Seren McKenzie
Director Infrastructure Services - SDRC
*Talking to
engineering/technical
people
*Why does the
infrastructure
department get so
much of the budget?
New bridge and approaches
Renewal and Road
Widening Project
Sealing unsealed roads in a village
Rehabilitation and stabilisation of a high use
road
Installing emergency water infrastructure – 2 tanks, 1.5km of
pipeline, filling and emptying pads and infrastructure
*What is Asset
Management from an
infrastructure
perspective?
Asset Management System
Asset Data & Specification
Asset Classification
& Register
Asset Condition & Performance
Levels of Service
Demand & Growth
Asset Criticality &
Risk
Operational & Capital Planning
Financial Planning & Forecasting
Asset
Management
Planning
Evidence Base
▪ What assets do we
have & what do they
look like?
▪ How do we account for
them?
▪ What condition are
they in and how are
they performing?
Strategic Intent
▪ Why do we provide
the service?
▪ How do the assets
deliver the service
and to what level?
▪ What service do we
want or are required
to deliver in the
future?
Planning & Delivery
▪ What activities are we
going to deliver?
▪ What is the cost of
delivering the
activities?
▪ How do we prioritise
our activities if we
can’t afford to do it
all?
Continuous
Improvement
▪ How do we continue to
improve our evidence
base, planning and
delivery?
High Level Scope Overview
Asset Data &
Specification
Asset
Classification &
Register
Asset Condition
Data &
Performance
Levels of
Service
Criticality &
Risk
Asset
Management
Plan
▪ Established single point of truth data repository (database)
▪ Defined asset data attributes
▪ Relationship between operational assets and financial assets is understood and
considered in repository structure (preferably one-to-one)
▪ Assets are visible on Council mapping (where applicable)
▪ (Financial) Asset register reflects data repository
▪ Assets have a financial value (where applicable)
▪ ‘Current’ condition data is available
▪ Established condition assessment program
▪ Data is updated from the field [Future activity]
▪ Service objective of assets is understood and documented
▪ Functional hierarchy and overarching design standards are established
▪ Current Customer Levels of Service and performance measures are defined &
documented
▪ Technical Levels of Service are defined, documented and costed
- Operational Levels of Service
- Capital Levels of Service (Renewal strategy)
▪ Development of a Core Asset Management Plan (or sub-plan) incorporating all of
the above
▪ Criticality Hierarchy has been developed and key risks identified
Asset Management Plan Structure
Introduction
Levels of Service
Growth and Demand
Stormwater Assets
Expenditure Program
Risk
Improvement Plan
Financial Forecasts
1
2
3
4
5
6
7
8
Strategic Intent
▪ Why do we provide the service?
▪ How do the assets deliver the
service and to what level?
▪ What service do we want to, or
will be required to, deliver in
the future?
Planning & Delivery
▪ What do we need to do?
▪ What is the cost what we need
to do?
▪ How do we prioritise our
activities if we can’t afford to
do it all?
▪ What are the consequences of
the activities we are not
funding?
NAMS.PLUS
Fact Base
Continuous Improvement
Stormwater Assets
Pipe Pits
Gross
Pollutant
Trap
End
Structures
Surface
Drain
Detention
BasinsCulverts
Quantity ~115 km 3,370 3 410 48 11 4,960
Replacement
Value$53.89 M $10.18 M $0.29 M $1.19 M $1.91 M $0.49 M $46.25 M
Stormwater Expenditure
Required
Funds
$535,000p.a.
Renewal
$425,000 p.a. $920,000 p.a.
▪ Routine inspection
program
▪ Routine and reactive
maintenance
▪ Emergent renewal of
failed assets
▪ Replacement of assets
identified in LTFP
▪ Condition & Defect
inspections
▪ Proactive replacement
of assets in condition 5
▪ Upgrade of assets
identified in LTFP
▪ Completion of LGIP
projects
Upgrade & NewOperations & Maintenance