Second Avenue SubwaySecond Avenue SubwayyyConstruction Progress Update Construction Progress Update
(N b t M h)(N b t M h)(November to March)(November to March)Presented by Presented by Presented by Presented by S3 Tunnel ConstructorsS3 Tunnel Constructors
ANDANDMTA CAPITAL CONSTRUCTIONMTA CAPITAL CONSTRUCTIONMTA CAPITAL CONSTRUCTIONMTA CAPITAL CONSTRUCTIONMarch 23, 2009March 23, 2009
1
03/23/2009
Topics CoveredTopics Covered• Progress update (November to March)•• Launch Box UpdateLaunch Box Update
•• Secant WallSecant WallSecant WallSecant Wall•• Slurry WallSlurry Wall
C t D kiC t D ki•• Concrete DeckingConcrete Decking•• Traffic Switch to East SideTraffic Switch to East Side
•• Shaft Site work at 69Shaft Site work at 69thth St. and 72St. and 72ndnd St.St.•• Upcoming WorkUpcoming Work
03/23/2009
2
Upcoming WorkUpcoming Work
Launch Box UpdateLaunch Box Update
Secant Pile Wall Construction
BetweenBetween91st and 93rd Street91 and 93 Street
03/23/2009
3
Secant Pile Wall Construction- 91st to 93rd St.Current Status
• Secant Wall Construction on West Side Completed
• Continuing Secant Wall Construction on East Sideg
03/23/2009
4
Location of Secant Walls
Portions Completely Installed
SECANT WALL
Portion CurrentlyPortion Currently Being Installed
03/23/2009
5
Secant Pile Wall Construction- 91st to 93rd St.
03/23/2009
6
Secant Pile Wall Construction- 91st to 93rd St.
03/23/2009
7
Launch Box Updatep
Slurry Wall ConstructionSlurry Wall ConstructionBetween
93rd and 95th Street
03/23/2009
8
Slurry Wall Construction- 93rd to 95th St.Current Status
• Slurry Wall on West Side Completed
• Continuing to work on Slurry Wall Construction onEast Side
03/23/2009
9
Location for Slurry wallsy
Portion Completely Installed
CANT WALL SLURRY WALL
Portion Being I t ll d C tl
NORTHInstalled Currently
03/23/2009
10
Slurry Wall Work
2nd Avenue Looking North
Building Building
Future 2nd Avenue Subway
03/23/2009
11
Slurry Wall – Guide Wall
03/23/2009
12
Slurry Wall – Panel Excavation
03/23/2009
13
Slurry WallNew Fence Panels to Protect Pedestrians
03/23/2009
14
Slurry WallInstallation of Rebar Cages
03/23/2009
15
Launch Box Update
Concrete Decking PlanConcrete Decking PlanConcrete Decking PlanConcrete Decking Plan
03/23/2009
16
Concrete Decking PlanProfile Looking North on Second AvenueProfile Looking North on Second Avenue
Concrete Deck PanelCap Beam
Deck Beam Splice Box (Beam Pocket)
03/23/2009
17
Concrete Decking PlanCurrent Status
• Cap Beams Are ALL Installed on the West Sidep
• All West Side Deck Beams are Installed• All West Side Deck Beams are Installed
All W Sid C D k P l I ll d• All West Side Concrete Deck Panels are Installed
• Continuing Utility Relocation & Work UnderConcrete Decking
03/23/2009
18
Concrete Decking ConstructionLooking South on Second Avenue
03/23/2009
19
Concrete Decking ConstructionLooking East on Second Avenue-MTA installed Rubber Noise Reduction Pads
03/23/2009
20
Concrete Decking ConstructionLooking from Top of 2nd Avenue
03/23/2009
21
Launch Box Update
Traffic Switch toTraffic Switch toTraffic Switch to Traffic Switch to East SideEast Side
03/23/2009
22
Traffic Switch to East Side
•• Switched Switched T ffi tT ffi tTraffic to Traffic to East Side East Side ononon on 03/10/200903/10/2009
03/23/2009
23
Shaft Site work at 69Shaft Site work at 69ththShaft Site work at 69Shaft Site work at 69thth
St and 72St and 72ndnd StStSt. and 72St. and 72 St.St.
03/23/2009
24
Shaft Site work at 69Shaft Site work at 69thth St. and 72St. and 72ndnd St. St. Current StatusCurrent Status
• Pre Construction Staging and Wok Zone Set up Completed• Pre-Construction Staging and Wok Zone Set-up Completed
• Sidewalk on West Side have been Reduced to 7 Feet
• All Parking Meters have been Removed
• Street Lights and Traffic Signals have been Relocated
• New Traffic Lane on West Side Completed• New Traffic Lane on West Side Completed
• Traffic Shifted to West Side
03/23/2009
25• Continuing Utility Relocation on East Side
Shaft Area Overall MPT Plan
72nd
St.71st St.70th St.69th St. 73rd St.
03/23/2009
26
69th St. Shaft Section69 St. Shaft Section
03/23/2009
27
Construction of New Traffic Lane on West Side West Side
03/23/2009
28
Utilities Relocation Work At Shafts
03/23/2009
29
Utilities Relocation Work At Shafts
03/23/2009
30
Shaft Area Bus Stop Relocation
Removed Bus Stops between 69th St. and 70th St. and between 71st St. and 72nd St.
03/23/2009
31
New Bus Stop Between 70th St. and 71st St. has been Established
69th Street Garbage Disposal Plan
Designated Garbage Disposal Areas
69th Street Garbage Disposal Plan has been C di t d ith C it d I l t d
03/23/2009
32
Coordinated with Community and Implemented
72nd Street Garbage Disposal Plan
72nd Street Garbage Disposal Plan has been Coordinated with Community and Implemented
03/23/2009
33
Coordinated with Community and Implemented
Upcoming Work
Launch Box:
• Continue Slurry Wall Construction on East Side
• Continue Secant Wall Construction on East SideContinue Secant Wall Construction on East Side
• Continue placing Deck Beams and Concrete Deck Panels on East Side
• Continue Utility Work Under the Deck on East Side
• Continue Launch Box Excavation
• Controlled Rock Blasting and Removal Preparation
03/23/2009
34
Controlled Rock Blasting and RemovalControlled Rock Blasting and Removal• The MTA has Performed Building Inspections Before Construction Started.• The Buildings have Again been Inspected by Monitoring / EngineeringThe Buildings have Again been Inspected by Monitoring / Engineering
Consultant Before this work Starts.• Controlled Blasting Work has been Designed and Analyzed by a Specialty
Blasting Consulting Expert.Th Bl ti Pl A U d R i d M t b A d b NY Cit• The Blasting Plans Are now Under Review and Must be Approved by NY City, Fire Department- Explosives Unit.
• NY City Fire Department Permit Will be Issued For All Aspects of This Blasting Work.
• Controlled Blasting and Rock Removal will be performed under a Permit Issued by NY City Dept. of Environmental Protection (DEP)
• The MTA has Installed Blasting Vibration Monitoring Equipment in Buildings at the Blast Areathe Blast Area.
• Controlled Blasting WILL be monitored by NY City-Fire Dept, Explosives Unit.
03/23/2009
35
Upcoming Work
Shaft Area 69th Street to 72nd Street:Shaft Area 69 Street to 72 Street:
•Start Electric and ECS (Telephone) Utility Relocations.
•Start Gas Main Relocation.
•Start Steam Main Relocation.
•Start Water Main Relocation•Start Water Main Relocation.
03/23/2009
36
03/23/2009
37
Second Avenue Subway ProjectCommunity Board 8y
March 23rd, 2009
March 27th, 2007
PROJECT SCHEDULE FOR 2009
DESIGN
PROJECT SCHEDULE FOR 2009
• Final Design is scheduled to be completed in December 2009
PROCUREMENT IN 2009PROCUREMENT IN 2009
• Contract 2A: 96th Street Station - Site Work & Heavy Civil
> D ti 43 M th f A il 2009> Duration: 43 Months from April 2009
• Contact 5A: 86th Street Station - Open Cuts & Utilities Relocation
> D ti 22 M th f J 2009> Duration: 22 Months from June 2009
Contract 2A: Scope of WorkContract 2A: Scope of WorkContract 2A: Scope of WorkContract 2A: Scope of Work
Stre
et
Stre
et
Stre
et
Stre
et
Stre
et
Stre
et
96th
S
94th
S
93rd
S
95th
S
97th
S
92nd
S
Existing Tunnel gConnection
Ongoing Construction for TBM l h B (C t t 1)
Contract 2A: Site Work and Heavy Civil
launch Box (Contract 1)
Contract 2A: 96th Street Station - Site Work & Heavy Civil
> Duration: 43 Months from April 2009
Contract 5A – Work Zone Lay out Plan
tree
t
tree
t
reet
West Side Stage of 2nd Avenue
Work ZoneWork Zone
85th
St
87th
St
83rd
Str
2nd Avenue
84th
Stre
et
86th
Stre
et
88th
Stre
et
82nd
Stre
et
85th
Stre
et
87th
Stre
et
83rd
Stre
et
East Side Stage of 2nd Avenue
Work ZoneWork Zone
Stre
et
Stre
et
Stre
et
Stre
et
2nd Avenue
Contact 5A: 86th Street Station - Open Cuts & Utilities Relocation> Duration: 22 Months from June 2009
84th
S
86th
S
88th
S
82nd
S