Saqib Shahzad Site Supervisor (Mechanical) PERSONAL SUMMARY A competent Site Supervisor (Mechanical) with excellent communication, organization and co-ordination skills. Possessing a proven track record of preparing and executing project plans and programs, ensuring that work is carried out in accordance with the companies procedures and clients satisfaction. Able to ensure timely, safe and cost effective design and implementation during the life cycle of projects from conception till customer satisfaction. WORK EXPERIENCE Employer Attock Refiner Limited Designation Site Supervisor (Mechanical) Location Morgah, Rawalpindi, Pakistan Period September 2014 till to-date Employed DESCON Engineering (Pvt.) Limited Designation Site Supervisor (Mechanical) Location Lahore Manufacturing Works Period January 2008 till August 2014 Duties: Ensuring that all engineering work is carried out in accordance with specifications, statutory requirements, laws, rules, regulations and other contractual requirements with due regards to safety, operability and maintainability Managing the projects from conception, pre-production through to completion. Providing technical support to the project team and wider regional teams. Responsible for: Overseeing the review, initiation and execution of contracts. Managing project budgets and keeping costs down. Producing Test Plans and reports Evaluating tenders and providing recommendations. Carrying out effective client liaison for all projects undertaken.

Upload: saqib-shahzad

Post on 07-Aug-2015

16 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Saqib Shahzad Site Supervisor CV

Saqib Shahzad

Site Supervisor (Mechanical)

PERSONAL SUMMARY A competent Site Supervisor (Mechanical) with excellent

communication, organization and co-ordination skills.

Possessing a proven track record of preparing and

executing project plans and programs, ensuring that work is

carried out in accordance with the companies procedures

and clients satisfaction. Able to ensure timely, safe and cost

effective design and implementation during the life cycle of

projects from conception till customer satisfaction.

WORK EXPERIENCE Employer Attock Refiner Limited Designation Site Supervisor (Mechanical) Location Morgah, Rawalpindi, Pakistan Period September 2014 till to-date Employed DESCON Engineering (Pvt.) Limited Designation Site Supervisor (Mechanical) Location Lahore Manufacturing Works Period January 2008 till August 2014 Duties: Ensuring that all engineering work is carried out in

accordance with specifications, statutory requirements,

laws, rules, regulations and other contractual requirements

with due regards to safety, operability and maintainability Managing the projects from conception, pre-production

through to completion. Providing technical support to the

project team and wider regional teams. Responsible for:

Overseeing the review, initiation and execution of contracts.

Managing project budgets and keeping costs down. Producing Test Plans and reports Evaluating tenders and providing recommendations. Carrying out effective client liaison for all projects

undertaken.

Page 2: Saqib Shahzad Site Supervisor CV

Liaising with customers on a regular basis to ensure the successful design and manufacture of products to agreed budgets and time frames.

To monitor, review and, where required, approve the mechanical construction activities of the EPC Contractors to ensure that all mechanical construction activities are carried out safely and fully in accordance with Company's HSE and technical requirements.

Ensuring that the work is carried out on schedule, within budget and to the specified quality requirements.

To carry out regular HSE audits and inspections, both ad-hoc and formal, of the contractors facilities and operations and to ensure that HSE standards are maintained at the highest levels.

Prepare audit and inspection reports and ensure that action items are promptly followed up by the contractors. Issue Unsafe Act Reports as and when required and ensure that these are promptly followed up and closed out by the contractors. Ensure that appropriate safety procedures are implemented during the execution of the work, which will include the review of method statements as well as witnessing at site.

Participate in toolbox talks relating to mechanical construction activities carried out by the contractors.

Ensure that the contractors adhere to the Contract specifications and that any deviations are reviewed and approved by appropriate authority

Liaise with the project Mechanical Engineer on technical issues as and when required.

Ensure that all materials used by the contractors are in accordance with the specifications.

Monitor Mechanical activities and ensure adequate Contractor resources to ensure optimum progress of the work in the mechanical discipline.

Work closely with the Quality Assurance Engineer to ensure the implementation of the Project QA/QC Plan.

Implement the Company Quality Assurance Plans through the checking, witnessing and recording of the quality activities as described within the Plans.

Witness all critical quality activities including hydro testing.

Liaise with the other discipline Construction Supervisors on a continuous basis to ensure smooth execution of the construction activities.

Ensure that all construction and pre commissioning activities are suitably documented to provide a smooth handover to the Site Commissioning Team.

Page 3: Saqib Shahzad Site Supervisor CV

Liaise closely with the Site Commissioning Team to ensure that any mechanical rectification required during the pre-commissioning and commissioning phases is promptly attended to.

Monitor as-built drawing preparation by the contractors to ensure that these are accurate and produced on time.

Report progress on the activities, versus the contractor's program, and advice of any potential slippages to the Head of Construction.

Review and comment on the contractors planning related to mechanical activities.

Liaise closely with Operations personnel, on a day-to-day basis, to ensure that they are kept fully informed of the contractor’s activities and that appropriate Operations input is obtained during the implementation of the work.

KEY SKILLS AND COMPETENCIES

Working knowledge of ASME Sec VIII Div I, ASME Sec

V, ASME Sec IX, Process Piping B31.3, 31.8, TEMA and

different API and ASTM standards and

recommended practices. Proficient at developing and organization of job

execution plans, quality plans, supervising field / site

supervisors, directing assigned personnel in meeting

cost and schedule, trouble shooting, resource

management Adept at conflict-resolution and planning and

managing projects from inception through

commissioning. Experienced in supervising all levels of technicians

and engineers Well versed with manpower loading and contracting

Extensive experience of planning, project

management, and design & client liaison. Experience of interpreting specifications and

preparing technical proposals. Ability to multi-task in a demanding engineering

environment. A strong track record in delivering projects on time

and within budget. Able to ensure that all H&S procedures are met and

maintained. Resolving complex technical issues and coming up

with fast efficient solutions. Ability to assess the financial feasibility and impact of

proposed budget items and also alternatives.

Page 4: Saqib Shahzad Site Supervisor CV

Current Project:

Working as Site Supervisor in planning and development department of Attock Refinery Limited on ARL UPGRADATION PROJECT. The project worth 251 million US$ and has been awarded as an EPCC project to M/S Hyundai Engineering Co. Ltd . The project comprises of following units: DHDS, SRU, HYDROGEN, AMIN, SOUR WATER RECOVERY and ISOMERIZATION unit.

S.No Project Description

1. Pre-flash Unit

To cater for the additional crude oil availability in its region, ARL is in the process of installing a state-of-the-art Pre-flash Unit of 10,400 barrels per day at one of its existing distillation unit to enhance the crude refining capacity.

2. Isomerization Unit

The Company is also installing an Isomerization Unit of 7,000 barrels per day to produce environmental friendly gasoline and enhance its production by 20,000 tons per month.

3. Diesel Hydrodesulphurization (DHDS) Unit

The Company is also installing DHDS Unit of 12,500 barrels per day to reduce sulphur contents to 500 ppm in High Speed Diesel to meet Euro-II specifications.

4. Expansion of Captive Power Plant

To cater the energy requirements of the Up-gradation Project, the existing captive power plant is being expanded by 18 Mega Watt (MW).

Jobs Performed: 65 TPH (11 BAR(G) – Water Tube

Boiler Manufacturing Year: 2008 Project # : 6145 Client: Oil & Gas Development Corporation (Pakistan) Scope of Work: Materials Estimation, Fabrication and Erection 05 TPH (17 BAR(G) – Fire Tube

Boiler Manufacturing Year: 2008 Project # : 6149 Client : OXYCHEM (Pvt.) Limited, Lahore (Pakistan) Scope of Work: Materials Estimation, Fabrication and Erection 120 TPH (96 BAR(G) – Heat Recovery Steam

Boiler Manufacturing Year: 2009 Project # : 6159 Client: 225MW HALMORE CCPP BHIKKI (Pakistan) Scope of Work: Materials Estimation, Fabrication and Erection 70 TPH (600 PSI(G) - Water Tube

Boiler Manufacturing Year: 2009 Project # : 6160 (Rework - 6117) Client: National Refinery Limited. Scope of Work: Fabrication & installation of Rework.

Page 5: Saqib Shahzad Site Supervisor CV

05 TPH (12 BAR(G) – Heat Recovery Steam

Boiler Manufacturing Year: 2010 Project # : 6159 (Additional work in 6159) Client: 225MW HALMORE CCPP BHIKKI Scope of Work: Fabrication & installation of additional work. 70 TPH (18 BAR(G) - Water Tube Boiler (Rework - 6126)

Manufacturing Year: 2010 Project # : 6168 (Rework - 6126) Client: Vimpex Deir Ez Zor,Syria. Scope of Work: Fabrication & Installation of Rework. 16 TPH (18 BAR(G) - Fire Tube Boiler

Manufacturing Year: 2012 Project # : DM.12226 Client: NESTLE PAKISTAN (PVT.) LIMITED Scope of Work: Materials Estimation, Fabrication and Erection 140 TPH (66 BAR(G) – Beggas Fire Water Tube

Boiler Manufacturing Year: 2013 Project # : DM.12227 Client: UNITED SUGAR MILLS (JDW) (PAKISTAN) Scope of Work: Materials Estimation, Fabrication and Erection

3 x 26TPH (18 BAR(G) – Water Tube

Boilers Manufacturing Year: 2013 ~ 2014 Project # : DM.13801 Client: Hyundai Engineering Company End User: ATTOCK REFINERY LIMITED (ARL) Scope of Work: Materials Estimation, Fabrication and Erection DEPLOYMENT IN SYRIA Employer Vimpex Paper Mills, Syria Designation Site Supervisor (Mechanical) Project Installation of Wrapping Machine, Agitators,

(New PLC, MCC & Pneumatic Control Panels), Termination of Power & Control Cables of Paper Mill 1 & 2)

Period 20th October 2011 to 20th June 2012 Employer Vimpex Paper Mills, Syria Designation Site Supervisor (Mechanical) Project Rehabilitation of 30 TPH Water Tube Boiler Period 1st July to 31st December 2010

Page 6: Saqib Shahzad Site Supervisor CV

PERSONAL HISTORY

Name : Saqib Shahzad

Father’s Name : Ali Asghar Tariq

Date of Birth : 02-06-1986

Religion : Islam

Permanent Address : Babar House,

Street # 4, Shahnawaz Colony,

Rahim Yar Khan, Pakistan.

Contact # : 0092-333-7476009

E-Mail

:

0092-334-0043998 0092-51-5487041 Ext 2709

[email protected] [email protected]

Computer Literacy : - Full Command over MS Office,

- AutoCAD for designing

- Primavera P-3, P-6 for scheduling

Qualifications: - SAP for Budgeting, Indenting & Purchasing

Qualification

Institute

Year Total Marks

%age

Marks Obtained

MATRIC Govt. Colony Secondary School,

2001

850

508 60%

Rahim Yar Khan.

Draftsman Govt. Technical Training Institute, 2003

-

Practical: 69%

(Mechanical) Rahim Yar Khan.

Theoretical: 48%

D.A.E. Govt. Institute of Technology,2007

3350

2399 72%

(Mechanical) Rahim Yar Khan.

B. Tech (Pass) Preston University of Lahore 2011 4 GPA 2.3 GPA 72%

Boiler Boiler Board Govt. of Punjab

Engineer (3rd Lahore 2012 Pass

Class)