TECO Peoples Gas andESG's Energy Savings
Project at James A. HaleyVeterans' Hospital
A review of the ongoing energy conservation
project being performed at the James A. Haley
Veterans' Hospital.
Daniel Townsend, PE, CEM
Energy Systems Group
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
2/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com
2016 Energy Systems Group, LLC | www.energysystemsgroup.com
James A. Haley Veterans Hospital
2
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
3/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com
2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Background Information on Tampa VAMC
3
Five local VA Facilities fall under the James A. HaleyVeterans Hospital
Our project focused on the Tampa VA Hospital Located west of the University of South Florida
North of Bruce B. Downs Blvd and Fowler Avenue intersection
Key Features 418 bed main hospital
118 bed nursing home
22 Special Programs: Spinal Cord Injury, Multi-Trauma, etc.
Multiple buildings with Central Thermal Plant
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
4/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Overview of Project
Conducted through the UESC contract mechanism
Key Participants
Veterans Administration TECO Peoples Gas Utility
Energy Systems Group ESCO
Multiple Subcontractors
Utility Savings: $2.240 mil per year
Total Project Costs: $19.662 mil
Simple Payback: 8.8 years (8.7 with rebate)
Development Period: 11 months
Number of ECMs: 21 Energy Conservation Measures
Scope of audit: 20 buildings
4
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
5/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Contract Mechanism
Utility Energy Service Contract (UESC)
Permits utility companies to develop energy savingsprojects with federal agencies such as the VA, DoD,NASA, USDA, etc.
Projects reduce utility costs - electrical, water or gas
demand Why are the utilities interested?
Good customer relations
Regulatory requirements Capacity benefits
5
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
6/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Process Preliminary Feasibil ity Audit
ESG engineers and clients identify potential projects
Initial costs and economic benefits of the project areestimated
ECM list is refined using economic criteria Usually Life Cycle Cost Analysis / Simple Payback
Scope of final study developed in a cooperative effortwith the agency
Cost to develop Investment Grade Audit (IGA)
proposed Covers design expenses to finalize scope, savings and costs
6
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
7/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Process Investment Grade Audit
The Investment Grade Audit (IGA) is the final proposalshowing all key project information
Proposed Scope of Work Equipment cut sheets, drawings, technical information
Financial information
Total Project Costs
Total Annual Savings
Operation and Maintenance Savings if applicable
Energy savings calculations
Measurement & Verification (a.k.a., Performance Assurance)Plan
7
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
8/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Process IGA Savings Calculations
Savings Calculations Excel based calculation sheet, or
Industry vetted software used to calculate savings
Excel based calculations show the following: Known inputs
Assumptions Formula used to derive savings
Calculations (often in a table format)
Industry vetted software usually includes the following: Software name and version
Input values
Output values
8
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
9/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Process IGA Savings Calculations Example
Utility Savings: O&M
ECM Description Dependencies
Water
Savings
(kgal)
Sewage
Savings
(kgal)
Project
Savings
MMBTU
Project
Savings kW
Project
Savings
kWh
Project
Utility Cost
Savings
Project
O&M Cost
Savings
1 Indoor and Outdoor Lighting
2.1 Water Upgrade
3.1 UV Lights3.1.1 UV Lights On-going Maintenance
4.2 Steam Trap
5.1 Controls Upgrade
5.2 Kitchen Exhaust Hood Ventilation Control
6.1 Chiller Plant Optimization
6.2.1 Secondary Chilled Water Optimization(chillers)
6.2.2 Secondary Chilled Water Optimization(motors)
6.2.2.1 Remove Valves in Secondary Loop
6.2.3 Building 38 chilled water loop conversion
6.3 DX Unit Replacement at MRI
6.4 Building 30 AHU Ductwork Mod
6.5 Building 38 AHU Issues / Airflow Controls
6.6 Building 1 AHU-4 Removal
6.7 Replace Coils in AHU 12 and AHU 20
6.8 Chiller Insulation
6.9 Sterilization Condensate Recovery
6.10 Convert AHU-7 & 8 to VAV system
AHU 11
AHU 14
AHU 22 and 23
Bldg 41 conversion from DX units to ChilledWater units
7.1 Transformer Replacement
9
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
10/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Process IGA Savings Calculations ExampleTitle Summary of Project
Project 5.2 Kitchen Exhaust Hood Ventilation Control
Site Tampa, FL
Description Control Kitchen Exhaust Hood
Givens Existing Source
Electric Cost: = 0.0809 ($/kWh)
Assumptions Motor Load Factor see table
Current Hours Per Day = 24hrs per day
Proposed full speed ops = 6hrs per day
Proposed partial speed ops. 7hrs per day
Days per Year = 365
Assumed max CFM = 11100CFM
Installed hp = 20
Initial motor efficiency = 85%
Existing motor efficiency loss of 10% of original efficiency
Motor kWh improvement lower threshold 0.05
Formula Motor Power (kW) = (Motor HP x 0.746 (kW/hp) x Load Factor) / (Efficiency)
Speed Corr. Factor = ((New RPM)/(Existing RPM)) 3
Existing Energy Use (kWh) = (kW) x (Hours of Use)
New Energy Use (kWh) = (kW) x (Hours of Use) x (Speed Correction Factor)
Total Savings (kWh) = (Existing Energy Use) - (New Energy Use)
BTU/hr to change air temp = CFM x 1.08 x (T2-T1)
10
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
11/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Process IGA Savings Calculations Example
11
Assumptions Motor Load Factor see table
Current Hours Per Day 24hrs per day
Proposed full speed ops 6hrs per day
Proposed parital speed ops. 7hrs per day
Days per Year 365
Assumed max CFM 11100 CFM
Installed hp 20
Initial motor efficiency 85%Existing motor efficiency loss of 10%of original efficiency
Motor kWh improvement lower threshold 0.05
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
12/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Process IGA Savings Calculations Example
12
Formula Motor Power (kW) =(Motor HP x 0.746 (kW/hp) x LoadFactor) / (Efficiency)
Speed Corr. Factor =((New RPM)/(ExistingRPM)) ^ 3
Existing EnergyUse (kWh)
=(kW) x (Hours ofUse)
New Energy Use(kWh)
=(kW) x (Hours of Use) x (SpeedCorrection Factor)
Total Savings(kWh)
=(Existing Energy Use) - (New EnergyUse)
BTU/hr to changeair temp
= CFM x 1.08 x (T2-T1)
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
13/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Identification of Technical / Financial Risk
Mathematical Model built in Excel
Known and Unknown inputs identified
Simulation used to identify potential outcomes
Unknowns replaced with probability distributions
Outputs identified
Thousands of iterations run using Monte Carlo Simulation Output of each iteration recorded and used to make
Probability Distribution Function (PDF)
Output PDF identifies probability of achieving predicted
savings Tornado Chart used to identify need for further analysis
13
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
14/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Simulation Process
14
Replacement of uncertain model
inputs with representative PDF
Outcome data gathered from
simulation output for further analysis
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
15/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Simulation Process Input Example
55%
60%
65%
70%
75%
80%
85%
90%
95%
100%
105%
15
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
16/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Simulation Process Output Example
16
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
17/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Process IGA Cost Development
Development of Scope of Work (SOW) with the clientsSubject Matter Experts
Facility engineers Maintenance personnel
Other key personnel
Use of SOW to obtain multiple bids from qualifiedsubcontractors
Selection of bids against multi-criteria evaluation Use of modified Analytic Hierarchy Process (AHP)
Intent is to get absolute best value for our clients
17
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
18/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Types of ECMs Identif ied at James A. Haley
Lighting upgrades LED, T-8 and controls
Water savings measures
Extensive building controls upgrades
Electrical distribution upgrades
Extensive HVAC (Heating, Ventilation, and AirConditioning) work Chiller plant optimization
Chilled water distribution improvements
Steam condensate recovery Redesign of air distribution systems
18
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
19/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Atypical ECMs
Sterilizer Condensate Recovery
Chilled Water Distribution Ultraviolet Lights in Air Handling Units
Increased use of pedal valves
19
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
20/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com
Summary
All projects are in effect self-supporting due to energysavings and payback requirements
$19.662 mil with 8.8 year payback
Substantial improvements to facilitys infrastructure andsystem reliability
Substantial improvement to the comfort of those wholive, work and visit the hospital
Large reduction in annual operating costs $2.240 mil per year reduction
20
-
7/25/2019 SAME April 2016 Luncheon Presentation - James A. Haley Veteran's Hospital: TECO and ESG's Energy Savings Project
21/21
2016 Energy Systems Group, LLC | www.energysystemsgroup.com2016 Energy Systems Group, LLC | www.energysystemsgroup.com 21
Thank Youwww.energysystemsgroup.com