    Standard Specification For Road Works

    SECTION 4

    FLEXIBLE PAVEMENT

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage 75

  • 8/16/2019 Section4 Felxible Pavement

    2/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    SECTION 4 - FLEI!LE P"#E$ENT

    Page

    4%& 'N!O'N( P"#E$ENT CO'RSES S4-7)

    4.1.1 Lower Subbase S4-78

    4.1.1.1 Description S4-78

    4.1.1.2 Materials S4-78

    4.1.1.3 Construction Methos S4-78

    4.1.2 Subbase S4-7!

    4.1.2.1 Description S4-7!

    4.1.2.2 Materials S4-7!

    4.1.2.3 Construction Methos S4-8"

    4.1.3 #ra$el Sur%acing S4-814.1.3.2 Materials S4-81

    4.1.3.3 Construction Methos S4-82

    4.1.4 Crushe &ggregate 'oabase S4-83

    4.1.4.1 Description S4-83

    4.1.4.2 Materials S4-83

    4.1.4.3 Construction Methos S4-84

    4%* !IT'$INO'S P"#E$ENT CO'RSES S4-)5

    4.2.1 (itu)en Pri)e Coat S4-8*4.2.1.1 Description S4-8*

    4.2.1.2 Materials S4-8*

    4.2.1.3 +,uip)ent S4-8*

    4.2.1.4 Construction Methos S4-87

    4.2.2 (itu)inous ac Coat S4-88

    4.2.2.1 Description S4-88

    4.2.2.2 Materials S4-88

    4.2.2.3 +,uip)ent S4-88

    4.2.2.4 Construction Methos S4-8!

    4.2.3 (itu)inous Sur%ace Dressing S4-!"

    4.2.3.1 Description S4-!"

    4.2.3.2 Materials S4-!"

    4.2.3.3 +,uip)ent S4-!1

    4.2.3.4 Construction Methos S4-!3

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage 7+

  • 8/16/2019 Section4 Felxible Pavement

    3/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    Page

    4.2.4 &sphaltic Concrete S4-!!

    4.2.4.1 Description S4-!!

    4.2.4.2 Materials S4-!!

    4.2.4.3 &sphaltic Concrete Mi/ Design S4-1"2

    4.2.4.4 +,uip)ent S4-1"*

    4.2.4.* Construction Methos S4-11"

    4.2.* (itu)inous Macaa) S4-110

    4.2.*.1 Description S4-110

    4.2.*.2 Materials S4-110

    4.2.*.3 +,uip)ent S4-110

    4.2.*.4 Construction Methos S4-110

    4%, SO'L(ERS S4-&&.

    4.3.1 Description S4-11!

    4.3.2 Materials S4-11!

    4.3.2.1 +arth Shoulers S4-11!

    4.3.2.2 #ra$el Shoulers S4-11!

    4.3.3 Construction Methos S4-11!

    4%4 ORI/ONT"L "LI0N$ENT1 S'RF"CE LE#ELS "N(

    S'RF"CE RE0'L"RIT2 OF P"#E$ENT CO'RSES S4-&*3

    4.4.1 oriontal &lign)ent S4-12"

    4.4.2 Sur%ace Le$els o% Pa$e)ent Courses S4-12"

    4.4.3 Sur%ace 'egularit S4-121

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage 77

  • 8/16/2019 Section4 Felxible Pavement

    4/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    SECTION 4 -

    FLEI!LE P"#E$ENT

    4%& 'N!O'N( P"#E$ENT

    CO'RSES

    4.1.1 Lower Subbase

    4.1.1.1 Description

    his wor shall consist o%

    %urnishing placing co)pacting

    an shaping lower subbase

    )aterial on a prepare an

    accepte subgrae in accorancewith this Speci%ication an the

    lines le$els graes i)ensions

    an cross-sections shown on the

    Drawings an5or as re,uire b

    the S.6.

    4.1.1.2 Materials

    Lower subbase )aterial shall be

    inorganic soil san gra$el

    weathere or %rag)ente rocor a )i/ture o% an o% these

    )aterials essentiall %ree %ro)

    $egetati$e an other organic

    )atter an e/pansi$e cla

    )inerals. t shall ha$e a

    )a/i)u) particle sie o% 7* ))

    or less an shall ha$e a C('

    $alue not less than that shown on

    the Drawings when co)pacte

    to

    !* o% the )a/i)u) rensit eter)ine in the (.S.

    1377

    Co)paction est 94.* g

    ra))er )etho: an soae %or 

    4 as uner a surcharge o% 4.*

    g.

    4.1.1.3 Construction Methos

    Prior to placing an lower

    subbase )aterial the unerling

    subgrae 9particularl the top 3""

    )) o% the subgrae: shall ha$e

     been shape an co)pacte in

    accorance with the pro$isions o% 

    Sub-Section 2.2.7.

     ;otwithstaning an earlier

    appro$al o% %inishe subgrae

    an a)age to or eterioration

    o% the subgrae shall be )ae

    goo to the satis%action o% the

    S.6. be%ore lower subbase is

    constructe.

    Lower subbase shall be place

    o$er the %ull with o% the

    %or)ation to the re,uire

    thicness as shown on the

    Drawings or irecte b the

    S.6. in one laer or )ore each

    laer not e/ceeing 2"" ))co)pacte thicness.

  • 8/16/2019 Section4 Felxible Pavement

    5/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    he lower subbase shall be

    %inishe in a neat an wor)an

    lie )anner an shall ha$e an

    a$erage thicness o$er an 1""

    )etre length not less than the

    re,uire thicness. he topsur%ace o% the lower subbase

    shall ha$e the re,uire shape

    superele$ation le$els an

    graes an shall be e$erwhere

    within the tolerances speci%ie in

    Sub- Section 4.4.

    4.1.2 Subbase

    4.1.2.1 Description

    his wor shall consist o%

    %urnishing placing co)pacting

    an shaping subbase )aterial

    on

    a prepare an accepte subgrae

    or lower subbase in accorance

    with this Speci%ication an the

    lines le$els graes i)ensions

    an cross-sections shown on the

    Drawings an5or as re,uire b

    the S.6.

    4.1.2.2 Materials

    Subbase )aterial shall be a

    natural or prepare aggregate

    co)prising crushe roc

    weathere or %rag)ente roc

    gra$el or crushe gra$el san

    or a )i/ture o% an o% these

    )aterials. t shall ha$e a s)all

     proportion o% plastic or 

    non-plastic %ines an shall be

    essentiall %ree %ro) $egetati$e

    an other organic )atter

    e/pansi$e cla )inerals an

    lu)ps o% cla. he )aterial

    shall con%or) to the %ollowing

     phsical an )echanical ,ualit

    re,uire)ents =-

    i: the li,ui li)it shall be

    not )ore than 2*>

    ii: the plasticit ine/ shall be

    not )ore than 0>

    iii: the aggregate crushing $alue

    when teste in accorance

    with M.S. 3" shall be not

    )ore than 3*>

    i$: unless otherwise speci%ie on

    the Drawings or irecte b

    the S.6. the )aterial shall

    ha$e a C(' $alue o% 3" or

    )ore when co)pacte to

    !* o% the )a/i)u) rensit eter)ine in the

    (.S.

    1377 Co)paction est 94.*

    g ra))er )etho: an

    soae %or 4 as uner a

    surcharge

    o% 4.* g>

    $: the graation shall con%or)

    to one o% the en$elopes

    shown in able 4.1 with the%raction passing the (.S. 7*

    u) sie$e not greater than 253

    o% the %raction passing the

    (.S. 42* u) sie$e.

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage 7.

  • 8/16/2019 Section4 Felxible Pavement

    6/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    TABLE 4.1 - GRADATION LIMITS FOR SUBBASE MATERIAL

    B.S.Sieve

    Size

    % Passing By eig!"

     A B # D E F

    $. &&'$. &&(.$ &&4.)$ &&'. &&4'$ *&)$ *&

    1-

    +-,$'$-$$1$-4-''-

    1)(-($4-)$

    +-,'-4$1$-+$-'

    -1

    $-$+$-,$'$-$1$-+$-'

    -1

    ,-1$-$4-)'$-4$$-'

    -1

    -$$-14-1'-$,-'

    -1

    -)-1$$-1+-)-'$

    4.1.2.3 Construction Methos

    Prior to placing an subbase)aterial the unerling subgrae

    9particularl the top 3"" )) o% the

    subgrae: or lower subbase shall

    ha$e been shape an co)pacte

    in accorance with the pro$isions

    o% Sub-Section 2.2.7 or Sub-Section

    4.1.1.3 as appropriate.

     ;otwithstaning an earlier

    appro$al o% %inishe subgrae or

    lower subbase an a)age to or

    eterioration o% the subgrae orlower subbase shall be )ae

    goo

    to the satis%action o% the S.6.

     be%ore subbase is constructe.

    Subbase shall be place with

    e,uip)ent appro$e b the S.6.

    o$er the %ull with o% the

    %or)ation to the re,uire thicness

    as shown on the Drawings or

    irecte b the S.6. in one laer

    or )ore each laer not e/ceeing

    2"" )) co)pacte thicness.

  • 8/16/2019 Section4 Felxible Pavement

    7/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    he subbase shall be %inishe in

    a neat an wor)anlie )anner>

    its with shall be e$erwhere at

    least that speci%ie or shown on

    the Drawings on both sies o%

    the centre-line> an its a$eragethicness o$er an 1"" )etre

    length shall be not less than the

    re,uire thicness. he top

    sur%ace o% the subbase shall ha$e

    the re,uire shape

    superele$ation le$els an graes

    an shall be e$erwhere within

    the tolerances speci%ie in Sub-

    Section 4.4.

    4.1.3 #ra$el Sur%acing

    4.1.3.1 Description

    his wor shall consist o%

    %urnishing placing co)pacting

    an shaping gra$el sur%acing

    )aterial on a prepare an

    accepte subgrae or lower

    subbase in accorance with this

    Speci%ication an the lines le$els

    graes i)ensions ancross-sections shown on the

    Drawings an5or as re,uire

     b the S.6.

    4.1.3.2 Materials

    #ra$el sur%acing )aterial shall be

    a natural or prepare soil-

    aggregate )i/ture co)prising

    gra$el an san sie particles

    together with a s)all proportion

    o% plastic %ines an shall be

    essentiall %ree %ro) $egetati$e

    an other organic )atter

    e/pansi$e cla )inerals an

    lu)ps o% cla. he )aterial

    shall

    con%or) to the %ollowing phsical

    an )echanical ,ualit

    re,uire)ents =-

    i: the li,ui li)it shall be

    not )ore than 3*>

    ii: the plasticit ine/ shall be

    in the range 4 to 1">

    iii: the aggregate crushing $alue

    when teste in accorance

    with M.S. 3" shall be not

    )ore than 3*>

    i$: the graation shall con%or)

    to one o% the en$elopes

    shown in able 4.2 with the

    %raction passing the (.S. 7*

    u) sie$e not greater than

    253 o% the %raction passing the

    (.S. 42* u) sie$e.

    TABLE 4.' - GRADATION LIMITS FOR GRAEL SURFA#ING

    B.S. SieveSize

    % Passing By eig!"

     A B # D

    +).$ &&1'.$ &&4.)$ &&'. &&4'$ *&)$ *&

    14$ - )$+ - ,' - 4$1$ - + - '

    1$$ - $+$ - ,$'$ - $1$ - + - '

    1, - 1$ - $4 - )'$ - 4$ - '

    1-

    $$ - (4 - )' - $ - '$

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage )&

  • 8/16/2019 Section4 Felxible Pavement

    8/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    Material with a )a/i)u)

     particle sie o% 37.* )) while

    otherwise not con%or)ing to the

    graation speci%ication but

    satis%ing the other

    re,uire)ents shall be acceptable pro$ie that it shall ha$e a

    C(' $alue o% 3"

    or )ore when co)pacte to

    !* o% the )a/i)u) r

    ensit eter)ine in the (.S.

    1377

    Co)paction est 94.* g

    ra))er )etho: an soae %or 

    4 as uner a surcharge o% 4.*

    g.

    4.1.3.3 Construction Methos

    Prior to placing an gra$el

    sur%acing )aterial the unerling

    subgrae 9particularl the top 3""

    )) o% the subgrae: or lower

    subbase shall ha$e been shape

    an co)pacte in accorance

    with the pro$isions o% Sub-

    Section 2.2.7 or Sub-

    Section4.1.1.3 as appropriate.

     ;otwithstaning an earlier

    appro$al o% %inishe subgrae

    or lower subbase an a)age

    to or eterioration o% the

    subgrae or lower subbase shall

     be )ae goo to the satis%action

    o% the S.6. be%ore gra$el

    sur%acing is constructe.

    #ra$el sur%acing shall be place

    to the re,uire with an

    thicness as shown on the

    Drawings or irecte b the

    S.6. in one laer or )ore each

    laer not e/ceeing 2"" ))

    co)pacte thicness. its with

    shall be e$erwhere at least that

    speci%ie or shown on the

    Drawings on both sies o% the

    centre-line> an its a$erage

    thicness o$er an 1"" )etre

    length shall be not less than the

    re,uire thicness an its

    )ini)u) thicness at an point

    shall be not less than the

    re,uire thicness )inus 2"

    )).

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage )*

  • 8/16/2019 Section4 Felxible Pavement

    9/52

    B.S. SieveSize

    % Passing By eig!"

    Ty/e I Ty/e II

    $. &&+).$ &&'. &&'. &&1. &&$.% &&'.+, &&'.%% &&, *&4'$ *&)$ *&

    1($ - 1

    -, - 4 - ,'$ - 41$ - +

    - 0 ''

    - 0

    1$ - 1) - 1, - (4 - ,$+ - $$

    -' - 4

    -1 - '$' - 1

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    he top sur%ace o% the gra$el

    sur%acing shall ha$e the

    re,uire shape superele$ation

    le$els an graes an shall be

    e$erwhere within 1" )) o%

    the re,uire plane or suchhigher appro/i)atel parallel

     plane as the S.6. shall appro$e.

    4.1.4 Crushe &ggregate 'oabase

    4.1.4.1 Description

    his wor shall consist o%

    %urnishing placing co)pacting

    an shaping crushe aggregate

    roabase )aterial on a preparean accepte subgrae or lower

    subbase or subbase in

    accorance with this

    Speci%ication an the lines

    le$els graes i)ensions an

    cross-sections shown on the

    Drawings an5or as re,uire b

    the S.6.

    4.1.4.2 Materials

    Crushe aggregate roabase

    )aterial shall be crushe roc

    or crushe gra$el or a )i/ture

    o% crushe an natural

    aggregates which is har

    urable clean an essentiall

    %ree %ro) cla an other

    eleterious )aterials.

    he )aterial shall con%or) to

    the %ollowing phsical an

    )echanical ,ualit re,uire)ents=-

    i: the plasticit ine/ shall be

    not )ore than 0>

    ii: the aggregate crushing $alue

    when teste in accorance

    with M.S. 3" shall be not

    )ore than

    3">

    iii: the %lainess ine/ when testein accorance with M.S. 3"

    shall be not )ore than 3">

    i$: not less than 8" o%

     particles retaine on the (.S.

    4.7* )) sie$e shall ha$e at

    least one %racture %ace>

    $: the weighte a$erage loss o%

    weight in the soiu)

    sulphate sounness test 9*

    ccles:

    when teste in accorance

    with &&S6 est Metho

    1"4 shall be not )ore

    than

    12>

    $i: the )aterial shall ha$e a C(' 

    $alue o% not less than 8"when co)pacte to !* o%

    the )a/i)u) r ensit

    eter)ine in the (.S. 1377

    Co)paction est 94.* g

    ra))er )etho: an

    soae %or 4 as uner a

    surcharge o% 4.* g>

    $ii:the graation shall co)pl

    with the en$elope shown

    in able 4.3 %or the tpespeci%ie.

    TABLE 4.+ - GRADATION LIMITS FOR

    #RUSED AGGREGATE ROADBASE

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage ),

  • 8/16/2019 Section4 Felxible Pavement

    10/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    4.1.4.3 Construction Methos

    Prior to placing an crushe

    aggregate roabase )aterial the

    unerling subgrae or lower

    subbase or subbase shall ha$e been shape an co)pacte in

    accorance with the pro$isions o% 

    the appropriate Section o% this

    Speci%ication. ;otwithstaning

    an earlier appro$al o% %inishe

    subgrae or lower subbase or

    subbase an a)age to or

    eterioration o% the subgrae or

    lower subbase or subbase shall

     be )ae goo to the satis%action

    o% the S.6. be%ore crusheaggregate roabase is

    constructe.

    Crushe aggregate roabase shall

     be place to the re,uire with

    an thicness as shown on the

    Drawings or irecte b the S.6.

    in one laer or )ore each laer

    not e/ceeing 2"" ))

    co)pacte thicness. its with

    shall be e$erwhere at least that

    speci%ie or shown on the

    Drawings on both sies o% the

    centre-line> an its a$erage

    thicness o$er an 1"" )etre

    length shall be not less than the

    re,uire thicness. he top

    sur%ace o% the crushe aggregate

    roabase shall ha$e the re,uire

    shape superele$ation le$els an

    graes an shall be e$erwhere

    within the tolerances speci%ie in

    Sub-Section 4.4.2.

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage )4

  • 8/16/2019 Section4 Felxible Pavement

    11/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    4%* !IT'$INO'S P"#E$ENT

    CO'RSES

    4.2.1 (itu)en Pri)e Coat

    4.2.1.1 Description

    his wor shall consist o% the

    care%ul an thorough cleaning o%

    the sur%ace o% a prepare an

    accepte crushe aggregate

    roabase an the %urnishing an

    application to the cleane

    roabase sur%ace o% a bitu)inous

     pri)ing )aterial all in

    accorance with this

    Speci%ication an the linesi)ensions an cross-sections

    shown on the Drawings an5or

    as re,uire b the S.6.

    4.2.1.2 Materials

    he bitu)inous pri)ing )aterial

    shall be either cut-bac bitu)en

    or bitu)en e)ulsion as state in

    the (ill o% @uantities.

    Cut-bac bitu)en shall be

    grae 'C-7" or MC-7"

    con%or)ing to the re,uire)ents

    o% M.S. 1*!.

    (itu)en e)ulsion shall be

    slow setting grae SS-1 or SS-

    1A con%or)ing to the

    re,uire)ents

    o% M.S. 101 as appropriate to

    the tpe o% roabase )aterial to

     be pri)e an appro$e b the

    S.6.

    4.2.1.3 +,uip)ent

    he e,uip)ent use b the

    Contractor shall inclue a

     power broo) a co)presse air

     blower a sel%-propelle pressure

    istributor %or bitu)inous

    )aterial an as necessar

    e,uip)ent %or storing an heating bitu)inous )aterial.

    9a: Power (roo)

    he power broo) shall be

    a rotar tpe speci%icall

    esigne %or sweeping roa

    sur%aces an shall be

    appro$e b the S.6.

    9b: Co)presse &ir (lower 

    he co)presse air blower

    shall co)prise a portable air

    co)pressor o% 3 cu.)5)in.

    in capacit at ".7 ;5s,.))

    eli$er pressure with a

    suitable hose an nole %or

     blowing clean a roa sur%acea%ter power broo)ing an

    shall be appro$e b the

    S.6.

    9c: Pressure Distributor %or 

    (itu)inous Material

    he istributor shall be a

     purpose built )oel o%

    recognise )anu%acture an

    shall be appro$e b theS.6. t shall con%or) to the

    re,uire)ents escribe

    hereuner.

    he istributor shall ha$e a

    suitable capacit an shall be

    e,uippe with a gas or oil

    %ire heating sste) capable

    o% heating a %ull charge o%

     bitu)inous )aterial to

    l8"BC. he heating sste)

    shall be such that o$erheating

    o% the bitu)inous )aterial

    will not occur an shall be o% 

    a tpe in which %la)es %ro)

    the burner o not co)e into

    irect contact with the casing

    o% the tan containing the

     bitu)inous )aterial. he

    tan shall be insulate in

    such a )anner that when

    %ille

    with bitu)inous )aterial atl8"BC an not heate

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage )5

  • 8/16/2019 Section4 Felxible Pavement

    12/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    the rop in te)perature shall be

    less than 3BC per hour. &

    ther)o)eter shall be pro$ie to

    )easure continuousl the

    te)perature o% the bitu)inous

    )aterial in the tan an shall beso arrange that the highest

    te)perature in the tan is

    )easure. he tan shall be

    %itte with an accuratel

    calibrate ipstic or contents

    gauge an the pipe %or %illing

    the tan shall be %itte with an

    easil replaceable %ilter.

    he istributor shall run on

     pneu)atic tre wheels o% suchwith an nu)ber that the loa

     prouce on the roa sur%ace

    when the $ehicle is %ull charge

    shall not e/cee l2 g5)) o%

    tre with. he $ehicle shall be

    e,uippe with a %i%th wheel

    tacheo)eter sste) to accuratel

    )easure its %orwar spee uring

    spraing operations.

    he istributor shall be e,uippewith a %ull circulation tpe spra

     bar with noles %ro) which the

     bitu)inous )aterial is sprae

    on to the roa sur%ace uni%or)l

    o$er the %ull spraing with.

    he spraing with shall be

    $ariable

    in incre)ents o% not )ore than

    1"" )) up to a )a/i)u) o%

    *." )etres. he spraing pu)p

    shall be ri$en b a separate

     power unit an shall be

    e,uippe with

    an accurate pressure gauge

    an an accurate %low rate

    gauge or )eter. 6n the suction

    sie the pu)p shall be %itte

    with an easil replaceable

    %ilter. he spra bar an

     pu)p shall be so

    esigne that bitu)inous )aterial

    at e$en te)perature an uni%or)

     pressure )a be sprae uni%or)l o$er the spraing with at

    controlle rates in the range

    ".2* to 8." litres5s,.) at nor)al

    istributor operating spees

    such that e$iation %ro) the

     prescribe rate o% application

    shall not

    e/cee 1".

    he istributor shall be e,uippe

    with a han spraing sste).

    he )eters %or the %i%th wheel

    tacho)eter sste) an the

     bitu)inous )aterial pu)ping

    %low rate pu)ping pressure an

    te)perature shall be locate in

    such a )anner that the $ehicle

    ri$er can easil rea the)while operating the istributor.

    he spra bar shall be controlle

     b a secon operator riing at

    the rear o% the $ehicle in such a

     position

    that all the ischarge spras are

    in his goo $iew.

    &ll )easuring e,uip)ent on the

    istributor shall ha$e been

    recentl calibrate an accuratean satis%actor recors o% the

    calibrations shall be sub)itte to

    the S.6. % in the course o% the

    wor the rates o% application o%

     bitu)inous )aterial are %oun to

     be inaccurate the istributor shall

     be withrawn %ro) the

  • 8/16/2019 Section4 Felxible Pavement

    13/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    9: Storage an eating

    Eacilities %or (itu)inous

    Material

    ans %or storage o%

     bitu)inous )aterial shallha$e a capacit suite to the

     propose rate o% utilisation

    o% the )aterial an the

    )etho an %re,uenc o% its

    eli$er to the

  • 8/16/2019 Section4 Felxible Pavement

    14/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    % necessar in orer to

     pre$ent the bitu)inous

    )aterial %ro) %lowing on the

    sprae sur%ace the pre

    scribe pri)e coat shall be

    applie in two separatespraing operations. the ,uantities applie shall not

    e$iate b )ore than 1"

    %ro) those prescribe. &reas

    with insu%%icient bitu)inous

    )aterial shall be resprae as

    necessar to )ae up the

    e%icienc all to the

    satis%action o% the S.6.

    he sur%aces o% structures

    roa %urniture an treesa?acent to the areas being

    sprae shall be protecte

    in such a )anner as to

     pre$ent their being spattere

    or )arre b bitu)inous

    )aterial. (itu)inous )aterial

    shall not be ischarge into

    roa rains gutters etc.

    9: Curing an 6pening to

    ra%%ic

    Pri)e coat shall nor)all be

    le%t unisturbe %or at least

    24 hours a%ter application an

    shall not be opene to tra%%ic

    until in the opinion o% the

    S.6. it has penetrate the

    roabase an cure

    su%%icientl so that it will not

     be pice up b the wheels

    o% $ehicles.

    he Contractor shall )aintain

    the pri)e coat all to the

    satis%action o% the S.6. until

    the o$erling pa$e)ent

    course is constructe which

    shall not be within 24 hours

    a%ter the application o% the

     bitu)inous pri)ing )aterial

    nor within such longer perio

    as is re,uire in the opinion

    o% the S.6. %or the pri)e

    coat to achie$e )a/i)u)

     penetration o% the roabase

    an beco)e %ull cure.

    4.2.2 (itu)inous ac Coat

    4.2.2.1 Description

    his wor shall consist o% the

    care%ul an thorough cleaning o%

    the sur%ace o% a prepare an

    accepte bitu)inous or bitu)en

     pri)e pa$e)ent course an the

    %urnishing an application to the

    cleane sur%ace o% a bitu)inous

    tac coat prior to the

    construction o% an o$erling bitu)inous pa$e)ent course all

    in accorance with this

    Speci%ication an the lines

    i)ensions an cross-sections

    shown on the Drawings an5or

    as re,uire b the S.6.

    4.2.2.2 Materials

    (itu)inous tac coat )aterial

    shall be rapi setting bitu)en

    e)ulsion o% grae 'S-1 or

    'S-

    1A con%or)ing to the

    re,uire)ents o% M.S.

    101.

    4.2.2.3 +,uip)ent

    he e,uip)ent shall be as

    speci%ie in Sub-Section 4.2.1.3.

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage ))

  • 8/16/2019 Section4 Felxible Pavement

    15/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    4.2.2.4 Construction Methos

    9a: #eneral Conitions

    (itu)inous tac coat shall

    onl be applie to a cleanr bitu)inous or 

     bitu)en pri)e sur%ace.

    (itu)inous tac coat shall

    onl be applie as %ar in

    a$ance o% the construction o% 

    the o$erling bitu)inous

     pa$e)ent course as is

    necessar to achie$e a satis

    %actor egree o% taciness

     be%ore the o$erling )aterialis place all to the

    satis%action o% the

    S.6.

    9b: Sur%ace Preparation an

    Cleaning

    Prior to appling bitu)inous

    tac coat the sur%ace to be

    treate shall ha$e been

     prepare in accorance withthe appropriate Sections o%

    this Speci%ication.

     ;otwithstaning an earlier

    appro$al o% this sur%ace an

    a)age to it or eterioration

    o% it shall be )ae goo

     be%ore tac coat is applie.

    ))eiatel prior to appling

     bitu)inous tac coat the %ull

    with o% the sur%ace to be

    treate shall be swept using a

     power broo) %ollowe b a

    co)presse air blower an i% 

    necessar scrape using han

    tools to re)o$e all irt ust

    an other ob?ectionable

    )aterial all to the satis%action

    o% the S.6.

    9c: &pplication o% (itu)inous

    Material

    he bitu)inous tac coat

    shall be sprae on to the

    cleane bitu)inous or

     bitu)en pri)e sur%ace b

    )eans o% a pressure

    istributor. &n areas

    inaccessible to the

    istributor spra bar shall be

    treate using the istributors

    han spraing sste). he

    rate or 

    rates o% application shall be

    as irecte b the S.6. base

    on the results o% testapplications but shall usuall

     be in the range ".2* to ".**

    litres5s,.). he te)perature

    o% the bitu)inous )aterial

    shall be )aintaine in the

    range 2*BC to 4*BC uring

    spraing operations.

    ac coat shall be istribute

    uni%or)l o$er the sur%ace to

     be treate without streaing>the ,uantities applie shall not

    e$iate b )ore than 1"

    %ro) those prescribe. &reas

    with bitu)inous )aterial in

    e/cess o% these li)its shall

    ha$e the e/cess re)o$e at

    the Contractors e/pense an

    areas with insu%%icient

     bitu)inous )aterial shall be

    resprae as necessar to

    )ae up the e%icienc all

    to the satis%action o% the S.6.

    he sur%aces o% structures

    roa %urniture an trees

    a?acent to the areas being

    sprae shall be protecte in

    such a )anner as to pre$ent

    their being spattere or

    )arre b bitu)inous

    )aterial. (itu)inous )aterial

    shall not be ischarge into

    roa rains gutters etc.

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage ).

  • 8/16/2019 Section4 Felxible Pavement

    16/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    ra%%ic shall be ept o%% the

    tac coat at all ti)es an

    the Contractor shall

    )aintain the tac coat all to

    the satis%action o% the S.6.

    until the o$erling pa$e)entcourse is constructe.

    4.2.3 (itu)inous Sur%ace Dressing

    4.2.3.1 Description

    his wor shall consist o% the

    care%ul an thorough cleaning o%

    the sur%ace o% a prepare an

    accepte bitu)inous or bitu)en

     pri)e pa$e)ent course an the%urnishing an placing on the

    cleane sur%ace o% one or two

    applications o% bitu)inous

    )aterial an co$er aggregate all

    in accorance with this

    Speci%ication an the lines

    i)ensions an cross-sections

    shown on the Drawings an5or

    as re,uire b the S.6.

  • 8/16/2019 Section4 Felxible Pavement

    17/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    Eor ouble bitu)inous

    sur%ace ressing the co$er

    aggregate %or the %irst

    application o% bitu)inous

    )aterial an co$er aggregate

    shall be no)inal 2" ))sie chippings an the co$er 

    aggregate %or the secon

    application o% bitu)inous

    )aterial an co$er

    aggregate shall be no)inal

    1" )) sie chippings.

    Co$er aggregates shall be

    screene crushe stone an

    shall co)prise clean r

    har tough soun angularan cubical chippings %ree

    %ro) $egetati$e an other

    organic )atter cla an

    other eleterious substances

    an containing %ew i% an

    %la

    or elongate particles. Dust

    chippings shall be washe

    clean all to the satis%action

    o% the S.6. Co$er agregates

    shall con%or) to the %ollowing phsical an )echanical

    re,uire)ents =-

    i: using the tpe o%

     bitu)inous )aterial to be

    use in the

    ii: the aggregate crushing

    $alue when teste in

    accorance with M.S. 3"

    shall be not )ore than

    3">

    iii: the weighte a$erage loss

    o% weight in the soiu)

    sulphate sounness test 9*

    ccles: when teste in

    accorance with

    &&S6 est Metho

    1"4 shall

     be not )ore than 12>

    i$: the %lainess ine/ when

    teste in accorance with

    M.S. 3" shall be not

    )ore than 2*>

    $: the polishe stone $alue

    when teste in accorance

    with M.S. 3" shall be notless than 4">

    $i: the graation shall con

    %or) to the appropriate

    en$elope shown in

    able

    4.4.

    4.2.3.3 +,uip)ent

    he Contractor shall pro$ie allthe plant an e,uip)ent

    necessar %or e/ecuting the wor 

    in accorance with this

    Speci%ication an shall %urnish

    the S.6. with such etails o%

     particular ite)s o% e,uip)ent

    e.g. )anu%acturer )oel tpe

    capacit weight etc. as the

    S.6. shall re,uire.

    he e,uip)ent shall inclue a

     power broo) a co)presse air

     blower a sel%-propelle

     pressure istributor %or

     bitu)inous

    )aterial all necessar e,uip)ent

    %or storing an heating

     bitu)inous )aterial aggregate

    spreaing e,uip)ent a suitable

    nu)ber o% tip-trucs an a sel%-

     propelle pneu)atic tre

    roller.

    Cawangan Jalan, Ibu Pejabat JKR, K.L

  • 8/16/2019 Section4 Felxible Pavement

    18/52

    Page .&

  • 8/16/2019 Section4 Felxible Pavement

    19/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    TABLE 4.4 - GRADATION LIMITS FOR BITUMINOUS SURFA#E DRESSING

    B.S.

    SieveSize

    % Passing By eig!"

    N2&ina3' &&

    #!i//ings

    N2&ina314 &&

    #!i//ings

    N2&ina31 &&

    #!i//ings

    N2&ina3, &&

    #!i//ings

    '$. &&'. &&14. &&1. &&,.+ &&

    4.)$ &&

    '.+, &&

    1$ - 1

    - '--

    - $

    - '

    -1

    $ - 1 - '

    - - $

    - '

    --

    1$ - 1

    - ' - 1

    - '

    ---

    1$ - 1

    - '$

    - 1

    9a: Power (roo)

    he power broo) shall be

    as speci%ie in Sub-Section

    4.2.1.39a:.

    9b: Co)presse &ir

    (lower he co)presse

    air blower shall be as

    speci%ie in Sub-Section

    4.2.1.3 9b:.

    9c: Pressure Distributor %or 

    (itu)inous Material

    he istributor shall be

    as speci%ie in Sub-

    Section

    4.2.1.39c:.

    9: Storage an eating

    Eacilities %or

    (itu)inous Material

    Storage an heating

    %acilities %or bitu)inous

    )aterial shall be as

    speci%ie in Sub-

    Section

    4.2.1.3 9:.

    9e: &ggregate Spreaing

    +,uip)ent

    &ggregates shall be place

    using )echanical

    spreaers o% a tpe

    appro$e b the S.6.

    he spreaers shall be

    capable o% appling

    aggregate uni%or)l o$erthe %ull with o% the area

     being treate an shall

    ha$e controls to regulate

    the

    rate o% sprea as re,uire

     b this Speci%ication all to

    the satis%action o% the S.6.

    9%: ip-rucs

    he Contractor shall

     pro$ie a suitable nu)ber 

    o% tip-trucs o% a tpe

    appro$e b the S.6.

    capable o% spreaing

    aggregate in accorance

    with this Speci%ication.

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage .*

  • 8/16/2019 Section4 Felxible Pavement

    20/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    9g: Pneu)atic re 'oller 

    he pneu)atic tre roller 

    shall be o% recognise

    )anu%cature an shall be

    appro$e b the S.6. tshall con%or) to the

    re,uire)ents escribe

    hereuner.

    he pneu)atic tre roller 

    shall be sel%-propelle an

    capable o% being re$erse

    without baclash> it shall

     be e,uippe with power

    steering an ual controls

    allowing operation %ro)either the le%t or right

    sie.

    he roller shall ha$e nine

    wheels e,uippe with

    s)ooth treae tres all

    o% the sa)e sie an

    construction an capable

    o% operating at in%lation

     pressures o% up to ".!

     ;5s,.)). Ei$e wheelsshall be on the ri$en a/le

    an %our on the steering

    a/le all e,uall space on

     both a/les an arrange so

    that the tres on the

    steering a/le trac )iwa

     between those on the

    ri$en a/le with a s)all

    o$erlap. he roller shall

     be e,uippe with water

    tans sprinler sste)s

    an pas o% coconut

    )atting to eep all tres

    e$enl wette uring

    operation.

    he roller shall be

    e,uippe with )eans o%

    a?usting its total weight

     b ballasting so that the

    loa per wheel can be

    $arie in the range 1."

    to2." tonnes.

    n operation the ballaste

    weight an the tre

    in%lation pressure shall be

    a?uste to )eet the

    re,uire)ents o% each

     particular operation. +ach

    tre shall be ept in%late

    at the speci%ie pressure

    such that the pressure

    i%%erence between an

    two tres shall not e/cee

    "."4 ;5s,.)). Means

    shall be pro$ie %or

    checing an a?usting

    tre pressures at all ti)es

    at the place o% the wors.

    he Contractor shall

     pro$ie the S.6. with a

    calibration chart %or the

    roller showing the

    relationship between the

    ,uantit or epth o%

     ballast an total weight

    an also

    a chart showing the

    relationship between

    wheel loa tre in%lation pressure an contact

     pressure.

    4.2.3.4 Construction Methos

    9a: #eneral Conitions

    (itu)inous sur%ace ressing

    shall onl be carrie out in

    r war) weather when

    the sur%ace to be treate is

    r.

  • 8/16/2019 Section4 Felxible Pavement

    21/52

    N2&ina3 Size2 Agg5ega"e

    Ra"e 2 A//3i6a"i2n 2 Pene"5a"i2n

    G5a7e7Bi"*&en

    '% &&

    14 &&

    1% &&

    , &&

    '. - +. 3i"5e8s9.&

    1.$ - '.' 3i"5e8s9.&

    1. - 1.$ 3i"5e8s9.&

    .) - 1. 3i"5e8s9.&

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    sur%ace to be treate or

    such other conitions as he

    shall consier etri)ental to

    the wor.

    9b: Sur%ace Preparation anCleaning

    Prior to constructing a

     bitu)inous sur%ace ressing

    the sur%ace to be treate shall

    ha$e been prepare in

    accorance with the

    appropriate Sections o% this

    Speci%ication.;otwithstani

    ng an earlier appro$al o% this

    sur%ace an a)age to oreterioration o% it shall be

    )ae goo be%ore sur%ace

    ressing is co))ence.

    ))eiatel prior to

    co))encing sur%ace

    ressing the %ull with o% the

    sur%ace to be treate together

    with an aitional 3"" ))

    with on each sie shall be

    sweptusing a power broo)

    %ollowe b a co)presse air 

     blower an i% necessar

    scrape using han tools to

    re)o$e all loose particles

    irt ust an other

    ob?ectionable )aterial all to

    the satis%action o% the S.6.

    n ouble bitu)inous sur%ace

    ressing construction the

    sur%ace o% the %irst

    application o% bitu)inous

    )aterial an co$er aggregate

    shall be si)ilarl )ae goo

    an cleane i))eiatel

     prior to co))encing the

    secon application.

    9c: &pplication o% (itu)inous

    Material

    he bitu)inous )aterial %or a

    single bitu)inous sur%ace

    ressing or %or each

    application o% bitu)inous

    )aterial an co$er aggregate

    o% a ouble bitu)inous

    sur%ace ressing shall be

    sprae on to the cleane

    sur%ace to be treate b

    )eans o% a pressure

    istributor. &n areas

    inaccessible to the istributor

    spra bar shall be treate

    using the istributors hanspraing sste).

    he rate or rates o%

    application shall be as

    irecte b the S.6. base

    on the results o% laborator

    tests

    an5or test applications but %or 

     penetration grae bitu)en

    shall usuall be in the

    appropriate range gi$en inable 4.*.

    TABLE 4.$ - RATES OF APPLI#ATION

    OF PENETRATION GRADED BITUMEN

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage .4

  • 8/16/2019 Section4 Felxible Pavement

    22/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    he rates o% application

    %or cut-bac bitu)ens an

     bitu)en e)ulsions shall

     be co))ensuratel higher 

    epening on their 

    resiual bitu)en contents.

    he te)perature o% the

     bitu)inous )aterial shall

     be )aintaine uring

    spraing operations within

    the appropriate range

    gi$en in able 4.0.

    he bitu)inous )aterial

    shall be istribute

    uni%or)l o$er the sur%aceto be treate without

    streaing> the ,uantities

    applie shall not e$iate

     b )ore than 1" %ro)

    those prescribe. he rate

    o% application shall be

    chece %or each spraing

    run b )easuring the

    $olu)e o% bitu)inous

    )aterial in the istributor

     be%ore an a%ter spraingan the area treate.

    &?ust)ents shall be

    )ae as necessar to

    ensure that the prescribe

    rate o% application is

    )aintaine

    in subse,uent runs.

    Spraing shall be

    iscontinue i))eiatel

    i% an e%ect e$elops in

    the istributor an it shall

    not be resu)e until the

    %ault has been recti%ie to

    the satis%action o% the

    S.6.

    he spraing o% bitu)inous

    )aterial o$er an portion o%

    the sur%ace to be treate

    shall not be carrie out )ore

    than two )inutes in a$ance

    o% placing the co$er

    aggregate

    on that portion at the

    speci%ie rate> an the progress

    o% spraing the bitu)inous

    )aterial shall be restricte as

    necessar to co)pl with

    this re,uire)ent.

    TABLE 4., - SPRA:ING

    TEMPERATURE FOR BITUMINOUS

    Bi"*&in2*sMa"e5ia3

    S/5ayingTe&/e5a"*5e

    %-1%%/ene"5a"i2n g5a7e;i"*&en

    #*"-;a6<;i"*&en g5a7eR#-) 25 M#-)

    Bi"*&en e&*3si2ns

    1$2# "2 1,$

    2#

    $%2# "2 ,$

    2#

    '$2# "2 4$ 

    2#

    (itu)inous )aterials

    (itu)inous )aterials shall

    not be heate to spraing

    te)peratures too soon in

    a$ance o% re,uire)ents.

    &n bitu)inous )aterial

    which has been heate to

    spraing te)perature %or

    )ore than ten hours or

    which has been o$erheate

    shall be re?ecte.

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage .5

  • 8/16/2019 Section4 Felxible Pavement

    23/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    n cases where the

     bitu)inous )aterial is

    applie in lanes there

    shall be a s)all o$erlap o% 

     bitu)inous )aterial at

    the ?oints between lanese,ual in with to the ege

    strip

    o% the sprae area which

    oes not recei$e the %ull

    rate o% application o%

     bitu)inous )aterial. Eor

    ouble bitu)inous sur%ace

    ressing ?oints in the

    secon application o%

     bitu)inous )aterial shall

     be o%%set %ro) those inthe %irst application b

    1*" -

    3"" )) %or longituinal

     ?oints an b at least 1."

    )etre where possible

    %or trans$erse ?oints.

    +ach spraing run shall

    co))ence an

    ter)inate on lengths o%

     builing paper placeacross the %ull spraing

    with i))eiatel

     be%ore an a%ter the

    section to be

    sprae. Su%%icient builing

     paper shall be

     place so that the istributor

    )a be starte an stoppe

    with the spra bar o$er paper

    an so that the correct

    istributor roa spee an rate

    o% spraing can be )aintaine

    o$er the entire length o% the

    section to be sprae all to

    the satis%action o% the S.6.

    ))eiatel a%ter use an

     be%ore application o%

    co$er aggregate the

     builing paper shall be

    re)o$e

    an ispose o% in a

    )anner appro$e b the

    S.6.

    Pro$ision shall be )ae

    %or a $olu)e o%

     bitu)inous )aterial o% at

    least 1" o% the capacit

    o% the istributor or such

    other ,uantit as the S.6.

    shall irect to re)ain in

    the istributor tan at the

    co)pletion o% each spraing

    run in orer to a$oi air

    entrap)ent within the

     bitu)en spraing sste).

    he sur%aces o% structures

    roa %urniture an trees

    a?acent to the areas

     being sprae shall be protecte

    in such a )anner as to

     pre$ent their being spattere

    or 

    )arre b bitu)inous

    )aterial. (itu)inous )aterial

    shall not be ischarge into

    roa rains gutters etc.

    9: &pplication o% Co$er 

    &ggregate

    (e%ore each spraing run

    o% bitu)inous )aterial

    co))ences su%%icient

    aggregate to pro$ie %ull

    co$er at the prescribe

    rate o% application o$er the

    entire area to be sprae

    shall ha$e been loae in

    trucs at the Site o% the

  • 8/16/2019 Section4 Felxible Pavement

    24/52

    N2&ina3Size

    Ra"e 2 A//3i6a"i2n2 Agg5ega"e

    ' &&

    14 &&

    1 &&

    , &&

    1) 0 ')

  • 8/16/2019 Section4 Felxible Pavement

    25/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    than 3 )inutes between the

    application o% the

     bitu)inous )aterial an the

    co))ence)ent o% rolling.

    he pneu)atic tre rollershall be ballaste to an

    operating weight o% ! - 1"

    tonnes an its tre

    in%lation pressure shall be

    ".*3

     ;5s,.)) %or sur%ace ressing

    wor. 'olling shall be

    continue %or as long as is

    necessar to thoroughl

    e)be the aggregate in the

     bitu)inous )aterial all tothe satis%action o% the S.6.

    'olling shall generall begin

    at the outer ege o% sur%ace

    ressing an progress

    uni%or)l towars the centre

    on each sie e/cept on

    super ele$ate cur$es where

    rolling shall begin at the

    lower ege an progress

    uni%or)l towars the higher ege. Consecuti$e roller

     passes shall generall

    o$erlap b about one hal% o%

    the rollers with.

  • 8/16/2019 Section4 Felxible Pavement

    26/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    %irst application shall be ept

    to a practicable )ini)u) an

    the secon application shall

     be constructe as soon as

    is practicable a%ter the

    co)pletion o% the %irst.

    4%*%4 "spatic Concrete

    4.2.4.1 Description

    his wor shall consist o%

    %urnishing placing shaping an

    co)pacting asphaltic concrete

     biner course an5or wearing

    course on a prepare anaccepte bitu)inous or bitu)en

     pri)e pa$e)ent course an

    shall inclue the care%ul an

    thorough cleaning o% sur%aces

    which are to be co$ere without

    recei$ing a bitu)inous tac coat.

    he wor shall be carrie out all

    in accorance with this

    Speci%ication an the lines

    le$els graes i)ensions an

    cross-sections shown on theDrawings an5or as re,uire b

    the S.6.

    4.2.4.2 Materials

    9a: &ggregates

    &ggregate %or asphaltic

    concrete shall be a )i/ture o% 

    coarse an %ine aggregates

    an i% necessar )ineral

    %iller. he ini$iual aggregates

    shall be o% sies suitable %or

     blening to prouce the

    re,uire graation o% the

    co)bine aggregate all to the

    satis%action o% the S.6.

    Coarse aggregates shall be

    screene crushe har roc

    angular in shape an %ree

    %ro) ust cla $egetati$e

    an other 

    organic )atter an other

    eleterious substances. he

    shall con%or) to the %ollowing

     phsical an )echanical ,ualit

    re,uire)ents =-

    i: the aggregate crushing $alue

    when teste in accorance

    with M.S. 3" shall be not

    )ore than 3">

    ii: the weighte a$erage loss o%

    weight in the soiu)

    sulphate sounness test 9*

    ccles:

    when teste in accorance

    with &&S6 est Metho 1"4 shall be not )ore than

    12>

    iii: the %lainess ine/ when

    teste in accorance with

    M.S. 3" shall be not

    )ore than 3">

    i$: the water absorption when

    teste in accorance with

    M.S. 3" shall be not )orethan 2>

    $: the polishe stone $alue

    when teste in accorance

    with

    M.S. 3" shall be not less than

    4" 9onl applicable to

    aggregates %or

    wearing course:.

    Eine aggregates shall be clean

    natural sans screene ,uarr

    %ines or )ining san. Mining

    san shall be thoroughl washe

     be%ore use. 6ther tpes o% %ine

    aggregate )a be use sub?ect

    to the appro$al o% the S.6.

    Eine aggregates shall be non-

     plastic an %ree %ro) cla

    loa) aggregations o% )aterial

    $egetati$e an other organic

    )atter an other eleterioussubstances.

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage ..

  • 8/16/2019 Section4 Felxible Pavement

    27/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    he shall con%or) to the

    %ollowing phsical an

    )echanical ,ualit re,uire)ents=-

    i: the weighte a$erage loss o%

    weight in the soiu)sulphate sounness test 9*

    ccles:

    when teste in accorance

    with &&S6 est Metho

    1"4 shall be not )ore than

    12>

    ii: the water absorption when

    teste in accorance with

    M.S. 3" shall be not )orethan 2.

     ;otwithstaning co)pliance with

    the re,uire)ents o% this

    Speci%ication li)estone

    aggregates shall not be per)itte

    %or use in wearing course.

    he graation o% the co)bine

    coarse an %ine aggregates

    together with orinar Portlan

    ce)ent ae as an ahesion an

    anti-stripping agent an i%

    necessar an other )ineral

    %iller shall con%or) to the

    appropriate en$elope shown

    in able 4.8

    TABLE 4. - GRADATION LIMITS FOR ASPALTI# #ON#RETE

    Mi= Ty/e ea5ing #2*5se Bin7e5 #2*5se

    Mi=Designa"i2n

     A# ' A#B '

    B.S. Sieve % Passing ;y >eig!"

    +).$ &&

    '. &&

    '. &&

    14. &&

    1. &&

    $. &&

    +.+$ &&

    1.1 &&

    4'$ *&

    1$ *&

    )$ *&

    1

    ), - 1

    ,4 - (

    $, - 1

    4, - )1

    +' - $

    ' - 4'

    1' - '

    , - 1,

    4 -

    1

    - 1

    )' - (+

    $ - '

    $ - )$

    +, - $

    + - $'

    1 - +

    11 - '$

    $ - 14

    + -

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage &33

  • 8/16/2019 Section4 Felxible Pavement

    28/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    he graation en$elopes in the

    abo$e able are purposel wier 

    than the tolerances %or goo

    wors control o% asphaltic

    concrete )i/es. Eor each tpe o% 

    )i/ re,uire in the

  • 8/16/2019 Section4 Felxible Pavement

    29/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    all in accorance with the

    )anu%acturers instructions. n such a

    case the agent shall be ae to the

     bitu)en biner use in the bitu)en

    stripping tests in the appropriate

    a)ount an )anner.

    &ggregate which oes not per%or)

    satis%actoril in the bitu)en stripping

    tests using the appro$e ahesion

    an anti-stripping agent when

    appropriate shall not be use in

    asphaltic concrete.

    4.2.4.3 &sphaltic Concrete Mi/ Design

    9a: Fob Mi/ Eor)ulae

    &%ter obtaining supplies or

     prouction 9as applicable: o% all

    aggregates consistent as to graation

    an other ,ualities the Contractor

    shall propose a ?ob )i/ %or)ula %or

    each class o% )i/ re,uire in the

    ii: eter)ination o% the bul

    speci%ic gra$it o% the speci)ens

    in accorance with &&S6

    est Metho 100>

    iii: eter)ination o% the stabilit an

    %low $alues in accorance with

    &&S6 est Metho 24*>

    i$: analsis o% the ensit an

    $ois para)eters to eter)ine

    the percentage o% $ois in the

    co)pacte aggregate the

     percentage o% $ois in the

    co)pacte aggregate %ille

    with bitu)en an hence the percentage o% air $ois in the

    co)pacte )i/.

    Eor each trial )i/ con%or)ing to a

     propose ?ob )i/ %or)ula the

     para)eters o% the abo$e tests an

    analses shall con%or) to the

    re,uire)ents o% the appropriate

    tpe o% )i/ as gi$en in able 4.1".

     A#14 - ea5ing $.% 0 ).% %

     A#14 - Bin7e5 #2*5se 4.$ - ,.$ %

     A#B ' - Bin7e5 #2*5se 4.% - ,.%

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage &3*

  • 8/16/2019 Section4 Felxible Pavement

    30/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    TABLE 4.1 - TEST AND ANAL:SIS

    PARAMETERS FOR ASPALTI#

    #ON#RETE

    Pa5a&e"e5 ea5ing #2*5se Bin7e5 #2*5se

    S"a;i3i"y S

    F32> F

    S"iness S8F

     Ai5 v2i7s in &i=

    2i7s in agg5ega"ei33e7 >i"! ;i"*&en

    ? $

  • 8/16/2019 Section4 Felxible Pavement

    31/52

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage &3,

  • 8/16/2019 Section4 Felxible Pavement

    32/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    $: the ?ob )i/ %or)ula graation

    o% the co)bine aggregate an

    %iller>

    $i: the proportions %or co)bining

    the hot bin aggregates an %iller>

    $ii:the bitu)en content 9b weight

    o% total )i/:>

    $iii:the r an wet )i/ing ti)es i%

    a batch plant is to be use or the

    )i/ing ti)e i% a continuous )i/

     plant is to be use>

    i/: the %ull results o% the

    co)prehensi$e Marshall)etho tests an analses as

    escribe abo$e %or each trial

    )i/ use in eter)ining the ?ob

    )i/ %or)ula.

    he S.6. )a re,uire changes o%

    an o% the %actors in each propose

     ?ob )i/ %or)ula an %urther tests

    an analses in orer to attain

    opti)u) ,ualit o% the asphaltic

    concrete )i/es.

    9b: Plant rials

    &%ter ha$ing recei$e the S.6.s

     preli)inar appro$al o% his

     propose ?ob )i/ %or)ulae the

    Contractor 

    shall arrange to )i/ la an co)pact

    asphaltic concrete con%or)ing to the

     propose %or)ula %or each class o%

    )i/ re,uire in the

  • 8/16/2019 Section4 Felxible Pavement

    33/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    TABLE 4.11 - TOLERAN#ES FOR ASPALTI# #ON#RETE MI@ES

    Pa5a&e"e5Pe5&issi;3e a5ia"i2n % By eig!" 2 T2"a3Mi=

    Bi"*&en.

    F5a6"i2ns 2 62&;ine7agg5ega"e /assing $. &&an7 3a5ge5 sieves.

    F5a6"i2ns 2 62&;ine7agg5ega"e /assing +.+$ &&an7 1.1 && sieves.

    F5a6"i2ns 2 62&;ine7agg5ega"e /assing 4'$ *&an7 1$ *& sieves.

    F5a6"i2n 2 62&;ine7agg5ega"e /assing )$ *&sieve.

    .'%

    $.%

    4.%

    +.%

    '.%

    4.2.4.4 +,uip)ent

    he Contractor shall pro$ie all the

     plant an e,uip)ent necessar %or

    e/ecuting the wor in accorance

    with this Speci%ication an shall

    %urnish the S.6. with such etails o% 

     particular ite)s o% e,uip)ent e.g.

    )anu%acturer )oel tpe capacit

    weight operating %eatures etc. as

    the S.6. shall re,uire.

    9a: 'oa Cleaning +,uip)ent

    'oa cleaning e,uip)ent will be

    re,uire where asphaltic concrete

    is to be lai on a sur%ace which is

    not to recei$e a tac coat. he

    e,uip)ent shall be the sa)e as that

    re,uire %or preparing a sur%ace %or 

    a tac coat an shall inclue a

     power broo) an co)presse air 

     blower as speci%ie in Sub-Sections

    4.2.1.3 9a: an 4.2.1.3 9b:

    respecti$el. 9b: &sphalt Mi/ing Plant

    he asphalt plant shall be either a

     batch plant or a ru) )i/ plant or a

    continuous )i/ plant o% recognie

    )anu%acture an shall be appro$e

     b the S.6. t shall con%or) to there,uire)ents escribe hereuner.

    he )i/ing plant shall ha$e a capacit

    suite to the

  • 8/16/2019 Section4 Felxible Pavement

    34/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    concrete )i/es within the tolerances

     prescribe in this Speci%ication all

    to the satis%action o% the S.6.

    Scales %or all weigh bo/es or hoppers

    shall be o% the springless ial tpeaccurate to within ".* o% the

    )a/i)u) loa that )a be re,uire.

    Scale ials an pointers shall be

    easil rea %ro) their operators

    nor)al position without signi%icant

     paralla/ errors. Scales shall be

    substantiall constructe so that the

    shall )aintain their accurac a%ter

    initial a?ust)ent. he Contractor

    shall %urnish not less than ten 2* g

    test weights at the plant %or checinga?usting an calibrating scales.

    ans %or storage o% bitu)en shall

    ha$e a capacit suite to the propose

    rate o% utiliation o% the )aterial an

    the )etho an %re,uenc o% its

    eli$er to the nor)all %our bins will be

    re,uire. he %ee bins an gates shall

     be so constructe an e,uippe that

    the shall be reail accessible %or

    calibrating at all ti)es an shall

     pro$ie %or a continuous an uni%or)%low o% each aggregate re,uire in the

    )i/.

    he plant shall ha$e a rotar ru)

    rer o% satis%actor esign %or ring

    an heating the co)bine aggregate so

    that its te)perature will be at the

    re,uire le$el at the ti)e it is )i/e

    with the bitu)en. he burner shall be

    so esigne that co)plete co)bustion

    o% the %uel will be obtaine an theaggregate will re)ain clean an not

     beco)e coate with soot or oil.

    he plant shall be e,uippe with %our 

    9or )ore: screens the s)allest o% which

    shall generall be not )ore than 3.2

    )). he screens shall ha$e a nor)al

    capacit slightl in e/cess o% the

    )a/i)u) output o% the )i/ing plant.

    he screens shall be reail accessible

    %or inspection.

    he plant shall inclue %our 9or )ore:

    storage bins %or screene aggregates

    each with a capacit o% not less than

    twice the pug)ill ea loa capacit.

    he bins shall be arrange so as to

     pro$ie separate r storage %or each

    screene %raction o% the aggregate. +ach

     bin shall be pro$ie with an o$er%low

     pipe o% such sie an location as to

     pre$ent an bacing up o% )aterial into

    other bins. +ach bin shall be soconstructe that representati$e

    aggregate sa)ples can be reail

    obtaine an

    Page &3+

  • 8/16/2019 Section4 Felxible Pavement

    35/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    shall ha$e )eans %or obser$ing the

    aggregate le$el. Separate r storage

    shall be pro$ie %or )ineral %iller an

    the plant shall be satis%actoril

    e,uippe to %ee %iller into the )i/er.

    Satis%actor )eans b either weighing

    or )etering shall be pro$ie to obtain

    the prescribe a)ount o% bitu)en in

    the )i/ within the speci%ie tolerance.

    Means shall be pro$ie %or checing

    the ,uantit or %low rate o% biner 

    entering the )i/er. Suitable )eans

    shall be pro$ie %or )aintaining the

     prescribe te)perature o% the bitu)en

    in the pipelines weigh bucet or %low

    )eter an spra bars.

    &n ar)oure ther)o)eter with a

    range o% 3" oC to 2"" oC shall be

    %itte in the bitu)en %ee line at a

    suitable location near the ischarge

    $al$e at the )i/er unit. Suitable ial-

    scale )ercur actuate ther)o)eters

    electric pro)eters or other

    ther)o)etric instru)ents shall be %itte

    at the ischarge chute o% the rer an

    in each hot aggregate storage bin toinicate the te)peratures o% the heate

    aggregates.

    he plant shall be e,uippe with a ust

    collector so constructe as to waste the

    )aterial collecte or %ee it uni%or)l

    to the heate aggregate.

    he plant shall be e,uippe with

    ae,uate an sa%e stairwas to the

    )i/ing plat%or) an sa)pling locations

    an guare laers an cat-wals shall

     pro$ie access to all other positions as

    necessar %or proper operation

    inspection an )aintenance o% the plant

    all to the satis%action o% the S.6. &ll

    gears pulles chains sprocets an

    other angerous )o$ing parts shall be

     properl guare an protecte. &)ple

    an unobstructe space shall be

     pro$ie on the )i/ing plat%or) an

    clear an unobstructe passage shall

     be )aintaine at all ti)es in anaroun

    the truc loaing area which shall be

    ept %ree %ro) rippings %ro) the

    )i/er.

    Special 'e,uire)ents %or (atch Plants

    +ach storage bin %or screene aggregate

    shall be pro$ie with a botto) outlet

    gate so constructe as to pre$ent

    leaage when close. hese gates shall

    ha$e a ,uic an co)plete closing

    action.

    he plant shall be e,uippe with a

    weigh bo/ or hopper %or accuratel

    weighing out aggregate %ro) each o%

    the screene aggregate storage bins.he weigh bo/ or hopper shall be

    suspene %ro) its scales le$er

    )echanis) an shall be su%%icientl

    large to hol a %ull batch e,ual to the

     pug)ill capacit without han raing

    or spilling o% the aggregate. he

    ischarge gate shall be so constructe

    as to allow rapi an co)plete

    e)pting o% the weigh bo/ or hopper

    into the )i/er an pre$ent leaage

    when close.

    he plant shall be e,uippe with a

     biner weigh bucet which shall be

    charge through a %ast acting non-rip

    $al$e in the biner %ee pipe locate

    irectl o$er the bucet. he bucet

    shall be suspene %ro) its scales le$er 

    )echanis) an shall ha$e a capacit

    su%%icient to weigh out biner up to

    2" o% the weight o% the pug)ill ea

    loa capacit. he bucet shall ha$e a

    ischarge )echanis) which shall

     pro$ie %or rapi an co)plete

    e)pting o% the bucet in a thin

    uni%or) sheet or )ultiple spras o$er

    the %ull length an with o% the )i/er.

    he icharge )echanis) shall not lea

    or rip when close.

    he batch )i/er shall be a suitable

    twinsha%t pug)ill with a capacit o% at

    least *"" g o% asphaltic concrete

    capable o% proucing a thoroughlho)ogeneous )i/ture. he clearance o% 

    the pale blaes %ro) all %i/e an

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage &37

  • 8/16/2019 Section4 Felxible Pavement

    36/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    )o$ing parts o% the )i/er shall be not

    )ore than 2" )). % the pug)ill is not

    enclose it shall be e,uippe with a

    ust hoo to pre$ent loss o% %ines %ro)

    the )i/ture. he ischarge gate shall

     be so constructe as to allow rapi anco)plete e)pting o% the )i/er an

     pre$ent leaage o% an )i/ constituent

    when close.

    he )i/er shall be e,uippe with

    an accurate ti)e loc sste) %or 

    controlling the operations o% a co)plete

    )i/ing ccle. t shall loc the

    aggregate weigh bo/ or hopper gate

    a%ter charging the )i/er with aggregate

    until the closing o% the )i/er gate at theco)pletion o% the )i/ing ccle> it shall

    loc the biner weigh bucet ischarge

    )echanis) uring the r )i/ing an

    wet )i/ing perios. 9he r )i/ing

     perio is e%ine as the inter$al o% ti)e

     between the opening o% the aggregate

    weigh bo/ or hopper gate an the start

    o% ischarging the biner weigh bucet.

    he wet )i/ing perio is e%ine as the

    inter$al o% ti)e between the start o%

    ischarging the biner weigh bucetan the opening o% the )i/er gate.:

    he r an wet )i/ing perios shall

     both be a?ustable in incre)ents o% not

    )ore

    than * secons %ro) ero to not less

    than

    12" secons total %or r an

    wet )i/ing.

    Special 'e,uire)ents %or Dru) Mi/

    Plants

    he col )aterial %eeer unit shall

    consist o% not less than * co)part)ents

    with suitable heape capacit

    appropriate %or the plant. +ach bin

    shall be pro$ie with a control gate

    an )easuring %eeer suitable %or

    accurate

     blening o% the aggregates on to the

    col %ee collecting con$eor. he col

    %ee sste) shall incorporate a e$ice

    %or )oisture co)pensation capable o% 

     proucing an accurate an continuous

     blen o% the ini$iual aggregate

    sies %ro) the col %ee co)part)ent.

    he ru) )i/er shall be o% an incline

    oil-%ire an parallel %low tpe in which

    the aggregates an e/haust gases %low

    in the sa)e irection. he ru) )i/er

    length to ia)eter ratio shall be such as

    to ensure e%%icient ring an inti)ate

    )i/ing o% aggregate %iller an biner

    o$er the %ull range o% rate operating

    e%%iciencies. & bpass chute shall be

    incorporate %or sa)pling o% col

    aggregate.

    Ereshl )i/e )aterial shall beeli$ere an store in a surge

    silo through a proper con$eor

    sste).

    Special 'e,uire)ents %or Continuous

    Mi/ Plants

    +ach storage bin %or screene aggregate

    shall be pro$ie with an accuratel

    controlle $ariable ori%ice gate

    ischarging on to an aggregate %ee)echanis). he ischarge ori%ice shall

     be rectangular with one i)ension

    $ariable b )eans o% an a?ustable an

    locable gate which shall ha$e an

    inicator showing the istance it is

    open. hese gates shall be use %or

    accuratel proportioning the screene

    aggregates

    %or the )i/.

    he plant shall ha$e )eans o%

    calibrating the aggregate bin ischarge

    gate openings b weighing test

    sa)ples obtaine b i$erting the

    aggregate %e out o% each bin into a

    suitable test bo/. est bo/es shall ha$e

    a capacit o% not less than 1"" g each.

    he plant shall ha$e satis%actor )eans

    o% e%%ecting positi$e interlocing control

     between the %low o% screene

    aggregates %ro) the storage bins an

    the %low o% biner %ro) the )eter orother proportioning e$ice. his control

    shall

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage &3)

  • 8/16/2019 Section4 Felxible Pavement

    37/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

     be acco)plishe b interlocing

    )echanical )eans or another

     positi$e )etho satis%actor to the

    S.6.

    he continuous )i/er shall be asuitable twin-sha%t pug)ill with an

    a?ustable a) an pales with

    re$ersible blae pitch %or a?usting the

    $olu)e o% 

    )i/ture hel in the pug)ill. he

    clearance o% the pale blaes %ro) all

    %i/e parts o% the )i/er shall be not

    )ore than 2" )). he biner shall be

    %e into the )i/er through a spra bar

    irecte on to the aggregate across the

    %ull with o% the pug)ill at the %eeen. he ischarging )i/ture shall pass

    o$er the a) into a hopper with a

    ischarge gate so constructe as to

    allow rapi an co)plete e)pting o%

    the hopper an pre$ent leaage o% the

    )i/ when close. he )i/er shall be

    e,uippe with a per)anent gauge %or

    )easuring the

    epth o% )i/ture in the pug)ill an a

    )anu%acturers calibration plate showing

    the $olu)e o% )i/ture in the pug)ill ateach incre)ent o% epth.

    he )i/ing ti)e shall be

    eter)ine using the %or)ula =-

    Mi/ing ti)e 9secons: I

    Dea weight o% )i/ in pug)ill 9g:

    Pug)ill output 9g per secon:

    an %or a gi$en output it )a be $arie

    slightl b a?usting the epth 9an

    hence weight: o% the )i/ture hel in

    the pug)ill b $aring the a) height

    the con%iguration o% the pale blaes

    or both. owe$er %or substantial

    a?ust)ents o% the )i/ing ti)e in

    orer to )aintain the epth at a le$el

    co)patible with e%%icient )i/ing i.e. so

    that the pale tips ?ust brea out o% the

    )i/ture at the height o% their action the

    rate o% %ee o% )aterials to the )i/er

    9an hence output: shoul be change.

    9c: ip-rucs

    he Contractor shall pro$ie a suitable

    nu)ber o% tip-trucs o% a tpe appro$e

     b the S.6. %or transporting asphaltic

    concrete %ro) the )i/ing plant to the

     pa$ing wors. he trucs shall ha$e

    tras with s)ooth %lat bes an sies

    an shall ha$e loa capacities o% not

    less than * tonnes. Prior to loaing the

    insie o% each truc tra shall be

    lightl an e$enl coate with a soap

    or etergent solution or such other

    li,ui as the S.6. shall appro$e to

     pre$ent ahesion o% the asphaltic

    concrete. he trucs shall be e,uippe

    with co$ers o% can$as or other suitable)aterial to protect the asphaltic

    concrete.

    9: &sphalt Pa$er 

    he asphalt pa$er shall be o%

    recognie )anu%acture an shall be

    appro$e b the S.6. t shall con%or)

    to the re,uire)ents escribe

    hereuner.

    he pa$er shall be sel%-propelle an

    capable o% re$erse as well as %orwar

    tra$el. t shall be e,uippe with a

    hopper at the %ront esigne to recei$e

    the pa$ing )i/ture %ro) tip-trucs an

    shall ha$e a )echanical istribution

    sste) %or spreaing the )i/ture

    e$enl

    an without segregation o$er the

    sur%ace to be pa$e in %ront o% a

    screeing an co)pacting unit which

    shall be e,uippe with a suitable

    heating e$ice. he screeing an

    co)pacting )echanis) shall be capable

    o% 

    con%ining the eges o% the )aterial

     being lai without the use o%

    stationar sie %or)s shall be

    a?ustable to strie o%% the )i/ture to

    the thicness an cross-section shape

    re,uire an shall be controlle b an

    auto)atic le$elling e$ice to prouce

    an e$en carpet o% bitu)inous )i/turewith a uni%or) sur %ace te/ture %ree

    %ro) inentations

    riges tear )ars or other irregularities.

  • 8/16/2019 Section4 Felxible Pavement

    38/52

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage &3.

  • 8/16/2019 Section4 Felxible Pavement

    39/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    he pa$er shall be capable o% laing

    the bitu)inous )i/ture in pa$ing

    withs in the range 2.* to 3.7* ) an

    o% %inishing the pa$e)ent laer true to

    the re,uire lines graes le$els

    i)ensions an cross-sections sub?ectto co)paction b rolling all to the

    satis%action o% the S.6.

    9e: 'ollers

    & pneu)atic tre roller an two

    steel wheele tane) rollers shall be

     pro$ie. owe$er a three wheele

    steel roller )a be substitute %or one

    o% the tane) rollers i% the S.6. shall soappro$e. &ll rollers shall be o%

    recognie )anu%acture an shall be

    appro$e b the S.6.

    he pneu)atic tre roller shall be

    as speci%ie in Sub-Section 4.2.3.3

    9g:. Steel wheele rollers shall

    con%or) to the re,uire)ents

    escribe hereuner.

    Steel wheele rollers shall be sel%- propelle an capable o% being re$erse

    without baclash> the shall be e,uippe

    with power steering an ual controls

    allowing operation %ro) either the le%t

    or right sie. he shall be e,uippe

    with water tans sprinler sste)s an

    scraper blaes to eep all wheels e$enl

    wette an clean uring operation.

    +ach steel wheele roller shall be

     ballaste so that its total

    operating

    weight is in the range 8 to 1" tonnes

    an its ri$en roll 9or rolls: shall e/ert a

    rolling %orce o% not less than 3.*

    tonnes5)etre o% roll with. he

    Contractor shall pro$ie the S.6. with a

    calibration chart %or each roller showing

    the relationships between the ,uantit

    or epth o% ballast an total weight an

    rolling %orce.

    4.2.4.* Construction Methos

    9a: #eneral Conitions

    &sphaltic concrete pa$ing wor

    shall onl be carrie out in r

    weather when the sur%ace to be

    co$ere is r or i% so

    speci%ie has recei$e a

     bitu)inous tac coat which shall

    ha$e achie$e a satis%actor

    egree o% taciness all to the

    satis%action o% the S.6. &ll

    laing rolling an %inishing

    wor shall be carrie out uring

    alight hours unless the Contractor 

    shall ha$e pro$ie suitable %loo-lighting %or the ?ob site to the

    satis%action o% the S.6.

    he S.6. )a orer the

    iscontinuation o% wor on account

    o% a$erse weather unsatis%actor

    conition o% )aterials e,uip)ent

    or sur%ace to be pa$e or such

    other conitions as he shall

    consier etri )ental to the wor.

    9b: Sur%ace Preparation an Cleaning

    Prior to constructing an asphaltic

    concrete pa$e)ent laer the sur%ace

    to be co$ere shall ha$e been

     prepare in accorance with the

    appropriate Sections o% this

    Speci%ication. ;otwithstaning an

    earlier appro$al o% this sur%ace an

    a)age to or eterioration o% it shall

     be )ae goo be%ore asphaltic

    concrete pa$ing wor is co))ence.

    % the sur%ace to be co$ere is not

    to be pro$ie with a bitu)inous

    tac coat then i))eiatel prior to

    co))encing asphaltic concrete

     pa$ing it shall be swept using a

     power broo) %ollowe b a

    co)presse air blower an i%

    necessar scrape using han

    tools to re)o$e all loose particles

    irt ust an other ob?ectionable

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage &&3

  • 8/16/2019 Section4 Felxible Pavement

    40/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    )aterial all to the satis%action o% the

    S.6.

    % the sur%ace to be co$ere is to be

     pro$ie with a bitu)inous tac coat

    then this shall be applie all inaccorance with the pro$isions o%

    Sub- Section 4.2.2.

    9c: &ggregate anling an eating

    +ach aggregate to be use in the

    asphaltic concrete )i/es shall be store

    in a separate stocpile near the )i/ing

     plant. Stocpiles o% san an other

    %ine aggregates shall be ept r using

    waterproo% co$ers an other )eans asnecessar. n placing the aggregates in

    the stocpiles an loaing the) into

    the )i/ing plants col aggregate %ee

     bins care shall be taen to pre$ent

    segregation or uncontrolle co)bination

    o% )aterials o% i%%erent graation.

    Segregate or conta)inate )aterials

    shall be rescreene or re?ecte %or use in

    the

  • 8/16/2019 Section4 Felxible Pavement

    41/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    he hot aggregates an %iller shall

     be ischarge into the pug)ill an

    )i/e r %or the r )i/ing ti)e

     prescribe in the ?ob )i/ %or)ula

    which shall usuall be in the range

    * to 1" secons. he hot binershall then be ae an wet )i/ing

     per %or)e %or the wet )i/ing ti)e

     prescribe in the ?ob )i/ %or)ula>

    this shall be su%%icient so that all

     particles o% aggregate are uni%or)l

    coate with bitu)en an shall

    usuall be 4* secons or )ore %or

    ense grae )i/tures.

    he $olu)e o% each batch shall be

    such that the tips o% the pug)ill pale blaes ?ust brea out o% the

    )i/ture at the height o% their

    action.

    &%ter the co)pletion o% wet )i/ing

    each batch o% asphaltic concrete

    shall be ischarge %ro) the pug)ill

    either into a storage hopper or

    irectl into a truc %or hauling to

    the pa$ing site. Care shall be

    taen that no segregation o% the)i/ occurs.

    Mi/ing in Continuous Mi/ Plants

    he screene hot aggregates an

    %iller shall be %e continuousl %ro)

    their storage bins in accorance with

    the proportions prescribe in the

    appropriate ?ob )i/ %or)ula

    co)bine in the plant an %e

    continuousl into the )i/er. he

    hot biner shall be sprae on to the

    co)bine aggregate as it enters the

     pug)ill at the rate re,uire to

    achie$e the bitu)en content pre

    scribe in the ?ob )i/ %or)ula. he

    )aterials shall then be carrie

    through the pug)ill an in the

     process be thoroughl )i/e b

    the action o% the pales an is

    charge o$er the a) into the stor 

    age hopper. he )i/ing ti)e 9as

    e%ine in Sub-Section 4.2.4.4 9b:

    Cawangan Jalan, Ibu Pejabat JKR, K.L

    shall be as prescribe in the ?ob

    )i/ %or)ula> this shall be

    su%%icient so that all particles o%

    aggregate are uni%or)l coate

    with bitu)en an shall usuall be

    4* secons or )ore %or ense

    grae )i/tures.

    he plant shall be so a?uste as to

    )aintain the le$el o% )i/ture in the

     pug)ill such that the tips o% the

     pale blaes ?ust brea out o% the

    )i/ture at the height o% their

    action.

    9%: ransportation o% &sphaltic

    Concrete

    &sphaltic concrete shall be

    transporte %ro) the )i/ing plant

    to the site o% the pa$ing wors in

    loas o% not less than * tonnes

    using

    tip-trucs as speci%ie in

    Sub-Section 4.2.4.4 9c:. +/cept

    where asphaltic concrete is to be

    han lai it shall be ischargeirectl into the pa$er hopper as

    re,uire %ro) the tip-trucs. Care

    shall be taen in the truc loaing

    hauling an unloaing operations to

     pre$ent segregation o% the )i/.

    During transportation the asphaltic

    concrete shall be protecte %ro)

    conta)ination b water ust irt

    an other eleterious )aterials.

    he te)perature o% asphaltic

    concrete i))eiatel be%ore

    unloaing %ro) the truc either

    into the pa$er hopper or on to the

    roa %or han spreaing shall be

    not less than 12*JC. &n loa

    which has coole below the

    speci%ie te)perature in the truc

    shall be re?ecte %or use in the

  • 8/16/2019 Section4 Felxible Pavement

    42/52

    S.6.

    Page &&*

  • 8/16/2019 Section4 Felxible Pavement

    43/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    #enerall each pa$ing laer shall

    ha$e a co)pacte thicness o% not

    less than twice the no)inal

    )a/i)u) aggregate sie o% the

    )i/ture an not )ore than 1""

    )).

  • 8/16/2019 Section4 Felxible Pavement

    44/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    ne$ertheless the te)perature o%

    asphaltic concrete at the

    co))ence)ent o% rolling shall be

    not less than 11"JC.

    n an areas inaccessible to the

    rollers proper co)paction shall be

    carrie out using $ibrating plate

    co)pactors han ta)pers or other

    suitable )eans all to the

    satis%action o% the S.6.

    nitial 9or breaown: rolling shall

     be carrie out with an appro$e

    steel wheele tane) roller or three

    wheele steel roller. he principal

    hea$ rolling shall be carrie out

    with an appro$e pneu)atic tre

    roller i))eiatel %ollowing the

    initial rolling> the pneu)atic tre

    roller shall be ballaste to an

    operating weight o% not less than 1*

    tonnes an its tre in%lation pressure

    shall be not less than ".7 ;5s,.)).

    he %inal rolling shall be carrie out

    with an appro$e steel wheele

    tane) roller an shall ser$e to

    eli)inate )inor sur%ace

    irregularities le%t b the pneu)atictre roller.

    &ll rollers shall operate in a

    longituinal irection along the

    carriagewa with their ri$en wheels

    towars the pa$er. 'olling shall

    generall co))ence at the lower

    ege o% the pa$e with an

     progress uni%or)l to the higher

    ege e/cept that where there is a

    longituinal construction ?oint at thehigher ege this shall be rolle %irst

    ahea o% the nor)al pattern o%

    rolling. #enerall successi$e roller

     passes shall o$erlap b hal% the

    with o% the roller an

    the points at which the roller is

    re$erse shall be staggere.

    owe$er when operating on

    graients in e/cess o% 4 the

     breaown roller shall not pass

    o$er an pre$iousl unrolle )i/

    when operating in the ownhill

    irection.

    n all cases co)paction shall be

    carrie out in such a )anner

    that each section recei$es e,ual

    co)pacti$e e%%ort all to the

    satis%action o% the S.6.

    he steel wheele rollers shall

    operate at spees o% not )ore than

    * )5hr an the pneu)atic trerollers shall operate at spees o%

    not )ore than 8 )5hr. ;o roller

    or 

    Cawangan Jalan, Ibu Pejabat JKR, K.L

  • 8/16/2019 Section4 Felxible Pavement

    45/52

    Page &&4

  • 8/16/2019 Section4 Felxible Pavement

    46/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    hea$ $ehicle shall be allowe to

    stan on newl lai bitu)inous )i/

     be%ore co)paction has been

    co)plete an the )aterial has

    thoroughl coole an set. 'olling

    shall continue as long as isnecessar to achie$e the appropriate

    re,uire)ent as %ollows =-

    Ty/e 2 Pave&en"

    Laye5 

    Re9*i5e7 #2&/a6"e7

    Densi"y

    ea5ing 62*5se ( - 1% Ma5s!a33

    7ensi"y

    Bin7e5 62*5se ($ - 1% Ma5s!a33

    7ensi"y

    Care shall be taen to pre$ent

    o$er- co)paction o% asphaltic

    concrete.

    their withs shall be e$erwhere at

    least those speci%ie or shown on the

    Drawings on both sies o% the

    centre-line> >

    the a$erage thicness o$er an

    1"" )etre length shall be not less

    than the re,uire thicness an

    the )ini)u) thicness at an

     point shall be not less than the

    re,uire thicness )inus * )).

    he top sur%ace o% a wearing or

     biner course shall ha$e the

    re,uire shape superele$ation

    le$els an graes an shall be

    e$erwhere within the tolerances

    speci%ie in

    Sub-Section 4.4.

    9: 6pening to ra%%ic

    &sphaltic concrete shall not be

    opene to tra%%ic until co)paction

    has been co)plete an the

    )aterial has thoroughl coole an

    set in the

    opinion o% the S.6. his will

    usuall be not less than 4 hours

    a%ter the co))ence)ent o% rolling.

  • 8/16/2019 Section4 Felxible Pavement

    47/52

    Ty/e 2 Pave&en"

    Laye5 

    Re9*i5e7 #2&/a6"e7

    Densi"y

    B2*n7 52a7;ase ( - 1% Ma5s!a33

    7ensi"y

    Leve33ing 62*5se ( - 1% Ma5s!a33

    7ensi"y

    Bin7e5 62*5se ($ - 1% Ma5s!a33

    7ensi"y

    ea5ing 62*5se ( - 1% Ma5s!a33

    7ensi"y

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    4%*%5 !it6ino6s $acada

    4.2.*.1 Description

    his wor shall consist o%

    %urnishing placing shaping anco)pacting bitu)inous )acaa)

    roabase

    an5or le$elling course an5or biner 

    course an5or wearing course on a

     prepare an accepte bitu)inous or 

     bitu)en pri)e pa$e)ent course

    an shall inclue the care%ul an

    thorough cleaning o% sur%aces which

    are to be co$ere without recei$ing

    a bitu)inous tac coat. he wor

    shall be carrie out all in accorancewith this Speci%ication an the lines

    le$els graes i)ensions an cross-

    sections shown on the Drawings

    an5or as re,uire b the S.6.

    4.2.*.2 Materials

    he )aterials %or bitu)inous

    )acaa) 9aggregates )ineral %iller

     bitu)inous biner an anti-stripping

    agent: shall co)pl with all there,uire)ents o% Sub-Section 4.2.4.2

    e/cept %or the co)bine graation

    re,uire)ents.

    Eor each bitu)inous )acaa) )i/

    the graation o% the co)bine

    coarse an %ine aggregates together

    with orinar Portlan ce)ent

    ae as

    an ahesion an anti-stripping

    agent an i% necessar an other

    )ineral %iller shall con%or) to the

    appropriate en$elope gi$en in able

    4.12. he biner content shall also

     be in accorance with able 4.12.

  • 8/16/2019 Section4 Felxible Pavement

    48/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    he Marshall ensit o% a

     bitu)inous )acaa) )i/ is

    e%ine as the a$erage ensit o% a

    set o% three test speci)ens )oule

    in the sa)e wa as asphaltic

    concrete speci)ens are prepare %or the stanar stabilit an %low test

    in accorance with &&S6 est

    Metho 24* using the 7* blows

     per %ace co)paction stanar. he

     bul speci%ic gra$it o% the

    speci)ens shall be eter)ine in

    accorance with &&S6 est

    Metho 100.

    he Marshall ensit o% each )i/

    shall be eter)ine using a sa)ple9or sa)ples: taen %ro) the )i/ing

     plant soon a%ter the co))ence)ent

    o% preparing each )i/ %or the

    its with shall

     be e$erwhere at least that speci%ie

    or shown on the Drawings on both

    sies o% the centre-line> an its

    a$erage thicness o$er an 1""

    )etre length shall be not less

    than the re,uire thicness. he

    top sur%ace o% bitu)inous

    )acaa) roabase shall ha$e the

    re,uire shape superele$ation

    le$els an graes an shall be

    e$erwhere within the tolerances

    speci%ie in Sub-Section 4.4.2.

    (itu)inous )acaa) le$elling

    course shall be %inishe in a neat

    an wor)anlie )anner> its

    i)ensions shall be as speci%ie or

    shown on the Drawings or as

    irecte b the S.6. all to the

    satis%action o% the S.6. he top

    sur%ace o% bitu)inous )acaa)

    le$elling course shall ha$e the

    re,uire shape superele$ation

    le$els an graes an shall be

    e$er where within the tolerances

    %or biner course speci%ie in Sub-

    Section 4.4.

    (itu)inous )acaa) biner anwearing courses shall be %inishe in

    a neat an wor)anlie )anner>

    their withs shall be e$erwhere at

    least those speci%ie or shown on the

    Drawings on both sies o% the

    centre-line> the a$erage thicness

    o$er an 1"" )etre length shall be

    not less than the re,uire thicness

    an the )ini)u) thicness at an

     point shall be not less than the

    re,uire thicness )inus * )). hetop sur%ace o% a wearing or biner

    course shall ha$e the re,uire shape

    superele$ation le$els an graes

    an shall be e$erwhere within the

    tolerances speci%ie in Sub-

    Section

    4.4.

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage &&7

  • 8/16/2019 Section4 Felxible Pavement

    49/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    TABLE 4.1' - GRADATION LIMITS AND BINDER #ONTENTS

    FOR BITUMINOUS MA#ADAM

    Mi= Ty/e B2*n7R2a7;

    as e

    B2*n7R2a7;ase

    Leve33ing#2*5se

    Bin7e5 #2*5se

    Bin7e5 #2*5se

    ea5ing#2*5se

    ea5ing#2*5se=

    Mi=Designa"

    i2 n

    BMR4 BMR' BML1 BMB' BMB' BM14 BM'

    B.S. Tes"Sieve

    %Passing

    ;y eig!"

    $. &&+).$ &&'. &&'. &&

    14. &&1. &&,.+ &&+.+$ &&1.1 &&+ &&)$ &&

    1($ - 1) - (4

    -

    $, - ),-

    44 - ,+' - 4,

    -) - '1' - (

    -1

    ( - 1)1 - ($

    $, - -

    44 - ,+1 - 4$

    -) - '1' -

    ----

    1$ - 1+ - ,1$ - '$

    --

    ' - ,

    -1

    ( - 1)1 - ($

    $ - '-

    44 - ,+' - 4,

    -) - '1' -

    --

    1($ - 1

    ,$ - $$' - )'+( - $$+' - 4,

    -) - '1' -

    ---

    1

    ($ - 1) - (4$ - ,$+ - 4$1$ - +

    -+ - )

    --

    1($ - 1

    ,$ - $$' - )'+( - $$+' - 4,

    -) - '1' -

    Bin7e5 #2n"en"

    +.$

    K

    .$%

    4.

    K

    .$%

    $.1

    K

    .$%

    4.)

    K

    .,%

    4.)

    K

    .,%

    $.

    K

    .$%

    4.(

    K

    .$%

    Cawangan Jalan, Ibu Pejabat JKR, K.LPage &&)

  • 8/16/2019 Section4 Felxible Pavement

    50/52

    FOR INTERNAL USEONLY 

    Standard Specification For Road Works

    4%, SO'L(ERS

    4.3.1 Description

    his wor shall consist o%

    %urnishing co)pacting an shapingearth or gra$el shouler )aterial on

    a prepare an accepte subbase or

    lower subbase or subgrae all in

    accorance with this Speci%ication

    an the lines le$els graes

    i)ensions an cross-sections shown

    on the Drawings an5or as re,uire

     b the S.6.

    Eor pa$e shoulers the bitu)inous

    sur%acing an unerling pa$e)entcourses shall be constructe as

    escribe in the appropriate Sections

    o% this Speci%ication.

    4.3.2 Materials

    4.3.2.1 +arth Shoulers

    +arth shouler )aterial shall

     be suitable )aterial as

    escribe in Sub-Section2.2.1.

    4.3.2.2 #ra$el Shoulers

    #ra$el shouler )aterial shall

    con%or) to the re,uire)ents %or

    gra$el sur%acing )aterial set

    %orth in Sub-Section 4.1.3.2.

    4.3.3 Construction Methos

    Shoulers shall be constructe in

    stages or in one operation as

    irecte or appro$e b the S.6.

     but in no instance shall a shouler

     be built up to a le$el higher than

    that part o% the abutting carriagewa

    structure which has been co)plete

    an accepte.

    Prior to placing an shouler

    )aterial the unerling subbase or

    lower subbase or subgrae shallha$e been shape an co)pacte in

    accorance with the pro$isions o% 

    Cawangan Jalan, Ibu Pejabat JKR, K.L

    Sub-Section 4.1.2.3 an the abutting

    carriagewa structure course or

    courses shall liewise ha$e been

    shape an co)pacte in accorance

    with