saterlee hall proposal

20
Saterlee Hall Proposal By Charger By Charger Networking Inc Networking Inc.

Upload: winifred-whitley

Post on 30-Dec-2015

26 views

Category:

Documents


0 download

DESCRIPTION

Saterlee Hall Proposal. By Charger Networking Inc. CNI’s Task. To design a computer network with as many services possible for the the third floor of Saterlee Hall. Project must include a minimum of: 2- Computer Labs (50 Computers) & 15 Offices - PowerPoint PPT Presentation

TRANSCRIPT

Saterlee Hall ProposalSaterlee Hall ProposalBy Charger By Charger

Networking IncNetworking Inc.By Charger By Charger

Networking IncNetworking Inc.

CNI’s TaskCNI’s Task

To design a computer network with as many services possible for the the third floor of Saterlee Hall. Project must include a minimum of:

2- Computer Labs (50 Computers) & 15 OfficesTotal cost of the project not to exceed 100k.

Project can propose options for an additional cost.

To design a computer network with as many services possible for the the third floor of Saterlee Hall. Project must include a minimum of:

2- Computer Labs (50 Computers) & 15 OfficesTotal cost of the project not to exceed 100k.

Project can propose options for an additional cost.

CNI’s Philosophy & Assumptions

CNI’s Philosophy & Assumptions

Open Source should be used whenever possible in order to maximize the networks performance and also to minimize costs.

All procurements are eligible for a 15% cost savings based on NYS contracts.

More is Better!!!

Open Source should be used whenever possible in order to maximize the networks performance and also to minimize costs.

All procurements are eligible for a 15% cost savings based on NYS contracts.

More is Better!!!

Our Design IncludesOur Design Includes Two Labs-One PC and one graphics

lab,

One Student Workgroup facility &

One Cozy room for relaxed networking.

Two Labs-One PC and one graphics lab,

One Student Workgroup facility &

One Cozy room for relaxed networking.

PC LabPC Lab

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

PC LabPC Lab Contains:

25 WS and one faculty computer-- Dell PC’s w 80GB HD & 15” FS Monitor & 256 RAM

2 HP Laser Printers-One Color & One B&W Video & Overhead projector w screen 2 Scanners Smart board Wireless Gateway

Contains: 25 WS and one faculty computer-- Dell PC’s w

80GB HD & 15” FS Monitor & 256 RAM 2 HP Laser Printers-One Color & One B&W Video & Overhead projector w screen 2 Scanners Smart board Wireless Gateway

Graphics LabGraphics Lab

Graphics LabGraphics Lab Contains:

19 WS & one faculty computer-- Dell PC’s with 80GB HD & 15” FS Monitor & 512 Ram

1 Computer with DVD RW capability 2 HP Laser Printers-One Color & One B&W Video projector w screen 2 Scanners Wireless Gateway

Contains: 19 WS & one faculty computer-- Dell PC’s

with 80GB HD & 15” FS Monitor & 512 Ram 1 Computer with DVD RW capability 2 HP Laser Printers-One Color & One B&W Video projector w screen 2 Scanners Wireless Gateway

Cozy RoomCozy Room

COZY Room Room 310COZY Room Room 310

1 PC w 1 scanner Wireless Gateway Cozy furniture with black lights,

rugs and (optional) beach scenes

1 PC w 1 scanner Wireless Gateway Cozy furniture with black lights,

rugs and (optional) beach scenes

Workgroup RoomWorkgroup Room

Workgroup Room Room 312Workgroup Room Room 312

Portable room dividers Tables and chairs 2 PC’s and Wireless & hardwire

connections 1 Scanner Color and BW Laser Printers

Portable room dividers Tables and chairs 2 PC’s and Wireless & hardwire

connections 1 Scanner Color and BW Laser Printers

Office SpacesOffice Spaces

Dell PC’s one per office. Centrally located Printers and

Scanners Wireless Capability(printers and scanners also for use by

office spaces)

Dell PC’s one per office. Centrally located Printers and

Scanners Wireless Capability(printers and scanners also for use by

office spaces)

Servers & SoftwareServers & Software

Cabinet and rack mounted with 5 Linux (Red Hat) servers:

Web(Apache) with FTP (FTPd) Boot with NIS+,DHCP Data (MySQL) Print (CUPS) Email (Sendmail)

Cabinet and rack mounted with 5 Linux (Red Hat) servers:

Web(Apache) with FTP (FTPd) Boot with NIS+,DHCP Data (MySQL) Print (CUPS) Email (Sendmail)

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Network Equipment Network Equipment

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Peggasus-RAID capable of 1GB xfer rates, resizing, RAID 0, 1, 3, 5 JBOD

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Dell Hi Perf rack mounted Servers SC1425, 1GB Ram, 32 GB SCSI Drive, 3.2 Xeon Proc, Rack Mountable

Server Configuration IncludesServer Configuration Includes UPS-Uninterruptible Power Supply Watchguard Firewall Level 5 Raid Laptop for diagnostics Patch Panel Router/Switches Equipment Cooler

UPS-Uninterruptible Power Supply Watchguard Firewall Level 5 Raid Laptop for diagnostics Patch Panel Router/Switches Equipment Cooler

OptionsOptions

Laptops- Gateway $819.99 Software-

Adobe Photoshop- Macromedia-Macromedia Studio MX

Laptops- Gateway $819.99 Software-

Adobe Photoshop- Macromedia-Macromedia Studio MX

Total CostTotal Cost

The Projected Cost…+/- $90,000…. you

have $10,000 for more options andfurnishings.

The Projected Cost…+/- $90,000…. you

have $10,000 for more options andfurnishings.

Charger Newtworking Inc.

Bridget

Cast of 1000's

Gerry MaryAnne

Owners

Charger Newtworking Inc.

Bridget

Cast of 1000's

Gerry MaryAnne

Owners

Established in 2001 as a high-speed low-drag corporation

dedicated to providing you the best possible network at the

lowest possible price.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this p icture.

In SummaryIn Summary

Charger Networking is standing by to support this project and can begin work one week after the contract is signed. Work should be completed within 3 weeks of starting date.

Charger Networking is standing by to support this project and can begin work one week after the contract is signed. Work should be completed within 3 weeks of starting date.