seog oh/ duke university/oct, 2002 trt/ atlas week at cern wire-joint production stringing status

19
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at Wire-Joint Production Stringing Status

Upload: rosamund-webster

Post on 01-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Wire-Joint Production

Stringing Status

Page 2: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Wire-joint Status One wire-joint production stations was reactivated in

June and the other in July The average production rate has been about

~80/station/8 hour shift. QC

Pull test for the first three wire-joints before production Requirement : the breakage has to occur other than wire-

joint. Usual breaking tension : ~200 gram Visual inspection of every wire-joints Image of every wire-joint is captured and saved

Need ~200/day to meet the schedule

Page 3: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Page 4: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Weekly Totals Wire Joints and Stringing

0

100

200

300

400

500

600

700

800

900

1000

2-Aug-02 9-Aug-02 16-Aug-02 23-Aug-02 30-Aug-02 6-Sep-02 13-Sep-02 20-Sep-02

Week ending

Qu

anti

ty

Weekly Sum Wire Joints

Weekly Sum Stringing

Page 5: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Stringing Status Before the stringing halt due to joint problem, 11

Type 2 and 1 Type 3 modules were strung. Both stations are active. 15 Type 2 and 8 Type 3 modules are waiting to be

strung. 30-40/day/station without re-work Re-work : After the stringing, ~5-10% of wires are

replaced low tension < 50 grams ~ 130 Hz Abs( T(front)-T(back)) >5 Hertz HV problem – tested at 1700 V

Page 6: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Page 7: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Page 8: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Module 2.12 2.12 History

The first module strung since the stringing resumption Mechanical construction was completed in Sept, 2001. Wire was cleaned only once just before it entered the module with

99% isopropyl alcohol in ultrasonic cleaner. Exhibited many odd wave forms in the tension measurement.

Operation, signal test Current draw : nothing unusual => <1 uA after a few days 4 noise channels -> reverse voltaged 3 ASD groups (3x16 straws) ->

Ok after reverse voltage Very few wires with local gain dip -> little problem with ‘dirt’ on the

wire surface No correlation between odd looking wave form and gain variation Preliminary gain map exhibits no gross misalignment -> waiting for

HU’s full gain mapping.

Page 9: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Module 2-12 22-Aug-2002

0

20

40

60

80

100

120

140

120 125 130 135 140 145 150 155 160 165 170 175 180 more

Frequency (Hz)

Front 8/22

Back 8/22

Page 10: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

M2-12 Front - Back 22-Aug-02

0

20

40

60

80

100

120

140

-5

-4.5 -4

-3.5 -3

-2.5 -2

-1.5 -1

-0.5 0

0.5 1

1.5 2

2.5 3

3.5 4

4.5 5

mor

e

Front - Back (Hz)

Page 11: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

M 3-06 Front - Back 30 Sept 02

0

20

40

60

80

100

120

140

160

180

200

-5

-4.5 -4

-3.5 -3

-2.5 -2

-1.5 -1

-0.5 0

0.5 1

1.5 2

2.5 3

3.5 4

4.5 5

Mor

e

Page 12: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Tension

Page 13: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Tension

Page 14: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Examples of gain dip due to dirt on wire (from 2.08).

Page 15: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Summary Wire-joint production and stringing is in full

production mode. Should not be problem meeting the schedule – completion

by August, 2003.

2.12 Proper wire cleaning is important. No obvious alignment problem Do not understand the odd tension wave forms. Re-

measurement shows the same.

Page 16: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Page 17: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Page 18: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Page 19: Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN