exchangers, 30 March 2005

    QC Inspector PID Representative

    QC Record ReviewedConstruction Representative* PMT Representative

    Work is Complete and Ready for Inspection:Name, Initials and Date:

    Name, Initials and Date:

    3. SA Form 2713-ENG -- Data & Operating Limits-Shell & Tube Heat Exchangers, October 20024. SA Form 2713-M-ENG -- Data & Operating Limits-Shell & Tube Heat Exchangers, October 2002

    T&I WitnessedName, Initials and Date:

    Quality Record Approved:

    Performed Inspection Work / Rework May ProceedName, Initials and Date:

    T&I Witnessed QC Record Reviewed

    Name, Organization,Initials and Date:

    T&I Witnessed

    REMARKS:

    QC Supervisor Proponent and Others

    Contractor / Third-Party

    ATTACHMENTS: 1 - SAES-A-005 ATTACHMENT E-1 Completion of Form 2713-ENG & 2713-M-ENG

    Saudi Aramco

    Name, Sign and Date:

    A General Requirements

    A2

    REFERENCE DOCUMENTS:

    A4The "as built" thickness of all the pressure containing parts beenspecified by the Design Engineer on the Safety Instruction Sheet afterthe completion of fabrication.

    SAES-E-004,Para. 14.4

  • 8/12/2019 SAIC-E-2001 Rev 2

    2/7

    MECH-SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

    ATTACHMENT 1 - SAES-A-005 ATTACHMENT E-1 Completion of Form 2713-ENG & 2713-M-ENGReview of SIS for Shell & Tube Heat Exchanger SAIC-E-2001 1-Dec-06

    SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 2 (Standards Cutoff - December 2005) REV 2 31-Dec-05