saving of dcdb and inverter from mansoon
TRANSCRIPT
DCDB AND 8 No.
INVERTER
SAVING FROM MANSOON
SITE TEAM WORKED FOR PLANNING AND EXECUTION-
1- STORE TEAM ( Mr. K.G Sharma & Harish )
2- ADMIN TEAM (Mr. Sudhansu Singh)
3- PROJECT TEAM (Mr.Dharmendra and Avneesh Chandra Shukla)
4-QUALITY TEAM (Mr.Manoj Gola )
5-PREFAB TEAM
.
ACIVITIES DONE FOR EXECUTION-
1-REQUIRED AREA (APPROX CALCULATED 560 SQ FEET ) AND AVAILABLE FLOOR AREA OF LT ROOM CALCULATED AS 810 SQ FEET. SO DECISION WAS YES.
2-PREFAB TEAM CONVINCED TO COVER CABLE TRUNCH OF LT FLOOR WITH WOOD FOR UTILISING CALCULATED AREA OF FLOOR.
3- TATA PROVIDED VEHICLE , KANWAR PROVIDED NEEDLES ,Mr.BABU PROVIDED WOODEN CUTTER FOR WOODEN WORK
4- BEFORE COMING HYDRA PREFAB TEAM WAS INSTRUCTED TO OPEN TOP WOODEN COVER OF BOXES.
5-PLANNED PROPER SEQUENCE OF PLACEMENT OF BOXES FOR UTILISING TOTAL AVAILABLE FLOOR AREA.
MODULE PALLAT WOOD USED FOR MAKING AREA CLEAR FOR PLACEMENT
HYDRA LIFTING DCDB BOX
PLACING OF DC CUBICAL IN LT ROOM
FEW BOXES PLACED IN LT ROOM
BOXES PLACED ON LT ROOM FLOOR
BOXES PLACED ON LT ROOM FLOOR
PLACING OF LAST DC CUBICAL IN LT ROOM.
LAST DC CUBICAL PLACED ON LT ROOM FLOOR.
TRIPAL COVERED AFTER INVERTER AND DCDB PLACEMENT.
Tripal covered around DCDB and inverter after placing it on LT room TOP VIEW
Tripal covered around DCDB and inverter after placing it on LT room Top view
TOP VIEW OF LT ROOM ROOF AFTER PREFAB.
WINDOWS ARE OPEN AND ROOF AND WALL CLOSED.
INNER VIEW OF LT ROOM AFTER PLACEMENT AND PREFAB WORK
OUTER VIEW OF LT ROOM AFTER INVERTER PLACEMEN,PREFAB CLOSING AND LOCKING OF BOTH SIDE DOOR OF LT ROOM