The Speculate Phase (Ch. 6)
Speculative Planning
Information is incomplete Future is uncertain
– Forecasts, predictions– Conjecture, “gut feel”
Plan should be– Flexible– Visible to the customer– NOT a tool for future punishment
Feature-based planning
Customers and project team members understand features
Features become deliverables Feature delivery is scheduled based on
relative value and risk– Duration of iterations– Timing of features
Goals of the Speculate Phase
A flexible plan for feature delivery– Feature timing (value and risk)– Anticipation of uncertainty (alternatives)
Reinforcement of project goals, business goals, and customer expectations– Why are we doing this– Who are we doing it for
Feature Breakdown Structure (8)
Build on what was done in the envision phase
Indented BOM type of organization Product
– Component Group
– Feature 1– Feature 2
Lab - Product Development
Detailed product design and modeling Specification and procurement of parts and materials Prototype product Router tooling Router (CNC) programming Product name, company name and logo Product web page Product display Quality control plan
Lab - Manufacturing Robot
Feeder for material blanks Branding/burning Workspace layout S-10 robot gripper S-10 robot programming S-10 robot integration AGV maintenance AGV modifications
Feature card (9)
Feature name and ID Description in customer terms Domain (customer or technology) Estimate of effort
– Requirements gathering/research– Design and specification– Material procurement– Coding, building, construction, assembly– Startup, testing, documentation
Feature Card (cont.)
Requirements uncertainty (exploration factor)– Erratic, fluctuation, routine, stable
Feature dependencies– Logical dependencies to other features– Space or resource dependencies
Acceptance tests– Customer criteria for acceptance
Performance Requirements (10)
Feature specific– Feature description– Acceptance testing
Global or general– Performance requirements card
Name and ID Description Difficulty Acceptance criteria
Release, Milestone,and Iteration Plan (11)
Iteration (2-6 weeks)– Delivery of tested features
Milestone (1-3 months)– Synchronization and integration– Project review and adjustments
Release (1 or more per project)– Product released to customer
Iteration Zero
Balance between planning and action Major project decisions (tradeoffs) Overall architecture design Team building and organization Project initialization No features delivered to the customer
Iteration Schedule
Assign features to each iteration Develop a theme for each iteration Cards and storyboarding are tools Group iterations into milestones, releases
– Business plan– Customer involvement– Definition or theme
Agile Project Plan
Week Item Description or theme
1 Iteration 0 Organization and planning
2-3 Iteration 1 Research/conceptual design
4-5 Iteration 2 Progress on detailed design
6 Milestone 1 Detailed design review
7-8 Iteration 3 Material procurement
9-10 Iteration 4 Construction/programming
11-12 Iteration 5 Construction/programming
13 Iteration 6 Testing and debugging
14 Milestone 2 Team demonstrations
15 Release Public demonstration
Iteration Planning Board
Types of Iteration Plans
All features assigned to iterations Choose the features for the next iteration,
and leave the rest in the pool Identify only those features for the next
iteration, as the pool is unknown
Progressive Estimation
Approximate estimate for the entire project Firm estimate for the next iteration or
milestone period By the end of the next period
– Develop a firm estimate for the following period– Update the overall project estimate
Scope Evolution
Traditional projects– Bare minimum– Gold-plated– Scope creep
Agile projects– Develop the minimum required features…– But make sure they can adapt and grow
Risk Management
APM process is designed to deal with uncertainty
Risk is reduced by doing and learning things, not by planning
Many project failures are caused by poor discipline or communication
Investing a lot in a master plan puts more at risk
Speculate Summary
Driven by the Envision phase Detailed project plan
– Iterative– Feature-based
Traditional project information may be evolutionary or progressive– Scope– Budget– Schedule