Page 1: SECL training presentation

Training Report

SECL Gevra Mines

Page 2: SECL training presentation
Page 3: SECL training presentation

Location, Physiography and Climate

• Gevra mining block having an area of about 19.03 sq.km is located in the central part of korba coalfield.

• Latitude 22°18’00’’ and 22°21’42’’ and Longitude 82°32’00’’ to 82°39’30’’.

• The elevation ranging from 288m to 328 m above mean sea level.

• The climate of the area is dry to moist tropical.• The temperature rises to 48° in May and drops to 7° in

December. The average annual rainfall is 1265 mm.

Page 4: SECL training presentation

METHOD OF MINING

• Gevra Opencast Project is being worked by opencast methods deploying shovel dumper combination and HEMM configuration.

• Deployment of draglines is not suggested as the combined thickness of the lower most seams i.e. LK seam (>48 m) will restrict the efficient deployment of dragline mining; and the inter-parting between LK(top) and LK(bottom) does not offer adequate load to justify the deployment.

Page 5: SECL training presentation
Page 6: SECL training presentation

Drilling & Blasting

• Drilling and blasting would be required only in OB bench before excavation by shovels.

• 381 mm RBH drills will be deployed for shovel benches of 42 cum rope shovel whereas 250 mm RBH drill will be deployed for benches of 12 cum shovels.

• 160 mm drills have been provided for drilling in benches of bands and partings.

• The explosives consumption has been envisaged as 0.30 – 0.35 kg/cum of excavation.

Page 7: SECL training presentation

Soil Disposal Planning

• The proposed sequence of mining is ideally suited for achieving the objective of placing maximum possible waste in the internal dumps.

• The opencast mining of Gevra block involves removal of 1267.00 M.cum. of Overburden.

• Presently, internal backfilling is being done in the quarry and considerable volume of OB is also being dumped in the external dump.

Page 8: SECL training presentation

Pumping and Drainage

• The pumping system at Gevra Expansion Project (35 Mty) has been designed to dewater the inflow of water due to precipitation falling within the active pit limit during the monsoon season to enable the mining activity to continue round the year.

• The surface within the mine intake area is gently undulating and local drainage pattern is towards the seasonal nala i.e. Laxman Nala. This nala drains into Ahiran river located towards north east

Page 9: SECL training presentation

Power Supply in the expansion report

• Gevra opencast expansion project will receive power at 33kV from existing 132/33kV substation of SECL at Gevra.

• The specific energy consumption of the project has been estimated as 3.408 kwh/t for a targeted production of 35 Mt per year.

Substation No. Voltage ratio Transformer Capacity1 33/3.4kV 2x6MVA

2 33/6.5kV 2x16MVA

3 33/6.6kV 2x16MVA

Page 10: SECL training presentation

Manpower & Productivity

Sl no. Particulars Nos. % of total manpower

1 Workers 355 64.43

2 Monthly Paid staff 167 30.31

3 Executives 29 5.26

Total 551 100.00

The sanctioned manpower for Gevra Opencast Expansion Project (25 Mty) was 2725.the group-wise break-up of incremental manpower from 25 to 35 Mty is given below

Page 11: SECL training presentation

Civil Construction

• excavation Workshop Complex.• E&M Workshop Complex.• Residential buldings.• Roads and culverts.colony roads and culvertsapproach roads and culvertshaul roaddiversion of road

Page 12: SECL training presentation

Land Acquisition

• The break-up of the land is as follows:- The sanctioned Project Report (25 Mty) will require 3584.671 Ha of land which is already acquired. Additional land reqirement for Project Report (25 to 35 Mty) is assessed as 599.815 Ha.

Particulars Forest Govt. Rev

Tenancy Total

A Land already acquired a. Quarry 385.121 289.514 1113.144 1787.779b. Safety zone 3.472 4.643 75.385 83.500c. Infrastructures &

rehabilitation515.434 261.859 936.099 1713.392

Sub-Total (A) 904.027 556.016 2124.628 3584.671

Page 13: SECL training presentation

B Additional land requirement

a Quarry area 78.507 10.682 160.282 249.471

b Safety zone 56.096 58.587 235.661 350.344

c Infrastructure & rehabilitation 0.00 0.00 0.00 0.00

Sub-Total(B) 134.603 69.269 395.943 599.815

C Total land for the project (A+B)

a Quarry area 463.628 300.196 1273.426 2037.250

b Safety zone 59.568 63.230 311.046 433.844

c Infrastructures & Rehabilitation

515.434 261.859 936.099 1713.392

Total land for the project (A+B)

1038.630 625.285 2520.571 4184.486

Page 14: SECL training presentation

Air Pollution Status

• The RDS was placed at various sampling station to collect sample .

• RDS were run for 48 hour every week (for three months to represent one season) to collect SPM,SO2 and NOX sample.

Page 15: SECL training presentation

• AIR QUALITY STANDARD: in micro gm/cubic mSTANDARD CATEGORY SPM RPM SO2 NOX

NAAQS(NATIONAL AMBIENT AIR QUALITY STANDARD

INDUSTRIAL(A)

500 150 120 120

RESIDENTIAL(B)

200 100 80 80

SENSITIVE(C) 100 75 30 30

AS PER AS MOEF NOTIFICATION GSR 742(E) DATED 25TH SEPTEMBER 2000

OLD MINE(A-O)

600 300 120 120

NEW MINES(A-N)

500 250 120 120

Page 16: SECL training presentation

• AIR QUALITY DATA FOR GEVRA PROJECT(24 HOURLY)

DATE OF SAMPLING

SPM RPM SO2 NOX

07.05.11 302 145 19 23

23.05.11 280 132 24 28

No Of Observation

2 2 2 2

ARITHMETIC MEAN

291 138.5 21.5 25.5

Page 17: SECL training presentation

Water pollution status

• Sample were collected from different location in May 2011 and analysed.

• From the surface water sources , after removal of floating/extraneous material, 3 lt of representative water sample were collected in plastic cans as per as IS:3025 and transported to laboratory for physiochemical test.

Page 18: SECL training presentation

• STANDARDPARAMETER PH TSS(mg/l) COD(mg/l) O&G(mg/l)

Below detection limit

0.01 5 20 1

AS PER AS MOEF NOTIFICATION GSR 742(E) DATED 25TH SEPTEMBER 2000

5.5 TO 9.0 100-200(FOR IRRIGATIONAL LAND)

250 10

Page 19: SECL training presentation

• EFFLUENT QUALITY REPORT(GRAB SAMPLING)FOR GEVRA PROJECT

SAMPLING STATION DATE PARAMETER

PH TSS COD O&G

GEVRA MINE DISCHARGE

05.05.2011 7.61 89 105 <1.0

30.05.2011 7.79 99 135 <1.0

Page 20: SECL training presentation

NOISE POLLUTION STATUS

• The noise level were measured by noise level meter continuously for 24 hrs at hourly interval ,in decibel under ‘A’ weighted average .Values were reported as equivalent day , night and day night noise levels.

Page 21: SECL training presentation

• STANDARD:MAXIMUM PERMISSABLE LIMITS IN DB(A) OF AMBIENT NOISE LEVEL AS PER MOeF NOTIFICATION S.O 123(E) DATED 14aTH FEBRUARY 2000 AND GSR742(E) ,DATED 25TH SEPT 2000

AREA CODE CATEGORY OF AREA

DAY TIME NIGHT TIME

A INDUSTRIAL 75 76

B COMMERCIAL 65 55

C RESIDENTIAL 55 45

D SILENCE ZONE

50 40

Page 22: SECL training presentation

• NOISE QUALITY DATA FOR GEVRA PROJECTS/L NO AREA

CODEDATE DATE NOISE LEVEL

Day time Night time

1 A 03.05.2011

19.05.2011

68.7,69.1 62.7,63.2

2 C 03.05.2011

19.05.2011

61.8,58.9 52.6,53.6

3 C 03.05.2011

19.05.2011

52.6,53.2 41.6,42.3

Page 23: SECL training presentation

Control measures for air pollution

• Water spraying by water Sprinklers (7 nos. of 28 KL and additional 3 to 6 nos. of 10 KL ) are being done regularly on approach roads , coal transportation roads and within the mining area to minimize the dust generation.

• Conveyor belts for movement of total coal mined from mine pit to surface will be installed to reduce dust generation due to transportation.

• About 36.98 lakh saplings planted in project area for dust suppression.

• Drills have been fitted with dust extractors.

Page 24: SECL training presentation

Control measures for noise

• About 36.98 lakh saplings already planted for noise attenuation.

• High capacity machines like 42 Cum. Shovels & 240 tonne dumpers, to be deployed in mine. This will ensure reduced number of vehicular trips, there by reducing noise levels.

• Provision of ear muffs/ear plugs to workers subjected to noise level above recommended limits.

• Routine maintenance schedules for machineries to eliminate noise as far as possible.

Page 25: SECL training presentation

Control measures for water pollution

• settling tank to treat mine water has been commissioned.

• oil & grease trap for workshop effluent treatment has been commissioned.

• mine sumps will act as a water recharge structure.

Page 26: SECL training presentation

MINE CLOSURE PLAN

• Mine closure is not something that happens at the end of a mine’s life, rather mine closure is an ongoing series of activities starting from the planning stage of a mine and ending with a suitably restored site that can be returned to the community.

• The extent of impacts are classified under:-

Environmental Aspects Technical Aspects Social Aspects Safety Aspects

Page 27: SECL training presentation

Environmental Aspects

• Hydro-geology• Reclamation of dumps and adjoining area • alternate use of land• rehabilitation and resettlement

Page 28: SECL training presentation
Page 29: SECL training presentation

Technical aspects

• Dump stabilization• Top Soil Management • Disposal management of hazardous material

Page 30: SECL training presentation

Social aspect

• Employment• Association & Consultation with Stake holders • Infrastructure and Services

Page 31: SECL training presentation

safety aspects

• Management of voids, fractures• Safety of adjoining mines• Dealing with fire