sconul library design award
DESCRIPTION
Presentation delivered during a visit by SCONUL Library Design Awards panel. University of York 10th July 2013TRANSCRIPT
![Page 1: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/1.jpg)
SCONUL Design Award
University of York10th July 2013
![Page 2: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/2.jpg)
“What I want is a library which is alive, and which is seen to be alive”
Harry Fairhurst, Founding University Librarian,
University of York
![Page 3: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/3.jpg)
![Page 4: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/4.jpg)
![Page 5: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/5.jpg)
![Page 6: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/6.jpg)
![Page 7: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/7.jpg)
![Page 8: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/8.jpg)
![Page 9: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/9.jpg)
![Page 10: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/10.jpg)
![Page 11: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/11.jpg)
Summary
• University Context• History, drivers, opportunities• Vision• Project delivery• Measurement & outcomes• Panel initial questions & requirements
![Page 12: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/12.jpg)
• Founded 1963; 50th this year• 1st UK under 50; UK top 15;
RAE 8th; World 103rd; Russell Group; WUN
• 15,265 students• >30 departments in
humanities, social sciences, science
• Campus growth– Heslington East
• City and Region• White Rose partnership
The University
![Page 13: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/13.jpg)
York distinctiveness
• University Plan– Excellence– Internationalisation– Inclusivity– Sustainability
• Teaching and research in balance, mutual and strong
• A Campus based community and Collegiate• Collaborative and consensual
![Page 14: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/14.jpg)
• > 1m items• >120 staff• Archives extensive &
unique• Developing digital library
expertise• SCONUL, RLUK, &
international groups• Now part of a broader
Information Directorate
The University Library
![Page 15: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/15.jpg)
Borthwick & Burton
• Borthwick Institute for Archives founded in 1952 as a forerunner of the University
• Raymond Burton Library for Humanities Research opened in 2003
• Archives moves from its city centre location to an extension to the Raymond Burton Library in 2005 and incorporated as Library & Archives
![Page 16: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/16.jpg)
Branch Libraries & beyond
• York Minster: the oldest and largest Cathedral Library in the country– Operated under a unique
partnership between the Dean & Chapter and the University of York
• King’s Manor Library– Both Grade One listed locations
• Associations with– The Railway Museum– Yorkshire Country House
partnership– York Museums Trust
![Page 17: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/17.jpg)
JB Morrell Library
• 1960's Library building • Designed in collaboration with University's first
Librarian, Harry Fairhurst – few barriers between stock and users– large open areas that could be altered as necessary– teaching accommodation– group studies– cafe
• One major extension to North of building: 1986-1987
![Page 18: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/18.jpg)
1967
![Page 19: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/19.jpg)
Initial drivers & opportunities
• Asbestos removal from JBM Library• Move of adjacent Computer Science academic
department to Heslington East, releasing a further refurbishment opportunity
• Joined up approach to Information provision as expressed in the 2008 Information Strategy
![Page 20: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/20.jpg)
![Page 21: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/21.jpg)
![Page 22: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/22.jpg)
![Page 23: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/23.jpg)
Pilot innovation?
![Page 24: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/24.jpg)
Specific drivers
• Building integrity• Upgrade to lighting, heating and ventilation
essential• Tired facilities• Improved zoning required• Need for bookable group & individual study space• Pressure on collection space• Increased emphasis on self service• Additional IT including use of personal devices
![Page 25: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/25.jpg)
Methods
• Consultation with users and staff• Data on space utilisation & future needs• Pedagogic change, inc PBL• Review of survey and comment data• International survey of best practice• Advice from Estates and contractors• Formal strategic project framework and
governance
![Page 26: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/26.jpg)
LibQUAL+ results 2008
![Page 27: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/27.jpg)
The Vision
![Page 28: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/28.jpg)
![Page 29: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/29.jpg)
![Page 30: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/30.jpg)
![Page 31: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/31.jpg)
Vision components 28 Nov 2008
• A research Library environment for deep study including archives
• A working Library for students and staff– Better group and individual space
• A ‘Commons’ type building – Multimedia provision (focused on Music & TFTV)– Interactive space (and with a range of staff)– Technology rich varieties of space (including PGRs)
![Page 32: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/32.jpg)
Design principles
• Respecting the integrity of the original design of the JB Morrell Library
• Common palette of finishes
• Buildings distinguished by use of colour in furniture
• Power throughout
• Wireless throughout
• Zoning
• Wide range of study facilities
• Longevity of furniture solutions
• Design shifted as the Computer Science building was added to the plans
![Page 33: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/33.jpg)
![Page 34: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/34.jpg)
![Page 35: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/35.jpg)
![Page 36: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/36.jpg)
![Page 37: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/37.jpg)
Project detail
• J B Morrell tender won by Shepherd Construction Ltd in Summer 2009o Building work January 2010 until 24 February 2012o Move of 95% of Library staff to portakabins August 2010
• Customer Services & Archives staff remained in buildingo Construction work took place over 6 phaseso Four floors; ground, first, second and third (also included roof refurbishment) o Library stayed open throughout o Work took place on one floor/part of a floor at a timeo Overnight working when necessaryo Large scale book moves throughout to accommodate the closing/re-opening of floors
• Computer Science building tender won by Shepherd Construction Ltd in Summer 2010o Building work October 2010 until 16 April 2011 o Three floors; ground, first and second (also included roof refurbishment) o Shorter timescale as contractor had full control of building
![Page 38: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/38.jpg)
Issues
• Maintaining a fully operational Library throughout the work
• Noise (from building work and the sub-contractors themselves)
• Loss of study space
• General communication between Library staff as on split sites
• Customer and Contractor expectations
• Move of some lesser used stock to external closed storage
• Renovating a building which had sparse records about infrastructure
![Page 39: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/39.jpg)
Opportunities realised
• Fairhurst building gave us the chance to offer innovative study spaces not seen before at York, and separated from the Morrell
• Opened up and improved networks with other departments in the University
• Library Cafe (additional £500k)
• Enabled 24/7 opening
• External cleaning of facade
• Putting the Library back on the map, and at the heart (“3rd place”)
![Page 40: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/40.jpg)
![Page 41: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/41.jpg)
![Page 42: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/42.jpg)
![Page 43: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/43.jpg)
![Page 44: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/44.jpg)
![Page 45: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/45.jpg)
Measurement
![Page 46: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/46.jpg)
LibQUAL+ 2009-2010
2009 2010
![Page 47: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/47.jpg)
LibQUAL+ 2011-2012
2011 2012
![Page 48: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/48.jpg)
Results 2012: Overall
![Page 49: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/49.jpg)
Library Survey Comments
“There is hardly room for improvement after the refurbishment. The extra space and staff are ideally suited to a wide range of needs.”
Female UG
![Page 50: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/50.jpg)
Library Survey Comments
“The library is a haven for study for me. If I need to focus on my work away from any distractions then the library is where I go.”
Male UG
![Page 51: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/51.jpg)
Library Survey Comments
“…Please put CS [Computer Science] texts on a lower floor, replace with a subject that has a more physically fit cohort!”
Male UG
Note: Computer Science books are currently housed on the 3rd Floor
![Page 52: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/52.jpg)
Library As Place vs Consortium Partners
![Page 53: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/53.jpg)
International comparison study• Joint initiative with the U of Wyoming to:– Draw on the sabbatical of a senior staff member– Replicate the study across both institutions– Focus on value and/or impact around• New building use• Help and advice• Discovery• Mobile use• Information literacy
![Page 54: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/54.jpg)
“Love the new Harry Fairhurst Building”
“Despite building disruption, staff have always done a good job and library information has improved over the past couple of years”
“…I really like the new Harry Fairhurst Building…a welcoming and relaxed atmosphere…thank you!”
![Page 55: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/55.jpg)
Transformation?
“Love the environment in the new building, especially some places really … feel comfortable “
LibQUAL+ Comment 2011
![Page 56: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/56.jpg)
Competing values in learning?
“The new Harry Fairhurst building is great but I really don't think sofas and beanbags are conducive to effective studying! It's fun to see people lying sprawled all over the floor though.”
LibQUAL+ Comment 2011
![Page 57: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/57.jpg)
Other benefits
• Green– Building design & return to original green ventilation– Thin clients and green IT– York Print Plus– £20m+ against £50m+ new build
• Process– Shelving & flexible loans– 24/7– LEAN– Enquiries convergence– Information convergence
• Social– Social capital through enhanced collaboration– Joined up resource approach– Donor investment
![Page 58: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/58.jpg)
![Page 59: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/59.jpg)
Brand reinforcement
• Follow through in the building of web and print identities
• Revelation of the hidden special and unique– Room names links– Room name signs
• Values externalisation– Customer focus/scholarship/respect
![Page 60: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/60.jpg)
Lessons learnt
• Signage review after experience• Good idea to leave (white) space• Good idea to trust students• Good idea to front load detailed planning• Good idea to go back for more, even when
you are told this is not the York approach• Bad idea to compromise on vision or quality• Design and build does not always work
![Page 61: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/61.jpg)
![Page 62: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/62.jpg)
![Page 63: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/63.jpg)
The outcome?
“It really makes me want to learn”
Student Comment 2011
![Page 64: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/64.jpg)
“Just a quick note to say how awesome the facilities are here. I have been to 3 Universities in 2 different
countries and this is definitely the best. The resources, study spaces, facilities and staff are all excellent. The
library alone is enough of a reason to consider studying here. Thank you very much”
Postgraduate student,University of York
![Page 65: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/65.jpg)
![Page 66: SCONUL Library Design Award](https://reader038.vdocument.in/reader038/viewer/2022102813/5465fb9caf7959383c8b76b9/html5/thumbnails/66.jpg)