PowerPoint Presentation

Industrial Training-Projek Membina Jalan Lencongan Timur Dari Persimpangan Jalan Tun Razak/Jalan LanggarSANJAY BOSS 101005791

+1INTRODUCTION TO INDUSTRIAL TRAINING

+TRAINING DETAILORGANIZATION NAME: PERUNDING ASAS CONSULTING ENGINEERSMAILING ADDRESS: NO. 3, TAMAN DESA AMAN, JALAN SULTANAH,05350 ALOR STAR, KEDAH D.A.SITE ADDRESS: PEJABAT TAPAK, NO. 6 TINGKAT 1,KOMPLEKS PERNIAGAAN TAMAN SAGA, JALAN ALOR MENGKUDU,05400 ALOR STAR, KEDAH D.A.CORE BUSINESS: CONSULTING

+PROJECT INVOLVEMENTThis project is involving the Ch.200 which is starting from the intersection of Simpang Kuala till the Ch.2000 which is the ending of the Simpang Kuala Public High School. This project is mainly concentrates on the improvement and upgrading of the two ways lanes to four ways lanes both ways, which is at a distance of 1.3 kilometers.

+SANJAY BOSS101005791

INFRASTRUCTURE UNIVERSITY KUALA LUMPURORGANIZATION MANAGEMENT STRUCTURE & MANAGEMENT

+HISTORYPerunding Asas Consulting Engineers is on established Civil and Structural Consulting Firm registered with BOARD OF ENGINEERS MALAYSIA (Lembaga Jurutera Malaysia) and MINISTRY OF FINANCE MALAYSIA (Kementerian Kewangan Malaysia).The firm was incorporated in January 1992 and it aims to provide professional consulting services in Civil and Structural Engineering Field. The firm has wide experience in all building structure for both government and private sector as well as water supply engineering and infrastructure development.+VISION AND MISSIONFully owned by Bumiputra, originally, lr Abd Rahim bin Salleh ond lr. Mohd Yatim bin Mohd Saman as partners. lr Abd Rahim bin Salleh place as a partner is now token over by lr. Hj. lsmail bin Mohd Zain who joined the company recently.

We had continuously invested in improvement and upgrading of computer and networking system in order to achieve the objective of providing fast and quality design.

+SERVICES AND FIELD SPECIALIZATIONThe Company offers a wide range of consultancy services in civil and structural engineering including preliminary investigation, feasibility studies, conceptual and preliminary design, detailed engineering design, contract documentation, tender evaluation, supervision and commissioning of projects, contract administration and project management.Civil / Infrastructure WorksSteel Formed StructureGovernment / Public BuildingCommercial / Residential

+MANAGEMENT STRUCTURES

+COMPANYS PERSONNEL

+SANJAY BOSS101005791

INFRASTRUCTURE UNIVERSITY KUALA LUMPUR

TASK SPECIFICATION SUMMARY

+TASK DESCRIPTION AND PROCEDURESSite supervising: The site supervising is a very important job, as I have to be responsible for the running of the work according to the schedule that already done during the planning phase. Site supervisor has to coordinate the contractor, deal with the purchasing and coordination of the purchase of materials, etc.

+AutoCAD designingAutoCAD is a software application for computer-aided design (CAD) and drafting. The software supports both 2D and 3D formats. The software is developed and sold by Autodesk Inc. I was assigned to design the detailed beam, the bridge drawing, the pedestrian walk and zebra crossing, the curb designing, the sump designing, drain designing, alteration, etc.

+Study Engineering Drawing and Project Details On the very first day, I was assigned to study the drawing and the whole project in order be up to date with the work done at the site. I manage to catch up to up to recent work within the given two days.

+Technical meeting Technical meeting is the meeting that will be done each 2 weeks in order for the main contractor brief the sub-contractor of the work that needed to be completed and the sub-contractor giving their claim form for the work that they have already completed. As a junior engineer, I gain a large amount of knowledge regarding the progress of work.

+Familiarization of tender contract @ Bill of Quantities In traditional contracting, a contract document comprising a list of the materials required for the works and their estimated quantities, produced by the quantity surveyor. The contractor tenders against this document, stating his price for supplying and installing each of the materials. I was assigned to recalculate the budget of the project as there were new changes in the method of statement where using the new price value does it. The sample of BQ is attached in the Appendix.+Developing Gantt chart and S-curve The Gantt chart is the most important thing in the planning process, as it will determine the flow of the project as well as the duration of the project. A proper Gantt chart will ensure the project to be done on time as well as proper budget. I was able to check the existing S-curve and check the recent progress with the S-curve. The Gantt chart is attached in the Appendix.+Surveying and Detailing Surveying may be defined as the science of determining the position, in three dimensions, of natural and man-made features on or beneath the surface of the Earth. In engineering surveying, either or both of the above formats may be used for planning, design and construction of works, both on the surface and underground. At a later stage, surveying techniques are used for dimensional control or setting out of designed constructional elements and also for monitoring deformation movements. I was assigned to do leveling and traversing of the bridge surrounding.

+PROBLEM ENCOUNTERED AND SOLVING APPROACHEDSite supervising: While doing the site supervising, I encountered many difficulties such as leaking of water from the underground utilities, finding life utilities in the underground which is not in the plan and the cracking of the house walls in the neighborhood. As an engineer, I manage to respond to all these problems. For the water flooding, I called the SADA and asked them cut off the water supply of that pipe and for the life utility that I found during the excavation; I called the TNB and asked them to check its availability. As for the cracking of the houses that occurred at the houses in the surrounding neighborhood, I file report to the claiming department and did follow up. These are a few problem encountered for the site supervising task. +PROBLEM ENCOUNTERED AND SOLVING APPROACHEDAutoCAD designing: As of the AutoCAD designing, the beginning of designing work was quite unfamiliar as lack of experiences and the deadline were very short. Pressure from the higher authority to finish the work made me panic and quite worried. Therefore, I worked overtime to ensure the work done on time, thus I managed to finish the work and summit it before the deadline.Studying Engineering Drawing and Project Detail: When I first reach, I did not understand much about the process of work and what is the thing to be done and when to finish it. But after a proper timetable and schedule I managed to overcome this and with the help of the existing staff who are very helpful and considerate and made time to teach me. +PROBLEM ENCOUNTERED AND SOLVING APPROACHEDBill of quantities: the first time they give me the tendering document it was hard for me to imagine how much material and staff needed but after I visited the site it was easy for me to estimate the costs and the material needed so after I came back to office I could do the calculation and finish the task that was given to me.

+PROBLEM ENCOUNTERED AND SOLVING APPROACHEDFamiliarization of tender contract @ Bill of Quantities: In this part, there were many issues that needed me to find proper approach of solving because the rates and the costs changes according to time and the ordering needed a precise understanding of the material needed. Therefore, I did some research which enabled me to solve my report with great success.

+SANJAY BOSS101005791

INFRASTRUCTURE UNIVERSITY KUALA LUMPURHEALTH & SAFETY PRACTICES

ETHICS & GOOD WORK PRACTICES

+

CONCLUSION AND RECOMMENDATIONThis Industrial Training is a great opportunity for me to learn vast information on the life as a working Engineer at the site. The exposure of this Industrial Training had given me knowledge which can not be obtain just by passing through the pages of references books. Therefore I am prominently in gratitude to everybody that involve in making me experience the site work.The recommendation that I would give is the duration of training should be increased to six months it will give an enormous experience of the working in the field. They would really see the progress of a project rather than just to see a glimpse of the working life. They could also learn more when more time is spending for the training.

+