Sap Manual - Basic
1. Creating Project
2. WBS Structure
3. Network
4. Activity
5. Cost Planning
6. Reports
![Page 2: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/2.jpg)
2
Step 1
![Page 3: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/3.jpg)
3
Step 2
Path : Logistics Project System Project Project Builder
Transcation : CJ20N
CLICK PROJECT BUILDER
![Page 4: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/4.jpg)
4
Step 3 : Create Project
CLICK Project
![Page 5: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/5.jpg)
5
Step 4
Project def.: Project Code
Project Description – Name of the Project
Project Profile: With Project Stock (Select from dropdown menu)
PRESS ENTER
FILL FILL
FILL
![Page 6: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/6.jpg)
6
Step 5
Start date: Project start date as per contract signature (Select from drop down menu)
Finish date: Project finishes date as per contract signature (Select from drop down menu)
FILL
FILL
PRESS ENTER
FILL
![Page 7: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/7.jpg)
7
Step 6
Long txt: Brief description of the project – Country, Owner, Client, and Scope
FILL
CLICK
![Page 8: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/8.jpg)
8
Step 7
PROJECT CREATED
DOUBLE
CLICK
![Page 9: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/9.jpg)
9
Step 8
CLICK
![Page 10: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/10.jpg)
10
Step 9 : Create WBS
Level: 1 (1st WBS Element should be at level 1)
WBS Element: Same as the Project code (WBS codes and structure to be finalised before uploading the data in
SAP)
Description: Contract
FILL FILL
PRESS ENTER
![Page 11: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/11.jpg)
11
Step 10
Complete the WBS uploading with correct level, code and description.
Keep saving the data in between to avoid any loss of data due to sudden power failures.
FILL
LEVEL
FILL
FILL
LEVELS
FILL
FILL
![Page 12: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/12.jpg)
12
Step 11
DOUBLE
CLICK
![Page 13: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/13.jpg)
13
Step 12
CLICK
VIEW WBS
![Page 14: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/14.jpg)
14
Step 13
Expand all the WBS elements
CLICK
![Page 15: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/15.jpg)
15
Step 14
![Page 16: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/16.jpg)
16
Step 15
PE: Planning Element ( Planning to be done at the lowest level)
Acct: Accounting ( Accounting to be done at the lowest level)
Bill: Billing (Billing to be done at the Contract Level)
CLICK
WHEREVER
REQUIRED
CLICK
![Page 17: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/17.jpg)
17
Step 17
CLICK
![Page 18: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/18.jpg)
18
Step 18: Create Network
CLICK
![Page 19: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/19.jpg)
19
Step 19
Network: Description same as WBS element
Network profile: Activity acct. ass. No plan costs (Select from the dropdown menu)
MRP Controller: 010 (Select from the dropdown menu)
FILL
FILL
FILL
PRESS ENTER
NETWORK CREATED
![Page 20: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/20.jpg)
20
Step 20
CLICK
![Page 21: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/21.jpg)
21
Step 22
CLICK
![Page 22: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/22.jpg)
22
Step 23: Create Activity
CLICK
![Page 23: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/23.jpg)
23
Step 24
FILL
PRESS ENTER
![Page 24: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/24.jpg)
24
Step 25
ACTIVITY CREATED
CLICK
![Page 25: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/25.jpg)
25
Step 27: WBS Release
CLICK
![Page 26: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/26.jpg)
26
Step 28
CLICK
![Page 27: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/27.jpg)
27
Step 29
CLICK
WBS RELEASED
![Page 28: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/28.jpg)
28
Step 30
CLICK
![Page 29: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/29.jpg)
29
Step 31
CLICK
![Page 30: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/30.jpg)
30
Step 32
USER STATUS CHANGED :
INIT TO BUDG
CLICK
![Page 31: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/31.jpg)
31
Step 33: Component Uploading
CLICK
![Page 32: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/32.jpg)
32
Step 34
FILL FILL
PRESS ENTER
![Page 33: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/33.jpg)
33
Step 35: Cost Planning
Path: Logistics Project System Financials Planning Costs in WBS
Overall values Change
Transcation Code: CJ40
CLICK
![Page 34: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/34.jpg)
34
Step 36
CLICK
![Page 35: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/35.jpg)
35
Step 37
CLICK
CLICK
![Page 36: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/36.jpg)
36
Step 38
Primary Costs: Direct Costs i.e Raw Material, Semifinished Produts, Subcontracts, Services etc.
Activityinput: Indirect Costs i.e Hourly Rates
CLICK
CLICK
![Page 37: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/37.jpg)
37
Step 39
CLICK FILL
CLICK
FILL COST CENTRE
FILL HOURS AS PER
THE COST SHEET
FILL ACTIVITY TYPE
PRESS ENTER
![Page 38: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/38.jpg)
38
Step 40
CLICK
PLANNED VALUE FOR
THE WBS ELEMENT
DISPLAYED
![Page 39: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/39.jpg)
39
Step 41
PLANNED VALUE FOR
THE WBS ELEMENT
DISPLAYED
PLANNED VALUE FOR
THE WBS ELEMENT
DISPLAYED
CLICK
![Page 40: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/40.jpg)
40
Step 42
FILL
FILL
CLICK
![Page 41: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/41.jpg)
41
Step 43
CLICK
![Page 42: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/42.jpg)
42
Step 44
CLICK
![Page 43: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/43.jpg)
43
Step 45
Path : Logistics Project system Financials Copy Costs and Revenues Copy Project
Costing (Ind)
Tranx code: CJ9FS
CLICK
![Page 44: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/44.jpg)
44
Step 46
Template Version: 0
Target Version: 1
FILL
FILL
FILL CLICK
CLICK
CLICK
![Page 45: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/45.jpg)
45
Step 47
CLICK
![Page 46: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/46.jpg)
46
Step 48
CLICK
CLICK
![Page 47: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/47.jpg)
47
Step 49
CLICK
![Page 48: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/48.jpg)
48
Step 50
CLICK
![Page 49: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/49.jpg)
49
Step 51
Path : Alstom Add on menu Project Management Reports ZPROJCOSTBOILER – Proj Review
CLICK
![Page 50: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/50.jpg)
50
Step 52
FILL
CLICK
![Page 51: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/51.jpg)
51
Step 53
CLICK
![Page 52: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/52.jpg)
52
Step 54
CLICK
SELECT THE VALUE WHICH
WHICH NEEDS TO BE CHECKED
![Page 53: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/53.jpg)
53
Step 55
CLICK
![Page 54: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/54.jpg)
54
Step 56
![Page 55: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/55.jpg)
55
Step 57
Tranx: PS 91
![Page 56: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/56.jpg)
56
Step 58
CLICK
![Page 57: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/57.jpg)
57
Step 59
CLICK
![Page 58: Sap Manual User Manual](https://reader034.vdocument.in/reader034/viewer/2022050623/5478395d5806b5f7188b476c/html5/thumbnails/58.jpg)
58
Step 60