Page 1 of 36 SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12 SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE SAIC- L-2031 30-Apr-13 PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY K. Raja Roa RFI No. REQUESTED INSPECTION DATE ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comment As Listed A Special Process Procedures & Controls (For Shop Start-up) STAGE A1 A2 A3 A4 A5 As Applic A6 A7 Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up) ITEM No. Note 1-5 is prior to start of any production work per Sch. Q notification (2 weeks minimum). 2. Contractor Quality uses this checklist & any of his own before Company Inspection audits new shops for SA SHOP APPROVAL. 3. "Shop" is an indoor/outddor fabrication facility approved by SA Inspection (SAES-W-011, Sect 17.6) that follows standard industry fabrication practice. 12- SAMSS-007 refers to AWS D1.1. See also standard practice referenced as Piping Fab Institute (PFI) & others. 4. Checklist identifies procedures, personnel, facilities, equipment & storage including necessary controls for quality on SA Projects to assure successful project start-up meeting quality reqmts. 5. SA can approve new shops Use thi guide o interview Projec Quality Q Mgrs fo Prime Contracto Subcontra for qual start o major project Special Process Procedures were submitted 30 days prior to the start of any work (operations) at fab shop as follows: Sch. Q, Att. V, Special Process Procedure Revision Approval is received BEFORE starting production work (operations) at new shop. Sch. Q, Att. V, • SA Approved Engineer is at site (6-8 weeks before shop kick- off) • Engineer can expedite WPS SCH. Q, Att. VI, Table 2 CSD has six-wee policy on return • Complete list of WPS is available in timely manner (no work delays) B) Structural procedure package to Project Inspection early • Use AWS D1.1 Prequalified welding procedures Sch. Q, Att. V, & IV welding threads (Meets SAES-L-110 & code as revised) C) Weld Consummable Control (Store, Issue, Reuse, Monitor) D) Welder Tracking (Qualification, WPS monitoring, retraining, etc) E) Heat input measurement & WPS monitoring (pipe welding) F) Pipe weld repair (weld defect repair, buttering, base metals) G) Pipe welding related (Bevelling, joint & surface prep, preheat) Sch. Q, Att. V, & IV prepared/submitted on SA Forms (Attachment A). B) Weld and Line Designation Table ("Weld Table") is submitted along with PQR documents (Attachment B) & provides a listing of materials, thickness, & weld joint types (individual line designation). C) Hardness Testing is per SASD AB-036386 (mandatory) D) Ferrite measurements per AWS A4.2 (as applicable). E) Weld maps & SCH. Q, Att. IV, Weld & Line Description Table details: A) Verify that service considerations are identical B) ORIGINAL CSD Cover Sheet listing status/restrictions is available C) Groove Weld procedures do not cover socket welds & fillets Additional sketch or clear field instruction notes for QC & welders is needed for SAES-W-011, Section 7

Upload: hamidjoyia

Post on 22-Dec-2015

210 views

Category:

Documents


50 download

DESCRIPTION

nbcnmsbc

TRANSCRIPT

Page 1: SAIC-L-2031 Rev 6

Page 1 of 18

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

As Listed

A Special Process Procedures & Controls (For Shop Start-up) STAGE 1

A1

A2

A3

A4

A5 As Applicable

A6 SCH. Q, Att. IV,

A7

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

Note

1-5

1. Contractor informs Company when a Subcontractor (or his own) fabrication shop (facilities, equipment & associated storage areas) are ready for Company approval. Notification is prior to start of any production work per Sch. Q notification (2 weeks minimum). 2. Contractor Quality uses this checklist & any of his own before Company Inspection audits new shops for SA SHOP APPROVAL. 3. "Shop" is an indoor/outddor fabrication facility approved by SA Inspection (SAES-W-011, Sect 17.6) that follows standard industry fabrication practice. 12-SAMSS-007 refers to AWS D1.1. See also standard practice referenced as Piping Fab Institute (PFI) & others. 4. Checklist identifies procedures, personnel, facilities, equipment & storage including necessary controls for quality on SA Projects to assure successful project start-up meeting quality reqmts. 5. SA can approve new shops in stages with controls in place.

Use this guide on interviewing Project Quality

QA/QC Mgrs for Prime

Contractor & Subcontractor for quality start

on major projects

Special Process Procedures were submitted 30 days prior to the start of any work (operations) at fab shop as follows:

Sch. Q, Att. V,

Special Process Procedure Revision Approval is received BEFORE starting production work (operations) at new shop.

Sch. Q, Att. V,

Welding Engineer (Contractor) is available for WPS package review/approval before "30 days Prior" submission deadline • SA Approved Engineer is at site (6-8 weeks before shop kick-off) • Engineer can expedite WPS revisions that avoid work start delay.

SCH. Q, Att. VI, Table 2

CSD has the six-week policy on WPS returns

Welding Procedures Package (WPS) per SAES-W-011 Sect 7. A) Piping WPS packages were submitted 30 days before work. • CSD has returned Status 1 or Status 2 cover sheets for all WPS • Complete list of WPS is available in timely manner (no work delays) B) Structural procedure package to Project Inspection early • Use AWS D1.1 Prequalified welding procedures • Maintain list of procedures/status at site

Sch. Q, Att. V, & IV

Welding Special Process Procedures & Controls are revised & approved (Sch. Q, Att. V, BEFORE work starts): A) Gap Control for socket welds (meets code as revised) B) Seal welding threads (Meets SAES-L-110 & code as revised) C) Weld Consummable Control (Store, Issue, Reuse, Monitor) D) Welder Tracking (Qualification, WPS monitoring, retraining, etc) E) Heat input measurement & WPS monitoring (pipe welding) F) Pipe weld repair (weld defect repair, buttering, base metals) G) Pipe welding related (Bevelling, joint & surface prep, preheat) H) Repad Installation, Bending & Forming (pipe bends, ovality) i) Structural Welding related (splicing, weld repair, prep, etc)

Sch. Q, Att. V, & IV

Welding Procedure Qualifications (for new shops): A) Procedure Qualification Records (PQRs) are prepared/submitted on SA Forms (Attachment A). B) Weld and Line Designation Table ("Weld Table") is submitted along with PQR documents (Attachment B) & provides a listing of materials, thickness, & weld joint types (individual line designation). C) Hardness Testing is per SASD AB-036386 (mandatory) D) Ferrite measurements per AWS A4.2 (as applicable). E) Weld maps & tables are detailed & attached F) Originals of all test records, mill certs, etc., are available to SA.

Never assume CSD previously approved WPS are valid. Check Weld & Line Description Table details: A) Verify that service considerations are identical B) ORIGINAL CSD Cover Sheet listing status/restrictions is available C) Groove Weld procedures do not cover socket welds & fillets Additional sketch or clear field instruction notes for QC & welders is needed for socket & fillet welds (size, # passes,etc)

SAES-W-011, Section 7

Page 2: SAIC-L-2031 Rev 6

Page 2 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

A8

A9

A10

A11

A12

A13

A14 Sch. Q, Att. IV,

A15

WPS Drawing Details (CSD common revisions): A) Branch Connection Drawings are detailed to show applications B) Weld size & prep depth shown (Drawings/Notes). Round up mm. C) Single V-Groove Drawings reflect the following Notes:• Maximum value for “t” • Maximum weld metal deposit value (GTAW, SMAW, etc) D) Fillet Weld Notes provide clear instruction to welders & QC:• Minimum size (full fillet) or “a min” for seal welds/shims• Detail/note integral acute angle attachments (dummy leg, bracing) E) Socket Weld Notes provide clear instruction to welders & QC:• Minimum number of passes (2), fillet size, shape, contour F) Seal Weld Notes provide clear instruction to welders & QC:• Process, sequence, shape, "no exposed threads" & NDT (MT/PT) Ensure documents are not returned unapproved by CSD

Sch. Q, Att. IV

WPS Miscellaneous details (CSD common revisions): A) SMAW & GTAW diameter limits per SAES-W-011 are correct B) Back purge rate notes (O2 level below 1% verified by analyzer) C) Galvanize welding (sch. 80+) has special prep & test procedure. D) Heat input limit range calcs are closely checked & correct E) ER-70S6 is not utilized (GTAW). Use ER-70S-2, 3 (NACE matl's). F) E-7018-1 (increased manganese) is specified for SMAW welds when Low Temperature applications are required at the Fab Shop. G) PQR Hardness Values do not exceed 200 BHN (NACE WPS) H) Travel speed RANGES are specified. Maximum Oscillations (3 x wire diameter) are verified to be within correct range (travel speed) i) Preheat Tables provide clear field instruction (SAES-W-011, etc)

Sch. Q, Att IV

Check WPS Weld & Line Description Table for misc. details: A) Identify lines that require Charpy Impact, PHWT & BHT (values) B) Cement lined pipe welding requires special CSD considerations C) Base metal thickness range requires backing (butts below 1/8") D) 100% PT & RT for GTAW butt welds below 1/8” or 3.2mm E) A separate procedure requiring surface preparation details and coating repair must be submitted for welding galvanized piping. F) Piping class 12LE0U1 (FBE-lined piping) requires similar treatment

SAES-W-011, Section 7

NDT/NDE Technique procedures have been Dhahran approved • Cover letter approval from NDTU Dhahran has been received • Revision requests and changes from NDTU Dhahran are complete

Sch. Q, Att.IV,

NDT/NDE CONTROL procedures are issued and clear for all • NDT controls by prime contractor assure adequate supervison • Critical elements in Control procedure maintain NDT integrity Guide for PID Review (NDT CONTROLS) Know the difference between NDT "Technique" Procedure & and NDT "Control" Procedure. Control is mandated by Q.

Sch. Q, Att. IV,

Attachment 1 Guide for

approval of NDT control

Procedures

PMI procedures & Equipment (Package) is CSD approved • Equipment for testing is at site or readily available • Material receiving checks & system of testing identification known

Sch. Q, Att. IV,

Coating Package (application/procedures) has been approved • Equipment & Set-up (See SAES-H-100 Checklists A, B, C, D) • Location (Site) & Operations must be approved by Saudi Aramco • Coating crews (blaster, painter, & supervisor) have SA cards.Heat Treatment Procedure & Equipment Package is CSD approved (similar to Welding per SAES-W-011, Section 13): • Cover letter approval from CSD has been received • Revision request/changes from CSD have been addressed • CSD has returned Status 1 or Status 2 cover sheets for WPS

Sch. Q, Att. IV,

Page 3: SAIC-L-2031 Rev 6

Page 3 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

A16

B STAGE 2

B1

B2

B3

B4

B5

B6

B7

B8

B9 Welding machines for each work station have current calibration

B10

Heat Treatment (associated process) requirements: A) Prior to work (2 wks), contractor or fabricator prepares a table listing each joint or component for heat treatment (to SA Inspection) B) Table (each joint or component) has location, dwg number, size, wall thickness, material, heating rate, cooling rate, soak temp/time. C) Brinnell Hardness Test procedure is NACE RP 0472, App. A • Brinnell Equipment Kit is available at site for testing • Contractor has good supply of "Certified" test bars (194, 200+) • Contractor has certificates available for hardness testing bars.

SAES-W-011, Section 13 & 14

Welder Qualification Testing (Welding Equipment Set-up & Welding Consummables)

Prior to welder qualifications, Shop Controls are established for welder WPS monitoring (heat input measurement & hardness tests), consumables, documentation & test materials.

Sch. Q, Att. IV,

Welder Testing (Procedures & Controls) are approved: A) An independent 3rd party (SA approved) has been selected B) Company is notified prior to any testing. C) Test Facilities are available at the Shop (to be approved). D) Equipment meets SA standard requirements (CS, alloy & SS)

SAES-W-011, Section 7

Welder Testing Facility is first approved (Safety, Electrical): • Machine spacing & clearances (layout) is adequate and safe. • Routing of cables & controls does not present safety hazards. • Ventillation & air supply is adequate for testing/training. • Grounding tests (equipment is well grounded) are performed • Electrical system & controls have been tested & are properly rated • Training/Testing areas have proper test stands and work support • Covers (to prevent arc flash) are in place for personnel protection

Contract Based Safety

Requirement Schedule A, B,

et al

Welders are considered competent, qualified through practice & trained in WPS & SA requirements by QC in place before testing by approved 3rd Party. (Identify experienced welders with JCC cards)

SAES-W-011, Section 7.2.5 a

Welding Procedure Controls for Low Temp Applications: • Initial welding (first ten, etc) is monitored (calibrated tong testers). • Best welders selected (Consistently meet Heat Input & Hardness) • Contractor use of E7018-1 (SMAW fill & cap) is strictly assured. PMI can distinguish higher manganese content in E-7018-1 • Welders with marginal heat input results are reassigned.

Sch. Q, Att. IV

Welding on NACE material is performed as follows: A) Welders are NACE experienced & familiar with NACE WPS B) Welders meet NACE WPS Heat Input & hardness values. C) NACE welders are listed on a roster & on SA JCCs. D) CS Welders demonstrate NACE ability through daily monitoring. E) Shops start early monitoring of Heat Input during training & testing to qualify any welders for NACE welding & Low Temp applications.

NACE Standard MR0175

Section 5.3

Work stations for each welder are checked as follows: A) There are a sufficient number of uncrowded work stations. B) Stations are level & capably support fabricated components. C) Sufficient shielding protection exists for welder work stations.

ANSI Z49.1, Annex J

Welder training & testing areas are segregated or in a separate area where approved welders with JCCs perform shop work.

SAEP-323, Section 6

Sch. Q, Section 3

Welding power supplies were calibrated per British Standard 7570 when impact toughness tests are required (SA, spec or code)

SAES-W-011, Section 19

Page 4: SAIC-L-2031 Rev 6

Page 4 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

B11

B12

B13

B14

B15

B16

B17

B18

B19

B20

Welding machines (singular or banked) have sufficient spacing and ventilation to dissipate heat.

ANSI Z49.1, Annex J

Welding machine leads are in good condition & are fed to each work location as follows: A) Organized & safely secured (tie wraps) overhead routing exist B) Laid out & properly covered in walkways for access/egress C) Method of lay out is an orderly fashion that prevents tripping. D) Lead routing through heavy equipment (forklift, crane, etc) area is between 2x4's or under inverted channels to prevent damage.

ANSI Z49.1, Annex J

Gas cylinders at welder stations are properly secured with quality hoses and fittings rated for use in GTAW set-ups (rigs).

ANSI Z49.1, Annex J

Each welder is supplied with the following at his work station.• Weld rigs (leak tested & good), Standard, Gas Lens, Mini Rig, etc...• Gloves, Helmet, Vest• Proper weld lenses, (shaded, clear,& cheaters)• Portable weld rod oven (calibrated)• Weld gages or gages are available • Grinder, File, Chipping Hammer / Hammer• Vise or Vises (work station)• Level, T square, Measuring Tape• Adequate lighting (fixed, portable, mini-lights for root pass check)• O2 detector is available for TIG welders • Calibrated Digital Pyrometer is available • Supports, guides or stands as needed for pipe or structural item.

ANSI Z87.1 & ANSI Z49.1,

Annex J

Welding Facilities (Environmental Shielding) provides adequate protection from elements of wind, sand & rain: A) Condition of the roof is good (no holes, missing panels, etc) B) Doors for closure are available and function properly C) Partitions are installed & properly oriented for environment. D) Wind Shields or tents are available in adequate numbers

SAES-W-011, Section 11.2

Welding equipment set-up & testing is complete: A) Maintenance, testing & monitoring records are available. B) Machines have a unique ID number C) Machines have leads and connections secured (as calibrated). D) Machines are properly grounded (tested & passed per results) E) Current Calibration sticker (checked with calibrated tong tester) F) Machine Controls function properly & current values are legibleG) Special GTAW equipment is available (Corrosion-Resistant Mat'l) H) Electrical supply & outlets are adequate & safely installed.

Sch. Q, Att. IV, Section 4

Welding Electrode & Consummable Storage: A) Climate controlled storage area is clean & free of dust & moisture B) Area is secured and has counters to control access C) Consummable Control personnel (issue) are available & trained

SAES-W-011, Attachment 1 & 2

Drying, Storage & Portable ovens are operable with calibrated controls (temperature gauge) per SAES-W-001 Table 1 Ranges. SAES-W-011, Table 1 requirements are posted near ovens.

SAES-W-011, Attachment 1 & 2

Calibrated weld rod holding ovens are set up & controlled:• Initial baking• Re-conditioning• Weld rod oven interior map indicates weld rod type & location • Weld rod oven interior map indicates weld rod status (final issue). • Logs, issue slips, rod receipt records, bake records, etc, exist.

SAES-W-011, Attachment 1 & 2

Pressurized gas cylinder (consumable) storage: A) Designated area exists for storage of cylinders B) Segregation (marking & identification) exists in storage area. C) Warning signage exists for this area (No smoking, cautions, etc) D) Storage area is on level concrete surface with bottles upright. E) Storage area can be locked & secured to prevent access. F) Locks & chains are available for cylinder storage areas. G) Tags (certs) are attached to cylinders (from approved sources) H) Records of receipt & documentation (log) kept on all cylinders

AWS Z49.1, Annex J

Page 5: SAIC-L-2031 Rev 6

Page 5 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

B21

B22

C STAGE 2

C1

C2

C3

C4

C5

C6 SCH. Q, Att- I

C7 SCH. Q, Att- I

C8 SCH. Q, Att- I

C9 SCH. Q, Att- I

C10 SCH. Q, Att- I

Shop has welding equipment (& tool) maintenance & repair ability. Alternately, Maintenance company performs repairs.

AWS Z49.1, Annex J

Shop has a Tungsten grinder (diamond cutting/grinding/shaping) & follows quality GTAW equipment & consumable handling practices. Procedures cover specific practice ... See Also SAIC-W-2006

AWS C5.5, Section 6

Manpower Reqmts (Quantity & Qualifications) Note: Task all inspectors with reqd reading (SATIPs). Tests after required reading are given by discipline with a goal for Process Improvement (SA System Training/Orientation)

Construction Manpower Forecast (start-up & peak) showing total numbers (welders, fitters, helpers, etc) is available.

Schedule Q, Sec- VI Table 2

QC MANPOWER FORECAST (start-up & peak) showing total number of inspectors, engineers & supervisors is available.

Schedule Q, Sec- VI Table 2

QC Manpower meets Construction manpower ratios.

Schedule Q, Sec- VI Table 2

CV-approved Quality personnel arrive early* (10-days before work) for job training & any testing requested by Saudi Aramco.

Schedule Q, Sec- VI Table 2

Quality Personnel experience minimum requirements (Contractors or subcontractors that perform the work) per Sch. Q: A) Have 10 years of industrial experience minimum (Age 27) B) Have 6 years experience in a given inspection specialty C) Have 4 years (of 6 years) in Oil & Gas (petrochemical) industry D) High School graduate, or equivalent E) Fully conversant with applicable Industry Standards & Specs F) Can perform inspection functions with minimal supervision. G) Can pass a SA interview & testing when requested by Company

SCH. Q, Att. I, Qualification

Requirements

Welding/Mechanical Inspectors: A) Certified as a CWI, CSWIP Certified Welding Inspector. B) Knows codes (ASME B31.3, 31.4 & 31.8, ASME V and IX, API 620 & 650, AWS D1.1, required for the execution of the WORK. C) Can monitor NDT work & results D) Qualified ASNT Level II (relevant methods) when performing, viewing, ensuring or auditing NDT specific method(s). E) Pass interview & test given to welding QC (knows workmanship, code undercut, WPS, socket weld specific reqmts & references, understands service implications and RELATED SPECIFICATIONS)

HAVE ALL WELDING QC TAKE TEST

Heat Treatment Inspector: A) Five years work experience (heat treatment tech or supervisor) B) Knows heat treatment methods/equipment used on projects C) Knows requirements of ASME B31.3 code & passes SA test

HAVE ALL PWHT QC

TAKE TEST

Coating Inspector: Inspector demonstrates a thorough working knowledge & proven ability in critical coating applications/methods & recognized industry standards. Inspector is qualified to NACE Level II Critical Coatings Certification, CSWIP Level I, or equivalent. INSPECTOR DEMONSTRATES ORGANIZATION & PROFICIENCY IN SAES-H-100 ATTACHMENTS A, B, C, D for SA INSPECTION

HAVE ALL COATING QC TAKE TEST

All IK CONTRACTOR & subcontractor NDT personnel performing NDT operations, or interpreting, reviewing, ensuring or auditing NDT operations meet SA requirements of SAEP-1142 & hold current NDT certifications. Also, RTFI Personnel must be certified by SA. NDT Personnel are monitored at start of work (Issue RFI).

NDT TECHS Demonstrate

Competency in the field

MONITOR initial work closely

Quality Assurance Manager is approved: A) Has demonstrated knowledge & training (ISO-9000 int'l stds) B) Has a university degree or equivalent C) Has a minimum of 10 years of direct experience in QA system activities in the oil, gas and petrochemical industries. D) Is willing to address Quality & Continuing Process Improvements as required by approved Quality Plan to SA customer satisfaction E) Understands the entire workscope for which he is responsible F) Passes day-long interview & test (as needed) for new QA Mgr. Note: Interview of Prime QA Mgr & Subcontractor QC Managers together recommended to see how they interact as a team and respond to SA expectations. Utilize this checklist on interview/test.

Dedicated solely for QA Mgr

duties & Quality Concerns

Page 6: SAIC-L-2031 Rev 6

Page 6 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

C11 SCH. Q, Att- I

C12 SCH. Q, Att VI,

C13 SCH. Q, Att- I

C14

C15 Adequate QC works Full Time while work is in progress.

C16

D Shop Layout & Location of Facilities STAGE 2

D1 Shop/Yard Layout Map is available during walkdown & review.

D2

D3 Segregated & enclosed area installations are complete.

D4

D5

D6

D7

D8

D9 Sch. Q, Att. IV,

D10 Sch. Q, Att. IV,

D11 Sch. Q, Att. IV,

D12 Sch. Q, Att. IV,

Quality Control Manager is approved: A) Has demonstrated knowledge & training in the use of measuring and test equipment routinely used in conducting inspections. B) Has university degree & 7 years inspection experience OR C) Has HS diploma with 10 years inspection experience related to supervision of construction activities (Oil, gas & petrochemical)

Other Duties do not conflict with QC Mgr duties

PMI technician & PMI procedures are available. A) PMI technician is qualified & certified as an ASNT RT Level I B) Has at least one year experience in using PMI instruments. C) Has passed a SA demonstration test with an approved PMI instrument on an alloy sample with 100% correct assessment.D) PMI Technician works to an approved written procedure. E) PMI technician has documented training (instrument & procedure)Approved by COMPANY (demonstration test performance)

HAVE ALL PMI TECHS

TESTED

Crane Inspector (demonstrates thorough working knowledge ofcodes such as ANSI-A17.1 & 17.2, ANSI-B30.1 through B30.16) for certification of cranes in newly constructed shops as follows: A) Concrete structural foundation inspections are performed B) Calculations for foundation & anchoring are available to SA C) Certs documenting Crane capacity & construction are required Crane Inspectors are available for work & tasked to read

HAVE ALL CRANE

INSPECTORS TASKED TO

READ

Adequate supervision is available for the quantity of shop workers for all shifts.

Schedule Q, Sec- VI Table 2

Schedule Q, Sec- VI Table 2

No Conflicts of Interest exist regarding personnel, NDT Companies, Third Party Inspection agency personnel & Contracted Inspection personnel performing the work. Personnel from other projects have approval/release letter.

Schedule A, Section 20

& Sch. Q

PFI-ES-43, Section 1

Environmental controls

Shop/Yard Layout is based on quality engineering controls & considers prevailing winds, dust movement & contamination.

PFI-ES-43, Section 1

Environmental controls

PFI-ES-43, Section 1

Environmental controls

Valve Testing Facility is upwind of CS dust & contaminants, enclosed & shielded from the elements (fouling & contamination).

PFI-ES-43, Section 1

Environmental controls

SS & alloy work areas are located upwind of all CS work areas.

PFI-ES-43, Section 3.6

Environmental controls

Coating operation is downwind or isolated, enclosed & shielded.

PFI-ES-43, Section 3.6

Environmental controls

PWHT facility or area is segregated, barricaded, accessible, well ventillated, with adequate supports & weather protection for work.

SAES-W-011, Section 13

Environmental controls

Radiography set-up per SAEP-1141 (Industrial Radiation Safety): A) Shop is prepared for NDT Unit Dhahran SAEP-1141 Safety Audit B) Copy of Radiation Safety Manual (SAEP-1141) is available C) Radiography location is isolated (2mr boundaries, barricades). D) Equipment storage areas are approved, locked and secured E) Transportation & Handling Safety measures are known

SAEP-1141, Section 1

Environmental controls

Storage yard is of adequate size to accommodate the types of materials expected to be received during the course of the project.

Storage yard organization allows easy material access & flow (for proper movement & handling) during the course of the project.

Preservation & Special Storage requirements are known and adequate space exists with carefully planned material organization.

Quarantine Areas are established (includes a tagging system) for reject materials. Fence or other marked boundary is in place.

Page 7: SAIC-L-2031 Rev 6

Page 7 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

D13 Sch. Q, Att. IV,

E Electrical Inspection & Safety (Access/Egress & Equipment) Identify Hazards

E1 Shop has adequate lighting (fixed overhead & portable lights).

E2 Shop has sufficient electrical outlets (support for workstations).

E3 Electrical outlets & extension cords have GFI’s & dust covers.

E4 Electrical power feeds (j-boxes, power, lighting, etc) are installed.

E5

E6

E7

E8

E9

E10

E11

E12

E13

E14

E15

E16

E17

E18

E19

E20

OFFICE SPACE clearly designated for Company & Contractor is available. Facilities for SA work access are per the contract.

Contract Safety Requirement

Contract Safety Requirement

Contract Safety Requirement

Contract Safety Requirement

Terminals for weld leads & power cables are shielded from contact by personnel or by metal objects (vehicles, cranes, etc).

ANSI Z49.1, Annex J

Welding Connections between welding leads & power supples are guarded by one of the following methods: A) Dead front construction and receptacles for plug connections B) Terminals located in a cover C) Insulating sleeves D) Other equivalent mechanical means.

ANSI Z49.1, Annex J

Welding Grounds are inspected/tested & in good condition.

ANSI Z49.1, Annex J

The workpiece being welded & the frame or chassis of all electrically powered machines is connected to a good ground.

ANSI Z49.1, Annex J

Grounding is done by locating the workpiece or machine on a grounded metal floor or platen, or by connecting it to a properly grounded building frame or other satisfactory ground.

ANSI Z49.1, Annex J

Chains, wire ropes, cranes, hoists, etc are not be used as grounding connectors or to carry welding current.

ANSI Z49.1, Annex J

The workpiece lead is not the grounding lead. The workpiece lead connects the work terminal on the power source to the workpiece.

ANSI Z49.1, Annex J

A separate lead is required to ground the workpiece or power source work terminal.

ANSI Z49.1, Annex J

The welding current magnitude is safely carried by the grounding conductor (not overloaded, hot).

ANSI Z49.1, Annex J

Areas are clear of tripping hazards. Lay out of production areasfor gas hoses, cables, mechanical assemblies, and other equipment do not cross walkways or interfere with routine tasks.

AWS Z49.1, Annex J

Work above ground or floor level has safety rails or lines to prevent falls. Safety lines & harnesses are available for fall protection.

AWS Z49.1, Annex J

Fire and explosion escape routes are identified and kept clear so that orderly, rapid, and safe evacuation of an area can take place.

AWS Z49.1, Annex J

Equipment, machines, cables, hoses & other apparatus are placed to prevent hazards to personnel in passageways. (ladders, stairs).

AWS Z49.1, Annex J

Warning signs are posted to designate welding areas & they specify that eye protection must be worn.

AWS Z49.1, Annex J

Protective screens exist for persons in areas adjacen to welding & cutting operations to protect them from radiant energy & hot spatter: A) Flame-resistant screens or shields B) Suitable eye and face protection and protective clothing. C) Appropriate radiation protective semi-transparent materials

AWS Z49.1, Annex J

Combustible control in welding areas is handled as follows: A) Combustibles are stored away or shielded from welding/cutting. B) Combustible floors, roofs, partitions are not found in weld areas. C) Building contents including trash, wood, paper, textiles, plastics and chemicals are kept away from welding areas D) Flammable gases and liquids are kept away from welding areas. E) Outdoors, dry grass & brush are kept away from welding areas.

AWS Z49.1, Annex J

Page 8: SAIC-L-2031 Rev 6

Page 8 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

E21

E22

E23

E24

E25

E26 Shop floors are level, clean and stable for ongoing work.

E27 Shop has adequate ventilation and air movers.

E28 Fire Extinguishers are stationed throughout the work areas

E29

E30

E31 Portable hoist & fork-lifts are rated & in good working condition.

E32 Access & egress pathways for fork-lifts & hoists are sufficient.

E33 Sufficient passage ways exist for personnel exit in an emergency

E34 Lifting components (slings, shackles, wire ropes, etc) are good.

E35 Overhead crane installations have been inspected & load tested.

E36

E37

E38 Safety Signage & Markings identify hazards (posts, doorways, etc)

E39

E40 Overall housekeeping of the shop is sufficient to prevent a fire.

E41

E42

Excessive noise, particularly continuous noise at high levels that can damage hearing is identified & warning signs/zones exist.

AWS Z49.1, Annex J

Machinery Guards are available to protect welders & other workers from injury by machinery & equipment being operated. A) Moving components & drive belts are covered by guards to prevent physical contact. (especially grinders) B) Workers are protected against accidental entry into the working envelope of all machinery and robotic equipment. C) Because welding helmets and dark filter lenses restrict visibility of welders, special attention is required for these hazards.

AWS Z49.1, Annex J

Persons do not consume food in work areas where toxic fumes are generated to avoid ingestion of contaminants. Lunch areas are designated and wash stations are readily available.

AWS Z49.1, Annex J

Equipment is installed in clean, dry areas and adequately protected from dirt and moisture.

AWS Z49.1, Annex J

EQUIPMENT for use is adequate for the scope of work required. A) Structural support fabrication areas & equipment are adequate B) Structural steel (jigs and cutting machines) are in good condition. C) Pipe rolling method exists for thick segments D) Air Compressors are adequate for supply at peak of work.

AWS Z49.1, Annex J

Contract Safety Requirement

Contract Safety Requirement

Contract Safety Requirement

Overhead cranes (existing shops) for lifting have current certification, are properly rated, & are found in good condition.

Contract Safety Requirement

CRANE CERTIFICATION for smaller cranes in newly constructed shops must be documented as follows prior to shop approval: A) Concrete structural foundation inspections are performed B) Calculations for foundation & anchoring are available to SA C) Certs documenting Crane capacity & construction are required

Contract Safety Requirement

Contract Safety Requirement

Contract Safety Requirement

Contract Safety Requirement

Contract Safety Requirement

Contract Safety Requirement

Storage racks & shelves are level & sufficiently supported Contract Safety Requirement

Safety Lanes (for access/egress) are marked in saftey colors such as yellow & black, etc to identify hazards

Contract Safety Requirement

Contract Safety Requirement

Disposal bins (trash cans, metal refuse, plastics, etc) are marked to identify contents allowed inside them (fire hazard warnings).

Contract Safety Requirement

Contract Safety Requirement

Paints, coatings & NDT supplies are stored per manufacturer's recommendations in climate controlled areas out of direct sun.

Contract Based Requirement

Cleaning materials & chemical storage as follows:A) Flammable material storage is away from heat/electrical sources • Storage is per manufacturer's (warning label) data sheet (MSDS) B) Cloths & Rags are stored & issued by Consummable Control • Cloth & rag storage bins have covers that are kept closed. • Used (refuse) Cloth & rag disposal bins are available.

Contract Based Requirement

Page 9: SAIC-L-2031 Rev 6

Page 9 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

E43 Supervisors & workers know protocol in case of emergency

E44 Emergency services (ambulance) is available.

E45

F Austenitic Stainless Steel & Nickel Alloy Shops PID Guide

F1

F2

F3

F4

F5

F6

F7 SS material stored outdoors is covered with water repellent sheet.

F8

F9 Walking on austenitic SS or nickel alloy material is not allowed.

F10

F11

F12

F13 Only 300 series SS brushes are used on austenitic & nickel alloys.

F14

F15

F16

F17

F18

F19

F20

F21

Contract Safety Requirement

Contract Safety Requirement

Precautionary labels on consumables & equipment concerning the safe use of the products are available for reading & guidance.

Contract Safety Requirement

Approve SS Shop

Stainless Steel & Nickel Alloy Shops address material Handling & Storage, Fabrication & Shipping per Piping Fabrication Institute (PFI) Standard ES-43.

PFI-ES-43, Section 1

Stainless Steel & Nickel Alloy Shops are safely & properly ventillated (ANSI Z49.1). Adequate air movers lift toxic fumes.

PFI-ES-43, Section 1

Handle Austenitic stainless steel & nickel alloys with nylon slings or equipment protected with a non-contaminating buffer mat'l.

PFI-ES-43, Section 2.1

Receive these alloys and conduct a visual exam of both internal & external surfaces to detect existing contamination or gouges caused by contact with contaminating material.

PFI-ES-43, Section 2.2

Fittings are stored on pallets or shelving that is constructed of non-contaminating material.

PFI-ES-43, Section 2.3

Storage areas for these materials are separate from the areas where carbon steel material is stored.

PFI-ES-43, Section 2.4

PFI-ES-43, Section 2.5

Carbon steel strapping is used if a durable, non-contaminating material (clean wood, cardboard, cloth, paper & SS buffer) isolates the strapping from contact with the stainless steel or nickel alloy. Gray duct tape (high chlorides) is absolutely prohibited

PFI-ES-43, Section 2.6

PFI-ES-43, Section 2.7

Fabrication requirements (austenitic stainless steel or nickel alloy): A) Contact surfaces of tools & equipment containing CS, zinc, copper or their alloys are covered in a noncontaminating material.

PFI-ES-43, Section 3.1

Tools such as grinding wheels & wire brushes previously used on carbon steel are not used on stainless steel or nickel alloys.

PFI-ES-43, Section 3.2

Grinding discs, abrasive discs & belts are made of resin-bonded alumina, silicon carbide or zirconium carbide. (No Sulphurized items)

PFI-ES-43, Section 3.3

PFI-ES-43, Section 3.4

All material removal & cleaning tools are marked to identify that they are to be used on austenitic & nickel alloy materials only.Marking is visible while a tool is in use. (Purple color code)

PFI-ES-43, Section 3.5

Austenitic & nickel alloy material fabrication areas are separated from CS areas (upwind to prevent cross contamination).

PFI-ES-43, Section 3.6

Suitable methods prevent cross contamination by CS shavings, grinding dust, & zinc dust from coating operations as follows: A) Enclosure, separation & location of work areas is adequate B) Engineering controls & ventillation assure cleanliness & safety

PFI-ES-43, Section 3.6

Where tape is used for back purging, the tape uses an adhesive with a water soluble chloride content not exceeding 50 ppm.

PFI-ES-43, Section 3.7

Pressure-sensitive & adhesive-backed tapes removed (along with any residual adhesive) utilize a suitable solvent or abrasive.

PFI-ES-43, Section 3.8

Cutting fluids or oils are low halogen, low sulphur & are completely removed from all surfaces prior to any welding or forming.

PFI-ES-43, Section 3.9

Shipping of materials utilizes new packing materials & shipping protectors such as PVC caps, plugs, & new adhesive tapes. No harmful substances are utilized in shipping.

PFI-ES-43, Section 4.1

Certified chloride-free marking or color coding has a water soluble chloride content below 50 ppm (measured after drying).

PFI-ES-43, Section 4.2

Page 10: SAIC-L-2031 Rev 6

Page 10 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

F22

F23

F24

F25

G NACE & NACE Low-Temp Material Shops

G1

G2

G3

G4

G5

H Field & Yard Welding (Outside of a Shop)

H1

H2

H3

I Procedures, Documentation & Records Control of Work

I1 QP

I2 Approved WPS are posted in multiple conspicuous work areas. QP

Identification tags & Attachment devices used are made of noncontaminating materials.

PFI-ES-43, Section 4.3

Austenitic stainless steel & nickel alloys are shipped in a manner that will minimize the risk of the material becoming contaminated.

PFI-ES-43, Section 4.4

Shipping alloys on same load as CS material ensures segregation through use of wood bracing or other non-contaminating material.

PFI-ES-43, Section 4.4

Equipment for Corrosion-resistant Material Welding such as austenitic stainless steel (excluding types 304/304L/316/316L), or nickel-based alloys meets these specific requirements: A) All manual GTAW uses a high frequency start & post-purge gas flow for the torch. B) A remote contractor & current control (pedal or torch mounted). C) Pre-set power source current start/rise and decay/stop controls triggered by a foot switch or torch mounted control is an acceptable alternative for the remote control. D) O2

Analyzers & proprietary dissolvable (water soluble) dams

SAES-W-016, Section 6

NACE Material Fabrication shops are segregated from other CS.

NACE MR0175,

Section 1

NACE Material Fabrication for NACE varieties are segregated from each other (NACE CS, NACE Low Temp CS, NACE alloy & SS).

NACE MR0175,

Section 1

NACE Material ID is by low stress stamp & unique color-code. Segments are stamped before cutting.

NACE MR0175,

Section 1

NACE Material storage is segregated by color code. (NACE CS, NACE Low Temp CS, etc). NACE varieties are not mixed together.

NACE MR0175,

Section 1

Careful Handling of NACE materials does not create susceptibility to Stress Corrosion Cracking in finished welds as follows: A) Heavy hammering is never allowed on NACE materials. B) Identification stamps use low-stress stamps.

NACE MR0175,

Section 1

SA Inspection approves indoor facilities (shops). Welding outdoors at a Shop facility in a yard is considered Field welding, & subject to increased NDE extent per SAES-W-011 as applicable: A) Low Temp (-18C MDT) applications outdoors receive 100% NDE B) Alloy steel (P-No. 4 & above), stainless, & nonferrous materials (all services except Cat. D fluids) welded outdoors are 100% NDE. C) Severe Cycle (Cat. M) shall be identified (100% NDE, 0 undercut) Follow SAES-W-011 Guideline carefully based on NDT Specs Create SPEC-CHECK as a field surveillance & review tool

SAES-W-011, Section 17.5

Develop & Utilize Spec-

Check ASAP on Projects

Attachment 2

Work stations located outside of a Shop in a Yard: A) The areas for work are properly identified as work stations. B) Stations are level & capably support fabricated components. C) Sufficient shielding & weather protection exists for stations. D) Adequate power & remote welding controls exist for stations. Additional NDE is required for Yard Welding Operations.

SAES-W-011, Section 17.5

Remote Current Control use (field welding) is available for welding more than 30 meters from power source (remote locations)

SAES-W-011, Section 19

Quality Plan & Sch Q reqmt

Approved procedures (required by Sch. Q) are available and understood by the workers and QC.

Provide Instructions

Provide Instructions

Page 11: SAIC-L-2031 Rev 6

Page 11 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

I3 Current AFC/ IFC drawings are issued & available for work QP

I4 Controlled record storage, i.e. offices, file cabinets, etc, is adequate QP

I5 QP

I6 QP

I7 SAEP-1160

J Valve Testing Shop

J1

J2 Proper segregation exists for CS, NACE & SS valve materials.

J3

J4

J5 Procedure for Field Testing of Valves is approved.

J6

J7

J8

K Coating Facility

K1

K2

K3

K4

K5

Provide Instructions

Document Quality

Computer availability for record storage and back-up is adequate. Document Quality

Contractor has a filing system for the following:• Calibration records• Material receipt records, CMTRs, Mill certs, valve reports, etc• Consumables & records• Welder certs • Drawing register • Construction forms & records (spools, materials, coating, etc)

Document Quality

Database per SAEP-1160 & SAIC-W-2008 for tracking and status • Weld ID system (Full Pen Butt welds, socket/groove & fillet)• Track weld special process until completion (PWHT, HT, PMI, etc) • Track welder performance • Track modifications (repairs) after completion • Track Pressure Tests (SAIC-A-2001 & Procedure detail steps)

Document Quality

See Other Checklist

Valve Testing at new shops is approved by SA Proponent as a desirable location for any field testing prior to line installation.

SAES-L-108, Section 4 4.7.1

SAES-L-108, Section 4

An adequate water supply (treated or demin water) exists & meets SA SAES-A-007 requirements for testing and purity.

SAES-L-108, Section 4

Test Equipment is available as follows and does not promote fouling & contamination of alloy components: A) Pressure Test manifold rated for work per SAES-A-004 reqmts. B) Pressure hoses rated for the work C) Water tanks, mixing apparatus & filling hoses

SAES-L-108, Section 4

SAES-L-108, Section 4

Personnel including QC dedicated to Valve receiving inspection & field testing have experience with valves and have been approved.

SAES-L-108, Section 4

List of valves to be tested is available before the start of work & meets SA standards and approved testing procedure.

SAES-L-108, Section 4

Records, QC form & unique ID numbers will exist for every valve tested. Valves are traceable to their unique test reports.

SAES-L-108, Section 4

See other checklist

Coating Works QC Set-up meets SAES-H-100 as follows: A) QC Equipment Kit (SAES-H-100 Attachment A Checklist Items) B) QC Equipment Check Sheet (SAES-H-100, Att B) available C) In-Process Inspection Sheet (SAES-H-100, Att C) available D) Paints/Coatings & Equipment Log (SAES-H-100, Att. D) available

SAES-H-100, Section 9

Ground is blacktop or marl base that will not allow dust from grade to rise & stick to wet paint.

SAES-H-100, Section 9

Protection from the elements (sun, wind blown sand & dust, moisture) is adequate for coating applications.

SAES-H-100, Section 8

Overspray protection (within the facility) is adequate & does not affect other ongoing fabrication work.

PFI-ES-43, Section 3.6

Coating material storage areas meets SA & manufacturer data sheet environmental condition requirements.

SAES-H-100, Section 6

Page 12: SAIC-L-2031 Rev 6

Page 12 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

K6

K7

L Material Handling and Storage

L1

L2

L3

L4

L5

M

M1 Sch Q, Att - IV

M2 Sch Q, Att - IV

M3 Storage bins for cut items are marked & organized. Sch Q, Att - IV

M4 Shop has segregated areas for reject & unusable scrap materials. Sch Q, Att - IV

M5 Sch Q, Att - IV

M6 Sch Q, Att - IV

M7 Sch Q, Att - IV

N System for documentation (Spool ID & Traceability)

N1 Sch Q, Att - IV

N2 Traceability to CMTRs (system) is documented & well organized. Sch Q, Att - IV

N3 Drawings & Revision Control system in place are organized. Sch Q, Att - IV

N4 Report Records (sytem) is available for spool ID & traceability Sch Q, Att - IV

SA Inspection approved initial set-up, Qualification report & the field demonstration & issued JCC cards to applicators.

SAEP-316, Attachment A, B

Coating Inspector qualification report & Inspector clearance card has been issued after successful inspection during demonstration.

SAEP-316, Attachment C, D

See other checklistPipe handling procedure including equipment used for handling is

Company approved and good practice is in effect as follows: A) Material is not rolled/dropped off trucks during unloading. B) Material is stacked properly to protect pipe and coatings. C) Slings are nylon or similar and wire rope slings are not used. D) Metal hooks are padded to prevent contact damage to coating E) Internally coated fittings are handled on the OD only. F) Bevel protectors remain intact and don't damage coatings.

SAES-L-450 Section 8

Components are protected from mechanical damage with welding ends protected with suitable wood, plastic, or metal covers and all fittings packaged in steel-banded wooden crates or secured to skids in staging areas for field use as follows: A) All fittings (02-SAMSS-005, Section 10) B) All flanges (02-SAMSS-011, Section 10)

02-SAMSS-005 Section 10

Field facilities for storage/preservation of materials are approved prior to the start of piping installation as outlined in SAES-L-350 Section 7 and as follows: A) On-Plot Material Warehouse and Storage Facilities B) Field Welding Consumable Storage Facilities C) Yard Welding Areas/Shops (CS, alloy and SS areas) D) Spool Storage areas, Lay Down Yards and staging areas E) Site Valve Testing Facility, Site Instrumentation/Testing facility

Sch Q Attachment IV,

The minimum amount of temporary support is available and spools are not laying on the ground. They are supported on wooden cribbing in approved staging areas. Fittings and valves are covered and stored in shipping crates or on racks off the ground.

SAES-L-350 Section 7

Stainless steel spools, components and other materials are kept covered during storage in lay down yards and staging areas.

SAES-L-350 Section 7

System for Plate, Piping & Material Receipt Inspection, Material Management & Storage

Matl Id & Traceability

Item in QP or Procedure

A "System" used for documentation regarding ID & Traceability for spools & structural assemblies (traceability to CMTRs) exists.

Item in QP or Procedure

CS Shop Storage areas (inside the shop) are adequate in size for large & small materials, well marked, organized & segregated.

Item in QP or Procedure

Item in QP or Procedure

Item in QP or Procedure

Storage areas (inside the shop) are off the ground & adequate wood (dunnage) or other supporting materials exist.

Item in QP or Procedure

Quarantine "Tagging System" used to segregate & store reject material does not invite use of unauthorized/rejected items.

Item in QP or Procedure

Quarantine "System" Disposal Rules are in effect & disposal schedules are available (Sch. G rules apply here also).

Item in QP or Procedure

Matl Id & Traceability

Item in QP or Procedure

COMPLETE TRACEABILITY is easily demonstrated for all components of pipe spools & structural assemblies

Item in QP or Procedure

Item in QP or Procedure

Item in QP or Procedure

Item in QP or Procedure

Page 13: SAIC-L-2031 Rev 6

Page 13 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

N5 QC forms exist for spool ID & traceability. Sch Q, Att - IV

N6 SAEP-1160

O System for Identification Transfer after cutting

O1 System (procedure) for transfer of ID BEFORE cutting exists Sch Q, Att - IV

O2 System for transfer contains Unique Identification Numbers or UINs Sch Q, Att - IV

O3 Sch Q, Att - IV

O4 Sch Q, Att - IV

O5 Sch Q, Att - IV

P Color Coding Verification Upon Receipt

P1 Sch Q, Att - IV

P2 Sch Q, Att - IV

P3 Sch Q, Att - IV

P4 Sch Q, Att - IV

P5 Sch Q, Att - IV

P6 Positive Material Identification (PMI) is witnessed. Sch Q, Att - IV

Q

Q1 System for Identification after sandblasting/coating exists Sch Q, Att - IV

Q2 Sch Q, Att - IV

Q3 Sch Q, Att - IV

R System Controls for Special Process (NDE, PMI, PWHT, etc)

R1 Sch Q, Att - IV

R2 Personnel are trained & understand this system of control Sch Q, Att - IV

R3 Sch Q, Att - IV

Item in QP or Procedure

Data Report Contents provide adequate tracking & information. SAIC-W-2008 (DATABASE) & SAIC-A-2001 (PRESSURE TESTS)

Item in QP or Procedure

Matl Id & Traceability

Item in QP or Procedure

Item in QP or Procedure

Item in QP or Procedure

System can be followed by those who do not speak or write in English. Example: Manoj is cutting two small diameter pipe lengths (different grade CS). Small pieces can easily be mixed, misplaced, dropped or placed in bins with other materials. Safeguards in place prevent this occurrence. Identification methods are effective.

Item in QP or Procedure

Material markings for identification are permanent marks that remain intact & legible on the material until recorded into QC records.

Item in QP or Procedure

Color code remains intact after cutting of pieces. System to disposition missing & faded color coded segments exists.

Item in QP or Procedure

Matl Id & Traceability

Item in QP or Procedure

Disposition rules for missing & faded (unidentifiable or questionable grade) color coded piping & materials exist.

Items in QP or Procedure

Quality Control (verification) is always performed upon receipt.

Items in QP or Procedure

Only Quality Personnel may approve repainting after the following: • Materials have been verified (CMTR & UIN) for distinct color code. • Quality Control documentation & issuance of NCR against Vendor • Notification & approval from Saudi Aramco is received • Positive Material Identification verifies composition (alloy, SS items)

Items in QP or Procedure

Material Receiving Inspection personnel (quality) are adequately trained and can identify missing, faded and improper (mixed) color coded items that arrive on site.

Items in QP or Procedure

Repainting is done with correct RAL paint per applicable SAMSS requirement (length & size of striping).

Items in QP or Procedure

Items in QP or Procedure

System Identification (Pipe Spools, Pipe Lengths, etc) After Sandblasting & Coating

Matl Id & Traceability

Item in QP or Procedure

Items in QP or Procedure

System prevents sandblasting removal of UINs (Unique Identification Numbers) & resulting loss of traceability • Protective tape covering stamp identifcation adjacent to weld • Marking inside spools with permanent marker (systematic marking)• Application of wire & stamped tags showing spool or segment UIN

Items in QP or Procedure

System protects UINs after coating • Remarking restrictions (QC notified) are identified • Stamped tag identification method is employed • Verification of UIN is performed by QC

Items in QP or Procedure

System of checks & control is in place for materials requiring special processes (NDE, PMI, PWHT, BHT, etc). Spool Clearance!!!

Items in QP or Procedure

Items in QP or Procedure

Identification status through special flagging & marking systems can physically identify spools & materials: A) Requiring a special process B) Completed and accepted special process C) Completed and rejected special process

Items in QP or Procedure

Page 14: SAIC-L-2031 Rev 6

Page 14 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

R4

R5 Sch Q, Att - IV

R6 Sch Q, Att - IV

R7 Completed Spool Staging Area(s) (Ready to ship, etc) exist. Sch Q, Att - IV

S System Controls for In-Process Spools

S1

T In-progress Radiographic Testing & Reporting Controls

T1 Sch Q, Att - IV

T2 Sch Q, Att - IV

T3 Sch Q, Att - IV

T4 Sch Q, Att - IV

T5 Sch Q, Att - IV

U System Controls

U1 Sch Q, Att - IV

U2 Signs in Segregated Areas exist (materials, warnings, etc) Sch Q, Att - IV

U3 Segregation Area rules exist and are followed. Sch Q, Att - IV

U4 Sch Q, Att - IV

System Documentation & Tracking Records are in place to identify all material special processes required before fabrication: A) Spool tracking & clearance Sheets B) NDE Clearance (RT Trackers, RT Backlog Control, etc) C) Coatings Application Tracking

Schedule Q & SAEP-1160

Database Reqmts

Items in QP or Procedure

Isolation rules & methods are employed for special processes: A) Segregation employed is effective B) Signs & barricade warning tape exist (segregated areas) • RT pending Laydown & Staging Areas • PWHT pending Laydown & Staging Areas • Coating Pending Laydown & Staging Areas

Items in QP or Procedure

Hold status (tagging, etc) system exists & is understood to prevent shipments of materials & spools not accepted by Quality.

Items in QP or Procedure

Items in QP or Procedure

Piping spools (assemblies) are checked, cross referenced & clearly marked after in-process verification of dimensional requirements. • Fit-up OK, Inspector initial & date, etc • Visual weld (VT) OK, Inspector initial & date • Final Dimensional check (Final) OK, Inspector initial & date

Schedule Q & SAEP-1160

Database Reqmts

Items in QP or Procedure

RT selection process has the highest integrity possible • Subcontractor QC does not exclusively select welds to be RT'd. • Contractors maintain tight control over selection of Random RT. • Subcontractor & Contractor QC work together in selection & invite Company QA personnel into the process in a spirit of Teamwork. RT Selection Process is closely watched & monitored

Guide for approval of NDT

control Procedures

RT shooting lists are available & system is monitored as follows: • Daily RT Shoot List is always available to Contractor & Company • RT Shoot List Results (previous day) are checked every day. • Tracking of Reject welds & reshoots are carefully monitored • Penalty shot selection is carefully monitored • Defect location marking is carefully performed & monitored

Guide for approval of NDT

control Procedures

Daily RT shooting lists with Reshoots (film & weld quality) identify shots as follows: • The cause of the Reshoot is identified (in writing) on the Shoot list. • Penalty shots are identified on the list. • Repair attempts (R1or R2) are identified on the Shoot list.

Guide for approval of NDT

control Procedures

RT Clearance (Repaired welds, reshoots, penalty shots) are closely monitored by Contractor • Poor welder performance is identified very early in the process. • Poor RT technique & performance is identifed & corrected early. • RT Clearance is verified by SA Level III at the earliest opportunity.

Guide for approval of NDT

control Procedures

RT Backlog is closely monitored by Contractor & Subcontractor. • Backlog goals are set & maintained early in the project. • System of tracking reports RT Backlog numbers regularly (weekly) • Backlogs exceeding 100 joints receive immediate attention to clear

Guide for approval of NDT

control Procedures

Tracking System for organization of material & storage is in place (Demonstrate how a piece of pipe and fittings become a spool)

Material Receiving Personnel are of adequate number & are properly trained and available.

Page 15: SAIC-L-2031 Rev 6

Page 15 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

U5 Sch Q, Att - IV

U6 Tracking system for spools is available (QC tracking lists, etc) Sch Q, Att - IV

U7 Color Coding system is approved (PFI-ES-22 & SAES-A-206) Sch Q, Att - IV

U8 Material Storage Yard is level and properly compacted or asphalted Sch Q, Att - IV

U9 Sch Q, Att - IV

U10 Sch Q, Att - IV

U11 Safety Signs (access/egress/overhead crane/etc) exist Sch Q, Att - IV

U12 Overhead crane construction is complete and approved by SA. Sch Q, Att - IV

U13 Overhead crane certification is available to SA Safety & Insp. Sch Q, Att - IV

V System Controls for Handling Materials

V1 Sch Q, Att - IV

V2 Sch Q, Att - IV

W Material Warehouse & Controlled Climate Storage

W1 5 M + E (Coating Consumables, Welding Electrodes, etc) Sch Q, Att - IV

X Equipment Check Points

X1

X2 Demineralized water (treated water) supply exists for SS shops

X3

X4

X5 Bending equipment is available & in good condition.

X6

X7

X8 Pipe ovality repair procedure is approved & details equipment. Sch Q, Att - IV

QC Inspection Personnel are adequate in number per Sch. Q & are properly trained & approved by Company prior to start of work.

Pipe racks or supports (metal, wood) are adequate to provide full support to new piping (3 to 4 sets) with no bowing or sagging

Material Receiving Yard is of adequate size for significant quantities of piping to be received

The System used for handling all types of materials meets minimum industry requirements and good practiceEquipment is properly outfitted to handle a variety of materials: • Stainless & alloy materials are not directly handled with CS • Coated materials & spools employ equipment protection coverings

Manufacturer recommended

Proper cleaning equipment (tools) for all diameter piping fabrication is available at the shop in adequate numbers as follows: A) Variety of grinders (internal, external prep of metal surfaces) B) Attachments (grinding wheels, cones, stones, flappers, etc) C) Slag hammers, chipping tools, brushes (Each worker) D) Adequate rags, cleaning solvents (Storage Room Control)

PFI-ES-5, Section (All)

PFI-ES-05, Section 4

Drills (various size) & presses are adequate in their number & condition for small diameter pipe openings. (No torches allowed)

PFI-ES-21, Section (All)

Internal machining tools (beveling, preparation) provide a quality surface finsih & allow fit-up of GTAW process butt welds

PFI-ES-21, Section (All)

PFI-ES-24, Section (All)

Procedure for pipe bending methods is approved (by CSD). A) Hot bending methods (Furnace, Incremental, & Induction bending)B) Cold bending methods (Rotary draw, ram & roll bending) C) Bends are examined, protrusions repaired (VT, MT/PT, UT) & gauging internals is performed (deformation, 97.5% nominal id)

PFI-ES-24, Section (All)

Pipe ovality repair tools (jacks, crescents*) for repairs to 3% out. * SMYS values are not exceeded. A 30-ton jack for CS (maximum)

PFI-ES-24, Section (All)

Page 16: SAIC-L-2031 Rev 6

Page 16 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

X9 Demineralized/Treated water supply (tank) exists for SS shop. QP scope of work

X10

X11 QP scope of work

Y Measuring & Test Equipment (M&TE) for Welding

Y1 QP

Y2 QP

REFERENCE DOCUMENTS:

Contract Schedule Q (Date Variable) Quality Assurance and Control, Inspection and Testing

01-SAMSS-010 - Fabricated Carbon Steel Piping (25 May 2011)

02-SAMSS-005 - Butt Welding Pipe Fittings (20-Feb. 2012)

012-SAMSS-008 - Erection of Structural and Miscellaneous Steel (9-May 2011)

SAEP-1141 - Industrial Radiation Safety (8-Dec-2010)

SAEP-323 - Performance Qualification Testing of Contract Welders and Brazers (01 July, 2008)

SAES-A-206 - Positive Material Identification (30-April 2011)

SAES-H-200 - Storage, Handling and Installation of Externally Coated Pipe (24 Oct 2011)

SAES-L-310 - Design of Plant Piping (29 April, 2007)

SAES-L-350 - Construction of Plant Piping (22 April 2009)

SAES-W-011 - Welding Requirements for On-Plot Piping (4-Oct. 2009)

ANSI/AWS Z49.1 - Safety in Welding, Cutting & Allied Processes (January 2004 Edition)

ANSI/AWS D1.1-96 - Structural Steel Welding Code (2004 Edition)

ASME B31.3 - Process Piping (2010 Edition)

NACE Standard MR0175 - Sulfide Stress Cracking Resistant Metallic Materials (2002 Edition)

NACE Standard RP0472 - Methods & Controls (Prevent In-Service Cracking of CS Welds in Corrosive Environments (2000)

PFI (Piping Fabrication Institute) Standard ES-01 - Internal Machining for Circumferential Butt Welds (2001 Edition)

PFI Standard ES-02 - Method of Dimensioning Piping Assemblies (2000 Edition)

PFI Standard ES-03 - Fabrication Tolerances (2000 Edition)

PFI Standard ES-05 - Cleaning of Fabricated Piping (1999 Edition)

PFI Standard ES-11 - Permanent Marking of Piping Materials (1998 Edition)

PFI Standard ES-21 - Internal Machining & Fit-up of GTAW Root Pass Circumferential Butt Welds (2001 Edition)

PFI Standard ES-22 - Color Coding of Piping Materials (1999 Edition)

PFI Standard ES-24 - Pipe Bending Methods, Tolerances, Process & Material Requirements (2001 Edition)

PFI Standard ES-26 - Welded Load Bearing Attachments to Pressure Retaining Piping Materials (1999 Edition)

PFI Standard ES-27 - "Visual Examination" The Purpose, Meaning & Limitation of the Term (2000 Edition)

PFI Standard ES-31 - Standard for Protection of Ends of Fabricated Piping Assemblies (2000 Edition)

PFI Standard ES-32 - Tool Calibration (2000 Edition)

PFI Standard ES-37 - Standard for Loading & Shipping of Piping Assemblies (2000 Edition)

PFI Standard ES-41 - Standard for Material Control & Traceability of Piping Components (1998 Edition)

PFI Standard ES-43 - Standard for Protection of Austenitic Stainless Steel & Nickel Alloy Materials (1999 Edition)

Flapper wheels to obtain ID cleanliness needed. Solvents for degreasing and cleaning piping after cutting operations needed. See PFI ES-5

PFI-ES-5, Section (All)

Bevel machines are in good condition. Means to meet groove weld parameters is acceptable to Company & gauges are available

Adequate quantities of the following M&TE exist: A) Hygrometers B) Digital pyrometers C) O2 Analyzers D) Calibrated tong testers E) Weld gauges (fillet, VWAC, Hi-Lo, etc) F) Calipers, tapes & levels Record log (certs, calibrations, etc) exists for all M&TE

Items in QP or Procedure

AUDITS for main shops for Carbon steel should be performed with attention to the elements listed in Piping Fabrication Institute ES-05, 21, 22, 24, 26, 27, 31, 37 and 41. Company will give close attention to systematic material and consumable control. Conduct shop audit well before offering the shop for Company approval.

Items in QP or Procedure

REMARKS: PASS ALONG THIS CHECKLIST AT TIME OF INTERVIEW OF SUBCONTRACTOR & PRIME CONTRACTOR QA/QC MGR INTERVIEW TO TASK THEM TO ASSURE A SMOOTH QUALITY START ON PROJECTS

Page 17: SAIC-L-2031 Rev 6

Page 17 of 18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED DISCIPLINE

SAIC- L-2031 30-Apr-13

PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

K. Raja Roa RFI No. REQUESTED INSPECTION DATE

ACCEPTANCE CRITERIA REFERENCE Yes No N/A Comments

Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up)

ITEM No.

Contractor Saudi Aramco

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Construction Rep.Name, Initials, & Date:

PMT Representative: Verified ¨ Reviewed ¨

QC InspectorName, Initials & Date:

PID Representative:Verified ¨ Reviewed ¨

QA/QC SupervisorName, Signature & Date:

Proponent and Others:Verified ¨ Reviewed ¨