Terminal 3 West Modernization Project March 4 , 2019 SAN FRANCISCO INTERNATIONAL AIRPORT CIVIC DESIGN REVIEW - CONCEPT PHASE

Upload: others

Post on 14-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

Terminal 3 West Modernization Project

March 4 , 2019

SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN REVIEW - CONCEPT PHASE

Page 2: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 2

TERMINAL 3 WEST

US 101

INTERNATIONALTERMINAL

TERMINAL 1

TERMINAL 2

TERMINAL 3

Project SiteTerminal 3 West

Page 3: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 3

Project Site + Airside Context

A. INTERNATIONAL TERMINAL ‘G’

B. BOARDING AREA ‘E’

C. EXISTING FACADE

INTERNATIONAL TERMINAL

BOARDING AREA F

BOARDING AREA E

TERMINAL 3 EAST

TERMINAL 3 WEST

B

A

C

Page 4: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 4

Terminal 3 East / Boarding Area ‘E’ Airside Architecture

TERMINAL 3 EAST TYPICAL WINDOW WALL DETAIL / DELUGE CONCEALMENT

MECHANICAL PENTHOUSE CLADDING BOARDING AREA ‘E’

Page 5: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 5

Project Goals

Seismic Retrofit Upgrade Systems International Operations

• Increase international operational flexibility by providing 3 wide-body and 4 narrow-body swing gates and creating an FIS connection to the customs inspection area in the International Terminal.

• Implement a world-class concessions program and increase revenue generation.

• Complement the exceptional Boarding Area E and Terminal 3 East passenger experience and create unique moments of surprise and delight.

• Upgrade and/or replace building systems deemed to be at the end of their life in order to improve operational functionality, reliability, and efficiency.

• Mostly in Pre Security Area (Landside)

• Provide seismic retrofit to Terminal 3 West and F-Connector.

1 2 3 4Passenger Experience and Revenue Generation

Page 6: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

SCOPE AREA

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 6

Existing Condition

International Terminal - Boarding Area G (ITB - BAG)

Boarding Area E (BAE)

Terminal 3 East (T3E)

International Terminal (ITB) Secure Connector

LANDSIDE

AIRSIDE

Boarding Area F

Terminal 3 West (T3W)

Page 7: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

NEW SCOPE AREA

NEW GATEHOUSES

T3 WEST GATE TABULATION

EXISTING GATES

PROPOSED GATES

NARROW WIDE

5 0

4 3

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 7

Aircraft Parking / Gates

International Terminal - Boarding Area G (ITB - BAG)

Boarding Area E (BAE)

LANDSIDE

AIRSIDE

Terminal 3 East (T3E)

Boarding Area F

Terminal 3 West (T3W)

Federal Inspection Services (FIS) Bridge

International Terminal (ITB) Secure Connector

Page 8: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

SCOPE AREA

NEW GATEHOUSES

SECURITY (NOT IN SCOPE)

GATE LOUNGE

CONCOURSE

NOT IN SCOPE

SECURITY LINE

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 8

Proposed Plan

Boarding Area F

International Terminal - Boarding Area G (ITB - BAG)

Boarding Area E (BAE)

Terminal 3 East (T3E)

Federal Inspection Services (FIS) Bridge

International Terminal (ITB) Secure Connector

LANDSIDE

SECURITY

SEC

UR

ITY

AIRSIDE

Terminal 3 West (T3W)

Page 9: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

NEW GATEHOUSES

SCOPE AREA

STRUCTURAL BUTTRESS

TERMINAL 3 EAST SEISMIC SUPPORT

The new structural addition ties directly to the existing structure, providing seismic strengthen-ing and contributing significantly to the seismic retrofit of the existing Terminal 3 West structure.

This is similar to the structural strategy executed in Terminal 3 East.

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 9

STRU

CTU

RAL

CO

NC

EPT

DIA

GRA

M

Seismic Support

International Terminal - Boarding Area G (ITB - BAG)

Boarding Area E (BAE)

Terminal 3 East (T3E)

AIRSIDE

LANDSIDE

Boarding Area F

Federal Inspection Services (FIS) Bridge

International Terminal (ITB) Connector

Terminal 3 West (T3W)

Page 10: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

14'-0

"4'

-0"

10'-0

"3'

-6"

FISCORRIDOR

GATELOUNGE

36'-8"21'-0"18'-0"4'-0"

MAT

CH

T3

EAST

23'-4

"

FISRESTROOM

SEISMIC SUPPORT

Conceptual Section

FIS CORRIDOR

GATE LOUNGE DEPARTURES LEVEL

SUPPORT

SECURITY CHECK-IN

MEZZANINE

MECH PENTHOUSE

SUPPORT

LANDSIDEAIRSIDE

EXISTING CONSTRUCTION

NEW CONSTRUCTION

ARRIVALS LEVEL

EXISTING TO BE DEMOLISHED

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 10

Page 11: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

Existing Mechanical Penthouses

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 11

Existing Massing

Boarding Area F

Terminal 3 East

Existing Mechanical Penthouse

AIRSIDE

LANDSIDE

TERMINAL 3 WEST

Page 12: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

Existing Mechanical Penthouse

New Mechanical Penthouses

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 12

Proposed Massing

AIRSIDE

LANDSIDE

(N) Gatehouse

(N) Gatehouse

(N) Gatehouse

TERMINAL 3 WEST

Boarding Area F

Page 13: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 13

Mechanical Penthouse

New Mechanical Penthouses

Page 14: SAN FRANCISCO INTERNATIONAL AIRPORT Terminal 3 West ... T3West_Presentation... · winter solstice december 21. west facade solar exposure 2:45 pm - 4:52 pm. east facade solar exposure

NEW FACADE SURFACE

PERIOD OF DAY W/ DIRECT SUN

SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN

March 4, 2019 14

6:19 PM March 206:14 AM

4:30 PM

W

S

E

N

4:52 PM

December 21

7:22 AM

4:00 PM

W

S

E

N

• Maximum period of time with direct sun• Sun impacts area for most of the afternoon

7:32 PM

June 21

4:49 AM

2:30 PM

W

S

E

N

7:32 PM (SUNSET)4:49 AM (SUNRISE)

7 PM

12 PM

9 AM

3 PM

1 PM

Altitude: 16 deg.

Altitude: 68 deg.

4:52 PM (SUNSET)

4:00 PM

12 PM

9 AM

7:22 AM(SUNRISE)

2:45 PM

Altitude: 8 deg.

• Minimal period of time with direct sun• Sun mainly impacts area during late afternoon

Altitude: 32 deg.

12 PM

3 PM

4:30 PM

6:19 PM (SUNSET)

9 AM

6:14 AM (SUNRISE)

• Sun impacts area from mid-afternoon to early evening

WINTER SOLSTICEDECEMBER 21

WEST FACADE SOLAR EXPOSURE 2:45 PM - 4:52 PM

EAST FACADE SOLAR EXPOSURENONE

SUMMER SOLSTICEJUNE 21

WEST FACADE SOLAR EXPOSURE 1 PM - 7:32 PM

EAST FACADE SOLAR EXPOSURE4:49 AM - 9 AM

SPRING / FALL EQUINOXMARCH 20 / SEPTEMBER 23

WEST FACADE SOLAR EXPOSURE 2 PM - 6:19 PM

EAST FACADE SOLAR EXPOSURE6:14 AM - 8 AM

Solar Analysis