Carter Process Control GmbH CPC NEWS Issue 7 2014 SEPTEMBER 2014 CPC was asked by a customer in Mexico to help solve a continual problem of magnetite build up in two CCI Drag Valves. The valve applications were HRH Bypass to condenser (18” x 22” Angle Valve) and HP Steam Turbine Bypass (8” x 8” Angle Valve). CPC’s solution was to upgrade the plugs to install a magnetite strainer in the plugs as can be seen below. Magnetite Upgrade Solution The strainer is designed to collect the magnetite in the plug preventing the magnetite from passing up through the balance holes and getting trapped between the plug and the guide bushing which would cause stiction to occur. In addition the gap between the plug and guide bush is modified. With this solution all magnetite is collected inside the plug and can be removed during regular maintenance.

Upload: trannga

Post on 13-Mar-2018

224 views

Category:

Documents


1 download

TRANSCRIPT

Carter Process Control GmbH

CPC NEWS Issue 7 2014

SEPTEMBER 2014

CPC was asked by a customer in Mexico to help solve a continual problem of magnetite

build up in two CCI Drag Valves. The valve applications were HRH Bypass to condenser

(18” x 22” Angle Valve) and HP Steam Turbine Bypass (8” x 8” Angle Valve). CPC’s solution

was to upgrade the plugs to install a magnetite strainer in the plugs as can be seen below.

Magnetite Upgrade Solution

The strainer is designed to collect the magnetite in the plug preventing the magnetite

from passing up through the balance holes and getting trapped between the plug and the

guide bushing which would cause stiction to occur. In addition the gap between the plug

and guide bush is modified. With this solution all magnetite is collected inside the plug and

can be removed during regular maintenance.

Onsite Support Services

Page 2 CPC NEWS ISSUE 7 2014

CPC recently supported its Representative Valve Services Ltd in Ireland in an important

shutdown which took place at a power station. Valve Services provided the manpower for

the shutdown and utilised the engineering and technical support of CPC to ensure a

smooth and successful return to service. The spare parts were supplied by CPC for all the

valves being overhauled pre shutdown.

CPC delivers complete replacement trim sets for CCI Drag Valves to an American power

station. The order consisted of all trim parts including soft goods at a quantity of 2 off of

each.

Critical Deliveries

Critical Deliveries (cont.)

CPC NEWS ISSUE 7 2014 Page 3

Utilising CPC’s advanced methods and

knowledge of fully sintered Tungsten Carbide

a well known Italian valve company

commissioned us to provide solid Tungsten

Carbide seats for ball valves in a highly

erosive application.

The total ordered quantity to date is 71 off.

Refurbishment Contracts

CPC is often asked to inspect control valve parts and evaluate if they can be refurbished

or need to be replaced. CPC performs a full inspection report with a cost recommendation

for both refurbishment and replacement. The below are recent parts received from a

power station in the Netherlands.

Ireland

CPC is pleased to welcome on board our new representative Valve Services Ltd in

Ireland.

Valve Services is the premier control Valve Service company for the whole of Ireland

and we are looking forward to working with them and supporting their control valve

parts needs.

Contact Details:

Valve Services Ltd

Euro Business Park

Little Island

Co. Cork

Ireland

Tel: +353 21 4510588

Fax: +353 21 4351100

Email: [email protected]

Web: www.valve.ie

New Representatives

Europaring F15

Brunn am Gebirge

A-2345

Austria

tel: +43 123 60040

Fax: +43 123 600401

Email: [email protected]

Web: www.carterprocess.com

CPC NEWS ISSUE 7 2014 Page 4