Dates can be manually planned in WBS hierarchy which does not have
networks. This can be done in project planning board by dragging the mouse for
the respective WBS element.
Also in structure planning one can enter the dates in table.
The Basic dates flows in WBS hierarchy as top!down from higher levels tolower levels or e"trapolated from lower levels to superior WBS element.
The basic dates consistency can be checked with in the WBS structure.
While e"ecuting the project the actual dates can be set in project planning board
or information system structure by dragging the respective WBS element bar and
compare the actual dates with basic dates.
There are several planning forms to plan basic dates on WBS element like Top
down #$nherited from to top to down% Bottom up #e"trapolated from bottom to
top level% &ree planning and Strict bottom up.
&or assigning actual dates which is Assigned during e"ecution phase by dragging
mouse in project planning date and one can compare actual and plan basicdates.
-
7/25/2019 SAP PM BOM ,and PS
2/118
$n the case of projects with assigned networks network scheduling functionality
automatically derives the dates for activities and WBS elements.
This can be using project planning board where you can select WBS elements
and assigned network activities.
Scheduling parameters determines the scheduling of networks i.e. forward orbackward scheduling #forward scheduling determines earliest dates and backward
scheduling determines latest dates%.
The difference between two dates #earliest and latest dates% are called as &loat
which can be negative or (ero and signifies that the network path is #or activities
from start of network to the end of the end of network% is critical.
The scheduled dates of the WBS elements are the wrap!up dates of the
assigned activities which are displayed as thin time bars in project planning
board.
These scheduled dates can be copied in basic dates of the WBS elements
and e"trapolate them to the superior WBS elements in the project hierarchy.
Settings of scheduling parameters)
$ndicators *network scheduling+ and *adjust basic dates+ set.
Assignment of scheduling type in scheduling parameters.
-
7/25/2019 SAP PM BOM ,and PS
3/118
Scheduling can be used to derive dates for activities-WBS
elements. etworks are always scheduled forward and backwards.
The scheduling type determines the original direction in which scheduling
takes place. $t can be carried out in two ways) Top!Down and Bottom!/p
scenarios.
The dates schedule in WBS structure can be copied to the basic dates of the
WBS elements for the purpose of e"trapolating them up the project hierarchy.
-
7/25/2019 SAP PM BOM ,and PS
4/118
Scheduling uses the 1uantity structure of network activities to derive dates in an
automated way.
Single network schedules all activities of the network. $f it is connected to other
networks by relationships their dates are treated like constraints.
$n overall network scheduling the system schedules all networks connected byrelationships.
WBS scheduling schedules all activities which are assigned to selected
WBS elements.
etwork can be scheduled)
$ndividually #etwork Scheduling%
2verall #Scheduling of 2verall network%
WBS scheduling
The activity data activity relationships and date restrictions form the basis for
determining the dates automatically.
$n 3rojects with assigned networks the dates of WBS 4lements and Activities
can be derived by scheduling. 5ere WBS 4lement transfers the date to higher
level
-
7/25/2019 SAP PM BOM ,and PS
5/118
elements and 4"trapolate it.
$n WBS with assigned networks the basic dates for the WBS element can be
planned in order to determine that certain part of the project has to be
completed within a fi"ed period of time.
-
7/25/2019 SAP PM BOM ,and PS
6/118
Scheduling parameter) They determine scheduling. These are created for
specific plants and network types.
'. Adjust basic dates) $t determines that after the scheduling run the
scheduled dates are copied to the basic dates of the network header.
,. Scheduling Type) $t determines the type of scheduling being carried out. &or e.g.forward first and then backward scheduling.
0. Start in the past) $t determines how much time back was the start date. $f
its more than the days mentioned scheduling is done from current date.
7. Automatic Scheduling) Scheduling is carried out when saving is carried out.
8. 9og Automatic) $f log is generated it is displayed automatically.
:. Break Spec. Scheduling) The e"act time at which a break is scheduled.
;. Shift 2rder) During scheduling. $t determines how the system deals with partially
completed activities.
-
7/25/2019 SAP PM BOM ,and PS
7/118
allocating work in Work &orce planning#W&3%
-
7/25/2019 SAP PM BOM ,and PS
8/118
-
7/25/2019 SAP PM BOM ,and PS
9/118
Scheduling Type) Determines type of scheduling being carried out.
'. Start in the past) $t determines how much time back was the start date. $f
its more than the days mentioned scheduling is done from current date.
,. Scheduling form) $t specifies as in on what basis is the scheduling being
carried out @ WBS element or etwork header.0. Adjust basic dates) $t determines that after the scheduling run the
scheduled dates are copied to the basic dates of the network header.
7. 9og Automatic) $f log is generated it is displayed automatically.
8. Shift 2rder) During scheduling it determines how the system deals with partially
completed activities.
:. Schedule when saving) Scheduling is done on saving.
;. 9atest material dates) based on latest and earliest dates the re1uirements
dates for a material is determined.
-
7/25/2019 SAP PM BOM ,and PS
10/118
'.
,.
0.
7.
4very time a network is scheduled forward and backward scheduling is
carried out by the system and if activated it determines float and capacity
re1uirements for activities reduction level used to schedule the network
earliest and latest dates for the relationship.
&orward scheduling determines the earliest dates.
Backward scheduling determines the latest
dates.
&loat) $f earliest dates are not same as latest
dates then float occurs.The Scheduling results are)
Scheduled start and finish for the network.
4arliest start and finish dates #earliest dates% and the latest start and finish
dates #latest dates% for activities and earliest and latest dates for relationships.
=eduction levels used to reduce the network and float times #total and free float%
for activities. And capacity re1uirements for activities.
-
7/25/2019 SAP PM BOM ,and PS
11/118
2ther influencing factors in scheduling)
$nternal processing) the normal Duration maintained in the activity is used by
the system for scheduling internally processed activity.
4"ternal processing) 3lanned delivery time or normal Duration #e"plicitly to
be activated in control key% will be used by system for scheduling e"ternallyprocessed activity.
eneral costs activity) Duration
=elationship) Time interval) &i"ed or as a percentage.
The work centers can be maintained in internally or e"ternally processed activity
and in relationships and work centers contains following informationCs)
'. &ormulas for calculating duration of activities
,. &actory calendar and operating time for each workday.
-
7/25/2019 SAP PM BOM ,and PS
12/118
A network must and always scheduled forwards and backwards and scheduling type
specifies whether forward scheduling or backward scheduling is carried out first.
&orward scheduling calculates the earliest start and finish dates for all activities and
the scheduled finish date of the network. A start activity is an activity in a network
that does not have a predecessor.
Backward scheduling calculates the latest start and finish dates for an activity #latest
dates% and the scheduled start date of the network. A target activity is an activity in
a network that does not have a successor.
When forward scheduling is performed first the date from which scheduling starts
is the basic start date in the network header. When forward scheduling is
performed after backwards scheduling the start date is calculated from backward
scheduling.
When backward scheduling is performed first the base date from which
scheduling starts is the basic start date in the network header. When backwards
scheduling is performed after forward scheduling the finish date is calculated fromforward scheduling.
Start dates are at the beginning of the day
#>>)>>%. &inish dates are at the end of the day
#,7)>>%.
-
7/25/2019 SAP PM BOM ,and PS
13/118
Scheduling Assembly Networks:
2verall etwork Scheduling can be performed for a sales order item.
This function schedules the network assigned to the sales order item and all
other networks with relationships to it #total network scheduling%.
The function leads to an update of all items in the sales order with assignmentsto the total network.
Overall Network Scheduling with Selection Options:
This function is used along with selection criteria to specify which network-sub!
network are to be taken into account as part of overall network scheduling.
A prere1uisite for the use of the 2verall network scheduling with selection options
function is that suitable levels are defined beforehand for the project system and
network types and number intervals are assigned to it.
-
7/25/2019 SAP PM BOM ,and PS
14/118
Activity Element & PR !ates
The system calculates dates for activity elements with reference to the start or
finish dates of the activity. ou maintain a time interval for the start and a time
interval for the finish.
"aterial Re#uirements !ate
The system calculates the re1uirements date for components with reference to the
start or the finish date of the activity. With the network type you can control
whether the earliest or latest start date is used as the re1uirements date in the
network.
$f the re1uirements date is before or after the start date of the activity you can enter
a corresponding lead time offset.
ou can set a manual re1uirements date for components.
-
7/25/2019 SAP PM BOM ,and PS
15/118
ou can maintain constraints for the start and finish of activities and - +or #offsets
for%+ activity elements.
Eonstraints can be relevant for both the earliest and the latest
dates. ou can maintain constraints for basic and forecast sets of
dates.
-
7/25/2019 SAP PM BOM ,and PS
16/118
9egend)
4S F earliest start
4& F earliest finish
9S F latest start
9& F latest finish
T& F total float
&& F free float
&loats supply information about time reserves available for individual activities and
one can use floats calculated in scheduling for e"ample in capacity leveling to
shift activities between their earliest and latest dates or to e"tend their duration.
Total float) The amount of time an activity can be shifted from its earliest dates into
the future without affecting the latest dates of its successor. #Total float) F 9S!4S
or 9&!4&%
&ree float) The amount of time an activity can be shifted from its earliest datesinto the future without affecting the earliest dates of its successor. #&ree float F
4S successor @ 4& activity%
-
7/25/2019 SAP PM BOM ,and PS
17/118
The slide describes the calculation of total floats and free floats)
The total float can be calculated as the difference between the earliest and
latest start of an activity.
$n the above e"ample)
Day : #>)>>% ! Day 8 #>)>>% F ' Day.
The free float of an activity can be calculated as the difference between the
earliest start of the successor and the earliest finish of the activity.
$n the above e"ample)
Day 6 #>)>>% ! Day ; #,7)>>% F ' Day.
,
-
7/25/2019 SAP PM BOM ,and PS
18/118
=eduction)
=eduction can be used when the time period within which activities are scheduled
is not enough for processing all the activities.
This reduces the scheduled duration of internally!processed activities and for
which reduction strategy has been maintained./p to si" reduction levels can be defined for each reduction strategy. The
percentage reduction re1uired can be entered for each reduction level.
,
-
7/25/2019 SAP PM BOM ,and PS
19/118
ou can plan project costs in two different ways)
?anual cost planning in the WBS
Eost planning using activities #network costing%
?anual planning in the WBS involves)
'. 2verall planning is a structure!oriented planning and is the most basic form. $n
this kind of cost planning you enter costs for each WBS element which will be
broken down by fiscal year if you want.
,. Eost element planning is a detailed planning of primary costs and activity inputs
which is cost element based and period based.
0. $n /nit costing you use a profile to enter 1uantities like internal activities
materials variable items and e"ternal services etc. for each WBS element.
/nit costing is cost element based.
7. &rom 7.:E release you can use 4asy Eost 3lanning which offers you an easy!
to!use tool for planning costs by cost element in a 1uantity structure. And further
one can use 4"ecution Services to enter actual data and commitment for the
related planned costs.
The plan costs can be determined manually as mentioned above and also by creating
,
-
7/25/2019 SAP PM BOM ,and PS
20/118,
activities for WBS elements and using these activities to plan costs.
When using networks and activities planned costs are automatically
calculated based on the resource re1uirements identified for activities and
operations.
=esources provide a 1uantity structure that can be dynamically valued by the system.
This method has the following advantages)
a. resulting plan can be copied to new projects
b. cost planning is shifted automatically along with the activities if parts of the
project are shifted.
c. 3lanning using network activities is by cost element and period.
-
7/25/2019 SAP PM BOM ,and PS
21/118
ou can plan project costs simply by creating activities for WBS elements #for e"ample in the
project planning board or structure planning transactions%.
3lanning in this case is by period and cost element.
This process has significant advantages over manual planning of primary costs or activity
inputs)
Eost planning can be postponed easily using a work package.
ou can copy this type of cost planning to new projects.
Eost planning is integrated with time scheduling and resource
planning.
,
-
7/25/2019 SAP PM BOM ,and PS
22/118
When you plan dates and resources in network activities the system determines
the corresponding planned costs automatically.
3lanned costs are determined for the following
objects) Activity inputs for internally!processed
activities
3rimary costs for e"ternally!processed activities and services
3rimary costs for general costs activities
3rimary costs for material components
Activity elements are costed as if they were activities.
System automatically calculates the planned cost based on planned dates and resources in
network activities.
Eost elements should be identified by cost relevant items. $dentification in internal activities
e"ternal activities is as)
$nternal activities- services) Determination is by means of secondary cost element assigned in
the network type master data
,
-
7/25/2019 SAP PM BOM ,and PS
23/118,
4"ternal activities-services )'% on stock!$t is identified by -l account ,% Stock! $t is
determined by automatic account determination
Eost planning is integrated with time scheduling and resource planning
-
7/25/2019 SAP PM BOM ,and PS
24/118
$nternally processed activities are used for the work which needs to be e"ecuted in own
company and assist in planning work.
$n the activity you need to maintain the work data and based on same system calculate costs
for these activities.
Work is an input for machine or person to e"ecute the activity. And work center is place
where the work is carried out and work output is provided.
Work centers contains data such as scheduling and capacity which assists in costing
scheduling and capacity planning of activities.
The costs can be distributed over the network duration for internally processed activities Gcost activities and controlled via distribution key.
The distribution key is determined from the activity or from work center #only in internally!
processed activities% if not maintained in activity. $f distribution key is not maintained or
determined costs are distributed evenly #over the earliest dates% in the activity.
4"ample) An activity spread across periods >6 and '> with a total work time of ,8> hours.
The dates and the distribution key used for the activity assign '>> hours to period >6 and
'8>
,
-
7/25/2019 SAP PM BOM ,and PS
25/118,
hours to period '>. $f the rate is '>> 4uros per hour for period >6 and 4uros per
hour for period '> and valuation per period has been stipulated the costs are
'>>>> 4uros for period >6 and ',>>> 4uros for period '>.
During e"ecution phase when you confirm the activities you consume the capacity
re1uired by the activity and enter the actual date and costs.
ou can distribute work among the employees by assigning persons to the activities
from a project team which can be set up from 5= organi(ational units persons or
positions.
-
7/25/2019 SAP PM BOM ,and PS
26/118
When procuring services e"ternally #outsourcing% you can create services or externally-
processed activities.
4"ample) ou commission a freelance engineer to design and build a machine.
When creating a e"ternally processed activity or service activity a purchase re1uisition is
created based on the settings and further processed in purchasing and the data can be
accessed from purchasing for e"ternal processing e.g. purchasing info record which
contains data for the pricing and delivery times.
E$ternally%processed activities give rise to planned costs e#uivalent to the prices romthe purchasing ino record or the price in the activity' he valuation variant or the
network costing variant determines which price is used or the valuation' (hen the
purchase re#uisition is activated and converted to a purchase order) the activity is
also shown as a purchase re#uisition commitment or purchase order commitment'
he account assignment category in the purchase order determines whether the
goods*invoice receipt is valued % that is) whether it gives rise to actual costs' + the
goods receipt is valuated) actual costs are posted to the activity and the commitment
is reduced by the amount o the purchase order' his means that the invoice receipt
,
-
7/25/2019 SAP PM BOM ,and PS
27/118,
may correct the actual costs'
Service activities are maintained or the purchase o services'
,reating such an activity establishes the link to "" Services -""%SR./' 0nlike
e$ternally%processed activities) service activities contain a service
speciication containing planned activities and value limits or unplanned
activities'
his service speciication is copied to the purchase order where Purchasing
can then modiy it' Service activities also give rise to planned costs or
purchase re#uisition*order commitments' +nstead o goods receipts) services
are later entered and accepted'
The service activities also initiates the purchasing process but contain the value limits
for the unplanned services and hierarchy of planned services to be procured. The
goods receipt process in Services activities involves following steps) service entry
and service acceptance.
The e"ternally processed activity and service activities are differentiated by Eontrol
keys.
-
7/25/2019 SAP PM BOM ,and PS
28/118
We can assign a work center and planned work to an e"ternally processed activity.
This allows to carry out capacity planning for vendors
Ehanges in network dates-1uantity will trigger workflow for a 32 change)
$f changes are made in the network to dates or 1uantities for material
components or e"ternal activities for which 32 has already been created .system
triggers a workflow automatically. The only prere1uisite is that this workflow has
been activated in the parameters for the network type table
The person responsible in purchasing will receive an information on the re1uired
changes.
$f only 3= is created changes in the network to dates-1uantities will update the
change in 3= automatically
,
-
7/25/2019 SAP PM BOM ,and PS
29/118
The $nternal processed activity e"ternal processed activity and service activities are
differentiated by Eontrol keys.
We can generate 3urchase re1uisition #3=% for e"ternally processed activities
from 3roject System. The 3= is converted to a 3urchase order #32% in
purchasing. A goods receipt and invoice receipt can then be posted for thepurchase order
We can assign a work center and planned work to an e"ternally processed activity.
This allows to carry out capacity planning for vendors
,
-
7/25/2019 SAP PM BOM ,and PS
30/118
ou can use general costs activities to plan all other costs that cannot be mapped via
internally!processed activities or e"ternally!processed-service activities.
$n the general costs activity you can enter a description the amount and currency a cost
element a duration and a distribution key for distributing costs.
The costs are distributed using the network duration for general costs activities.
Distribution is controlled by means of the distribution key for the activity. $f no distribution
key is maintained the costs are distributed evenly over the earliest dates in the activity.
ou can create a unit cost plan for the general costs activity.
This means that detailed costing is possible even at an early stage of the project
#for e"ample for sales pricing%.
The activities which cannot be tracked though internal-e"ternat activities-services can be
tracked through general cost activities to plan costs
4g travel e"pense for meeting.enral cost activity is assigned to cost object
Eosts are distributed as per scheduled duration which is controlled by distribution key
,
-
7/25/2019 SAP PM BOM ,and PS
31/118,
.There are cases where distributionkey has not been maintainedin those cases
even distribution of cost is done based on the earliest dates in the activity
Detaled costing can be done like during sales pricing phase that is at beggining
phase of project
-
7/25/2019 SAP PM BOM ,and PS
32/118
ou can create invoicing plans directly for network activities #e"ternal service or general
costs% or components procured e"ternally.
This means that it is possible to plan costs and outgoing payments on the basis of dates
entered in the invoicing plan. Eosts are not simply distributed but are calculated precisely
at the times specified in the invoicing plan.
ou can create an invoicing plan by copying a reference invoicing plan.
The reference invoicing plan fi"es cost and payment times relative to a start date.
Alternatively you can copy billing milestones as dates to the invoicing plan of the activity. $f
you copy the milestones rather than creating them manually they can be postponed
along with the dates in the invoicing plan if the activities are rescheduled.
ou cannot create invoicing plans in combination with unit costings #for general costs
activities or material components%.
0
-
7/25/2019 SAP PM BOM ,and PS
33/118
2n the basis of days periods or fiscal years one can plan payment flows i.e. revenues
and e"penditure.
$n WBS elements manual planning of revenues and e"penditure is by period. At
commitment item level #3roject Eash ?anagement master data% planning takes place.
The 1uantity structure in the network and the billing plans in the WBS or SD document
are valuated in the automatic planning of financial data.
Automatic planning will be done by day. 3lanned line items will be written.
Based on assignment to -9 accounts commitment items will be determined. /nlike
revenue and costs calculation payment date calculation takes account of the
customer and vendor payment terms respectively.
ote) The credit side payment plan of the network is determined using theasynchronous network costing only.
The dates and the payment terms are used in the 3S billing plan for planning incoming
payments. Sales order items will also be used in assigning the billing plan data and
payment terms#of the dates or sales order item%.The delivery date including the
payment conditions is used if there is no billing plan for the sales order item.
0
-
7/25/2019 SAP PM BOM ,and PS
34/1180
$n the case of activities processed e"ternally and e"ternally procured components
invoicing plan including payment conditions are used @ or the delivery dates including
payment conditions are used where there is no invoicing plan
$f an invoicing plan has been maintained payment data is only planned for
general costs activities
-
7/25/2019 SAP PM BOM ,and PS
35/118
3lanned revenues and incoming payments is relevant in billing plan.
Dates for Down payments are relevant only for payments #not revenues%.
?ilestone billing dates appear as planned incoming payments and planned revenues. Two
things are important for dates and amounts i.e. payment terms and payment target
#e"ample) payment ' week after invoice issue with ,H discount%
2nce the project is e"ecuted invoice billing will be generated and appear in the project as
actual revenues and customer payment obligations. With respect to dawn payment date
down payment re1uests will be generated by the billing program which are recorded inthe payment data for the project.
Billing plan can be created for a sales order a sales order item or for a billing element in the
WBS.
3lanned costs and planned outgoing payments are relevant during the $nvoicing plan.
0
-
7/25/2019 SAP PM BOM ,and PS
36/1180
$nvoicing planes can be created for e"ternally!processed activities e"ternally!
procured material components service activities and cost activities.
-
7/25/2019 SAP PM BOM ,and PS
37/118
Depending on the transaction you can calculate costs for one network #e"ample) network
maintenance% or a range of networks #e"ample) all networks for selected WBS elements
in structure planning or the project planning board%.
ou can calculate network costs asynchronously. The advantage of this is that you can select
and cost broader ranges #e"ample) A to I% and carry out costing in the background.
0
-
7/25/2019 SAP PM BOM ,and PS
38/118
Eosting variant controls calculation of planned and actual cost. Eosting variant
is assigned to order type. etworks are of order category ,>.
The valuation procedure is defined by valuation variant which is a component of
costing variant. Based on valuation variant prices are determined by the system to
value componenets material activity type processes subcontracting and e"ternal
activities. Jaluation variant searches for prices in se1uence from the price sources.
3rice entered first is selected first
?aterials)3rice is selected either from purchasing date or material master record
Activity type G 3rocesses) 3rice is selected either from activity based costing or
cost center accounting
4"ternallly processed activity)price is selected either from the activity or from
purchasing information record
0
-
7/25/2019 SAP PM BOM ,and PS
39/118
When customi(ing the order value update you stipulate for each order category and
type whether the order or network is appended ! that is whether its planned costs are
added to the project cost plan for assigned WBS elements.
There are two tables for the order type #network type%. The first is defined per order type
the second #parameters for network% per order type and plant.
A third important table is the network profile containing default values for the network and
its activities.
The costing variants for plan and actual costs are determined at network header level.
The costing sheet and overhead key are determined at activity level. They control processcost accounting or application of overhead. Depending on the creation process these
keys are inherited from the network header or the assigned WBS element.
0
-
7/25/2019 SAP PM BOM ,and PS
40/118
The costing variant contains the basic control information needed to carry out
costing. The valuation variant contains all the information which controls the
valuation of)
?aterial components
$nternal activities
4"ternal activities
This information also
controls how
overheads areapplied.
Jaluation can be
determined plant by plant.
The KBy periodK indicator enables you to calculate costs for internally!processed
activities period by period.
The costing type contains further detailed information for controlling costing.
0
-
7/25/2019 SAP PM BOM ,and PS
41/118
ou can classify the resources in broadly , categories from the networks point of
view) $nternal and e"ternal activities.
$nternally processed activities) These activities - work are carried out by
machines and - or persons of own company. ou can schedule the activities as
per re1uirement distribute the work among persons.
4"ternally processed activities) these activities are e"ecuted - processed by other
companies. These are carried out by purchasing department. The service
activities are also procured e"ternally however different from e"ternally
processed activity that you need to define service specification and the limit for
the unplanned activities which is provided by the service provider.
0
-
7/25/2019 SAP PM BOM ,and PS
42/118
1usiness scenario
To e"ecute a project materials are re1uired
which can be procured e"ternally #purchasing% or
manufactured in own company #3roduction%. These
materials are managed in project!specific stock.
As the project controller you are interested in)
The values in the project at the different stages of purchasing or production
#project controlling%
Stocks of raw materials semi!finished and finished products used for your project
0
-
7/25/2019 SAP PM BOM ,and PS
43/1180
#stock controlling%
?aterials provide linkage between many other SA3 functional modules like
?aterials ?anagement #3urchasing and $nventory ?anagement% Sales and
Distribution plant maintenance and 3roduction 3lanning and Eontrol.
The materials are assigned to activities which helps in material re1uirement and
planning in a project.
The product which is manufactured in your project is in turn made up ofa variety of material components.
The first step is to plan the procurement and consumption of the requiredcomponents in your project.
Projects are linked to Materials management, Sales and istri!ution and
Production Planning via materials.
-
7/25/2019 SAP PM BOM ,and PS
44/118
$n order to plan the material re1uirements of a project materials can be assigned to
activities. 2n the basis of stock the materials are classified as stock or non!stock items.
The item category stock items #9% are for such materials which are stored in stock e.g. project
stock sales order stock or warehouse stock and reservations can be created for such
materials. Based on the 1uantity re1uired in the project the re1uirement planning can be
initiated. The procurement element for e"ternal procurement is a purchase re1uisition and for
re1uirement planning is planned order.
&or productions of assembled material material B2? is e"ploded and the
re1uirement planning is e"ecuted for all the materials mentioned in B2?.
on!stock items #% are for materials which are to be procured directly for the network which
is not using ?=3 #i.e. not procured via project stock sales order stock or warehouse stock%.
&or non!stock items 3urchase re1uisitions are created which are passed on directly to
3urchasing.
0
-
7/25/2019 SAP PM BOM ,and PS
45/118
The item category Kstock itemK #9% is used for materials kept in stock. When you save
your data the system creates a reservation for the re1uired material. A purchase
re1uisition ! which is passed on to 3urchasing ! can also be created for components
procured e"ternally.
The main function of material re1uirements planning is to ensure material availability
#in other words to procure the re1uired 1uantities in time ! both in!house and for sales
and distribution%. This includes monitoring stocks and above all creating procurement
proposals for purchasing and production.
$ndependent re1uirements ! that is re1uirements for finished products assemblies or raw
materials ! trigger re1uirements planning. $n order to cover the re1uirements order1uantities and dates have to be determined and the corresponding procurement elements
scheduled. The procurement element for re1uirements planning is a planned order and
for e"ternal procurement a purchase re1uisition. &urthermore the dependent
re1uirements for materials produced in!house #in other words the 1uantity of components
re1uired to manufacture a finished product or assembly% are determined by e"ploding the
bill of material. 3lanned orders are created at each B2? level to cover re1uirements
when a material shortage occurs.
7
-
7/25/2019 SAP PM BOM ,and PS
46/1187
2nce 1uantities and dates have been planned in re1uirements planning these
planned procurement elements are converted to Ke"actK procurement elements) for
production this is the production order and for e"ternal procurement the purchase
order. When the order or purchase order is being processed the production order
is delivered or a goods receipt is posted to stock #plant stock or project-sales order
stock%.
The goods issue that takes place as a result of this activity reduces the stock
and posts actual costs to the KconsumingK network activity.
$tem Eategory 9 #stock item% is used for components kept in stock .
4nsuring material availability is the main function of ?=3 which includes monitoring
stocks and creating procurement proposals for purchasing and production .
=e1uirement for finished products saleable assemblies and spare parts
trigger re1uirement planning.
2rder 1uantities and dates have to be determined in order to cover the
re1uirements .
&or re1uirement planning the procurement element is the planned order and
for e"ternal procurement it is purchase re1uisition .
3lanned procurement elements are converted into e"act procurement elements
once the 1uantities and dates are planned.
$t is 3roduction order for production and purchase order for e"ternal procurement.
-
7/25/2019 SAP PM BOM ,and PS
47/118
The item category Knon!stock itemK #% is used for components that are not procured
by way of warehouse stock or project-sales order stock but are procured directly by a
network activity instead.
3urchase re1uisitions are created for these components. These re1uisitions are passed
on directly to 3urchasing. When the goods are received they are not placed into stock
but posted to the activity.
on!stock items cannot be managed as project stock or sales order stock.
on Stock $tem #% )These are the items which are procured directly by network activity and not through
warehouse stock project stock or sale order stock .
3urchase re1uisitions are created first and then passed directly to purchasing.
When the goods are received they are directly posted to activity .
on stock items cannot be managed as project stock or sale order stock .
There are two procurement types for direct procurement with item category )
7
-
7/25/2019 SAP PM BOM ,and PS
48/1187
3urchase =e1uisition for the network
Third party re1uisition for the
network
-
7/25/2019 SAP PM BOM ,and PS
49/118
Ehanges in network dates-1uantity will trigger workflow for a 32 change)
$f changes are made in the network to dates or 1uantities for material
components or e"ternal activities for which 32 has already been created .system
triggers a workflow automatically. The only prere1uisite is that this workflow has
been activated in the parameters for the network type table
The person responsible in purchasing will receive an information on the re1uired
changes.
$f only 3= is created changes in the network to dates-1uantities will update the
change in 3= automatically
7
-
7/25/2019 SAP PM BOM ,and PS
50/118
"or instance # $n this case the way in which the material can !e procureddepends on !oth item category and material attri!utes.
The material master stores the information of
the material attri!utes.-$t contains information like %
-&hether the material is purchased orinternally manufactured.
-&hether the requirements are individualor collective or !oth
-
&hether the material can !e procured inadvance.
The control data of the project definitiondetermines whether stocks can !e !uilt or not
7
-
7/25/2019 SAP PM BOM ,and PS
51/1187
The account assignment category of the salesorder determines whether sales order can !e!uilt up
' setting within the ()M can !e specified todetermine whether the components can !eprocured independently of the material mastersettings.
-
7/25/2019 SAP PM BOM ,and PS
52/118
The components can !e assigned to theactivity with the help of the procurementindicator.
The Procurement indicator contains thedefault values for determining the stock andthe procurement type.
' procurement indicator can !e specified inthe network profile. This gets defaulted in thecomponent assignment.
7
-
7/25/2019 SAP PM BOM ,and PS
53/118
The B2? transfer functionality in SA3 3S helps you to assign the material from B2? to
the network activities based on the reference point field which is assigned to the material
and network activities.
WBS B2?s can be assigned to 3roject B2?s using the B2? Transfer transaction .
The corresponding selection parameters must be chosen to perform the same.
Advantage of B2? transfer functionality is that the changes in the B2? during the course
of the project will change in the activities #you need to run B2?!transfer again every time
you make changes in B2?%.
ou can also manually assign materials to network activities without reference point fields.
7
-
7/25/2019 SAP PM BOM ,and PS
54/118
*eference point % This is the logical link !etween a ()M component and anetwork activity. $t ensures that the automatic assignment of the materialcomponent happens correctly.
&hile the assignments !y themselves are project specific, they can !e madesimultaneously for a large num!er of networks in the project.
$ndividual components, individual ()M assem!lies or a multi level ()M can!e assigned.
These assignments can happen manually without reference points as well.
3rocedure &or B2? Transfer)
"ield in the ()M and the network activity which needs to !e used asthe reference point needs to !e specified.
These fields must have the same structure in !oth the o!jects. "orinstance % +'*, eight digits .
Possi!le entries for the reference point can !e defined incustomi-ing.
*eference points in the ()M +omponents and the network activitiesmust !e defined.
The ()M PS $nterface must !e started after changing the ()M/
7
-
7/25/2019 SAP PM BOM ,and PS
55/1187
()M +omponents are assigned to activities in this process.
Purchase requisitions and reservations are created for the assignedcomponents if *eservation0Purchase *eq. indicator is activated.
-
7/25/2019 SAP PM BOM ,and PS
56/118
A material that you allocate to activities in a network can be kept in various stocks.Depending on your project you can access different types of stock for materials
planning)
Sales order stock and project stock are important for controlling purposes #for monitoring
the stock value in a sales order or project% and from an ?=3 point of view #the stocks
are reserved for the sales order item or WBS element other stock elements cannot
access them%.
The various stock types are managed for each material component using the account
assignment category. ou define the account assignment category when you assign the
material to the network activity #popup in manual assignment strategies in B2?!3S
interface and standard network%.
The possible account assignment categories depend on the assignment of the network
activity to a stock object #WBS element or sales order item% on the item category for
the assignment #direct procurement for non!stock items% on the material master which
can e"clude collective or specialist stock management.
As of =elease 7.8A you can use ?=3 elements #grouping% to manage a joint project
stock for an entire project or for several projects #this is a rougher method than managing
stock per individual WBS element%.
ou maintain the account assignment categories possible for network purchase
7
-
7/25/2019 SAP PM BOM ,and PS
57/1187
re1uisitions in customi(ing.
-
7/25/2019 SAP PM BOM ,and PS
58/118
$nstead of managing the material either in a plant stock or for each individual WBS
element and having no control at all over procurement or being fully responsible we
can go for re1uirement grouping. Through re1uirement grouping we can determine
the degree of control ourselves.
3rere1uisites for using re1uirement grouping )
Jaluated group stock
rouping WBS elements
?=3 roups that allow re1uirement grouping
Assigned components should have periodic lot si(es.
The most basic scenario involves grouping the re1uirement of all the WBS
elements in the project into one WBS element.
2r we can create projects which are only meant for grouping re1uirement of otherprojects.
7
-
7/25/2019 SAP PM BOM ,and PS
59/1187
-
7/25/2019 SAP PM BOM ,and PS
60/118
Jaluated project stock must be allowed in the project definition control data.
With the e"ception of automatic re1uirement grouping ?=3 element indicator
must be set for WBS elements.
?=3 groups involved in re1uirement grouping must be determined in customi(ing
for the WBS.
8
-
7/25/2019 SAP PM BOM ,and PS
61/1188
-
7/25/2019 SAP PM BOM ,and PS
62/1188
-
7/25/2019 SAP PM BOM ,and PS
63/118
$t is common in engineering projects for critical components with long and unreliable
delivery times to be purchased at an early stage in the project much before the
project activities in which the components will be used are specified. Advance
procurement process is used in such situations.
Advance procurement can only be used when you are using sales order or project
stock .
8
-
7/25/2019 SAP PM BOM ,and PS
64/118
Order ,ategories and order types
Documents are used to enter business transactions in the =-0 System. 2rders are
one type of business transaction. 2rders are determined by their order category.
The network is an order category. 2rder types are prescribed by the system for the
relevant applications.
ou can define your own order types within an order category. The order type
describes how the order is controlled.
Eustomi(ing includes two tables one for the order type and another for the
order type-plant combination.
The order category is used to control)
'. umber assignment
,. Default value settings
0. /ser!specific status management
7. /ser!specific field control$n the case of networks order types-plants can be header!assigned or activity!
assigned. ormally activity!assigned networks are used where costs are gathered
in each activity. 5eader!assigned networks are only significant for the assignment of
networks to sales orders #without WBS%.
Pro2ect 3 Assignment o orders
8
-
7/25/2019 SAP PM BOM ,and PS
65/1188
ou can assign various SA3 orders to a project e"amples include internal orders
production orders and plant maintenance orders. ou can then use the project
hierarchy reports to evaluate these assigned orders with the WBS element.
4ach order is a cost object with its own costing parameters such as planned costingvariant actual costing variant and overhead sheet. The planned costs of assigned
orders are used to determine the planned costs of the project.
ou assign orders to the project either by assigning a WBS element to the order
header or by assigning the order to a network and activity as a subnetwork. $f the
assignment is re1uired only for cost control and analysis you need to assign order to
the relevant WBS element. $f the assignment is re1uired both for scheduling and
cost control you need to assign the order as a subnetwork. The WBS element is
derived from the network activity. ote that production orders cannot be assigned as
subnetworks.
Documents are used to enter business transactions in the =-0
System. 2rders are one type of business transaction.
2rders are determined by their order category.
The network is an order category. 2rder types are prescribed by the system for the
relevant applications.
ou can define your own order types within an order category. The order type
describes how the order is controlled.
Eustomi(ing includes two tables one for the order type and another for the
order type-plant combination.
The order type is used to control)
umber assignment
Default value settings
/ser!specific status management /ser!
specific field control
3lant and order type parameters are used to control)
$f the network is activity! or header!assigned
3lanned and actual costing variants
The settlement rule strategy
-
7/25/2019 SAP PM BOM ,and PS
66/118
ou can use the KappendedK indicator to specify per order category whether an
order is appended ! that is whether the planned values for the order are included
in the planned value of the corresponding WBS element)
'. $f the KappendedK indicator is set the order planned value increases the
WBS element planned value. The information system shows the total
as the project plan. When cost planning is taken over as the budget
the values from appended orders also contribute to the budget.
,. $f the KappendedK indicator is not set the order planned value is not
added to the WBS planned value. $n budgeting the plan total for such
orders must be added manually so that these orders can use funds
later.
8
-
7/25/2019 SAP PM BOM ,and PS
67/118
ou can use the KappendedK indicator to specify per order category whether an
order is appended ! that is whether the planned values for the order are included
in the planned value of the corresponding WBS element)
2nce released all orders are apportioned ! this means that their plan commitment
and actual values are funds assignments against the funds in the project. The
order value table contains an indicator which you can use to make orders
KapportionedK earlier at the KcreatedK stage.
ou can set appended and apportioned indicator based on the order categoryorder
type and controlling area
An e"ception to apportionment at release is in the case of networks for preliminary
planning.$n 3roject System customi(ingyou can specify network types to be used
for preliminary planning.3reliminary planning networks are never apportioned.Their
related plan values do no increase the assigned value for the relevant WBSelement
$n the case of networks #order category ,>% you can use the network type
parameters to determine whether the network is)
5eader!assigned or activity!assigned ! that is whether costs are managed in
the network activities or collected in the header
8
-
7/25/2019 SAP PM BOM ,and PS
68/1188
A preliminary planning network whose plan commitment and actual values
are not apportioned ! meaning that they do not appear as assigned values
in the project.
-
7/25/2019 SAP PM BOM ,and PS
69/118
4eader%Assigned Networks
$n a 5eader!assigned networks all the costs #activity and material% are assigned at
network header level
After assignment of network header to a WBS element All costs are transferred to
WBS element. Assignment of activities to WBS elements is only to summari(e thedates
We you have to use header!assigned networks to assign networks to sales order in
case sales order are not assigned to projects as no assignments can be made to a
sales order item in the network activity.
Activity%Assigned Networks
Eosts are collected on activities in case activites are used as account assigned
objects.3lant-network type parameters deines the condition if the network header
or network activities are to be used as cost objects.
Activity! assigned networks are usually used when activities are assigned to various
WBS elements.5ere every activity in the network is an account assignment object.
Which implies we can analy(e planned costs commitments and actual costs
for each activity.
The costs are aggregated and displayed for the WBS elements to which
the activities are assigned.
8
-
7/25/2019 SAP PM BOM ,and PS
70/1188
Activity account assignment is a special feature of networks. All other order types are
header!assigned. Activity account assignment is controlled via the appropriate
indicator in the table K3arameters for network typeK.
5eader assigned networks should be used when networks are assigned to salesorders without WBS.5eader assigned networks can also be used when the
enitre network is assigned to a single WBS element
-
7/25/2019 SAP PM BOM ,and PS
71/118
SD document item assignment is controlled via the account assignment category.
The account assignment category is controlled via SD re1uirements type
determination.
$mportant factors that affect account assignment are the strategy group the ?=3
type and item category group from the material master of the product as well as
the document type of the SD document.
The system defaults the item category when you create an order. ou can accept
the default or overwrite it. 3ermitted item categories are defined in Eustomi(ing.
The permitted planning strategies are assigned to the material using the planning
strategy group. This is necessary so that you can find the correct re1uirements type
in independent re1uirements management and sales order management.
The default re1uirements type is the main strategy in the planning strategy group.
$f no planning strategy group is defined in the material master the system uses the
item category group #sales and distribution screen in the material master% and if
necessary the ?=3 characteristic to search for the re1uirements type for the salesorder.
8
-
7/25/2019 SAP PM BOM ,and PS
72/118
The account assignment category determines the E2 object to which document
1uantities and values are assigned. ou use it to determine the following)
/sing the special stock indicator #SS$ above% that goods movements in 9ogistics use
plant stock sales order stock or project stock.
/sing the consumption posting indicator #Eons. above% the E2 object to which the
values of a material document are assigned.
Settings)
& F Eollective stock consumption posting to the consumer #order activity%
The account assignment category is important for procuring components directly.
4 F Luantities and values managed in the sales order item
This account assignment category is important for make!to!order production without
WBS.
D F Luantities managed using sales order item values managed in projects
This account assignment category is important for non!valuated project
stock with WBS and sales order item
L F Luantities and values managed in projects
This account assignment category is important for project stock
8
-
7/25/2019 SAP PM BOM ,and PS
73/1188
F 3lant stock values managed using project
This account assignment category is important for sales order items sold
from plant stock with
value posting to the project. $t differs from account assignment category K&K in
the field control
of the account assignment block.
-
7/25/2019 SAP PM BOM ,and PS
74/118
Activity!Based Eosting offers a facility for allocating and distributing the overhead to its cause.
Activity!Based Eosting provides useful information on)
2verheads reduction by process improvement
3rofitability increase by highlighting unprofitable products or customers
Activity!Based Eosting is advantageous for having)
M Transparent overheadsM 3arallel 1uantity and value flows
M 3recise assignment of internal activities to consumer
*3eanut butter effectK can be avoided through even distribution of overheads among all
the cost drivers.
:
-
7/25/2019 SAP PM BOM ,and PS
75/118:
$n Activity!Based Eosting processes are the controlling objects. 3rices can be either
maintained manually or using activity and cost input planning in the case of cost
centers and activity types. Through activity based costing processes are debited to
cost objects or profitability segments.
-
7/25/2019 SAP PM BOM ,and PS
76/118
Templates are created in NEustomi(ingO and determined by controlling area costing sheetoverhead key and template environment #for networks @ >>7 for WBS @ >>8% for the
function. $n the 3roject System templates can be assigned to WBS elements networks
#header assigned% or network activities. 3rocess costs are allocated to cost objects or
profitability segments by assigning a process template. 3rocess costs are calculated based
on the templates selected for the project.
After template selection the calculation program
determines the following
3rocesses in the template relevant for the
project
M Luantity of each process consumed by
the:
-
7/25/2019 SAP PM BOM ,and PS
77/118:
project
Ealculated value to be added to the
project at the start end or continuously
The price for the process and the allocation cost element are determined by
entering one process per line in the process template. ?ulti!level processes can be
mapped by referencing another process template in the working template.
The 1uantity used by the cost object is determined using the cost driver. This enables
the allocation of the relevant values to all the levels in the process hierarchy as far
as cost objects or profitability segments.
Eost drivers can originate from many different sources in the =-0 System or e"ternal
systems. 4"amples ) weight #material master% number of components activities of a
particular category work center #network% number of sales orders for market
segment #9$S% etc. The 1uantities determined by the cost driver are multiplied by the
price of the process. The resulting value is charged to the cost object #in the
e"ample the WBS or network-activity% and the process is credited.
-
7/25/2019 SAP PM BOM ,and PS
78/118
Actual prices for activity types and business processes are calculated in 2verhead
cost controlling at the end of the period.
Actual prices F Actual costs - Luantities consumed
The possibility of revaluation at actual prices and its specification for each
activity type are controlled in Eustomi(ing in the parameters for the actual
version depending on the fiscal year.
The difference between the actual price and the originally allocated price is
charged to the cost objects.
=evaluation at actual prices for activities and business processes can be done
in the 3roject System and in the Eost 2bject Eontrolling.
=evaluation at actual prices using an activity type is illustrated in the e"ample given
in the slide
:
-
7/25/2019 SAP PM BOM ,and PS
79/118
2verheads calculation is used to allocate overhead costs to cost objects such as activities
and WBS elements. Ealculations are done based on the Eosting sheet entered in
the cost object and the overhead key entered on the WBS elementnetwork header or network activity. 2verheads can be calculated for
planned commitment and actual values. 2verhead calculations are
done using the 1uantity based or percentage allocation rates.
The following postings get generated through overheads allocation)
Debits to cost object #WBS element etwork header oretwork activity %
Eredits to cost center # overhead order or process %
:
-
7/25/2019 SAP PM BOM ,and PS
80/118:
2verhead costs are updated using the secondary cost elements
in the costing sheet credit rows and these can be simulated also.
-
7/25/2019 SAP PM BOM ,and PS
81/118
Eosting sheet is derived by means of the costing variant from the K3arameters for
etwork TypeK table in the case of networks. The costing sheet and the overhead key
can be changed in the network header.
The costing sheets to be used in the activities are made a default through this.
&or WBS elements the costing sheet is derived directly from the project profile. $n
the case of 4asy Eost 3lanning and the unit costing for WBS elements the cost
planning draws on a costing sheet for a costing variant which is assigned to the
project profile through the planning profile.
2verhead keys for activities are inherited from their respective WBS elements.
:
-
7/25/2019 SAP PM BOM ,and PS
82/118
2verheads are calculated using a costing sheet.
The overhead surcharge can either be a percentage if it is value driven or an absolute value
of measure if it is 1uantity driven. The overhead is calculated against a base which is defined
by the cost elements. Eost elements or cost element areas are collected in base lines.
&actors such as Eontrolling area company code plant overhead group network type time
period and plan versus actual determine the overhead rate applied. 2verhead key assigned
to the cost object decides the determination of overhead group in customi(ing. Thus a single
costing sheet with fle"ible rates can be made use of different organi(ational units or
individual activities.
:
-
7/25/2019 SAP PM BOM ,and PS
83/118
As of =elease 7.:E the SA3 System offers an easy!to!use tool for planning costs in
WBS elements. The tool is called K4asy Eost 3lanningK.
4asy Eost 3lanning for projects can be accessed from the 3roject Builder. ou can choose
a WBS element from the structure tree and then you create costing items for the selected
WBS element.
$n 4asy Eost 3lanning cost planning is cost element based.
ou can use planning templates to enter costing items in which characteristics are valued.
The e"ample above shows work in hours being valued at '>>.
The characteristic values which are linked from the planning template are 1uantities
values or actions from the costing items. $n the e"ample above the link is to the1uantity for an internal activity.
When you accept them the costing items appear in the structure tree beneath the
relevant WBS element.
As an easy way to create a project preliminary costing 4asy Eost 3lanning can be very
useful.
The costs so planned are then broken down ! for e"ample using a 1uantity structure of
:
-
7/25/2019 SAP PM BOM ,and PS
84/118:
networks-activities.
4asy Eost 3lanning can also be used to enter plan data for later project e"ecution.
5aving done this you can later use 4"ecution Services to enter commitment and
actual data relating to the planned costs. /se customi(ing to stipulate in which
plan version values planned in 4asy Eost 3lanning are stored.
As part of the network costing the system automatically determines planned
costs when you plan dates and resources for the following objects)
a. &or internally processed activities) activity inputs
b. &or e"ternally processed activities G service activities) 3rimary costs
c. &or genreal costs activities) primary costs
d. ?aterial componenets) primeary costs.
ou can use planning templates to create 1uantity structures for 4asy Eost
3lanning.ou can enter 1uantities and prices in the template or regulate activation using
formulas or conditions.
ou can use characteristics assigned to the planning template as variables for the
formulas-conditions. The characteristics are valued by the user when the
planning templates are copied into 4asy Eost 3lanning.
-
7/25/2019 SAP PM BOM ,and PS
85/118
/nit costing is done to calculate cost plan per WBS element. 5ere we use
planned 1uantities instead of cost.
$t is not period dependent
At cost element level plan values are displayed
$nput information related to sources of supply 1uantities and prices mark the useof unit costing to generate cost plan per WBS element
:
-
7/25/2019 SAP PM BOM ,and PS
86/118
Structure Oriented Planning:
Simplest type of planning is structure based planning. 3lan values are displayed
in hierarchy
The total cost planned is aggregate
$t is neither by cost element nor is period specific
Jarious views are used to display the different values in structure!oriented
planning
3lanned total Jiew!this shows total aggregate at superior WBS element #9evel
' WBS element%
The distributable or distributed view!This view is used to check distribution of
budget among child WBS element
Eumulative or remainder view!This view is used to check distribution of budget
across years
2rder-network view!This displays the planned cost od appended orders-networksassigned to WBS element
Cost Element Planning/Activity Input Planning:
When more detailed information is re1uired cost element planning is done. $t
is independent of project scheduling
?anual reschedule of cost planning becomes mandatory if a project or
individual
:
-
7/25/2019 SAP PM BOM ,and PS
87/118:
package schedule is changed
This planning is adopted if precise information is available as it becomes sure not
to reschedule-postpone the project
-
7/25/2019 SAP PM BOM ,and PS
88/118
The plan profile is used to control overall cost-revenue planning. $t contains costing variants
for the unit costing or 4asy Eost 3lanning.
$t also contains indicators for updating revenue plan values via customer 1uotations or sales
orders.
ou assign the plan profile to the project by way of the project profile. ou can change it in the
project definition.
Eosts and revenues can be planned in different E2 plan versions.
ou either specify the plan version during planning or if you are using 4asy Eost 3lanning
you assign it to the controlling area.
3lanning layouts are used to plan costs revenues payments and statistical key figures.
ou can use the =eport 3ainter to create the layouts and can assign them to planner profiles.
/sers can choose planner profiles and assign them to the user master record.
3lanning profile) /se transaction 23SB
The 3lanning profile contains the settings related to planning. $t control overall
cost-revenue planning. 3lanning profile is assigned to project using project profile. Eosting
variant are
:
-
7/25/2019 SAP PM BOM ,and PS
89/118:
relevant if we are using unit costing and easy cost planning
E2 plan version is re1uired to be specified if we are using easy cost planning.
3lanner profile and planning layouts are specific to use of detailing planning
using *cost element-activity input+
-
7/25/2019 SAP PM BOM ,and PS
90/118
3lanning profile is contains the settings for overall planning detailed planning
and unit costing
Details for each field can be checked using
&' $mportant field details are as)
Total Jalue) Defines overall planning without any reference to fiscal year
Annual 3lanning) Defines overall planning with reference to fiscal year
Bottom up 3lanning) 2verall planning values are e"trapolated after saving
4"change rate type) Determines which e"change rate is to be used for currency
conversion of overall values
;
-
7/25/2019 SAP PM BOM ,and PS
91/118
Transaction 2PPT to edit costing and valuation variant
Eosting variant is mostly used for unit costing easy cost planning and also used for
costing networks. The field costing type determines for which WBS element
#costing object% costing is done
Jaluation variant determines the prices and rates. $n the above mentioned slidesystem will first check for *3lanned price '+ if it fails system will check for *standard
price+ and again if it fails it will check for *moving average price+ from material
master. $f system now fails it will trigger an error message during cost determination
;
-
7/25/2019 SAP PM BOM ,and PS
92/118
+nternally%processed activities:
$f no distribution key or work center is maintained in the activity the costs are distributed
evenly over the earliest dates in the activity. Jaluation is at the rate in the valuation variant.
Depending on the strategy being used the system can determine the most current date.
valuation is determined by the rate maintained in the valuation variant. Based on the
strategy adopted system determines the latest date. $f no work center-distribution key is
maintained the system distributes the cost evenly over the earliest dates.
,osts activity:
Ease ')$nvoice plan maintained)the values in periods are as per the values mentioned
in invoicing plan
Ease ,)$nvoicing plan not maintained and distribution key maintained)The activity value
is
;
-
7/25/2019 SAP PM BOM ,and PS
93/118;
distributed to the periods based on the distribution key maintained in the activity
Ease 0)$nvoicing plan not maintained and distribution key not maintained)The
costs are distributed evenly over the earliest dates in the activity
$f an invoicing plan has been maintained the values in the periods are set
as specified in the invoicing plan.
2therwise the activity value is distributed to the periods using the distribution key in
the activity. $f no distribution key is maintained in the activity the costs are distributed
evenly over the earliest dates in the activity.
Service activities or e$ternally%processed activities:
Ease ')$nvoice plan maintained)the values in periods are as per the
values mentioned in invoicing plan
Ease ,)$nvoicing plan not maintained)The activity value is set in the period of the
latest activity start date.Also the system determines the price from the purchasing info
record or the activity value.
$nvoicing plan has priority for the values
$f an invoicing plan has been maintained the values in the periods are set
as specified in the invoicing plan.
2therwise the activity value is set in the period of the latest activity start
date.
The invoicing plan has priority for the values. $f no invoicing plan has been
maintained the system determines the price from the purchasing info record or
the activity value.
"aterial components:
Ease ')$nvoice plan maintained)the periods and in some casesvalues are
taken from invoicing plan
Ease ,)$nvoicing plan not maintained)The system determines the price from the
purchasing info record or the price is taken from material master as per
valuation variant.5ere material re1uirement date determines the period
$f an invoicing plan has been maintained the periods and in some cases the
values are taken from the invoicing plan. $f no invoicing plan has been maintained
the values are taken from the purchasing info record or the price is taken from the
-
7/25/2019 SAP PM BOM ,and PS
94/118;
material master per the valuation variant. $n this case the period is that from
the material re1uirements date.
-
7/25/2019 SAP PM BOM ,and PS
95/118
The customer accepts the 1uotation. A sales order is created in the system where
appropriate using the 1uotation as a template. The activities listed in the 1uotation
are entered in the sales order as sales order items.
The items are assigned to the project. They are used for revenue planning and for
posting revenues to the project by means of milestone billing.
Two companies are responsible for e"ecuting the project ! $D4S A and $D4S /P.
$D4S /P creates a sales order for $D4S A and assigns the document item to the
billing element T!'>>QQ.'.,.
9ater on $D4S /P bills its services to $D4S A on a resource!related basis.
A billing re1uest is created in the system via resource!related billing. This is billed and
results in revenues for $D4S /P.
;
-
7/25/2019 SAP PM BOM ,and PS
96/118
$n SA3 where project is a controlling object)
Sales order created and after structuring of project sales order will account assigned toWBS. Then revenue planned in sales order.
2nce Work completed in project actual cost captured in WBS and &inal product will
be delivered to Elient.
Billing will be completed and actual revenue generated. Actual =evenue will
be transferred to WBS.
While =esult analysis performed for project the Actual =evenue and Eost will settled
to the profitability segment.
Sale document structureM Sales Document type represents the type of business transaction and functions and
the flow of document with in sale order. 3rocessing.
M $tem Eategories are assigned to sales document category. While creation of Sales order
it will default the item category but user can change it as per re1uirement.
M Schedule line category is assigned to $tem Eategory. While creation of document
system will default the scheduled line category but it can changed according to
re1uirement.
;
-
7/25/2019 SAP PM BOM ,and PS
97/118;
+tem ,ategory
M Item Category is determine by Sales Document type and thematerials Items category group in a sales order.
M Item Category controls function for Sales Order like Item Type,Pricing, illing Plan, resource related or deli!ery related.
M It controls if pricing is rele!ance for billing, rele!ance for Deli!erySchedule "ine Item, and contains Incompletion "og and Partner te#t.
-
7/25/2019 SAP PM BOM ,and PS
98/118
#'%=epresents a process of make!to!order production without a work breakdown structure.
$n this case the sales order item is the contolling instrument. Account assignment category
4 specifies that the sales order item forms a separate E2 object.
Eosts and revenues of the sales order item are usually settled to the profitability segment.
#,%/sing assembly processing you can generate a network when you create the sales order.
When you save your data the system creates a WBS and assigns the sales order item to a
WBS element in this WBS. $n this case the sales order depicts the sales view the project is
the controlling instrument and logistical processing is represented by the network.
Account assignment categories D or L #Eons. F 3 in each case% specify that revenues
are assigned to the billing WBS element of the project.#0%As an alternative to assembly processing you can assign a sales order item to a WBS
element in a project. Eontrolling takes place in the project. ou can assign orders or
documents to the project. Jalue assignment to the project is controlled via account
assignment categories D and L. These differ from each other in the way that they
manage 1uantities.
;
-
7/25/2019 SAP PM BOM ,and PS
99/118
?ethods for plan revenue in a project are)
a. ?anual revenue planning) this can be based on structure or revenue element
where the later is a cost element and period based.
b. 3S billing plan) this is cost element and period based planning.
c. SD document) this is part of integration with SD module where sales order itemor 1uotation items are used as revenue planning. This kind of planning is cost
element and period based.
;
-
7/25/2019 SAP PM BOM ,and PS
100/118
=evenues can be planned in projects using the following methods)
?anual planning in billing elements in the project structure.
This type of planning can follow the same procedure as cost planning or can be by
revenue element.
Sales orders #all SD documents assigned%.
Sales order items are assigned to WBS elements. $n Eustomi(ing you can stipulate for a
combination of sales document category #1uotation order and so on% sales
document type controlling area and system status whether the billing data #for
e"ample in a billing plan% from a sales order should update the revenue plan for an
assigned WBS element. The dates and planned revenues concerned originate eitherfrom the billing plan for the sales order items or #if there is no billing plan% from the
net value and apportionment data for the item. The revenue element originates from
-9 account determination in SD.
Billing plan in project billing elements.
The revenue element is defined in Eustomi(ing.
;
-
7/25/2019 SAP PM BOM ,and PS
101/118
There are different ways of creating billing plans)
?anually
By copying a reference billing plan
$n SD and 3S reference billing plans can be
called upon automatically
By copying billing milestones from work
breakdown structures or networks
By copying billing milestones automatically from
the network in assembly processing
;
-
7/25/2019 SAP PM BOM ,and PS
102/118
$n the SD document you can define a detailed billing plan with a number of billing dates
instead of just a single billing date. A billing plan is a schedule containing individual billing
data for a particular sales document.
?ilestone billing is widely used in projects #for e"ample construction projects%.
$f you use milestone billing the total value to be billed is apportioned to the individual dates
in the billing plan per defined rules.
Billing plan dates can be blocked for billing
ou can set billing blocks manually or remove them by activating billing milestones.
As of =elease 7.> billing plans can also be entered for billing elements in projects. Such
billing plans can if re1uired be copied to the sales order later #make sure you delete
any e"isting billing plan in the billing element if you do not the planned revenues will be
determined via the 3S billing plan and not the SD billing plan%.
A billing plan can contain down payment dates. These dates affect payment but not
revenue.
;
-
7/25/2019 SAP PM BOM ,and PS
103/118
-
7/25/2019 SAP PM BOM ,and PS
104/118
The term KVersion" is used in the project system in different conte"ts. Different
types of versions include simulation versions project versions and E2 planning
versions are available in SA3 3roject System which are discussed below.
3roject versions are snapshots of a project at a specific point in time and are
used for documenting the progress of a project over time. Both 1uantities and
values are stored in versions and it can be created either manually or
automatically when a status changes. $n the case of status change the project
profile contains a reference to a version profile which specifies the name of
the project version to be created when a particular user or system status is
set.
Simulation versions) $n the 3roject System these are versions that you can
change. ou might for e"ample create simulation versions in the following
situations)
$n the 1uotation phase) generally speaking at this stage there is not yet
an operative project.
To draw up alternative planning scenarios for e"isting operative projects
or parts of these.
E2 plan versions are used to plan revenues and costs. ou can copy values
from one version to another. ou can change planned values manually in every
version and cost values are retained.
-
7/25/2019 SAP PM BOM ,and PS
105/118
Simulation versions are used to draw up alternative Kwhat ifRK planning
scenarios. They are created manually can be changed and if necessary
deleted again which is unlike released operative WBSs with activities.
Simulation versions are useful during the 1uotation phase of a project
and possible to plan several simulation versions.
ou can create simulation versions even at the time of e"ecution of project
where you can copy from operative to simulation versions compare analy(e
and work with other versions and transfer them back to the operative
project.
When an operative project is copied to a simulation version or vice versa a
log file is created which contains the objects that were transferred and any
error messages that were issued in the process.
Simulation versions can be created either for an entire WBS or for
sub! hierarchies of a WBS.
Simulation versions are edited in the project planning board or in projectplanning board from SA3 =-0 7.:E release.
The system performs the test run while transfer to check if the operative
or simulation version can be transferred.
?ultiple Simulation version can be created compared and evaluated.
-
7/25/2019 SAP PM BOM ,and PS
106/118
Simulation customi(ation consists of two steps)
'. Jersion keys) one should work with permissible version keys since these cannot
be deleted once simulations has been created.
,. Simulation profile) This determines which all objects will be copied while creating
simulations #in addition to the structure information% from simulation tooperative #and vice versa%. $f there are no simulation profile all the te"ts will be
copied. The simulation profile will be defaulted in the project due to assignment
in project profile.
ust like project version simulation versions can be compared with each other in
information system whereas the cost element report does not support the
simulation versions. /nlike operative projects simulation versions cannot be
changed in structure info system.
-
7/25/2019 SAP PM BOM ,and PS
107/118
When you transfer data from operative projects to simulation versions #or
vice versa% the following objects are copied)
Work breakdown structure
etwork with activities activity elements relationships and
subnetworks ?ilestones
?aterials for the activity
Documents 3S te"ts and long te"ts #depending on the simulation profile
used%
Eapacity re1uirements
$nvoicing plan for the network and billing plan for the WBS element
#as of =elease 7.8A%
The following objects are not copied)
2ther orders #e.g. no production orders%
3roduction resources-tools
-
7/25/2019 SAP PM BOM ,and PS
108/118
3roject versions enable you to record a snapshot of a project at a specific
moment in time ! this can be used for future comparison with the
operative project.
ou can create a project version automatically #i.e. triggered by a system or user
status%.
ou can also create a project version manually)
While changing the WBS
While changing the network
$n the Structure-Dates information system for one or more projects
Data transfer when Jersion profile settings are used while using these transactions)
'. Status dependent project versions.
,. TE network maintenance E,, or WBS element maintenance E>,
Data transfer which is $ndependent of version profile and dependent on
database profile)
0. TE E;' and E;,
7. Structure information system
-