Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Wire-Joint Production
Stringing Status
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Wire-joint Status One wire-joint production stations was reactivated in
June and the other in July The average production rate has been about
~80/station/8 hour shift. QC
Pull test for the first three wire-joints before production Requirement : the breakage has to occur other than wire-
joint. Usual breaking tension : ~200 gram Visual inspection of every wire-joints Image of every wire-joint is captured and saved
Need ~200/day to meet the schedule
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Weekly Totals Wire Joints and Stringing
0
100
200
300
400
500
600
700
800
900
1000
2-Aug-02 9-Aug-02 16-Aug-02 23-Aug-02 30-Aug-02 6-Sep-02 13-Sep-02 20-Sep-02
Week ending
Qu
anti
ty
Weekly Sum Wire Joints
Weekly Sum Stringing
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Stringing Status Before the stringing halt due to joint problem, 11
Type 2 and 1 Type 3 modules were strung. Both stations are active. 15 Type 2 and 8 Type 3 modules are waiting to be
strung. 30-40/day/station without re-work Re-work : After the stringing, ~5-10% of wires are
replaced low tension < 50 grams ~ 130 Hz Abs( T(front)-T(back)) >5 Hertz HV problem – tested at 1700 V
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Module 2.12 2.12 History
The first module strung since the stringing resumption Mechanical construction was completed in Sept, 2001. Wire was cleaned only once just before it entered the module with
99% isopropyl alcohol in ultrasonic cleaner. Exhibited many odd wave forms in the tension measurement.
Operation, signal test Current draw : nothing unusual => <1 uA after a few days 4 noise channels -> reverse voltaged 3 ASD groups (3x16 straws) ->
Ok after reverse voltage Very few wires with local gain dip -> little problem with ‘dirt’ on the
wire surface No correlation between odd looking wave form and gain variation Preliminary gain map exhibits no gross misalignment -> waiting for
HU’s full gain mapping.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Module 2-12 22-Aug-2002
0
20
40
60
80
100
120
140
120 125 130 135 140 145 150 155 160 165 170 175 180 more
Frequency (Hz)
Front 8/22
Back 8/22
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
M2-12 Front - Back 22-Aug-02
0
20
40
60
80
100
120
140
-5
-4.5 -4
-3.5 -3
-2.5 -2
-1.5 -1
-0.5 0
0.5 1
1.5 2
2.5 3
3.5 4
4.5 5
mor
e
Front - Back (Hz)
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
M 3-06 Front - Back 30 Sept 02
0
20
40
60
80
100
120
140
160
180
200
-5
-4.5 -4
-3.5 -3
-2.5 -2
-1.5 -1
-0.5 0
0.5 1
1.5 2
2.5 3
3.5 4
4.5 5
Mor
e
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Tension
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Tension
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Examples of gain dip due to dirt on wire (from 2.08).
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Summary Wire-joint production and stringing is in full
production mode. Should not be problem meeting the schedule – completion
by August, 2003.
2.12 Proper wire cleaning is important. No obvious alignment problem Do not understand the odd tension wave forms. Re-
measurement shows the same.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN