saraf phase-i control system rebuildthe saraf phase-i control system needs to be delivered from...
TRANSCRIPT
![Page 1: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/1.jpg)
13 October 2011
1
SARAF Phase-I Control System Rebuild
E. ReinfeldI. Gertz, I. Eliyahu
ICALEPCS 2011
![Page 2: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/2.jpg)
2
Outline
ICALEPCS 2011
Overview of SARAF control system Problem definition Solution definition Implementation
![Page 3: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/3.jpg)
3
Introduction
SARAF Phase-I consists of a 4MeV high current RF superconducting LINAC of protons and deuterons Commissioned to ACCEL the facility was planned to be delivered as a turnkey project The commissioning process and the control system were not completed Phase II (upgrade up to 40MeV) is planned to be completed untill 2017
2006-2009:Commissioning of SARAF accelerator
2010:Delivery to SARAF team
2010:First two beam lines are completed
2018:Facility is working in full capacity.Phase 2 done
ICALEPCS 2011
![Page 4: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/4.jpg)
4
System overview
ICALEPCS 2011
Accelerator part mounted by ACCELin 2006-2010
Beam lines0 and 1, completedBy the SARAF Teamin 2010
![Page 5: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/5.jpg)
5
Control system overview
ICALEPCS 2011
![Page 6: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/6.jpg)
6
Problem definition
ICALEPCS 2011
The control system was delivered while in development phase. Lack of knowledge transfer, limited documentation Fragile infrastructure Undocumented methodology and strategy Simple design – complex operation The rebuilding process needs to be done in parallel to accelerator operation The control system has to be streamlined and stable before SARAF phase II
Need to invest the effort now.
![Page 7: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/7.jpg)
7
Solution definition
ICALEPCS 2011
The control system needs to be moved to operational phase.
Build knowledge base Revamp infrastructure Define a clear strategy Simplify operation Restructure the control system Define a methodology Deliver the rebuilt system before SARAF phase II
Systematic approach is planned.
![Page 8: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/8.jpg)
8ICALEPCS 2011
Implementation
Study the system
Migrate software
Rebuild the system
Deliver the system to the operation team
![Page 9: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/9.jpg)
9ICALEPCS 2011
Vacuum control system
Accelerator vacuum control system.
Beam lines vacuum control system.
Initial state of vacuum control systems before redesign and rebuild.
![Page 10: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/10.jpg)
10ICALEPCS 2011
Accelerator full vacuum control system – new system.
Operator screen Expert screen
Vacuum control system
![Page 11: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/11.jpg)
11ICALEPCS 2011
Phase A - Preparations Study, map and document the control system Clear and organize the system elements Fix major issues, and provide support to operators Design the control methodology in light of SARAF Phase-II
Vacuum CS
Ion source CS
Diagnostics CS
![Page 12: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/12.jpg)
12ICALEPCS 2011
Phase B – software migration
The control system is based on Labview 8.2.1. Migrate the software to the latest stable version of Labview. Verify correct operation and document the process.
![Page 13: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/13.jpg)
13ICALEPCS 2011
Phase C – rebuild the system
Review each control system and application Add system level capabilities and design Streamline hardware and application Rebuild and modernize the control room Verify, validate, document
![Page 14: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/14.jpg)
14ICALEPCS 2011
Phase D – delivery
Write procedures Train the team Activate the system
Diagnostics CS
Vacuum CS
Ion source CS
![Page 15: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most](https://reader035.vdocument.in/reader035/viewer/2022081618/60a476705bf3da136b6d5e76/html5/thumbnails/15.jpg)
15ICALEPCS 2011
Summary
The SARAF Phase-I control system needs to be delivered from development to operational status.
Phase A of the project is currently ongoing Most of the control system is documented and mapped Methodology and strategy are being consideredWorking hard to restructure the system and start migrating the software soon