scott o’connor – engineer group lead desirée wolfgramm – senior engineer energy northwest

15
POWERFUL SOLUTIONS Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest Jan. 31, 2013 Small Modular Small Modular Reactors Reactors

Upload: jasia

Post on 13-Jan-2016

27 views

Category:

Documents


0 download

DESCRIPTION

Small Modular Reactors. Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest Jan. 31, 2013. Energy Northwest. A not-for-profit Municipal Corporation. Energy Northwest Projects. Packwood Lake Hydro-electric Project (27 MWe). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

POWERFULSOLUTIONS

Scott O’Connor – Engineer Group LeadDesirée Wolfgramm – Senior Engineer

Energy NorthwestJan. 31, 2013

Small Modular ReactorsSmall Modular Reactors

Page 2: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

POWERFULSOLUTIONS

Asotin County PUD

Clark Public Utilities Kittitas County PUD Pend Oreille County PUD

Benton County PUD

Cowlitz County PUD Klickitat County PUD Seattle City Light

Chelan County PUD

Ferry County PUD Lewis County PUD Skamania County PUD

City of Port Angeles

Franklin County PUD Mason County PUD 1 Snohomish County PUD

City of Richland Grant County PUD Mason County PUD 3 Tacoma Public Utilities

City of Centralia Grays Harbor County PUD

Okanogan County PUD Wahkiakum County PUD

Clallam County PUD

Jefferson County PUD Pacific County PUD

A not-for-profit Municipal Corporation

Energy Northwest

Page 3: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

Energy Northwest ProjectsEnergy Northwest Projects

White Bluffs Solar Station(38 KWe)

Columbia Generating Station (1,170 MWe)

Packwood Lake Hydro-electric Project (27 MWe)

Nine Canyon Wind Project(96 MWe)

Page 4: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

• Valuable regional and national resource

• Safe, reliable and cost effective

• Attributes well demonstrated in U.S.

• Global revival includes SMRs

4

Nuclear EnergyNuclear Energy

Page 5: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

• Modular in design – manufactured in factory; delivered and installed at the site

• Small size enables many applications

5

Small Modular ReactorsSmall Modular Reactors

Page 6: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

• PNW Utility SMR Working Group formed in 2009 by Energy Northwest and Northwest utilities

6

SMR – Northwest Utility SupportSMR – Northwest Utility Support

Energy Northwest Franklin County PUD

Asotin County PUD Grant County PUD

Benton County PUD Kittitas County PUD

Benton REA PNGC Power

Ferry County PUD Portland General Electric

Page 7: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

7

SMR – Government SupportSMR – Government Support

• Jan ‘12 – DOE encourages SMR technology• March ‘12 –$450 million in government

cost-share funding for up to two SMRs• April ‘12 – EN sends letter to DOE, on behalf

of nuclear working group, supporting SMR• Nov ‘12 – DOE partnership with B&W and

TVA announced

Page 8: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

8

SMR – Modular TechnologySMR – Modular Technology

• Scalable

• NuScale design: up to 12 modules generating 540 Mwe

• Technology developed/tested by OSU, INL and Nexant-Bechtel under DOE funded research

Page 9: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

3

Reactors housed inside high strength steel containment vessels; submerged in 4 mil gals of water below ground level inside the Reactor Building.

The Reactor Building is designed to withstand earthquakes, floods, tornados, hurricane force winds and aircraft impacts.

12-module, 540 MWe NuScale Plant

Passively Safe Reactor Modules

Page 10: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

• Study group monitoring SMR technology

• Carbonless Energy Park

10

SMR – Path ForwardSMR – Path Forward

Page 11: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

Remain Informed:Find us on:

www.energy-northwest.com

Page 12: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

Nuclear Energy as Part of a MixA majority of Washington residents think that we need a mix of energy sources, including nuclear energy.

Need a mix of both renewable and more traditional power sources, including nuclear

Renewables alone Don’t know

Page 13: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

65% Support a New Nuclear Plant

Page 14: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

Voters Favor Adding Nuclear Energy

Nuclear is prioritized by statewide respondents second, just short of hydro in terms of overall effectiveness of meeting future statewide energy demands.

Page 15: Scott O’Connor – Engineer Group Lead Desirée Wolfgramm – Senior Engineer Energy Northwest

Remain Informed:Find us on:

www.energy-northwest.com