schedule

134
Con on Pro ion Pre ing Pro WBS Kic ing Mob iod Man ion Rec der Pro q.) Eng q.) Pro q.) Con q.) HES q.) Civ q.) Civ q.) Ele q.) Ele q.) Mec q.) Mec q.) Rec wer Tra ing HES ion MCU MCU IIF ing MSW ing DDC ing Fir ing HE ing Per ing Ope ent Per ak) Bad ing Dur ity Pro ing Pro ion Pro ion Pro Lot Pro ent Wor im) Pre hop Pre ard Pre use Lig ion Mov ess

Upload: boypardede

Post on 30-Jan-2016

3 views

Category:

Documents


0 download

DESCRIPTION

SCHEDULE

TRANSCRIPT

Page 1: Schedule

Con on Pro ionPre ingPro WBSKic ingMob iodMan ionRec derPro q.)Eng q.)Pro q.)Con q.)HES q.)Civ q.)Civ q.)Ele q.)Ele q.)Mec q.)Mec q.)Rec werTra ingHES ionMCU MCUIIF ingMSW ingDDC ingFir ingHE ingPer ingOpe entPer ak)Bad ingDur ityPro ingPro ionPro ionPro LotPro entWor im)Pre hopPre ardPre useLig ionMov essInt ionMob izeIns ion

Page 2: Schedule

Gat assLad yakRea orkHea ionMov essInt ionMob izeIns ionGat assLad yakRea orkSma entCon essMob izeIns ionRea rk PRE INGRev ingSit phyCol ignCol ignPre ityDev CEPApp artApp BS)App lanApp lanApp lanApp iteApp CEPTem CCFSur veyPre veyBow ankIns aryIns iceDel nerIns entIns ly)Ins ionIns ityQA/ ionEng ingRe- ionSur opoSoi estSur ingSur ole

Page 3: Schedule

Pre ureSit lanGra lanAdm iceSec ackMCC oomWat werSan it Pit #2WDR er Tai er Squ **)Und ankShe reaWat ankSep ankFou mpsDra BoxFen ateCla einYar apePre ingDet ionDet lotDet lotDet ityDet MF)Des mpsOil /B)Wat /B)boo 01)oth nk)oth nk)oth ge)oth ge)oth ge)Jet agefor WDRfor clefor k. Plu agethe wersec es.WDR terTai tershe reaPre entEle mer

Page 4: Schedule

Det ineDet inDet le.MCC outGro ailOut ailBui temDet phyPre reaDow llsPre llsUps llsDow llsPre SIDSID ea SID reaSID reaSID (s)SID werSqu reaAir iceAir oomDED ionIss ingIss ingMat ingPre BOMPro valPre RO)Com ageCom IFCCom istPro entMat ionMat ialRec MROBid ionNeg ionMai ingMai ityFue uelPor letSca ingCor ingMai orkBox astPip ileGua ial

Page 5: Schedule

Ste ureSte ureReb barCon ialCon eteSub oilBas e AAsp altGeo ileBag ackCem entPai alsPip ialCha ingBar redSte alsRop alsWel bleCiv blePla orkRoo ialGra ingAnc oltTil lesPVC ipeFib ankOth ersMai orkPum mpsSte ipeSte alsVal lveJoi ngsMai entEle bleEnc BoxGro alsPan nelLig ingCab iesDuc alsIns bleCab BoxIns ugeIns terIns tchIns alsIns ngs

Page 6: Schedule

Pla TagMai ry Del ityFue uelPor letSca ingDel orkDel orkDel orkMat ionIns ityFue uelPor letSca ingIns orkIns orkIns orkCon on Fab ionFab barCut ialReb ingReb blyFab iceCut alsWel ingSur entCoa ingIns iesQA/ ionFab ackCut alsWel ingSur entCoa ingIns iesQA/ ionFab reaCut alsWel ingSur entCoa ingIns iesQA/ ionFab terCut alsWel ingSur ent

Page 7: Schedule

Coa ingIns iesQA/ ionFab terCut alsWel ingSur entCoa ingIns iesQA/ ionFab oomCut alsWel ingSur entCoa ingIns iesQA/ ionFab ityCut alsWel ingSur entCoa ingIns iesQA/ ionFab werCut alsWel ingSur entCoa ingIns iesQA/ ionFab ertFor ionReb ionFor allReb entCon 50)Con ingFor valQA/ nceFab ateFab ostFab ionFab ostFab ortFab ortFab ameFab rbs

Page 8: Schedule

Fab tenFab bleReb ionFor ionReb entFor allCon ingCon ingFor valQA/ nceFab ny)Reb ionFor ionReb entFor allCon ingCon ingFor valQA/ nceFab PitCut ialSet orkFab #1Cut ialSet orkFab #2Cut ialSet orkFab itsCut ialWel ingSur entCoa ingQA/ ionFab #1Cut ialWel ingSur entCoa ingQA/ ionFab #2Cut ialWel ingSur entCoa ingQA/ ionFab reaCut als

Page 9: Schedule

Wel ingSur entCoa ingIns iesQA/ nceFab reaCut alsWel ingSur entCoa ingIns iesQA/ nceFab reaCut alsWel ingSur entCoa ingIns iesQA/ nceFab werCut alsWel ingSur entCoa ingIns iesQA/ nceFab ingCut alsWel ingSur entCoa ingIns iesQA/ nceSit aryJoi veySur OutChe ityCle ingSha aseSoi estExc alsIns ny)Hau banEmb entSoi ingSoi OD)Sit ingIns ing

Page 10: Schedule

App oseDep oseDep oseQA/ ionHES valPil ion(5) terSur OutDet ityBow ingPip ingQA/ ion(6) terSur OutDet ityBow ingPip ingQA/ ion(13 er)Sur OutDet ityBow ingPip ingQA/ ion(14 ionSur OutDet ityBow ingPip ingQA/ ion(20 ionSur OutDet ityBow ingPip ingQA/ ion(20 ionSur OutDet ityBow ingPip ingQA/ ion(1) ingSur OutDet ityBow ingPip ingQA/ ion

Page 11: Schedule

(8) reaSur OutDet ityBow ingPip ingQA/ ion(13 er)Sur OutDet ityBow ingPip ingQA/ ion(13 ck)Sur OutDet ityBow ingPip ingQA/ ion(2) ackSur OutDet ityBow ingPip ingQA/ ion(3) oomSur OutDet ityBow ingPip ingQA/ ion(4) ingSur OutDet ityBow ingPip ingQA/ ion(F) RKS(F. ingSta zetSur OutBow ingPil ionBow ankPip ingSoi ll)Sub OD)San ingLea ete

Page 12: Schedule

Reb entIns orkCon ingCur imeFor valQA/ ionCon umnBow ankIns ingReb entApp lerIns orkFix ortCon ingCur imeFor valFin ingMov ingQA/ ionCon eamBow ankIns gerReb entIns BarApp lerIns orkCon ingCur imeFor valFin ingMov gerQA/ ionSte ureMov ingDel ureSet ionEre ureLev ingFit ureFul horFul intApp ingTou up Fin ingMov ingQA/ ionRoo ingMov ing

Page 13: Schedule

Ins p CIns RodIns kleIns oofFin ingRem ingQA/ ionWal llsMov ingIns allIns ameIns ameIns ageApp ingApp ingQA/ ionCei ingMov ingIns ameIns ameIns terIns potIns ciaIns iorIns iorDum nt)Fin ingRem ingQA/ ionPlu temIns ipeIns ipeFlo ainSqu otoLav V3Lav 119Uri oirKit inkJet V20Ins letIns ipeFin ingQA/ ionCon oorBow ankSoi ingSub tedSan ing

Page 14: Schedule

Ins ticIns eshPla menIns orkPla ingCur imeFor valFin ingQA/ ionFlo ileIns le Ins ileEle ionIns ingIns rayIns ingIns resIns lesIns AC)Ins -1)Int bleQA/ ionDoo owsIns orsSet ingIns owsQA/ ionPai ingSet ingApp ingApp allApp ingApp allQA/ ionSep ankCon letBac illQA/ ionQA/ ionSys ion(F. ackSta zetSur OutBow ingPil ab)Bow ankPip ingSoi ll)

Page 15: Schedule

Sub OD)San ingLea eteReb entIns orkCon ingCur imeFor valQA/ ionCon umnBow ankIns ingReb entApp lerIns orkFix ortCon ingCur imeFor valFin ingMov ingQA/ ionCon eamBow ankIns gerReb entIns BarApp lerIns orkCon ingCur imeFor valFin ingMov gerQA/ ionSte ureMov ingDel ureSet ionEre ureLev ingFit ureFul horFul intApp ingTou up Fin ingMov ing

Page 16: Schedule

QA/ ionRoo ingMov ingIns p CIns RodIns kleIns oofFin ingRem ingQA/ ionWal llsMov ingIns allIns ameIns ameIns ageApp ingApp ingQA/ ionCei ingMov ingIns ameIns ameIns terIns potIns ciaIns iorIns iorDum nt)Fin ingRem ingQA/ ionPlu temIns ipeIns ipeFlo ainSqu otoLav V3Lav 119Uri oirKit inkJet V20Ins letIns ipeFin ingQA/ ionFlo ileIns le

Page 17: Schedule

Ins ileEle ionIns ingIns rayIns ingIns resIns lesIns AC)Ins -1)Int bleQA/ ionDoo owsIns orsSet ingIns owsQA/ ionPai ingSet ingApp ingApp allApp ingApp allQA/ ionQA/ ionSys ion(F. oomSta zetSur OutBow ingPil ab)Bow ankPip ingSoi ll)Sub OD)San ingLea eteReb entIns orkCon ingCur imeFor valQA/ ionCon umnBow ankIns ingReb entApp lerIns ork

Page 18: Schedule

Fix ortCon ingCur imeFor valFin ingMov ingQA/ ionCon eamBow ankIns gerReb entIns BarApp lerIns orkCon ingCur imeFor valFin ingMov gerQA/ ionSte ureMov ingDel ureSet ionEre ureLev ingFit ureFul horFul intApp ingTou up Fin ingMov ingQA/ ionRoo ingMov ingIns p CIns RodIns kleIns oofFin ingRem ingQA/ ionWal llsMov ingIns allIns ameIns ame

Page 19: Schedule

Ins ageApp ingApp ingQA/ ionCei ingMov ingIns ameIns ameIns terIns potIns ciaIns iorIns iorDum nt)Fin ingRem ingQA/ ionPlu temIns ipeIns ipeFlo ainSqu otoLav V3Lav 119Uri oirKit inkJet V20Ins letIns ipeFin ingQA/ ionFlo ileIns le Ins ileEle ionIns ingIns rayIns ingIns resIns lesIns AC)Ins -1)Int bleQA/ ionDoo owsIns orsSet ingIns ows

Page 20: Schedule

QA/ ionPai ingSet ingApp ingApp allApp ingApp allQA/ ionQA/ ionSys ion(F. ingSta zetSur OutBow ingPil entBow ankPil ingMas ionSoi ingSub OD)San ingLea eteIns ionMor imeQA/ ionPil ab)Bow ankSoi ll)Sub OD)San ingLea eteReb entIns orkCon ingCur imeFor valQA/ ionCon umnBow ankIns ingReb entApp lerIns orkFix ortCon ingCur imeFor valFin ing

Page 21: Schedule

Mov ingQA/ ionCon eamBow ankIns gerReb entIns BarApp lerIns orkCon ingCur imeFor valFin ingMov gerQA/ ionSte ureMov ingDel ureSet ionEre ureLev ingFit ureFul horFul intApp ingTou up Fin ingMov ingQA/ ionRoo ingMov ingIns p CIns RodIns kleIns oofFin ingRem ingQA/ ionWal llsMov ingIns allIns ameIns ameIns ageApp ingApp ingQA/ ionCei ing

Page 22: Schedule

Mov ingIns ameIns ameIns terIns potIns ciaIns iorIns iorDum nt)Fin ingRem ingQA/ ionPlu temIns ipeIns ipeFlo ainWat werIns letIns ipeFin ingQA/ ionCon oorBow ankSoi ingSub tedSan ingIns ticIns eshPla menIns orkPla ingCur imeFor valFin ingQA/ ionFlo ileIns ileEle ionIns ingIns rayIns ingIns resIns ???Int bleQA/ ionDoo owsIns orsSet ing

Page 23: Schedule

Ins owsQA/ ionPai ingSet ingApp ingApp allApp ingApp allQA/ ionQA/ ionSys ion(F. er Sta zetSur OutBow ingPil ingBow ankPip ingSoi ll)Sub OD)San ingLea eteReb entPla oltIns orkCon ingCur imeFor valQA/ ionCon labBow ankSub ll)Sub OD)San ingLea eteReb entIns orkApp lerApp intCon ingCur imeFor valFin ingQA/ ionDit tchBow ankSub ll)Sub OD)

Page 24: Schedule

San ingLea eteReb entIns orkApp lerApp lerCon ingCur imeFor oveFin ingQA/ tchIns ingQA/ ionSte ureMov ingDel ureSet ionEre ureLev ingApp ingTig horFin ingRem ingQA/ ionRoo ingMov ingIns p CIns RodIns kleIns oofFin ingRem ingQA/ ionWal ingMov ingIns ameIns RodIns ladRem ingQA/ ionGro temIns uitIns ionInt temQA/ ionLig ionPla RodIns uit

Page 25: Schedule

Ins ortPul torIns ls)Con RodInt temQA/ ionPlu temIns terIns outFin ingQA/ ionEle ionIns ingIns rayIns ingIns resIns lesIns -1)Int bleQA/ ionLig ionIns lbsIns ionIns lbsQA/ ionPum A/BSoi ll)Soi OD)Lea eteReb entIns horFix ingIns orkCon ingCur imeFor valFin ingQA/ ionIns A/BLev horApp ingPum entCon letCon temCon werQA/ /QCIns temIns ion

Page 26: Schedule

Ins cesQA/ ionQA/ ionSys ion(F. terSta zetSur OutBow ingPil ingBow ankPip ingSoi ll)Sub OD)San ingLea eteReb entPla oltIns orkCon ingCur imeFor valQA/ ionCon labBow ankSub ll)Sub OD)San ingLea eteReb entIns orkApp lerApp intCon ingCur imeFor valFin ingQA/ ionDit tchBow ankSub ll)Sub OD)San ingLea eteReb entIns orkApp lerApp lerCon ing

Page 27: Schedule

Cur imeFor oveFin ingQA/ tchIns ingQA/ ionSte ureMov ingDel ureSet ionEre ureLev ingApp ingTig horFin ingRem ingQA/ ionRoo ingMov ingIns p CIns RodIns kleIns oofFin ingRem ingQA/ ionWal ingMov ingIns ameIns RodIns ladRem ingQA/ ionSID SIDAnc ingApp ingIns ormIns SIDFin ingQA/ ionGro temIns uitIns ionInt temQA/ ionLig ionPla RodIns uit

Page 28: Schedule

Ins ortPul torIns ls)Con RodInt temQA/ ionPlu temIns terIns outFin ingQA/ ionEle ionIns ingIns rayIns ingIns resIns lesIns -1)Int bleQA/ ionLig ionIns lbsIns ionIns lbsQA/ ionPum A/BSoi ll)Soi OD)Lea eteReb entIns horFix ingIns orkCon ingCur imeFor valFin ingQA/ ionIns A/BLev horApp ingPum entCon letCon temCon werQA/ /QCIns temIns ion

Page 29: Schedule

Ins cesQA/ ionQA/ ionSys ion(F. reaSta zetSur OutBow ingCon labBow ankSub ll)Sub OD)San ingLea eteReb entPla lt Fix ingIns orkApp lerApp intCon ingCur imeFor valFin ingQA/ ionCon allReb entIns orkApp lerApp intCon ingCur imeFor valFin ingQA/ ionDit tchBow ankSub ll)Sub OD)San ingLea eteReb entIns orkApp lerApp lerCon ingCur imeFor ove

Page 30: Schedule

Fin ingQA/ tchIns ingQA/ ionSID SIDAnc ingApp ingIns ormIns SIDFin ingQA/ ionGro temIns uitIns ionInt temQA/ ionEle ionIns ingIns resIns BoxInt bleQA/ ionLig ionIns ionIns lbsQA/ ionPum A/BSoi ll)Soi OD)Lea eteReb entIns horFix ingIns orkCon ingCur imeFor valFin ingQA/ ionIns A/BLev horApp ingPum entCon letCon temCon werQA/ /QCIns tem

Page 31: Schedule

Ins ionIns cesQA/ ionQA/ ionSys ion(F. 6")Sta zetSur OutBow ingPil (6)Bow ankPip ingSoi ll)Sub OD)San ingLea eteReb entPla oltIns orkCon ingCur imeFor valQA/ ionCon labBow ankSub ll)Sub OD)San ingLea eteReb entIns orkApp lerApp lerCon ingCur imeFor valFin ingQA/ ionSte ureMov ingDel ureSet ionEre ureLev ingApp ingTig horFin ingRem ing

Page 32: Schedule

QA/ ionRoo ingMov ingIns p CIns RodIns kleIns oofFin ingRem ingQA/ ionHan ingFit ng)Ful ingTou UpQA/ ionGro temIns uitIns ionInt temQA/ ionPlu temIns terIns outFin ingQA/ ionEle ionIns uitIns ingIns resInt bleQA/ ionLig ionIns lbsQA/ ionQA/ ionSys ion(F. 01)Sta zetSur OutBow ingFab ionCut ialWel ingSur entCoa ingQA/ ionSca ingEre ing

Page 33: Schedule

Ins ingMov ingRem ingSoi ankSur OutSub ut)Sho ng Acc ingTem ionSoi OD)Den estQA/ ionSla ingBow ingSan ingLea eteReb labPla op)For ionCon or Cur imeFor valFin ingQA/ ionDia ingIns ingApp intReb ankWal ionPla ve)Pla honPla oltFix ingCon allCur imeFor valRem ingLea estFin ingQA/ ionSoi ankSoi ankCom OD)Den estQA/ ionSte PitAnc ingApp ing

Page 34: Schedule

Ere ateFin ingQA/ ionQA/ ionSys ion(F. 01)Sta zetSur OutBow ingFab ionCut ialWel ingSur entCoa ingQA/ ionSca ingEre ingIns ingMov ingRem ingSoi ankSur OutSub ut)Sho ng Acc ingTem ionSoi OD)Den estQA/ ionSla ingBow ingSan ingLea eteReb labPla op)For ionCon or Cur imeFor valFin ingQA/ ionDia ingIns ingApp intReb ankWal ionPla ve)Pla hon

Page 35: Schedule

Pla ateFix ingCon allCur imeFor valRem ingLea estFin ingQA/ ionSoi ankSoi ankCom OD)Den estQA/ ionHan ingEre ingFin ingQA/ ionQA/ ionSys ion(F. 01)Sta zetSur OutBow ingFab ionCut ialWel ingSur entCoa ingQA/ ionSca ingEre ingIns ingMov ingRem ingSoi ankSur OutSub ut)Sho ng Acc ingTem ionSoi OD)Den estQA/ ionSla ingBow ingSan ingLea ete

Page 36: Schedule

Reb labPla op)For ionCon or Cur imeFor valFin ingQA/ ionDia ingIns ingApp intReb ankWal ionPla ve)Pla honPla ateFix ingCon allCur imeFor valRem ingLea estFin ingQA/ ionSoi ankSoi ankCom OD)Den estQA/ ionHan ingEre ingFin ingQA/ ionQA/ ionSys ion(F. 01)Sta zetSur OutBow ingFab ionCut ialWel ingSur entCoa ingQA/ ionSca ingEre ingIns ing

Page 37: Schedule

Mov ingRem ingSoi ankSur OutSub ut)Sho ng Acc ingTem ionSoi OD)Den estQA/ ionSla ingBow ingSan ingLea eteReb labPla op)For ionCon or Cur imeFor valFin ingQA/ ionDia ingIns ingApp intReb ankWal ionPla ve)Pla honPla oltFix ingCon allCur imeFor valRem ingLea estFin ingQA/ ionSoi ankSoi ankCom OD)Den estQA/ ionSte PitAnc ingApp ingEre ate

Page 38: Schedule

Fin ingQA/ ionQA/ ionSys ion(F. 4")Sta zetSur OutBow ingPil eamBow ankPip ingSoi ll)Sub OD)San ingLea eteReb entIns orkCon ingCur imeFor valQA/ ionCon ionApp intReb entPla oltIns orkApp lerApp lerCon ingCur imeFor valFin ingQA/ ionBac ingSoi illSoi OD)QA/ ionSte ureMov ingDel ureSet ionEre ureEre ureFit ailWel ailEre derTou ingLev ing

Page 39: Schedule

App ingTig horFin ingRem ingQA/ ionLad ionSoi ig)Soi OD)San ingLea eteReb entPla oltIns orkCon ingCur imeFor valFin ingBac illQA/ ionWat ingIns donIns ipeIns ipeFin ingQA/ ionGro temIns uitIns ionInt temQA/ ionQA/ ionSys ion(F. 4")Sta zetSur OutBow ingPil eamBow ankPip ingSoi ll)Sub OD)San ingLea eteReb entIns orkCon ingCur imeFor val

Page 40: Schedule

QA/ ionCon ionApp intReb entPla oltIns orkApp lerApp lerCon ingCur imeFor valFin ingQA/ ionBac ingSoi illSoi OD)QA/ ionSte ureMov ingDel ureSet ionEre ureEre ureFit ailWel ailEre derTou ingLev ingApp ingTig horFin ingRem ingQA/ ionLad ionSoi ig)Soi OD)San ingLea eteReb entPla oltIns orkCon ingCur imeFor valFin ingBac illQA/ ionWat ing

Page 41: Schedule

Ins donIns ipeIns ipeFin ingQA/ ionGro temIns uitIns ionInt temQA/ ionQA/ ionSys ion(F. df)Sta zetSur OutBow ingPil eamBow ankPip ingSoi ll)Sub OD)San ingLea eteReb entIns orkCon ingCur imeFor valQA/ ionCon ionApp intReb entPla oltIns orkApp lerApp lerCon ingCur imeFor valFin ingQA/ ionBac ingSoi illSoi OD)QA/ ionSte ureMov ingDel ure

Page 42: Schedule

Set ionEre ureEre ureFit ailWel ailEre derTou ingLev ingApp ingTig horFin ingRem ingQA/ ionLad ionSoi ig)Soi OD)San ingLea eteReb entPla oltIns orkCon ingCur imeFor valFin ingBac illQA/ ionWat ingIns donIns ipeIns ipeFin ingQA/ ionGro temIns uitIns ionInt temQA/ ionQA/ ionSys ion(F. 1")Con ionBow ankSoi ingSoi OD)Lea eteReb entIns hor

Page 43: Schedule

Fix ingIns orkCon ingCur imeFor valFin ingQA/ ionQA/ ionSys ion(F. 1")Con ionBow ankSoi ingSoi OD)Lea eteReb entIns oltFix ingIns orkCon ingCur imeFor valFin ingQA/ ionQA/ ionSys ion(F. 1")Con ionBow ankSoi ingSoi OD)Lea eteReb entIns horFix ingIns orkCon ingCur imeFor valFin ingQA/ ionQA/ ionSys ion(F. ankCon ionBow ankSoi ingSoi OD)

Page 44: Schedule

Lea eteReb entIns horFix ingIns orkCon ingCur imeFor valFin ingQA/ ionQA/ ionSys ion(F. ankCon ionBow ankSoi ingSoi OD)Lea eteReb entIns horFix ingIns orkCon ingCur imeFor valFin ingQA/ ionQA/ ionSys ion(F. 1")Sta zetSur OutBow ingPil entBow ankPil ingQA/ ionCon on Bow ankSoi ng)Soi OD)Lea eteReb entFix ingIns orkCon ingCur imeFor val

Page 45: Schedule

Fin ingQA/ ionQA/ ionSys ion(F. BoxSoi terSur OutCle ingRep entBot ED)Slo ingSoi ionRou ingQA/ ionTem ow)Sur OutExc entSlo ingRou ingQA/ ionBox ng)Sur OutCle ingBow ingRep entBot ED)Soi OD)Pip ED)Ins eamPre entApp intSoi ingSoi DD)QA/ ionBox cy)Sur OutCle ingBow ingRep entBot ED)Soi OD)Pre entApp intSoi ingSoi DD)QA/ ionBox on)Sur Out

Page 46: Schedule

Cle ingBow ingRep entBot ED)Soi OD)Pre entApp intSoi ingSoi DD)QA/ ionRem lowExc oilBac illSoi DD)QA/ ionBox ng)Sur OutCle ingBow ingRep entBot ED)Soi OD)Pre entApp intSoi ingSoi DD)QA/ ionOpe CCFSur OutBow ingSub nt)Bot ingSoi OD)San yerIns barIns orkCon ingCur imeFor valFin ingQA/ ionCon BoxSur OutBow ingBot ingSoi OD)San yerIns bar

Page 47: Schedule

Ins orkCon ingCur imeFor valPla verFin ingQA/ ionFin ingJoi ageQA/ ionQA/ ionQA/ ion(F. ankSta OutSta OutCon labBow ingExc ualSoi DD)San yerLea eteReb entFra orkCon ingCur imeFra oveQA/ ionCon allReb entIns ainFix ingFra orkApp intCon ingCur imeFra oveQA/ ionFin ingPla olePla verIns ipeInt aceInt ainbac ionQA/ ionQA/ ionQA/ ion(F. ion

Page 48: Schedule

Sta zetSur OutBow ingFen ionDig ionFix nt)For orkCon entCon ingFor valBac ionQA/ ionCon ingDig ingSoi OD)San ingLea eteReb entFor orkCon ingCur imeFor valBac ionQA/ ionFen ionBra ionCha ionBar ionTou ingQA/ ion(Tr ionDig ionFix nt)For orkCon entCon ingFor valBac ionQA/ ion(Tr ionBra ionCha ionBar ionTou ingQA/ ionNew on)Bow ankDig ion

Page 49: Schedule

Exc on)San yerLea eteReb entPos ingFor orkCon ingCon ingFor valBac ionSca allIns me Ins opeIns inkIns ockTou ingQA/ ionSca tleNew cy)Bow ankDig ionExc on)San yerLea eteReb entPos ingFor orkCon ingCon ingFor valBac ionSca allIns me Ins opeIns inkIns ockTou ingQA/ ionSca tleNew ea)Bow ankDig ionExc on)San yerLea eteReb entPos ingFor ork

Page 50: Schedule

Con ingCon ingFor valBac ionSca allIns me Ins opeIns inkIns ockTou ingQA/ ionSca tleNew cy)Bow ankDig ionExc on)San cm)Lea 75)Reb entFor orkPos ingCon ingCon 50)For valCon ionBac ionSca allIns me Ins opeIns inkIns ockTou ingQA/ ionSca tle(F. einCla ng)Sur OutSur OutRe- ialVer entVer aseVer aseVer MixSub ionSur OutSoi ic)Hau entSoi er)

Page 51: Schedule

Com OD)Fin ingDen estQA/ ionSub aseSur aseHau ED)Soi er)Sub er)Sub er)Fin ingDen estQA/ ionBas aseSur aseHau ED)Bas er)bas er)bas er)Lev ingDen estQA/ ionSur altPri oatCle ow)Swe ingApp nt)Cur oatQA/ oatTac oatCle ow)Swe ingApp nt)Cur oatQA/ oatAsp eteCle lt)Lay er)Lev er)Com er)Den estQA/ ionQA/ ionQA/ ionPar ea)Sur OutSur OutRe- ial

Page 52: Schedule

Ver entVer aseVer aseVer MixSub ionSur OutSoi ic)Hau entSoi er)Com OD)Fin ingDen estQA/ ionSub aseSur aseHau ED)Soi er)Sub er)Sub er)Fin ingDen estQA/ ionBas aseSur aseHau ED)Bas er)bas er)bas er)Lev ingDen estQA/ ionQA/ ionQA/ ionKan in Sur OutRoa nt)San yerPla ockPla ingQA/ ionSig pe)Sur OutDel oadDig ingLea eteReb entPla ostSup ost

Page 53: Schedule

For orkCon ingCur imeRem orkBac ionQA/ ionPai ingMar ingApp aceApp ockApp ingQA/ ionQA/ ionQA/ ion(F. werCon ionSta ut Bow ankSoi ingSoi OD)Lea eteReb entIns oltFix ingIns orkCon ingCur imeFor valFin ingQA/ ionIns werLev horApp ingEre werCon 301QA/ ion(F. ionPow lotPil ionPip ingFit ionVer itywel olepai ingGro ingGro venGro odyBac ion

Page 54: Schedule

QA/ ionPol ingPil ingPip ingSoi ll)Sub OD)San ingLea eteReb entPla oltPla uitIns orkCon ingCur imeFor valBac actQA/ ionIns ingSet ingPla resPla bleEre ghtAnc ingAnc tenGro ingQA/ ion(F. SIDSID terOth SIDSID ut SID rksSID ionSID ion(F. am)Sur OutSet entDri ingBor ingPip entBac ED)Dig ingIns ED)Ins ingIns orkCon entCur imeRem orkBac act

Page 55: Schedule

QA/ ion(F. am)Sur OutSet entDri ingBor ingPip entBac ED)Dig ingIns ED)Ins ingIns orkCon entCur imeRem orkBac actQA/ ion(F. uctGro venGro odyBac ionQA/ ion(F. 01)Sta zetSur OutBow ingPip 01)Fou ionExc ingSoi OD)Pla ortFix ingSan ingLea eteIns barIns orkCon ingCur imeBac illSoi OD)QA/ ionPip ng)Fou ionExc ingSoi OD)Gra cmLea eteIns bar

Page 56: Schedule

Ins orkCon ingCur imeRem orkBac ionQA/ ionPla inePip ipeFit eldFul eldPla verQA/ ing(F. ng)Pip 01)Sta zetSur OutBow ingFou ionExc ingSoi OD)Pla ortFix ingSan ingLea eteIns barIns orkCon ingCur imeRem orkBac ionQA/ ionPip SMFSta zetSur OutBow ingBar oadClo f )Ope alfOpe adeDem sh Che bleCut entDem ED)Fou ionIns barIns orkCon ingCur ime

Page 57: Schedule

Pla verQA/ ionPla inePip ipeQA/ ingRep ingIns verApp entQA/ ion(F. orkGra assSpr oilPla assWat ingQA/ ionPla ionDig ingRep oilPla ionWat ingPro ortQA/ ion(C. cal(C. ingLev horApp ingPum A/BCon A/BCon temCon werQA/ /QC(C. ingLev horApp ingPum A/BCon A/BCon A/BCon A/BQA/ /QC(C. ingLev horApp ingPum A/BCon A/BCon A/BCon A/BQA/ /QC(C. /B)

Page 58: Schedule

Lev horApp ingPum A/BCon A/BCon A/BCon A/BQA/ /QC(C. /B)Lev horApp ingPum A/BCon A/BCon A/BCon A/BQA/ /QC(C. /B)Lev horApp ingPum A/BCon A/BCon A/BCon A/BQA/ /QC(C. WDRIns lveIns letQA/ ion(C. ateIns lveIns letQA/ ion(C. ankIns lveIns letQA/ ion(C. ingQA/ lotEre ipePip entIns ingFit eldFul eldCon lveQA/ ion(C. MF)QA/ ingQA/ lotEre ipe

Page 59: Schedule

Pip entIns ingFit eldFul eldCon lveQA/ ionTie ew)Rep CPIPer orkPro entPro itePto itepro iteWai ownshu ownCut nt)Tug ingFul eldRad estQA/ ion(C. cleQA/ iceQA/ WDRQA/ ateQA/ ankQA/ umpQA/ er)QA/ ck)QA/ iceQA/ ackQA/ age(C. rksOth rksQA/ ion (E cal(E. merRep CPIMat CPIMat valWor ainPic useLev ionApp ingPla aceFix tonIns ingInt ingPul afo

Page 60: Schedule

Ins angIns xedChe offInt afoTes ingTes ialQA/ ion(E. CC)Ins oomIns torIns barIns CCBIns ingIns tchInt ingInt rceInt letPla TagPla am Fun estDes estDC estQA/ ionLot MCC(E. ridSta OutGri ng)Soi ingSub ionDri estDri RodPul or)Exo le)Exo le)Bac ineMar ingQA/ ion(E. lesRep ronReq mitPer oveSet entPul le Ins angIns xedInt ineQA/ ion(E. les

Page 61: Schedule

Und bleSta OutExc nchCom oilPul blePla ileQA/ ionbac actint ectPla uitCon 01Con 02Con 03Con 04Con 05Con MCCCon afoQA/ ionMar ingPla kerQA/ ionQA/ ion(E. raypre rayins ortben raybon rayQA/ ion(E. ngsCom ingCom ingQA/ ion(E. etcQA/ iceQA/ oomQA/ reaQA/ ackQa/ WDRQA/ ateQA/ ank(E. rksOth rksQA/ ing (D ork(G) Up(G) INGPum torVis nit

Page 62: Schedule

Ins idChe antChe aseChe ccuChe ionChe velUnc temCon estMeg torMeg bleCab nelGro nelIns ionIns g, Wel ionHid estFin ent(G) ingPum mpsVis istIns umpIns mpsCon al)Gro nelIns ionPip ineIns g, Wel ionHid estDew ingFin ent(G) upRep CPICon om)Con om)(G) Uprep CPIPro iteDel eamDel eamCPI UpRec ityAs agePro ingCon veyPro ingFin ageCon vey

Page 63: Schedule

Ver ingAs etePro ingBor inoBor ingQA/ ingBor oadBor ingQA/ ingTem ingFin iesQA/ valTem iceTem tleQA/ tlePro OutHan verClo Out

Page 64: Schedule

538 days4 days1 day4 days1 day22 days22 days3 days1 day1 day1 day1 day1 day2 days3 days2 days3 days2 days3 days7 days10 days1 day2 days1 day2 days2 days2 days2 days5 days2 days4 days4 days7 days7 days7 days7 days7 days7 days14 days14 days14 days14 days11 days2 days1 day1 day1 day

Page 65: Schedule

5 days5 days5 days18 days3 days6 days6 days6 days9 days9 days9 days13 days7 days7 days7 days7 days6 days2 days3 days2 days2 days2 days14 days2 days2 days2 days2 days2 days2 days5 days16 days1 day2 days2 days5 days4 days2 days2 days2 days2 days2 days2 days21 days2 days2 days2 days1 day1 day

Page 66: Schedule

12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days

Page 67: Schedule

12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days12 days5 days7 days6 days1 day4 days1 day3 days3 days3 days14 days10 days10 days10 days10 days10 days8 days3 days3 days3 days3 days3 days7 days7 days7 days7 days

Page 68: Schedule

7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days7 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days8 days

Page 69: Schedule

8 days7 days7 days7 days7 days7 days7 days7 days7 days5 days5 days5 days5 days5 days5 days5 days5 days404 days307 days20 days20 days20 days20 days12 days4 days5 days2 days3 days1 day1 day12 days4 days5 days2 days3 days1 day1 day12 days4 days5 days2 days3 days1 day1 day12 days4 days5 days2 days

Page 70: Schedule

3 days1 day1 day12 days4 days5 days2 days3 days1 day1 day12 days4 days5 days2 days3 days1 day1 day12 days4 days5 days2 days3 days1 day1 day12 days4 days5 days2 days3 days1 day1 day35 days3 days3 days3 days3 days1 day28 days2 days2 days77 days75 days75 days75 days75 days75 days75 days75 days

Page 71: Schedule

75 days48 days6 days6 days6 days6 days6 days36 days2 days2 days32 days3 days3 days3 days3 days1 day28 days2 days2 days5 days4 days5 days5 days4 days5 days5 days4 days5 days6 days2 days3 days2 days2 days1 day8 days2 days3 days2 days2 days1 day8 days2 days3 days2 days2 days1 day12 days4 days

Page 72: Schedule

5 days2 days3 days1 day1 day12 days4 days5 days2 days3 days1 day1 day12 days4 days5 days2 days3 days1 day1 day12 days4 days5 days2 days3 days1 day1 day12 days4 days5 days2 days3 days1 day1 day48 days1 day3 days2 days4 days4 days2 days4 days4 days30 days30 days30 days35 days35 days35 days

Page 73: Schedule

4 days4 days4 days3 days3 days19 days4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day

Page 74: Schedule

4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day4 days2 days1 day2 days2 days1 day404 days121 days2 days2 days2 days36 days1 day3 days3 days4 days3 days3 days

Page 75: Schedule

2 days5 days3 days28 days3 days3 days38 days1 day3 days3 days2 days5 days4 days3 days28 days4 days2 days2 days3 days41 days1 day3 days3 days1 day2 days5 days3 days28 days4 days2 days2 days3 days14 days14 days4 days4 days4 days4 days4 days3 days3 days3 days2 days2 days3 days3 days13 days13 days

Page 76: Schedule

2 days2 days2 days3 days2 days2 days2 days19 days13 days12 days4 days4 days4 days5 days5 days2 days17 days13 days2 days2 days2 days2 days2 days3 days3 days6 days2 days2 days2 days16 days2 days2 days1 day1 day1 day1 day1 day1 day1 day1 day1 day2 days2 days44 days1 day3 days4 days4 days

Page 77: Schedule

2 days5 days2 days2 days1 day28 days4 days2 days3 days7 days3 days7 days9 days7 days7 days7 days7 days7 days7 days7 days7 days9 days12 days10 days2 days5 days2 days11 days3 days3 days6 days3 days4 days2 days4 days2 days2 days2 days3 days3 days121 days2 days2 days2 days36 days1 day3 days3 days

Page 78: Schedule

4 days3 days3 days2 days5 days3 days28 days3 days3 days31 days1 day3 days3 days2 days5 days4 days3 days28 days4 days2 days2 days3 days41 days1 day3 days3 days1 day2 days5 days3 days28 days4 days2 days2 days3 days14 days14 days4 days4 days4 days4 days4 days3 days3 days3 days2 days2 days3 days

Page 79: Schedule

3 days13 days13 days2 days2 days2 days3 days2 days2 days2 days19 days13 days12 days4 days4 days4 days5 days5 days2 days17 days13 days2 days2 days2 days2 days2 days3 days3 days6 days2 days2 days2 days16 days2 days2 days1 day1 day1 day1 day1 day1 day1 day1 day1 day2 days2 days7 days3 days

Page 80: Schedule

7 days9 days7 days7 days7 days7 days7 days7 days7 days7 days9 days12 days10 days2 days5 days2 days11 days3 days3 days6 days3 days4 days2 days3 days3 days121 days2 days2 days2 days36 days1 day3 days3 days4 days3 days3 days2 days5 days3 days28 days3 days3 days31 days1 day3 days3 days2 days5 days

Page 81: Schedule

4 days3 days28 days4 days2 days2 days3 days41 days1 day3 days3 days1 day2 days5 days3 days28 days4 days2 days2 days3 days14 days14 days4 days4 days4 days4 days4 days3 days3 days3 days2 days2 days3 days3 days13 days13 days2 days2 days2 days3 days2 days2 days2 days19 days13 days12 days4 days4 days

Page 82: Schedule

4 days5 days5 days2 days17 days13 days2 days2 days2 days2 days2 days3 days3 days6 days2 days2 days2 days16 days2 days2 days1 day1 day1 day1 day1 day1 day1 day1 day1 day2 days2 days7 days3 days7 days9 days7 days7 days7 days7 days7 days7 days7 days7 days9 days12 days10 days2 days5 days

Page 83: Schedule

2 days11 days3 days3 days6 days3 days4 days2 days3 days3 days127 days2 days2 days2 days3 days1 day3 days12 days2 days2 days2 days1 day3 days2 days3 days36 days1 day3 days4 days3 days3 days2 days5 days3 days28 days3 days3 days38 days1 day3 days3 days2 days5 days4 days3 days28 days4 days2 days

Page 84: Schedule

2 days3 days41 days1 day3 days3 days1 day2 days5 days3 days28 days4 days2 days2 days3 days14 days14 days4 days4 days4 days4 days4 days3 days3 days3 days2 days2 days3 days3 days13 days13 days2 days2 days2 days3 days2 days2 days2 days19 days13 days12 days4 days4 days4 days5 days5 days2 days17 days

Page 85: Schedule

13 days2 days2 days2 days2 days2 days3 days3 days6 days2 days2 days2 days11 days2 days2 days1 day1 day1 day1 day2 days2 days44 days1 day3 days4 days4 days2 days5 days2 days2 days1 day28 days4 days2 days3 days7 days7 days6 days3 days3 days3 days3 days3 days3 days6 days6 days4 days2 days

Page 86: Schedule

2 days2 days11 days3 days3 days6 days3 days4 days2 days3 days3 days113 days2 days2 days2 days42 days1 day3 days3 days4 days3 days3 days2 days2 days3 days2 days28 days3 days3 days55 days1 day3 days4 days3 days3 days5 days4 days2 days2 days3 days28 days4 days2 days3 days55 days1 day2 days3 days

Page 87: Schedule

3 days3 days5 days4 days2 days2 days4 days28 days4 days2 days3 days7 days3 days15 days14 days4 days4 days4 days4 days2 days2 days2 days3 days3 days14 days13 days2 days2 days2 days3 days2 days2 days2 days14 days11 days7 days7 days7 days3 days3 days7 days4 days4 days4 days2 days11 days2 days7 days

Page 88: Schedule

7 days7 days7 days2 days2 days2 days9 days5 days5 days5 days2 days9 days7 days7 days7 days7 days7 days7 days7 days9 days7 days5 days5 days5 days7 days57 days4 days5 days4 days4 days4 days4 days4 days4 days28 days4 days3 days3 days10 days1 day5 days4 days2 days1 day1 day4 days10 days10 days

Page 89: Schedule

10 days10 days3 days3 days113 days2 days2 days2 days42 days1 day3 days3 days4 days3 days3 days2 days2 days3 days2 days28 days3 days3 days55 days1 day3 days4 days3 days3 days5 days4 days2 days2 days3 days28 days4 days2 days3 days55 days1 day2 days3 days3 days3 days5 days4 days2 days2 days4 days

Page 90: Schedule

28 days4 days2 days3 days7 days3 days15 days14 days4 days4 days4 days4 days2 days2 days2 days3 days3 days14 days13 days2 days2 days2 days3 days2 days2 days2 days14 days11 days7 days7 days7 days3 days3 days14 days2 days2 days6 days6 days2 days2 days7 days4 days4 days4 days2 days11 days2 days7 days

Page 91: Schedule

7 days7 days7 days2 days2 days2 days9 days5 days5 days5 days2 days9 days7 days7 days7 days7 days7 days7 days7 days9 days7 days5 days5 days5 days7 days57 days4 days5 days4 days4 days4 days4 days4 days4 days28 days4 days3 days3 days10 days1 day5 days4 days2 days1 day1 day4 days10 days10 days

Page 92: Schedule

10 days10 days3 days3 days189 days2 days2 days2 days54 days1 day3 days4 days3 days3 days7 days2 days2 days4 days2 days2 days4 days28 days4 days2 days3 days40 days5 days4 days2 days2 days3 days28 days4 days2 days3 days53 days1 day2 days3 days2 days3 days4 days4 days2 days2 days3 days28 days3 days

Page 93: Schedule

2 days3 days5 days3 days14 days2 days2 days6 days6 days2 days2 days7 days4 days4 days4 days2 days9 days7 days7 days7 days7 days9 days7 days5 days5 days7 days57 days4 days5 days4 days4 days4 days4 days4 days4 days28 days4 days3 days3 days10 days1 day5 days4 days2 days1 day1 day4 days10 days

Page 94: Schedule

10 days10 days10 days3 days3 days127 days1 day1 day1 day40 days1 day1 day1 day2 days1 day1 day2 days2 days3 days2 days28 days3 days3 days53 days1 day3 days4 days3 days3 days5 days2 days2 days2 days3 days28 days2 days2 days3 days15 days14 days4 days4 days4 days4 days2 days2 days2 days3 days

Page 95: Schedule

3 days14 days13 days2 days2 days2 days3 days2 days2 days2 days14 days7 days7 days7 days3 days7 days4 days4 days4 days2 days9 days5 days5 days5 days2 days9 days7 days7 days7 days7 days9 days5 days3 days2 days3 days3 days135 days3 days3 days3 days1 day1 day1 day1 day1 day1 day52 days10 days

Page 96: Schedule

10 days10 days5 days13 days5 days10 days10 days10 days10 days10 days10 days2 days53 days1 day5 days5 days10 days3 days3 days4 days28 days2 days2 days2 days65 days3 days3 days10 days10 days3 days3 days3 days3 days4 days28 days7 days5 days3 days5 days5 days15 days12 days12 days12 days3 days19 days2 days2 days

Page 97: Schedule

10 days3 days3 days4 days4 days118 days3 days3 days3 days1 day1 day1 day1 day1 day1 day52 days10 days10 days10 days5 days13 days5 days10 days10 days10 days10 days10 days10 days2 days53 days1 day5 days5 days10 days3 days3 days4 days28 days2 days2 days2 days65 days3 days3 days10 days10 days3 days3 days

Page 98: Schedule

3 days3 days4 days28 days7 days5 days3 days5 days5 days11 days8 days8 days8 days3 days6 days4 days1 day1 day4 days4 days118 days3 days3 days3 days1 day1 day1 day1 day1 day1 day52 days10 days10 days10 days5 days13 days5 days10 days10 days10 days10 days10 days10 days2 days53 days1 day5 days5 days

Page 99: Schedule

10 days3 days3 days4 days28 days2 days2 days2 days65 days3 days3 days10 days10 days3 days3 days3 days3 days4 days28 days7 days5 days3 days5 days5 days11 days8 days8 days8 days3 days6 days4 days1 day1 day4 days4 days135 days3 days3 days3 days1 day1 day1 day1 day1 day1 day52 days10 days10 days

Page 100: Schedule

10 days5 days13 days5 days10 days10 days10 days10 days10 days10 days2 days53 days1 day5 days5 days10 days3 days3 days4 days28 days2 days2 days2 days65 days3 days3 days10 days10 days3 days3 days3 days3 days4 days28 days7 days5 days3 days5 days5 days15 days12 days12 days12 days3 days19 days2 days2 days10 days

Page 101: Schedule

3 days3 days4 days4 days126 days1 day1 day1 day47 days1 day1 day2 days3 days2 days3 days3 days4 days3 days28 days2 days3 days42 days1 day5 days2 days2 days2 days2 days3 days28 days2 days2 days3 days8 days2 days5 days3 days16 days14 days4 days2 days3 days3 days1 day2 days3 days2 days1 day

Page 102: Schedule

2 days2 days2 days3 days3 days31 days1 day1 day1 day1 day1 day1 day1 day1 day28 days1 day1 day1 day2 days5 days1 day2 days2 days1 day2 days7 days4 days4 days4 days2 days3 days3 days126 days1 day1 day1 day47 days1 day1 day2 days3 days2 days3 days3 days4 days3 days28 days2 days

Page 103: Schedule

3 days42 days1 day5 days2 days2 days2 days2 days3 days28 days2 days2 days3 days8 days2 days5 days3 days16 days14 days4 days2 days3 days3 days1 day2 days3 days2 days1 day2 days2 days2 days3 days3 days31 days1 day1 day1 day1 day1 day1 day1 day1 day28 days1 day1 day1 day2 days5 days

Page 104: Schedule

1 day2 days2 days1 day2 days7 days4 days4 days4 days2 days3 days3 days126 days1 day1 day1 day47 days1 day1 day2 days3 days2 days3 days3 days4 days3 days28 days2 days3 days42 days1 day5 days2 days2 days2 days2 days3 days28 days2 days2 days3 days8 days2 days5 days3 days16 days14 days4 days

Page 105: Schedule

2 days3 days3 days1 day2 days3 days2 days1 day2 days2 days2 days3 days3 days31 days1 day1 day1 day1 day1 day1 day1 day1 day28 days1 day1 day1 day2 days5 days1 day2 days2 days1 day2 days7 days4 days4 days4 days2 days3 days3 days37 days36 days1 day1 day2 days1 day3 days2 days

Page 106: Schedule

2 days3 days1 day28 days1 day1 day1 day1 day1 day37 days36 days1 day1 day2 days1 day3 days2 days2 days3 days1 day28 days1 day1 day1 day1 day1 day37 days36 days1 day1 day2 days1 day3 days2 days2 days3 days1 day28 days1 day1 day1 day1 day1 day37 days36 days1 day1 day2 days

Page 107: Schedule

1 day3 days2 days2 days3 days1 day28 days1 day1 day1 day1 day1 day37 days36 days1 day1 day2 days1 day3 days2 days2 days3 days1 day28 days1 day1 day1 day1 day1 day39 days2 days2 days2 days2 days1 day1 day1 day36 days1 day1 day2 days1 day3 days2 days3 days1 day28 days1 day

Page 108: Schedule

1 day1 day1 day1 day86 days26 days24 days2 days4 days4 days4 days8 days2 days2 days3 days1 day1 day2 days2 days1 day18 days16 days1 day1 day1 day2 days3 days1 day4 days3 days3 days2 days2 days2 days10 days9 days1 day1 day1 day2 days2 days2 days2 days2 days2 days1 day9 days9 days

Page 109: Schedule

1 day1 day1 day1 day1 day2 days2 days1 day1 day1 day3 days1 day1 day2 days1 day10 days9 days1 day1 day1 day2 days2 days2 days2 days2 days2 days1 day62 days24 days6 days6 days20 days20 days20 days24 days24 days24 days52 days24 days5 days5 days51 days1 day6 days6 days6 days6 days6 days

Page 110: Schedule

6 days6 days34 days6 days4 days5 days5 days5 days4 days5 days5 days5 days39 days1 day1 day28 days1 day2 days2 days1 day1 day2 days1 day1 day28 days1 day1 day32 days2 days1 day1 day2 days1 day1 day28 days1 day1 day4 days1 day1 day1 day2 days2 days1 day1 day2 days2 days156 days

Page 111: Schedule

20 days20 days20 days47 days10 days10 days10 days10 days40 days20 days20 days20 days50 days10 days10 days10 days10 days10 days10 days10 days40 days10 days10 days10 days27 days10 days10 days10 days10 days10 days36 days1 day1 day1 day1 day31 days1 day2 days1 day18 days2 days2 days2 days2 days1 day42 days1 day1 day

Page 112: Schedule

1 day1 day1 day2 days2 days2 days2 days32 days1 day2 days3 days4 days1 day2 days1 day1 day2 days3 days41 days1 day1 day1 day1 day1 day1 day1 day1 day2 days32 days1 day1 day2 days2 days1 day1 day1 day1 day1 day2 days40 days1 day1 day1 day1 day1 day1 day1 day1 day

Page 113: Schedule

1 day31 days1 day1 day1 day1 day1 day1 day1 day1 day1 day1 day41 days1 day1 day1 day1 day1 day1 day2 days2 days1 day28 days1 day2 days2 days4 days4 days2 days2 days1 day1 day2 days3 days110 days62 days45 days45 days2 days2 days2 days2 days2 days19 days16 days3 days5 days5 days

Page 114: Schedule

10 days10 days10 days10 days12 days10 days5 days5 days5 days5 days5 days5 days5 days12 days10 days5 days9 days9 days9 days9 days9 days9 days12 days11 days10 days10 days10 days10 days11 days6 days5 days5 days5 days5 days6 days11 days11 days11 days11 days11 days11 days11 days5 days5 days55 days55 days55 days2 days

Page 115: Schedule

2 days2 days2 days2 days19 days16 days3 days5 days5 days10 days10 days10 days10 days12 days10 days5 days5 days5 days5 days5 days5 days5 days12 days10 days5 days9 days9 days9 days9 days9 days9 days5 days5 days29 days25 days25 days25 days25 days25 days25 days43 days10 days10 days10 days10 days10 days10 days10 days

Page 116: Schedule

10 days10 days40 days10 days10 days25 days15 days10 days8 days8 days12 days12 days2 days2 days39 days39 days1 day1 day1 day1 day1 day2 days2 days1 day3 days1 day31 days1 day1 day1 day8 days1 day2 days2 days1 day1 day150 days4 days4 days3 days3 days3 days3 days3 days3 days3 days3 days3 days

Page 117: Schedule

4 days40 days40 days4 days4 days4 days4 days4 days4 days4 days4 days4 days4 days34 days4 days4 days4 days10 days8 days8 days8 days8 days8 days8 days9 days9 days45 days0 days45 days30 days30 days30 days30 days47 days3 days3 days6 days6 days6 days6 days6 days6 days6 days6 days6 days36 days6 days8 days

Page 118: Schedule

9 days47 days3 days3 days6 days6 days6 days6 days6 days6 days6 days6 days6 days36 days6 days8 days9 days4 days3 days3 days3 days4 days41 days8 days8 days8 days41 days41 days7 days7 days7 days7 days7 days7 days7 days7 days7 days37 days7 days7 days7 days40 days40 days5 days5 days5 days5 days5 days

Page 119: Schedule

5 days5 days35 days5 days5 days5 days4 days4 days2 days2 days4 days4 days47 days47 days8 days8 days8 days47 days5 days5 days5 days5 days5 days5 days5 days5 days5 days35 days5 days5 days5 days47 days14 days14 days14 days17 days1 day1 day1 day14 days14 days14 days14 days47 days14 days14 days14 days44 days

Page 120: Schedule

14 days14 days14 days14 days14 days16 days14 days14 days14 days39 days32 days10 days10 days10 days10 days7 days5 days5 days5 days5 days5 days5 days327 days13 days1 day1 day3 days3 days3 days3 days3 days13 days1 day1 day3 days3 days3 days3 days3 days13 days1 day1 day3 days3 days3 days3 days3 days13 days

Page 121: Schedule

1 day1 day3 days3 days3 days3 days3 days13 days1 day1 day3 days3 days3 days3 days3 days13 days1 day1 day3 days3 days3 days3 days3 days4 days1 day1 day3 days4 days1 day1 day3 days4 days1 day1 day3 days20 days1 day20 days20 days20 days20 days20 days20 days20 days14 days1 day1 day10 days

Page 122: Schedule

10 days10 days10 days10 days10 days10 days4 days2 days1 day1 day1 day1 day1 day1 day1 day1 day1 day1 day1 day1 day2 days2 days2 days2 days2 days2 days2 days2 days2 days2 days2 days30 days30 days30 days404 days4 days1 day1 day1 day1 day1 day1 day1 day1 day1 day1 day1 day1 day

Page 123: Schedule

1 day1 day1 day1 day1 day1 day1 day13 days2 days2 days2 days2 days2 days2 days1 day1 day1 day2 days2 days2 days2 days2 days4 days1 day23 days7 days7 days7 days7 days7 days7 days10 days10 days10 days10 days10 days3 days12 days6 days6 days6 days6 days6 days6 days6 days6 days6 days10 days

Page 124: Schedule

10 days5 days5 days5 days5 days5 days5 days5 days9 days4 days4 days4 days4 days4 days4 days1 day1 day8 days6 days6 days7 days7 days35 days30 days30 days30 days30 days30 days404 days1 day1 day1 day311 days2 days2 days2 days2 days2 days2 days2 days21 days20 days20 days100 days67 days13 days2 days2 days

Page 125: Schedule

2 days2 days2 days2 days2 days2 days2 days2 days2 days2 days2 days2 days2 days2 days3 days3 days3 days17 days7 days2 days2 days2 days2 days2 days2 days10 days2 days2 days3 days3 days2 days23 days1 day12 days18 days7 days7 days7 days7 days7 days7 days7 days484 days458 days180 days278 days13 days5 days

Page 126: Schedule

3 days5 days440 days7 days5 days2 days7 days5 days2 days5 days5 days3 days17 days14 days5 days14 days7 days7 days