1/10/15 Sebastien LEPY – Chairman SDC ENTSO-E Assembly Meeting E-HIGHWAY2050 PROJECT RESULTS ELECTRICITY HIGHWAY BOOKLET

Upload: others

Post on 27-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

1/10/15

Sebastien LEPY – Chairman SDC

ENTSO-E Assembly Meeting

E-HIGHWAY2050 PROJECT RESULTS ELECTRICITY HIGHWAY BOOKLET

Page 2: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

Click to edit Master title style E-Highways 2050 at a glance

Page 2

2012-2015 research project, funded by EC

Focus = grid development 2030 - 2050 towards decarbonation of the European power sector with design & testing of new methodologies

A large consortium with ENTSO-E, TSOs, industrial associations, academics, consultants and 1 NGO

A booklet and a conference 3-4 Nov. 2015 in Brussels to present the results

Page 3: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

Click to edit Master title style Important outcomes

Page 3

New methodologies and tools to build long term scenarios, identify investment needs and value them that will inspire the TYNDP

Scenarios for 2050 with high RES development and corresponding grid investment needs RES imply grids (but no “overlay” grid) Grid reinforcements displayed with triggering RES

Page 4: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

Click to edit Master title style

Page 4

Grid architectures for 2050

Large scale RES

100% RES

Small & local

Fossil & nuclear

Big & market

4

Page 5: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

Click to edit Master title style

Page 5 5

Hourly stochastic simulations

at macro area level

0 20 40 60 80

100 120 140 160 180

Installed capacities (GW) wind PV CSP nuclear biomass fossil

Adequacy OK? Energy mix OK? Imbalances OK?

Final installed capacities/ final Imbalances Incl. assessment of storage and Demand

Side Management needs

0 0.2 0.4 0.6 0.8

1

1 23

45

67

89

111

133

155

177

199

221

243

265

287

Wind time series

0

1

1 13

25

37

49

61

73

85

97

109

121

133

145

157

169

PV time series

0

0.0001

0.0002

1 11

21

31

41

51

61

71

81

91

10 111 12 13 14 15 16 17 18 19

Load time Series

Inputs: set of time series (11 wind and PV, 3 load)

NO

A top down scenario construction

Redistribution of the generation between

macro areas

Range of Imbalances

+/- 80% +/- 80% +/- 30% +/- 30% +/- 10%

Large RES

100% RES

Small &

local Big&

market

Large fossil fuel

Page 6: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

Click to edit Master title style The E-Highways 2050 Booklet

Page 6

The Booklet sums up the results and the ‘story’ of the project The basis for the 3-4 November conference Currently under consultation within both the Project and ENTSO-E (Monitoring Body, SDC, SOC and MC) An updated version of the Booklet has been sent to the Assembly on 30 September for review and for approval by the mid of October

Page 7: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

Click to edit Master title style Mark the date

Conference “Unveiling the Electricity Highways Project Results: Europe’s

Future Secure and Sustainable Electricity Infrastructure” on 3-4 November in Brussels

Sebastien LEPY Chairman SDC ENTSO-E [email protected]

Page 8: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

Click to edit Master title style Common Grid reinforcements

Page 8

−  Overview of the proposed new transmission reinforcements to support each of the five scenarios.

−  Predominance of “North to South” corridors à all scenarios have several reinforcements collecting electricity from the North of the pan-European electricity system (North Sea, Scandinavia, UK and Ireland) and transport it to the continental synchronous area (northern DE, PL, NL, BE and FR) including via submarine corridors.

−  Major corridors also enable the collection of energy from southern countries like ES and IT, but also support their needs with the generation coming from the North.

Widths à according to average reinforcement capacity Colour à the scenario where the reinforcement is needed

Page 9: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

Click to edit Master title style The starting grid

Page 9

Not the real grid (> 8000 electrical nodes), but a model with 100 clusters (electrical nodes). The network foreseen until 2030, and included in the TYNDP14

Page 10: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

Click to edit Master title style Not an Overlay Grid, but Grid reinforcements

Page 10

−  The project results show that due to HIGH RES development the need for grid reinforcements in all five scenarios, but NO Overlay HV Grid

−  The network extension rate is in direct relation with the growth rate of non-dispatchable generation, especially wind and PV;

−  The new lines and reinforcements to be implemented before 2040 à subset of the ones to be delivered before 2050 in order to meet by then the low carbon economy orientation

NO overlay grid

Proposed Reinforcements

Page 11: Sebastien LEPY – Chairman SDC PROJECT RESULTS ENTSO-E … · PV CSP nuclear biomass fossil Adequacy OK? Energy mix OK? Imbalances OK? Final installed capacities/ final Imbalances

Click to edit Master title style Some examples: The North Sea area

Page 11

−  In the initial grid à capacities of the radial links are only around ½ of installed offshore wind capacities

−  Further reinforcements due to high RES penetration have been assessed within the study

−  Main conclusion à by 2050 some offshore clusters with huge volumes of wind power are not close to clusters exhibiting energy deficits

−  Example à the offshore cluster near western Denmark is interesting for providing energy to northern Continental Europe rather than to Denmark (no need)

−  Several possible routes to go from an offshore cluster to a cluster with deficit in energy (e.g. DE): −  through DK (radial connection to DK and extra capacity DK - DE); −  and/or through a circular meshing - offshore North Sea clusters