Migration Solutions for Non-Honeywell SystemsSatnam Bhogal
October 4th, 2018
Challenges of Legacy Systems
Demand that IT provides economic advantage
cannot be met
Inflexibility affects response time to
shifting customer demands
Unable to expand cost-effectively to meet capacity
requirements
Difficulties harnessing new
business opportunities with current
limitations of system
Insufficient ability to predict abnormal situations and
equipment breakdown
Pending threat of outage or incident
Low availability of spare parts means costly
maintenance
Customer’s Vision
Workshops
with Customers &
Owners
Business/
Domain
Consulting Project Team Project Team
Initial Scope
Definition
Phase I Deliverables :1.High level business req.
2.Technology map
3.Expected outcomes
Phase II Deliverables: 1.Budgetary proposal
2.Master Technology Plan
3.Opportunity assessment
4.System architecture
5.Deployment Schedule
Budgetary Proposal
Opportunity Assessment
Phase III Deliverables: 1.Firm proposal
2.FEED
3.Business process Models
4.Detailed Soln. Analysis
Final Scope and
Firm Proposal
Phase IV Deliverables: 1.Project kick off
2.Design
3.Implement
4.Test
5.Commission
Project Deployment
Continous Innovation:1.After market support
2.Value audits
Fine Tuning
Phase 1
Vision &
Concept/
Demand
Studies
Phase 2Discovery
Process /
Master
Technology
Plan
Phase 3
Business Process
Modeling (BPM) /
Front End
Engineering
(FEED)
Phase 4
Project
Execution
Phase 5
Value
Sustenance
Program Engagement & Lifecycle Execution
"Honeywell helped us develop a plan to migrate our product and supplied both
the justification and economic benefit analysis for us to do so,”- RVA
FEED & Pre-FEED Activities
Conceptual Design
• Philosophy Documents
• Vision Documents
• Guideline Documents
• Design Studies and
Recommendations
Front-End Engineering & Design
• Philosophies and the visions developed during
conceptual design are transformed into actual
designs
• Project standards are critical in ensuring
consistency across the facility
• Project execution strategies
4
Competitor Legacy System | How Honeywell Addresses It
Proven Long Term Support Equals Customer Confidence
Needs/Challenges
• Doing nothing causes unplanned Shutdowns
• Parts & Service not available
• System not capable
• Need for More
• Safety, Reliability & Efficiency
• Need for Better Life Cycle Support
Our Capability
• Proven Long term Support
• Incremental HMI and Controller
Migration
• Tools that share Competitor
systems knowledge
• Experion with Series C300
Key
Differentiator
Value Proposition
For Honeywell customers with 3rd Party DCS Systems in addition to Experion or TPS/TDC;
Who need to replace the obsolete 3rd party System Honeywell’s 3rd Party Migration solution
Provides Low Risk, Cost effective Migration to Experion by providing consulting, tools, kits
and long term support
5
Control
Logix
Legacy Competitor System Landscape
Master
Advant
Freelance
Contronic /
Melody
DCI
System 6
Infi 90/
Harmony
Teleperm
APACS
- Quadlog
Provox
RS/3
Delta V
WDPF /
Ovation
Spectrum /
Spec 200
IA Series
Process
Logix
MOD 300
MOD V
Simatic
S5/S7
Modicon
PLC’s
Centum CS
Centum XL
Centum
CS1000/3000
Centum VPTriconex
ICS Triplex
ProSafe -RS
Distributed Control System
PLC Type Application
Safety System
Key
6
LEAP for
Operations
Cloud Enabled
Execution
Universal &Connected
Assets
Edge Device
Integration
Cyber Secure Conformity
(IEC62443-3-3)
Engineer and Operate Efficiently
• Advanced Operator Solutions (Orion with
Embedded APC & Alarm Management)
• Next Gen Virtualization Solutions
• Cloud Engineering with Smart Test
• Auto Document & MOC (TRACE)
Integrated Controls & Subsystems
• Universal Channel Technology (DCS, Safety
& PLC) & Integrated RTU
• Electrical & Ethernet (EIM; EIP & IEC 61850)
Edge Device Integration Simplified
• Automated Device Commissioning
• Smartline & Wireless Advantage
• Fire & Gas Integration
• Skid Integration
Options to Consider When Modernizing
Customer’s Intellectual Property is Retained and Translated
* HMI Migration solution need to be evaluated with site specific feasibility study before proposal
Short-Term Life Extension(HMI Migration)*
Phased Migration
Rip andReplace
7
Honeywell HMI Migration
Evaluate Based on System Requirements
"We needed a solution
that would improve
process performance
while still leveraging our
investment in the Bailey
and Foxboro controllers.”Alexandre Gershberg
Head of Instrumentation &
DCS - Kirishi Refinery
8
Honeywell Controller Migration
9
Why Rip and Replace?
10
Competitor System Migration Tools
❖ Controller DB Migration tools- ABB MOD 300
- Emerson RS3
- Yokogawa Centum-CS3000
- Yokogawa Centum-CS
- Invensys Foxboro-I/A
- Yamatake PM100
- ABB Bailey (Prelim)
- Emerson PROVOX (Prelim)
Competitor Displacement -Tools
11
❖ Inventory/Parser tools- Invensys Foxboro-I/A
- Siemens Teleperm M
- Yokogawa Centum-CS3000 (P)
- Yokogawa Centum-CS
- Yokogawa Centum-XL (P)
- ABB MOD 300 (P)
- Emerson RS3 (P)
- Emerson PROVOX (P)
- Moore APACS (P)
❖ Graphics Migration tools- Emerson Provox
- Invensys Foxboro-I/A
- ABB Bailey
❖ PLC DB Migration Tools- PLC 5/SLC500 PLC to Control Edge PLC
❖ SCADA DB Migration Tools- Citect to Experion SCADA
Controller DB Migration – Control Match Tool
Control Match tool helps to retain the Customer IP
20
Supports Following system
types:
❖ ABB MOD 300
❖ Emerson RS3
❖ Yokogawa Centum-CS,
❖ Yokogawa Centum-CS3000
❖ Invensys Foxboro-I/A
❖ Yamatake PM100
12
Foxboro Controller Data Migration
13
Graphic Migration – Graphic Match Tool
Supports Following
system types:
❖ Emerson Provox
❖ Invensys Foxboro-I/A
❖ ABB Bailey
14
Graphics Improvement
15
Migration Concept Foxboro I/A 100 Series
Term connector
FBM
Cable
Term Connector + cable + either (1) connection block or (2) plug
connector block or (3) discrete wire block = Termination Cable
Assembly (TCA) Rear of FTB
Mounting post
Interconnects to
Foxboro card
Side view of FTB
Connection options “Nosecone” interface detail
The FBM connector is commonly referred to as a
“nosecone”
16
Foxboro System Migration to Experion
Database
Foxboro System
Wiring Terminations
AW, AP, or WP
Foxboro IA Nodebus
CP
Server
C300
FTE
Experion System
ACE
Series C IO’s
Name FC101Unit GRDesc FlowKey CntrlTuning 1.0T1 .5EU bbls/hr
Phase by phase
Migration
17
Traditional Hot Cut-Over
•Typically used at Refineries and some Chemical facilities
•Process never goes down (hopefully) but runs in manual for durations
•Takes a LONG time to complete the system conversion
•Plant Personnel required for every conversion
•Field work required during Hot Cutover
•Requires substantial planning
•Risk to operations
•Requires changing of configuration to support cutover
A new Methodology to Migrate Control Systems
• Individual modules linked together
•Aligns with marshalling terminals
•Unlimited number of stacks
•Parallel Migration of:
- PLC, DCS, Remote I/O in
parallel
- Different manufacturers
- Great Solution for Older
Honeywell Systems
Automated Hot Cut-over
•Process interruption limited to running PID function in manual for a few seconds
•No field work required – bypass valves, signal generation, manual valve control
•Limited Plant Personnel required
•Some planning required
•Configuration verified during hot-cut over
•System Conversion anytime
•Competitive Systems or Older TDC Systems
Why Honeywell?
Honeywell delivers a continuous evolution pathway to System
modernization without rip and replace.
Honeywell has a longstanding record of delivering a phased approach to platform
modernization that delivers:
• Low-risk / low disruption to operations
• Lowest total cost of ownership
Year 40+ Year 20 Year 10
Delivering a sustainable outcome. Honeywell is committed to the continued long-term support of our customers by investing in:
• The continuous evolution of our flagship Experion® PKS platform
• In-country project management, engineering and support capabilities
21
• Turn Key Contract - Total Replacement with Initial HMI Migration
• PCS Rehabilitation Project of replacing legacy Bailey Infi 90
• Scope of project covers engineering, installation, commissioning of Experion PKS, Safety Manager and FI
• I-Mac responsibility for full scope
• Control Network design and configuration
• Integration of plant and 4 remote sites
• Relocation of Process Control Centre
ECS1
1
S2
2
S3
3
SE
4
PC
5
CH
13
CA
14 1
CT
17
BR
19
MP
20
MG
22
SO
31 1
Serv-cl.
BA
Batafong
RS232
Coax
12
6362
LOOP 1 Principale
LOOP 10
SONGOLONLOOP 11 CITE
Noeuds
01 à 30 : PCU
31 à 40 : Serveur
41 à 60 : Communication
61 à 70 : EWS
01 : Principale
02 : Broyage et Parcs
03 : Sécheurs et Calc.
04 : Expédition
05 : Centrale Elec.
06-09 : Réserves
10 : Songolon
11 : Cité
Réseau
Infinet
PCV - Ethernet
01 à 10 : Serveurs
11 à 30 : Clients Usine
31 à 40 : Clients Aux.
41 à 50 : Clients Adm.
Coax
Serv-cl.
RS232
PompesFiltres
CICI
Pompes
- Pompes
- Dosage
LOOP 2 PARCS
Broyage
PA
21
Parcs
RadioTelephone
PCC
SS3
LOOP 3 SECHEURS
Calcina-
tion
ABR5 PCC PCC
S
S
3
FUTURE
PCC
LOOP 5 LOOP 4
CHARGEMENT
Manut.
Poussiere
ABR5
50
50
51
51
42
42
45
45
44
44
43
43
30
ABR5ABR5
Centrale
PCC
IS-50NX-CT
125-220 MHz - 375W
220-700 MHz - 125W
700-1000MHz - 50 W
Antenna
Equipment
CYLINK-19MP
PCL
Dryers
3534
PCC
CIU at
DRYERS
Centrale
6 7 8
B
M
S
1
B
M
S
2
B
M
S
3
32
I
I
T
0
3
I
I
T
0
3
I
I
T
0
2
I
I
T
0
2
I
I
T
0
3
I
I
T
0
3
POND
23
ClientClientClient
Client
Client Client
IP Address 172.20.18.31
Agglomeration
172.20.18.21 172.20.18.22 172.20.18.23
FiberOptic
converter to RJ45
FiberOptic
converter to RJ45
CAT 5
cables
RTD and RTD redundant
servers at PCC room
SCSI Cables
FiberOptic
converter to RJ45
Switch
Hub
Fiber Optic Hub
PCL Fure
172.20.18.11 172.20.18.12
Agglo PCL Central
172.20.18.3 172.20.18.2
Client Client
PCL Central
Fiber Optic Hub
Switch
FiberOptic/ RJ45 converter
FiberOptic/
RJ45 converter
172.20.18.41 172.20.18.42
Bailey to Experion Success Story
Compagnie des Bauxite de Guinee
22
• Total ABB Bailey with Delta V HMI Replacement
INFI90/Delta V to Experion Success Story
Client: Groupement Berkine Anadarko/Sonatrach JV
Location: HBNS Block 404, Berkine Basin, Algeria
Application: Oil production facility through four-trains at
285,000 b/d
Project: CPF Automation Upgrade Replacement of legacy ABB Bailey Infi90/Delta V
Scope: Experion PKS, Safety Manager, OTS, FDM
Eng Services, PM, Staging/Checkout & Site Work
I/O: DCS – 3,648
SS – 4812
FGS – 3,216
I/F’s – 28,800
Hassi Berkine (HBNS) CPF
23
Foxboro I/A to Experion Success Story
Replacement of Installed System Less than 12 years Old
• Client: Middle East Oil Refinery (Midor)
• Location: Alexandria
• Application: Oil refinery with 100,000 b/d capacity (18 process units
with utilities and offsites)
• Project: Automation Rehabilitation and Upgrade replacement of
legacy Invensys I/A system (Ver. 6.1.2 and 8.4.3 (CR5)
• Scope: Experion PKS, FDM, HIMA u/g , MUX u/g ,Eng Services,
PM, Staging/Checkout & Site Work
• DCS and I/O:
DCS – 17,944
I/F’s links - 40 devices
Midor
24
QAFAC to Experion Success Story
Replacement Project with Enhanced Supportability
• Location: Mesaieed Industrial City, Qatar
• Application: Production of methanol and methyl
tertiary butyl ether (MTBE)
• Project: DCS Control System Upgrade/Replacement
Replacement of legacy Invensys I/A system ver
8.4.3 (u/g’d 2009), add in of CO2 Project and
Boiler Integration. Change-over April 2014.
Scope increase with F&G System and Control
Room Refurbishment.
• Scope:
Experion PKS, Universal I/O, PHD, FDM, Safety
Manager, Engineering Services, PM,
Staging/Checkout & Site Work
• DCS and I/O:
– DCS – 3883 IO
– SCADA Points - 28800
– Sequences-96
QAFAC
25
Multi-System Migration to Experion Success story
Phased Migration over 5 years
Migrated Hiway system, Foxboro IA, Rosemount RS3,
Delta V and PLCs.
Used Wiring Kit and Control Match tool
Benefits
• Flexible, Reliable and Efficient Platform
• Centralized control room with common operator interface for
improved effectiveness and operator confidence
• More accurate information for faster decision making
• Human Machine Interface (HMI) to help operators perform
their jobs more efficiently and effectively
Borregaard Sarpsborg, Norway
26
• Raised Performance Levels Through Greater Process Reliability and Stability
Foxboro and Bailey HMI Migration Success
Kirishi Refinery - Russia
• Improved decision making with better and faster access to process information
• Simplified work through one common interface and graphical displays between different process units
• Retained investment in Foxboro/Bailey controllers until point of obsolescence
27
28