sas c pomel - pc 2 - plan massewebgenery-documents.s3.amazonaws.com...g 12 g 11 g 10 g 09 g 08...

1
G 05 G 06 G 03 G 04 G 01 G 02 R+1 R+1 4.00 11.92 12.90 4.00 7.16 9.42 4.00 8.59 9.49 4.00 2.50 2.50 2.50 9.63 4.00 6.24 4 6.24 3.68 6.24 4 6.24 5.00 5.00 1.40 5.00 15.56 10.33 2.49 4.00 5.71 4.19 12.30 6.59 12.82 1.00 1.00 1.00 1.00 1.00 1.00 +411.70 pente 12% sur 14m +411.26 5.00 plateforme pente 2% sur 5m +407.50 pente 10% sur 13m +407.75 +411.36 pente 5% sur 7m 1.00 grillage existant abri bus existant chemin piéton +410.00 +410.00 +411.80 +411.80 +408.80 +408.80 F. existant = +417.60 HAIES A CONSERVER HAIES A PLANTER ARBRES A SUPPRIMER = 12 ARBRE A CONSERVER = 2 PMR CHEMINEMENTS PIETONS ESPACES VERTS EMPRISE CONSTRUCTION EXISTANT + VILLA + PK SURFACE DU TERRAIN 4198 m² G 13 G 12 G 11 G 10 G 09 G 08 +407.50 +407.50 +407.50 9 Logements ARBRES A PLANTER = 11 espace vert reservé haie existante à supprimer 26.26 5.00 5.00 1.40 1.10 pente 12% sur 10m 5.00 5.00 1.40 0.99 12.82 12.82 12.86 12.86 6.24 4 6.24 3.68 6.24 4 6.24 6.26 4 6.26 3.30 1.98 aire de retournement 2.20 F. existant = +418.40 local 2 roues 9.48 m² 6 Garages Local 2 roues EMPLACEMENTS RESERVES haie existante haie existante bâtiment existant F. = +417.77 F. = +419.57 F. = +419.57 F. = +417.77 F. = +416.57 F. = +416.57 G 07 +407.50 6.38 12.97 7.16 5.81 F. = +415.27 8.00 8.42 R+1 R+1 R+1 R+1 R+1 F. lucarne créée = +416.42 F. lucarne créée = +416.42 3.54 3.10 3.37 6.20 3.37 3.10 3.58 2.20 10.51 7.61 7.40 14.18 PK 4 PK 5 PK 6 PK 7 PK 8 PK 9 PK 10 PK 11 PK 12 2.09 1.15 3.30 PK 13 2151.34 m² PK 3 PK 1 PK 2 2.14 2.50 2.50 3.30 5.00 1.40 5.00 Aire de dépose O.M 10.60 m² 1047.35 m² 1.00 1.00 4.00 1.00 1.00 1.00 1.00 1.00 9.80 11.25 Aire de dépose O.M 10.80 m² ACCES LOT 6 LOT 7 B B A A LOT 8 LOT 3 +408.70 +409.90 LOT 1 LOT 4 LOT 2 LOT 5 8.00 à l'axe 8.00 à l'axe 8.00 à l'axe FT FT FT Route de la Croisée 10001 10002 10003 10000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 69 71 72 73 74 75 76 77 79 80 81 82 83 84 85 86 93 94 96 99 101 102 103 104 105 106 107 108 109 116 117 118 119 120 137 10004 10006 10007 10005 138 139 140 141 142 143 144 145 146 148 149 151 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 169 170 171 172 173 176 183 185 186 187 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 234 235 236 237 238 23 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 339 343 344 345 346 347 348 349 350 351 352 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 371 372 373 374 Route de Corzent 407.00 408.00 409.00 410.00 412.00 413.00 414.00 415.00 411.00 406.00 2.00 3.00 3.00 4.00 375 376 377 378 RACCORDEMENTS BATIMENT COLLECTIF RACCORDEMENTS RESEAUX ELECTRICITE - GAZ - AEP - TELECOM puisard puisard puisard puisard puisard puisard puisard puisard puisard rétention surverse 3L/s vers réseau communal EP EU RACCORDEMENTS TAE sur réseau communal BE STRUCTURES BE FLUIDES BUREAU SPS BE VRD BUREAU DE CONTROLE ECONOMISTE-COORDINATEUR GEOMETRE 1/200ème PERMIS DE CONSTRUIRE SAS C.POMEL Promotion construction 1754 route des Collines 74550 CERVENS PLAN MASSE 19h00 18h00 16h30 hiver été 7h30 6h00 5h00 automne SUD OUEST NORD EST 003 PC 2 14-15 [email protected] F:(04) 50 71 37 01 BARNOUD TROMBERT ALPES CONTROLES [email protected] T:(04) 50 70 33 29 T:(06) 88 30 06 66 Anthy-sur-Léman (74) Les Fossaux 1 Route de la Croisée PROJET DE CONSTRUCTION D'UN ENSEMBLE IMMOBILIER Création de 7 villas et aménagement d'un bâtiment existant en 9 logements collectifs BET LOUSTAU [email protected] T:(04) 50 73 19 61 14 novembre 2014 Terrain: Aménageur: christophe BONDAZ ARCH I tectures TEL : 04 50 81 50 46 FAX : 04 50 71 58 65 74200 THONON LES BAINS LE DOMAINE DE MARCLAZ 21 impasse de Marclaz [email protected] 9 Av. Gal de Gaulle - 74200 Thonon-les-Bains Chef Lieu 74500 VINZIER Vue 1 Vue 2 Vue 3 Vue 4 Vue 6 Vue 5

Upload: others

Post on 31-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SAS C POMEL - PC 2 - Plan massewebgenery-documents.s3.amazonaws.com...G 12 G 11 G 10 G 09 G 08 +407.50 +407.50 +407.50 9 Logements ARBRES A PLANTER = 11 espace vert reservé haie existante

G 05

G 06

G 03

G 04

G 0

1G

02

R+1

R+1

4.00

11.9

2

12.9

04.

00

7.16

9.42

4.00

8.59

9.49

4.00

2.50

2.50

2.50

9.63

4.00

6.24

4

6.24

3.68

6.24

4

6.24

5.00

5.00

1.40

5.00

15.56

10.3

3

2.49 4.00

5.71

4.19

12.3

0

6.59

12.8

2

1.00

1.00

1.00

1.00

1.00

1.00

+411

.70

pent

e 12

% s

ur 1

4m

+411.26

5.00

plat

efor

me

pent

e 2%

sur

5m

+407

.50

pente 10% sur 13m

+407

.75

+411.36

pent

e 5%

sur

7m

1.00

grilla

ge e

xista

nt

abri

bus e

xista

nt

chem

in pié

ton

+410.00+410.00

+411

.80

+411

.80

+408.80+408.80

F. e

xista

nt =

+41

7.60

HAIES A CONSERVER

HAIES A PLANTER

ARBRES A SUPPRIMER = 12

ARBRE A CONSERVER = 2

PMRCHEMINEMENTS PIETONS

ESPACES VERTS

EMPRISE CONSTRUCTION EXISTANT + VILLA + PK

SURFACE DU TERRAIN4198 m²

G 13

G 12

G 11

G 10

G 09

G 08

+407

.50

+407

.50

+407

.50

9 Lo

gem

ents

ARBRES A PLANTER = 11

espace vert reservé

haie existanteà supprimer

26.2

6 5.00

5.00

1.40

1.10

pente 12% sur 10m

5.00

5.00

1.40

0.99

12.8

212

.82 12.86

12.86

6.24

4

6.24

3.68

6.24

4

6.24

6.26

4

6.26

3.30

1.98

aire

dere

tour

nem

ent

2.20

F. existant = +418.40

local

2 ro

ues

9.48

6 Gar

ages

Loca

l 2 ro

ues

EMPLACEMENTS RESERVES

haie

exist

ante

haie

exist

ante

bâtim

ent e

xist

ant

F. =

+41

7.77

F. = +419.57

F. = +419.57

F. =

+41

7.77

F. =

+41

6.57

F. =

+41

6.57

G 0

7

+407

.50

6.38

12.97

7.16

5.81

F. = +415.27

8.00

8.42

R+1

R+1 R+1

R+1 R+1

F. lucarne créée

= +416.42

F. lucarne créée

= +416.42

3.54

3.10

3.37

6.20

3.37

3.10

3.58

2.20

10.51

7.61

7.40

14.18

PK 4

PK 5

PK 6

PK 7

PK 8

PK 9

PK 1

0

PK 1

1

PK 12

2.09

1.15

3.30

PK 1

3

2151.34 m²

PK 3

PK 1

PK 2

2.14

2.50

2.50

3.30

5.00

1.40

5.00

Aire

de

dépo

se O

.M10

.60

1047.35 m²

1.00

1.00

4.00

1.00

1.00

1.00 1.00

1.00

9.80

11.25

Aire

de

dépo

se O

.M10

.80

ACCES

LOT 6

LOT 7

B

B

A

A

LOT 8

LOT 3

+408.70

+409.90

LOT 1

LOT 4LOT 2

LOT 5

8.00

à l'a

xe

8.00à l'axe

8.00à l'axe

FT

FT FT

Route de la Croisée

10001

10002

10003

10000

12

3

456

78

9101112

13

14

1516

17

18

19

20

21

22

2324

25

2627

2829

30

31

3233

34

35

3637

3839

40

41

4243

44

45

4647484950

51

52

53

54

55

56

57

58

5960

61

62

63

64

65

66

69

71

7273

7475

76

77

79

80

8182 83

84

85

86

93

94

96

99

101

102

103

104

105

106

107

108

109

116

117

118

119

120

137

10004

10006

10007

10005

138

139

140

141

142

143

144

145146148

149

151

153

154

155

156

157

158159

160161

162

163

164

165

166

167

169

170

171

172

173

176

183

185

186

187

189

190

191

192

193

194

195

196

197

198

199

200

201

202

203

204

205

206

207

208209

210

211

212213

214

215

216

217

218

219

220

221

222

223

224

225

226

227

228

229

230

234

235

236 237

238

239

240

241242243

244

245246

247

248

249

250

251

252253

254

255

256

257259

260

261

262

263

264

265

266

267

268

269 270

271

272

273

274

275276 277 278

279

281

282

283

284

285

286

287

288

289

290

291

292

293

294

295

296

297

298

299

300

301

302

303

304

305

306

307

308

309

310

311

312

313314

315

316

317

318

319

320

321

322

323

324

325

326

327

328

329

330

331

332

333

334

335

336

339

343

344

345346

347

348

349

350

351

352

354

355

356

357

358

359

360

361

362363

364

365

366

367

368369

371

372

373

374

Rout

e

de

Cor

zent

407.0

0

408.0

0

409.0

0

410.00

412.

00

413.

00

414.

00

415.

00

411.0

0

406.

00

2.00

3.00

3.00

4.00

375

376

377

378

RACCORDEMENTSBATIMENT COLLECTIF

RACCORDEMENTS RESEAUXELECTRICITE - GAZ - AEP - TELECOM

puisard

puisard

puisard

puisard

puisard

puisard

puisard

puisard

puisard

rétention

surverse 3L/s

vers réseau communal EP

EU

RACCORDEMENTS TAE sur réseau communal

BE STRUCTURES

BE FLUIDES

BUREAU SPS

BE VRD

BUREAU DE CONTROLE

ECONOMISTE-COORDINATEUR

GEOMETRE

1/200èmePERMIS DE CONSTRUIRE

SASC.POMEL Promotion construction1754 route des Collines74550 CERVENS

PLAN MASSE

19h00

18h00

16h3

0

hiver

été

7h30

6h00

5h00

automne

SUD

OUEST

NO

RD

EST

003

PC 2

14-15

[email protected]

F:(04) 50 71 37 01BARNOUD TROMBERT

ALPES [email protected] T:(04) 50 70 33 29

T:(06) 88 30 06 66

Anthy-sur-Léman (74)Les Fossaux1 Route de la Croisée

PROJET DE CONSTRUCTIOND'UNENSEMBLE IMMOBILIERCréation de 7 villas et aménagement d'un bâtiment existant en 9 logements collectifs

BET [email protected]

T:(04) 50 73 19 61

14 novembre 2014

Terrain:

Aménageur:

christophe BONDAZARCH I tectures

TEL : 04 50 81 50 46 FAX : 04 50 71 58 65 74200 THONON LES BAINS

LE DOMAINE DE MARCLAZ21 impasse de Marclaz

[email protected]

9 Av. Gal de Gaulle - 74200 Thonon-les-Bains

Chef Lieu 74500 VINZIER

Vue 1

Vue 2Vue 3

Vue 4

Vue 6

Vue 5