seaspan shipyards mpv industry day

40
Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved. Welcome to Seaspan Shipyards MPV Industry Day June 22, 2021 Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Upload: others

Post on 09-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Welcome to Seaspan ShipyardsMPV Industry Day June 22, 2021

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Page 2: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Russell DavisonVice President, Canadian Coast Guard ProgramsSeaspan Shipyards

NSS & CCG Program Overview

Page 3: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

NSS & CCG Program Overview – Russell Davison

MPV Program Overview – Gary Michael

Supplier Engagement – Steve Christiansen

Question & Answer

MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Page 4: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Building More Than ShipsKey objectives of the National Shipbuilding Strategy

Renew Canada's fleet of combat and non-combat vessels

Create and support a sustainable marine sector

Training and educational partnerships

Generate economic benefits to Canada

Page 5: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

A Century of Shipbuilding in North Vancouver

Photo: North Vancouver Museum and Archives

How it started…

Photo: Seaspan Shipyards 2020

How it’s going…

Page 6: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Seaspan Shipyards Today

100+years of history as

pioneer of shipbuilding and

ship repair on Canada’s west coast

~2,700Employees

3Full-service shipyards

in Vancouver and Victoria,

British Columbia

400+ years

building ships and subs

1st1st1Ship per week

commercial repair & overhaul

First class of large vessels

delivered under the NSS

LNG conversion in North America

1.6B+in contracts awarded to

660+ Canadian suppliers

450ships

delivered and serviced

&

Management team with$

Page 7: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Three Seaspan Shipyards Provide Broad Range of Capabilities, Capacity, Flexibility

Vancouver Shipyards (VSY) Victoria Shipyards (VSL) Vancouver Drydock (VDC)

Key site for NSS-related work International centre of excellence for ship repair & conversions

Centre of excellence for large & complex ship repair

Largest shipbuilding & repair company on Canada’s West Coast

Page 8: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Supporting the Canadian Coast Guard in its Missions

On average day, the Canadian Coast Guard…

• Coordinates 19 search & rescue incidents

• Saves 13 lives through on-water response

• Assists 43 people in search & rescue

• Manages 1,100 vessel movements

• Carries out 11 fisheries patrols

• Supports 11 scientific surveys

• Deals with 3 pollution events

• Surveys 3.5 km of navigation channel bottom

Source: Canadian Coast Guard, March 2020

Longest coastline in the world: 243,000 km

5.3 million km2 of ocean and inland waters

Page 9: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Page 10: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

2 Joint Support Ships

1 Offshore Oceanographic Science Vessel

Proudly Building Canada’s Next Generation of Non-Combat Vessels

1 Polar Icebreaker

3 Offshore Fisheries Science Vessels

16 Multi-Purpose Vessels

Page 11: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Three Ships in 15 Months – First Class of Ships Completed Under the NSS

CCGS Sir John Franklin CCGS Capt Jacques Cartier CCGS John Cabot

Page 12: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Gary MichaelProgram Director, Multi-Purpose VesselsSeaspan Shipyards

MPV Program Overview

Page 13: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Multi-Purpose Vessels – Program Overview

MPV project• Part of Canadian Coast Guard Fleet Renewal Program

Announced May 2019

• Canadian Government investment in up to 16 MPVs

⎯ To replace three existing classes of ships ranging in size from 70m to 83m

Goal• Design, build and deliver next-generation class of up to 16 vessels to replace existing:

⎯ High Endurance Multi-Tasked Vessels (HEMTV)

⎯ Medium Endurance Multi Tasked Vessels (MEMTV)

⎯ Offshore Patrol Vessels (OPV) and one Specialty Vessel (SV)

Page 14: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Missions & Operational Requirements

Primary Missions

• Aids to navigation and waterways management

• Icebreaking

• Search and rescue

Secondary Missions

• Environmental response

• Vessels of concern

• Maritime security & sovereignty

• Ocean science/hydrography

• Conservation and protection

MPV Area of Operations

Page 15: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

MPV Design Details

Length Overall

99.9m

Draft

6.2m

Breadth

19.5m

Displacement

8,200 tonnes

Lightship Weight

6,200 tonnes

Complement

50 crew

Page 16: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Key Design Features

Helo deck, fixed hangar and maintenance facility

4 boats:• RHIB• Spill Response Barge• 2x50 person lifeboats

Working deck, with modular mission containers

Buoy handling crane (20t, SS5)

Icebreaking hull

Cargo Hold 900m310MWinstalled power

4 Engines: 2x3.5MW2x1.5MW

2x AzimuthingThrusters:3.5MW each

Dynamic Positioning in SS5

Page 17: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Flight 1: 6x ships

Flighted Design/Build: Preliminary Approach To Ensure Design Flexibility and Future-Proofing

Design in process

Flight 2: 6x ships

Next design when Flight 1 in build

Flight 3: 4x ships

Final version with tech upgrades

Existing HEMTV Existing MEMTV Existing OPV

Page 18: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

MPV 15

MPV 14

MPV 13

MPV 12

MPV: Preliminary Design & Build Schedule

2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Flight 1 Design

2031 2032 2033 2034 2035 2036 2037 2038 2039

MPV 16

MPV 2

MPV 1

MPV 3

MPV 5

MPV 4

MPV 6

MPV 7Flight 2 Design

MPV 8

MPV 9

MPV 10

MPV 11

Flight 3 Design

Page 19: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Steve ChristiansenVice President, Supply Chain ManagementSeaspan Shipyards

Supplier Engagement

Page 20: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Building a Nationwide Supply Chain Over $1.6B and counting in contracts awarded to more than 660 suppliers coast to coast

Ontario: $756M

British Columbia: $562M

Quebec: $116M

Prairie Provinces: $94.5M

Maritimes: $94.5M

Page 21: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Supplier Engagement Strategy

Suppliers directly

engage with Seaspan

Shipyards

Suppliers engage and

work directly with

major OEMs &

systems integrators

Direct Engagement Indirect Engagement

Page 22: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

MPV Procurement Strategy

Competitive procurement processbased on ‘best value’ to Canada

Maximize Canadian contentTo grow and sustain marine industry in Canada provided they are:• Technically compliant and price

competitive

Enter into long-term supply and service agreements to leverage favorable pricing and supplier performance• Incentivize investment in Canada • Opportunity to award shipsets

for lifetime of program

Use System Integrators to execute design, and sometimes supply and install

Page 23: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Industrial Regional Benefits (IRB) Policy

Transformed into

Industrial Technological

Benefits (ITB) Policy in

2014.

Seaspan’s NSS projects and

programs are governed by

the IRB policy

Ensures that Canadian

industry benefits from

Government defence and

security procurement

Requires companies to

undertake business

activities in Canada

valued at 100% of

contract value they have

been awarded by

Government of Canada

Canada’s IRB Policy:

Seaspan is looking for suppliers who can support Canadian content value & Small/Medium Business participation as part of the MPV Program

Page 24: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

2021/22 Single System Integrator Opportunities & Design Agents

Power & Propulsion

Navigation, Communications& Sensors

Working Deck Equipment

Ship Control & Monitoring System (SCMS)

HVAC System

Aviation Systems

Outfitting/Joinery

Design

Page 25: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

2022/23 Long Lead Item Opportunities

Bow Thrusters

Cranes

Heat Exchangers

Switchboards

Anchor/Windlass

Cathodic ProtectionWatertight doors, windows & portholes

Sewage Treatment Plant

Centrifugal Pumps

Boilers

Fire Fighting Systems

Page 26: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

2024 Build Opportunities

Pipe

Steel Cabling

Insulation Package

Valves

Strainers

Paint

MechanicalElectrical

Pipe Fabrication

Page 27: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Partnering withSeaspan Shipyards

Page 28: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Seaspan Supplier Portal

Register at Supplier.Seaspan.com

Page 29: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Questions & Answers

Page 30: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Question:

Is there a current overall vessel specification for the MPVs available for review?

Page 31: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Question:

What efforts are being made to use Canadian suppliers wherever possible?

Page 32: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Question:

To be considered a supplier, what exactly is Seaspan looking for?

Page 33: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Question:

What are your needs and requirements for specific equipment and systems?

Page 34: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Question:

Any plans for zero emissions for these vessels?

Page 35: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Question:

What are Seaspan’s plans for digital technologies and automation?

Page 36: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Question:

Does Seaspan intend to select a single company to design, integrate and supply the power generation and electric propulsion system?

Page 37: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Question:

Will the MPV opportunity for suppliers be for one ship, multiple ships, or all ships?

Page 38: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Question:

What happens after I register on the supplier portal?

Page 39: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Question:

Will you be holding another MPV session to give us more detail on the ships’ requirements?

Page 40: Seaspan Shipyards MPV Industry Day

Seaspan Proprietary and Confidential as set out above. All disclosure or reproduction prohibited. ©2021 Seaspan ULC and Affiliates. All rights reserved.

Thank You