service, skills and commitment

16
Service, Skills and Commitment Alpha Mechanical Contracting Ltd. Alpha Alpha Alpha Mechanical award-winning and measurable results every time! (Alpha) is a leading Western Canadian mechanical contracting firm. Since 1974, we have developed our capabilities to meet the diverse needs of our customers. Clients, consultants and general contractors rely on us to deliver quality plumbing, heating, ventilation, air conditioning, specialty piping, fire protection and gas fitting systems. A family- run business, we have a proven record and provide a personal guarantee for all our projects. We are innovative, flexible and ready for an ever-changing future. has the capacity to manage major, complex, and varied projects. Our history of projects range from equipment installations to retrofits to total turnkey projects. Whether it’s the installation of complex medical gas systems in hospitals or typical plumbing services, Alpha is committed to excellence and ensures client satisfaction with every project undertaken. We have successfully completed a multitude of projects ranging from routine service to multi-million dollar facilities. At , meeting your needs is a measure of our success which we achieve by providing expert planning and construction services. Our customers hire us because they value in-depth expertise and high quality results. They return to us again and again because we treat them like partners and our vast experience, our great people and our determined efforts ensure value added projects and satisfied clients. At we understand your requirements and can relate to your specific needs through your construction phases. From your project tender, to construction, to demonstration and turnover, our diverse experience and our innovative approach results in reduced costs, increased productivity and high quality projects. Being an accredited contractor and employing Gold Seal certified employees, we have been recognized for exceeding industry standards and ensuring project success. Our experienced, reliable, qualified and skilled journeymen, apprentices, and office staff will provide you with MECHANICAL JL/tlr rev05/16 www.alphamechanical.ca

Upload: others

Post on 12-Sep-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Service, Skills and Commitment

Service, Skills and Commitment

Alpha Mechanical Contracting Ltd.

Alpha

Alpha

Alpha Mechanical

award-winning and measurable results every time!

(Alpha) is a leading Western Canadian mechanical contracting

firm. Since 1974, we have developed our capabilities to meet the diverse needs of our customers.

Clients, consultants and general contractors rely on us to deliver quality plumbing, heating,

ventilation, air conditioning, specialty piping, fire protection and gas fitting systems. A family-

run business, we have a proven record and provide a personal guarantee for all our projects. We

are innovative, flexible and ready for an ever-changing future.

has the capacity to manage major, complex, and varied projects. Our history of projects

range from equipment installations to retrofits to total turnkey projects. Whether it’s the

installation of complex medical gas systems in hospitals or typical plumbing services, Alpha is

committed to excellence and ensures client satisfaction with every project undertaken. We have

successfully completed a multitude of projects ranging from routine service to multi-million dollar

facilities.

At , meeting your needs is a measure of our success which we achieve by providing expert

planning and construction services. Our customers hire us because they value in-depth expertise

and high quality results. They return to us again and again because we treat them like partners

and our vast experience, our great people and our determined efforts ensure value added projects

and satisfied clients.

At we understand your requirements and can relate to your specific needs

through your construction phases. From your project tender, to construction, to demonstration

and turnover, our diverse experience and our innovative approach results in reduced costs,

increased productivity and high quality projects.

Being an accredited contractor and employing Gold Seal certified employees, we have been

recognized for exceeding industry standards and ensuring project success. Our experienced,

reliable, qualified and skilled journeymen, apprentices, and office staff will provide you with

M E C H A N I C A L

JL/tlr rev05/16

www.alphamechanical.ca

Page 2: Service, Skills and Commitment

NR/tlr rev09/18

UBC Orchard Commons – Completed in 2016, this LEED Gold certification project is an academic and residential space for international and domestic students. This 448,000 square foot mixed use academic/student housing facility is the new home for the UBC Vantage College Program. Work consisted of full mechanical services for 1,049 beds, administrative space and a new commercial kitchen.

New Westminster Anvil Centre - Completed in 2014, this LEED Gold multi-use civic facility/office tower consisted of a brand new 350 seat theatre and over 100,000 plus square feet of office space. Work consisted of plumbing, HVAC, fire protection and specialty aquatherm systems.

Vancouver Aquarium Expansion and Revitalization Project - Completed in 2014, This VRCA Gold award winning project is the largest expansion undertaken by the Aquarium. Work consisted of plumbing, HVAC, fire protection, District Energy Systems and salt water life support systems throughout the new facility.

UBC Centre for Comparative Medicine - Completed in 2012, the mechanical work in this new building consisted of a complete mechanical systems installation as well as automated drinking water systems, radio active waste systems and a remote monitored steam plant to support this scientific research facility.

UBC Earth Sciences Building - Completed in 2012, This VRCA Gold award winning project consisted of specialized mechanical services to support the new multi-purpose research facility. The project also was able to achieve LEED Gold certification.

Chilliwack General Hospital - Completed in 2010, this design build project involved renovation and expansion to the existing facility. The state-of-the art design and leading practices facilitated improvements to patient flow through the emergency department, with diagnostic and ambulatory services. Work consisted of plumbing, HVAC, fire protection and medical gas systems.

Vancouver Convention Centre Expansion Project (VCCEP) - Completed in 2009, this LEED Silver project is a landmark facility in one of the most spectacular water front settings in the world. It was a showcase for the 2010 Olympic Games.

Yaletown Roundhouse Station - Completed in 2009. This VRCA Gold Award Winning Canada Line project is one of the largest and most complex underground stations built 19 metres below the heart of the down town core.

Killarney Community Pool - Completed in 2006, this VRCA Gold award winning project was a highly complex facility. Work consisted of plumbing, HVAC and extensive pool piping for the 6 metre waterslide, leisure pool and 25 metre main pool.

Killarney Ice Rink & Lobby Addition - Completed in 2009, this state-of-the-art Leed Gold arena served as a practice facility for 2010 Olympic athletes participating in figure skating.

Michael Smith Lab - Completed in 2005, work consisted of specialized mechanical services to support a cutting edge scientific experimentation research facility.

Catamaran Ferries Assembly Building - Completed in just 3 months in 1996, this VRCA award winning project was a fast track, highly complex project. Work consisted of plumbing, HVAC, fire protection, site services and installation of sophisticated breathing and compressed air systems.

MECHAN I CA L

www.alphamechanical.ca

New Westminster Anvil Centre

New Construction

VCCEP Yaletown Roundhouse

Killarney Community Pool Catamaran Ferries

UBC Centre for Comparative Medicine

UBC Earth Sciences Building

Vancouver Aquarium

UBC Orchard Commons

Page 3: Service, Skills and Commitment

MECHAN I CA L

New Construction

w Cambie Fire Hallw Tilbury LNGw South Surrey Rec. Centre Additionw UBC Tennis Centrew North Vancouver Operations Centrew BCIT Gateway Underground Plumbingw Grandview Woodlands Phase I Undergroundw Four Host First Nation 2010 Aboriginal Pavilionw Renfrew Community Centrew Coca Colaw View Royal Parkade - Victoriaw Canada Line - Waterfront Stationw Canada Line Olympic Village Stationw Olympic Village TPSw Dr. Peter Aids Centrew Surrey Family YMCAw Burnaby Lake Sports Complexw UBC Thunderbird Student Housingw Surrey Memorial Hospitalw Killarney Community Poolw Marine & Byrne Commercial Centrew Mira on the Parkw Vancouver Convention Centre Expansion Projectw Templeton Stationw Sea Island Stationw YVR Stationw Olympic Village Stationw Broadway Stationw Yale Town Stationw RTP C-626 VCC Guidewayw Brentwood Pedestrian Bridge - C564w Champlain Mall Water Featurew Lake City Skytrain Stationw Renfrew Station C-510w Renfrew Sub Station C-510w Rupert Skytrain C-510w BC Hydro Administration Annexw Interfor Underground Water Worksw Sapperton Station - Plaza C-548w RTP 2000 - C-516w Sapperton Station C-505w SAR C203 Elevated Guidewayw Original Cakeriew Braid Skytrain Station C-506w Staples, Surrey BCw Production and Sperling Skytrain Stationsw Air Canada Battery Charge Buildingsw Holdom Skystrain Stationw Lake City Sub Station C513

w Brentwood Skytrain C512Bw Gilmore Skytrain Stationw Lougheed Station C-508w Burnaby Fire Station No. 5w Eagle Quest Golf Centre, Coquitlam BCw Air Canada Cargo Buildingw YVR Walkwaysw LDS Church Stake Centre, Abbotsford BCw 2325 Ottawa St., Port Coquitlam, BCw Discovery Park #8w Toyota Canada Warehouse & Head Officesw Coquitlam City Hallw Ironwood Plaza, Richmond BCw Staples, Langley BCw Garden City Commercial Buildingsw Hong Kong Bank, North Vancouver BCw Totem Hall, Squamish BCw BC Nurses Unionw Jewish Community Centre Expansionw Place des Arts, Coquitlam BCw VGH Students Alumni Buildingw Garvin Building "D", Surrey BC w Walnut Grove Shopping Centrew North Works Yard, Surrey BCw Tsawwassen Ferry Terminalw QTA - Quick Turn Around Facility, YVRw West Coast Expressw Van-City, Maple Ridge BCw Lumberland Fleetwoodw Pacific Coast Terminals Lab/Control Buildingw Pioneer Grain Terminalw BC Hydro, North Vancouver BCw Laidlaw Waste Managementw Our Lady of Fatima Churchw 1st Nations Long House of Learning, UBCw Burnaby Village Museumw Pacific Press, Surrey BCw Softball City, Surrey BCw St. Lukes Churchw Port Mellon IIw #12 Service Battalion

Completed 1988-2018

NR/tlr rev09/18

www.alphamechanical.ca

Page 4: Service, Skills and Commitment

Tenant Fit-Up/Renovation

Park Royal Mall Redevelopment – Completed in 2017, this three year project consisted of various upgrades/retrofits for Park Royal North, Simons, City Market and the new food court.

Steve Nash Fitness World – Completed in 2015, this fast track project consisted of plumbing, HVAC and Fire Protection systems.

Vancity – Completed from 2011 to 2015, Over the last four years we have retrofitted ten locations throughout the lower mainland.

UBC Sauder School of Business - Completed in 2012, this LEED Silver two year renovation project consisted of multiple phases to upgrade the entire mechanical system. Many challenges were overcome in order to accommodate the academic business schedules of the faculty.

Surgical Centre Inc - Completed in 2012, this private healthcare facility was completed on a very tight schedule. Work consisted of plumbing, HVAC, fire protection and sophisticated medical gas systems.

Lions Gate Hospital Emergency Department - This highly specialized project completed in 2008. The mechanical work for this project consisted of plumbing, HVAC, fire protection and sophisticated medical gas and piping systems.

Queen Elizabeth Theatre Phase 1. - This fast track project was completed in less than 5 months. Work consisted of plumbing, specialized HVAC systems and fire protection to upgrade the existing theatre.

Burnaby Youth Justice Services Centre - Completed in 2007, the new Burnaby Youth Custody Services replaced the previous youth custody centre built in the late 1950's. This "Leed Silver" building consisted of 84 beds amid a fully functional services centre which required a full upgrade of mechanical services throughout the facility.

UBC Faculty of Dentistry Tenant Improvement Level 2 - This project was completed on a tight schedule for an arriving tenant in 2005. Work consisted of plumbing, HVAC, vacuum and sophisticated medical gas systems for the entire fit-up of 144 dental chairs.

YVR - DTB DHW System Upgrades - Completed in just 3 months in 2003, this VRCA award winning project was a fast track, highly complex installation of an 800-gallon per hour solar-powered heating system. Work consisted of installing the largest solar heating system in B.C., which included two new energy-efficient hot water tanks and 100 solar panels located on the roof of the domestic terminal building.

NRC - Completed in 2004, this four year project consisted of various specialized upgrades at the UBC NRC Laboratory Facility. Work consisted of plumbing, HVAC, fire protection and sophisticated process gas systems (we continue to work on-site completing new on-going projects).

401 Burrard - This high-rise retrofit was completed on a tight schedule for arriving tenants in 2003. Work consisted of a complete upgrade to the mechanical services for the entire fit-up of all 18 floors.

MECHAN I CA L

Surgical Centre Inc. New WestminsterUBC Sauder School of Business

NRC 401 BurrardYVR - DTB Solar Panels

Lions Gate Hospital

Vancity

Steve Nash Fitness World

Park Royal Mall Redevelopment

NR/tlr rev09/18

www.alphamechanical.ca

Page 5: Service, Skills and Commitment

Tenant Fit-Up/Renovation

w� Anvil Centre Humidifierw� Coach McArthurGlenw� 520 West 6th Avew� 8169 City Shopw� SFU Discovery Food Courtw� Tekmira w� 1608 Cliveden Engine Dynow� FTI Building Phase 2w� Henry Angus – UBCw� Hay River Health Centrew� Vancouver Aquarium Waterfall Caféw� First Capitalw� Seaspan C735w� Via Rail Potable Water Replacementw� Vancity 183w� Park Royal Mall Food Courtw� Park Royal Mall City Marketw� Vancouver Detox Centre w� 1608 Cliveden Tenant Improvementw� Park Royal Mall Demo Package 1w� Park Royal Mall Package 9w� Vancity Branch 88w� Park Royal Mall Simons & Department

Storew� Richmond Oval Hot Yogaw� Park Royal Mall North Package 10w� Black Rice Izakayaw� H&M Richmondw� Steve Nash Fitness World Lougheed Mallw� 1260 Granville Icy Space Renow� Robson Sump Pump Stationw� H&M Guildford Town Centrew� Targetw� Skytrain OMC Expansionw� H&M High Streetw� Central City 4th Floorw� Vancity Branch 16w� Vancouver Aquarium Phase 1B Demow� Family Services of Greater Vancouverw� Queen Elizabeth Ductwork Replacementw� First Impressionsw� Vancity Branch 17w� Fraser North KCC/CDU Royal Centre

Mallw� Vancity Branch 33w� Vancity Branch 26w� Vancity Branch 45w� Vancity Filter Demow� Central City 4th & 5th Floor Tenant

Improvementsw� Yaletown Housew� Smartcard & Faregate Joyce & Pattersonw� Vancity Branch 3w� Vancity Branch 19w Vancity Branch #16 - Burnabyw Family Services of Greater Vancouver

w Queen Elizabeth Replacement Ductworkw First Impressionsw Vancity Branch #17 - Burnabyw Fraser North Kidney Care Clinic &

Community Dialysis Unitw Vancity Branch #33 - Port Coquitlamw Microsoft TI Demolitionw Vancity Branch #26 - Richmondw Vancity Branch #45 - Vancouverw UBC Sauder School of Businessw 4th & 5th Floor TI Central Cityw Yaletown Housew Smartcard & Faregate - Joyce, Patterson

and Royal Oak Stationsw Pacific Centre for Reproductive Medicinew Vancity Branch #19 - Deltaw Vancity Branch #3 - Vancouverw Aecom - Lake City Centrew Studio Remix Hair Salonw Queen Elizabeth Theatre Phase 2w BC- LDB Vancouver Bi-Fuel Generator

Installmentsw HSBC Burnaby Branchw Queen Elizabeth Phase 2 Plazaw ICBC Surrey Branchw NRC Boiler Replacementsw Terra MacLeodw Tim Hortons - Tsawwassenw Library Squarew Boulevard Casino - Race Bookw BCIT Technology Placew Fraser Downs Casinow Lions Gate Hospital Emergency

Departmentw Boulevard Casinow Queen Elizabeth Theatre Phase Iw RCMP New Westw Burnaby Youth Justice Services Centrew YVR DTB Level 1 Corridorw Tim Hortons, Burnabyw YVR - East 1TB Oversize Baggagew Burquitlam Plaza Demolitionw Imagination Marketw YMCA Cross Trainingw YVR Operations Areaw YVR Link Renovationw YVR Pre-Board Screen 1TBw UBC Faculty of Dentistryw Bonsor Park Recreational Centrew YVR - Preboard Screening - ITBw Richmond Public Libraryw Richmond Country Clubw LDS Meeting Roomw BC Liquor Distribution Offices &

Warehouse

w Broadway Tech Center- cafeteria, fitness centre and washrooms

w Centennial Ice Arenaw Volvo Penta - Tenant Improvementw Pooh Corner Daycarew North Fraser Pretrial Centrew Library Square - 14th Floor Lan Room

Expansionw YVR - ITB Cute Room Mechanical

Changesw Tim Horton's, Tsawwassen, BCw Wedgewood Hotel Spaw School District #48 - Board Office

Renovationsw Staples, Richmond BCw YVR - Washroom/Lunchroom Facilityw YVR-C-35 Modif., DTB Levels 2 & 3w Indian and Northern Affairs Canada at

1138 Melville Streetw YVRAA - Proposed New Cute Room,

ITB Level 1w BCBC Lab 3034 - Phase 1w BCBC Phase 2w Kensington Community Centre

Additionw T & T Supermarket - Head Officew Walmart, Lougheed Mallw Anesa Communicationsw Sprott Shaw College, Abbotsford BCw PHC Hornbyw 1022 Davie Streetw YVR - DTB Level 1 Retailw Fisheries Renewal BCw Gateway Country Computers, North

Vancouver BCw YVR - DTB Level 3 Canpass Officew Gateway Country Computers, Langley

BCw St. Joseph the Worker Churchw UBC - Cunningham Buildingw Vancouver Community College 3rd

Floor w Renovations - King Edward Campusw Lafargew Chapter's Infinity Building, Robson St.w Canadian Western Banking, Maple

Ridge BCw Benefit Floorsw YVR Level 3 North Pod Connectorw Liquor Distribution Branch, Langley BCw The Vancouver Clubw Quizno's Infinity Building, Robson St.w GE Canadaw Moberly Parkw Edmonds Community Centrew YVR Gas Meter Seals

Completed 1988-2018

MECHAN I CA LNR/tlr rev09/18

www.alphamechanical.ca

Page 6: Service, Skills and Commitment

Tenant Fit-Up/RenovationCompleted 1988-2018

MECHAN I CA L

w Extra Foods, Maple Ridge BCw Sinclair Centre Washroom Renovationsw KMBR Office Renovationsw Western Grocers Cold Room

Renovationsw West Vancouver Ice Arenaw YVR Retail Streetw Taiga Forest Productsw Langley Operation Centrew Canadian Airline International - Baggage

Servicew Grabba Jabbaw Dr. Ross Hortonw Joanne Dormanw Royal Bank, Nanaimo & Hastingsw Little Mountain Placew YVR Starbucksw YVR Big Apple Bagelw YVR Legends Bar & Grillw Canadian Airline International Ground

Service Equipmentw Air Canada Cabin Servicesw Air Canada Arrivalsw 1965 Cornwall Avenuew Air Canada Baggagew Royal Bank, Chinatownw Pacific Highway Border Crossingw UBC Thea Korner Buildingw UBC Gathering Placew 1125 Howe Street - 2nd Floorw Vancity Credit Union - Fraser & 47thw Select Hair Salonw Skeena Terracew Claire's Pacific Centrew VPSC - Laundry Facilityw TD Bank - Continentalw Royal Bank - Newportw T & T Supermarket Vancouverw YVR Miscellaneousw Antels, Lougheed Mallw Westechw CAI - Training Department Phase II w Heddon Chong Smithw 1500 Hartley Building "B"w Vancity Credit Union - Kingsway &

Joycew Chancery Software, Canada Wayw Royal Bank - 605 Robsonw Arbutus Fitness Centrew Garment Factoryw Orpheum Theatre - Stage Heat -

Vancouver BCw Fast Freight - 1500 Hartley

w Capilano College Reno "B"w Vancouver Career Collegew Royal Bank, Maple Ridge BCw Dueck Restaurantw Dr. Dario Majstorovicw Royal Bank Dundaravew CAI - Hanger 4w YVR- C533 Interim Worksw YVR DTB Level 3w Bank of Montreal Nanaimo BCw Impact Plazaw Red Cross - 3rd Floorw BC Tel Buildingw Orpheum Theatre - Boiler - Vancouver

BCw CAI - OPS Centrew Ford Theatre - VIPw CAI - Passenger Servicew London Drugs - Ironwood Plazaw North Surrey Recreation Centrew BC Transit - Burnabyw Bay Plazaw Surrey Letter Carrierw YVR - Level 1 Demolitionw HRDC Renovationsw Royal Bank Guildfordw Cara Kioskw YVR - Tea Gardenw GM Place Visitors Roomw Kitsilano Community Centrew YVR - Quads 4 & 6w Fortune Wokw Air Canada - Maple Leafw Scandanavian Building Maintenancew Royal Bank - 5th Floor - Vancouverw YVR - Drug Toiletw ATS Traffic Camera Unitw Danier Leatherw Bank of Nova Scotiaw TD Bank - Walnut Govew Ford Theatrew Gateway Theatrew Asea Brownw 601 West Broadwayw BDC Business Developmentw North Shore Credit Unionw CAI - Boiler Upgradew CAI - Training Departmentw CAI - Clean Roomw Bellisma Fashionsw Granville Island Breweryw Bank of Montreal Brentwood Mallw YVR - Statesidew CAI - Paint Booth

w Bank of Montreal, Haneyw CP Rail - Granville Squarew North Shore Credit Union - Amblesidew Airport Squarew Bootlegger Cottonwood Mallw Kento Seafoods, Richmond BCw Detwiller, NPS, UBCw BC Garment Factory, Vancouver BCw T-Bird Arena, UBCw Richmond Savings, West Vancouver BCw St. Vincent's ARBw BCR Truck Wash, West Vancouver BCw Hong Kong Bank, New Westminster, BCw Cascabel Restaurantw Canada Trust, Burnaby BCw Royal Towers Casinow Mandarin Casino

NR/tlr rev09/18

www.alphamechanical.ca

Page 7: Service, Skills and Commitment

Special ProjectsIndustrial

JL/tlr rev0113

Peace Portal Pump Station -

Facility Expansion West Coast Express -

Lions Gate Waste Water Treatment Plant -

Harbour Pump Station

Miller Creek Hydro Electric

Completed in 2010, this new sanitary pump station consisted of complete plumbing, HVAC and process piping systems.

Completed in 2010, work consisted of plumbing and compressed air systems to upgrade the washdown locations along the track.

Completed in 2003, work consisted of installing owner supplied hypochlorite storage tanks and associated process equipment. Piping systems installed included water, sodium hypochlorite, instrument air and non potable water.

- Completed in 2003, work included fabrication of new reservoir tanks and associated piping systems to complete the backup water system.

- Completed in 2003, located in Pemberton, BC, this project was completed under Design Build parameters.

Granville Pump Station

Sunnyside Well No. 2

Ocean Spray Cranberry

Port Moody Pump Station

J.D. Sweid Meat Plant

Moores Poultry Processing Plant

- Completed in 2002, this sewage pump station consisted of complete plumbing, HVAC and process piping systems.

- Completed in 2002, work consisted of demolition of the existing wells and installation of new hypochlorite generation systems and chlorine analyzer systems to the new facility.

- Completed in 1995, work consisted of a large upgrade to the holding tanks and conveyor system for which specialized stainless steel piping systems were required for the new process cleaning system.

- Completed in 1994, work consisted of full plumbing, HVAC and process piping systems.

- Completed in 1981, work consisted of plumbing, HVAC and process piping systems.

- Completed in 1981, work consisted of plumbing, HVAC and specialty drainage systems.

M E C H A N I C A L

www.alphamechanical.caJustice Institute of BC

Lions Gate Waste Water Treatment Plant Harbour Pump Station

Miller Creek Hydro Electric

Ocean Spray Cranberry

Port Moody Pump Station

Port Moody Pump Station

Granville Pump Station

Miller Creek Hydro Electric

Page 8: Service, Skills and Commitment

Special ProjectsInstitutional

UBC Earth Science Building - Completed in 2012, This VRCA Gold award winning project consisted of specialized mechanical services to support the new multi-purpose research facility. The project also was able to achieve LEED Gold certification.

UBC Sauder School of Business - Completed in 2012, this LEED Silver two year renovation project consisted of multiple phases to upgrade the entire mechanical system. Many challenges were overcome in order to accommodate the academic business schedules of the faculty.

Walter Moberly Elementary School Seismic Upgrade - Completed in 2009, this 15 month seismic upgrade required meticulous planning and organization to keep the school open during construction.

St. Thomas Aquinas High School - Completed renovations in 2005, work included plumbing, HVAC and fire protection systems.

UBC West Mall Swing Space Building - This 2005 project included plumbing and HVAC piping systems for the new classrooms & lecture halls.

Carey Theological College Academic Building - UBC - This 5 storey concrete housing project consisted of plumbing and HVAC systems upgrades which completed in 2005.

BCIT - We have completed a variety of projects at BCIT. Work has included plumbing, HVAC, fire protection, process piping, and lab waste systems. Projects completed are NE-10-Auto Body, SE-16, Scramble Lab, Environmental Lab, Computer Resources, NW-1, NE-9, Physics Lab, Dean’s Office, Drafting Lab, Bio-Med Lab, SE-14, NE-6 and Waste Lab.

Corpus Christi Heating System Modifications - Completed in 2002, this project consisted of installing a full upgrade to the existing heating systems within the classrooms. A preventative maintenance program performed by Alpha service technicians ensures optimum performance of the heating system.

St. George's School - Completed in 2000, work consisted of full mechanical systems including plumbing, HVAC, gas piping, acid waste and fire protection system.

Langara College - Completed in 1999, work consisted of plumbing, HVAC and fire protection systems within the classrooms.

West Vancouver Secondary School - Completed in 1999, work consisted of plumbing, HVAC and fire protection systems.

UBC Thea Koerner House - In 1994, Alpha completed work on this renovation project consisting of plumbing, HVAC and fire protection system upgrades.

Crofton House - Completed in 1994, work consisted of plumbing, HVAC, fire protection and gas systems for the new classrooms and labs for the new addition to the existing school.

UBC School of Social Work - Completed in 1993, work consisted of installing a complete mechanical system.

MECHAN I CA L

UBC Sauder School of Business

UBC Sauder School of Business

Walter Moberly Elementary School

UBC Earth Sciences Building

School of Social WorkUBC Carey Theological College

BCITSt. Thomas Aquinas High SchoolUBC West Mall Swing SpaceNR/tlr rev09/18

www.alphamechanical.ca

Page 9: Service, Skills and Commitment

Special ProjectsInstitutional

w Queen Mary w Waldorf Schoolw SFU WAC Bennett Libraryw York House Schoolw St. Georges School - Junior and Senior

Science Labw UBC West Mall Swing Spacew UBC Flushing Heating Systemw BCIT SE-14 Library Additionw St. Thomas Aquinas High Schoolw Waldorf School - Early Childhood Centrew BCIT SE-14 Libraryw BCIT NE-10 Autobodyw BCIT SE-16w Corpus Christi Churchw BCIT Computer Resourcesw BCIT NW-1w BCIT NE-9 Renovationw Caulfield Elementaryw BCIT Physics Labw BCIT Ocean's Officew Gladstone Secondaryw SFU Video Conferencew Kitsilano Secondaryw West Vancouver School District HVAC

Modificationsw BCIT Drafting Labw BCIT Bio Med Labw BCIT SE-14 Library

w BCIT NE-6w UBC Purdy Pavilionw SFU Disable Washroomw Garibalid Highlandsw UBC Computer Science Room 200-201w BCIT - Waste Labw SFU - 4th Floorw SFU - Language Labw UBC Old Facility Clubw UBC Angus Reid Buildingw Templton Secondary Schoolw UBC Computer Sciencesw SFU - West Central Mallw UBC Computer Science Refitw UBC Buchanan Building "A"w St. Georges Dining Hallw South Delta Sr. Secondaryw Kwantlen College, Richmond BCw UBC - Cecil Green Housew Total Education Schoolw UBC - JB MacDonald Buildingw UBC - David Lam Management Centrew SFU Transit Exchangew UBC Services Buildingw New West Secondaryw Quilchena Elementary

Completed 1988-2018

MECHAN I CA L

NR/tlr rev09/18

www.alphamechanical.ca

Page 10: Service, Skills and Commitment

UBC Earth Science Building - Completed in 2012, This VRCA Gold award winning project consisted of specialized mechanical services to support the new multi-purpose research facility. The project also was able to achieve LEED Gold certification.

UBC Centre for Comparative Medicine - Completed in 2012, the mechanical work in this new building consisted of a complete mechanical systems installation as well as automated drinking water systems, radio active waste systems and a remote monitored steam plant to support this scientific research facility.

Michael Smith Lab - Completed in 2005, the mechanical scope of work consisted of specialized mechanical services and piping for this cutting edge scientific experimentation research facility.

UBC Faculty of Dentistry - Tenant Improvement Level 2 - This project was completed on a tight schedule for an arriving tenant in 2005. Work consisted of plumbing, HVAC, vacuum and sophisticated medical gas systems for the entire fit-up of 144 dental chairs.

VGH 5th Floor Reno Jack Bell Research Centre - Completed in 2004, work consisted of plumbing, HVAC, fire protection, acid waste and medical gas systems.

NRC - Work was completed on various specialized upgrades at the UBC NRC Laboratory facility. Work consisted of plumbing, heating, HVAC, fire protection and sophisticated process gas systems.

UBC Chemistry Building Labs - Completed in 2001, work included the upgrade and retrofit of process gases, laminar flow fume extraction, HVAC and conventional and special waste DWV plumbing systems.

BC Centre for Disease Control - Completed in 1997, under a very strict schedule, the mechanical work consisted of laboratory upgrades including HVAC, plumbing and special pure water piping systems for the installation of all owner supplied equipment for the research labs.

Cantest - Completed in 1997, work consisted of two phases, phase one for the entire renovation of the existing building and phase two for the completion of the medical gas package in the labs. A complete mechanical system was added which included plumbing, HVAC, fire protection and medical gas systems.

MECHAN I CA L

UBC Centre for Comparative Medicine

UBC Earth Science Building

UBC Faculty of Dentistry

Special ProjectsLaboratories

BC Centre for Disease Control

NRCMichael Smith Lab

QLT - Medicinal Chemistry Lab VGH - Jack Bell Research

Michael Smith Lab UBC

NR/tlr rev09/18

www.alphamechanical.ca

Page 11: Service, Skills and Commitment

Special ProjectsLaboratories

w Canexus HVAC Renovationw NRC Labs 1407 & 1409w Canexusw BCIT Research and Computer Labsw Terra MacLeodw BCIT Technology Buildingw QLT Micro Lab/QLT Inc.w QLT Medicinal Chemistry Laboratoryw Ultima Dental Labw UBC BOC NRC w UBC Bioinformatics Centre Michael Smithw QLT - Medical Chemistryw UBC - AG Canada Building Phase 2w NRC - Fuel Cell Test Facilityw MRT Skid, NRCw Michael Smith Lab, UBCw Questair - Gas Supply Upgrade, NRCw Silgiken Lab, BCIT Technology Buildingw NRC Labs 170/270 Upgradesw NRC UBC Labs 104/105w BCIT Scramble Labw BCIT Envior Engineering Labw Botting System Tech, BCITw Inphogene, BCITw Chancery Software, BCITw NRC Lab 185 Upgradew GL & V Technology, NRC/UBCw Microbiology Lab, Burnaby BCw UBC Chemical Engineering Lab

Completed 1988-2018

MECHAN I CA L

NR/tlr rev09/18

www.alphamechanical.ca

Page 12: Service, Skills and Commitment

NR/tlr rev09/18

Surgical Centre Inc - Completed in 2012, this private

healthcare facility was completed on a tight schedule.

Work consisted of plumbing, HVAC, fire protection

and sophisticated medical gas systems.

Richmond General Hospital Emergency Department

- Completed in 2011, the new expanded emergency

department featured multiple care spaces which

helped emergency teams better prioritize cases and

reduce congestion and wait times. Work consisted of

plumbing, HVAC, fire protection and sophisticated

medical gas systems.

Chilliwack General Hospital - Completed in 2010,

this design build project involved renovation and

expansion of the existing facility. The state-of-the art

design and leading practices facilitated improvements

to patient flow through the emergency department,

with diagnostic and ambulatory services. Work

consisted of plumbing, HVAC, fire protection and

medical gas systems.

Lions Gate Hospital Emergency Department - This

highly specialized project was completed in 2008.

Work consisted of plumbing, HVAC, fire protection

and sophisticated medical gas systems.

VGH Jim Pattison Pavilion Basement Finishing

Phase 1 - Completed in 2006, this fast track fit-up

consisted of plumbing, HVAC, fire protection and

highly complex medical gas systems.

Lions Gate Hospital Ultrasound / Chiller upgrade -

Completed in 2007, this multi-phased project

required a complex and detailed schedule to

successfully hoist and install the 200 ton chiller. The

hospital remained fully operational throughout the

duration of the project.

VGH Academic Ambulatory Care - Medical Gas

System - Completed in 2006, this medical gas project

consisted of installing all medical gas and piping

systems throughout the ambulatory care centre.

Royal Columbian Hospital - Intensive Care Unit

Expansion - Completed in 2007, the complex

mechanical work consisted of plumbing, HVAC, fire

protection, specialty waste systems, steam,

condensate and specialized medical gas systems to

complete the intensive care unit.

UBC Hospital - Koerner Pavilion Surgical Daycare

& O.R. Suite Renovation - Completed in 2006,

work consisted of plumbing, HVAC, fire protection

and medical gas systems.

Mt. St. Joseph Hospital - Completed in 2004, this

1½ year project consisted of 5 phases of renovation.

Work consisted of a full upgrade to the existing

hospital including new plumbing, HVAC, fire

protection and sophisticated medical gas services.

Surrey Memorial - This highly specialized project

was completed in 1993, the mechanical work

consisted of plumbing, HVAC, fire

protection and sophisticated medical

gas systems.

MECHAN I CA L

www.alphamechanical.ca

Special ProjectsHospitals

Richmond General Hopsital

Chilliwack General Hospital

Lions Gate Hospital Emergency Dept. VGH Jim Pattison Pavilion LGH Ultrasound Chiller Upgrade

Surrey MemorialVGH Academic Ambulatory Care VGH Centennial Pavilion

Surgical Centre Inc. New Westminster

Page 13: Service, Skills and Commitment

MECHAN I CA L

Special ProjectsHospitals

w� RCH – Phases 3 & 4 Trauma & Isolation

w� SMH EVD Roomsw� RGH UBC – Faculty of Medicinew� SMH Contact Call Centrew� Burnaby Hospital Supertrackw� Tricities Dialysis Upgradew� SMH Charles Barhamw� Fraser Health Authority 4th Floor

Upgradew� Burnaby Hospital Endoscopyw� SMH Boiler Upgrade Phase 2w� SPH Dialysis Unit Reno & R.O.

Upgradew SPH G.I. Clinicw St. Paul’s Hospital Dialysis Unit Reno &

R.O. Upgradew St. Paul’s Hospital G.I. Unitw Eagle Ridge Hospital Hot Water Supply

Pipingw Eagle Ridge Hospital Electrical Upgrade

Phase 2w VGH Willow Pavilionw St. Vincent’s Brock Fahrniw Lions Gate Hospital - Maternity Clinic

and TV Rentalw Vancouver Cancer Centre Radiation

Therapy Annex Vaultsw RCH - Integrated Interventional O.R.w Lions Gate Hospital - Cysto Washroomw Children’s & Women’s Health Centrew Maple Ridge Hospitalw St. Paul’s Hospitalw VGH Centennial Pavilion - Phase I

Demow BC Cancer Agencyw LGH Emergency Departmentw RCH Medical School Expansionw Richmond Hospital Morgue Renovationw LGH Maintenance Renovationw RCH - Intensive Care Unit Expansionw LGH Ultrasound/Chiller Upgradew LGH Infrastructurew PAH - Fluoroscopyw UBC Hospital Koerner Pavilion w Richmond Hospital Pediatricsw Richmond Hospital 3rd Floor

Renovationw SPH - Burrard Buildingw VGH Academic Ambulatory Care

w BBY General Hospital Pre-Opw SPH - Medical Gas Panelw Richmond Hospital Palliative Carew Mt. St. Joseph Hospital Dark Roomw Burnaby General Hospital - Pre-op

Renovationsw St. Paul’s Hospital - Medical Gas Servicesw Richmond Hospital - Palliative Carew Brock Fahrni Buildingw SMG - Operating Roomw Riverview Hospitalw Mt. St. Joseph's Hospitalw St. Paul's I-Capture Officesw FVCC 3rd Floor Renovationw Riverview Hospital - Valley view Centre

Lawnw SPH Emergency Showerw Royal Columbian Hospital Material

Servicesw Peach Arch Hospital CT Renovationw BC Cancer Agency - Non Gyne Cytologyw BC Cancer Agency - Analytical Cytologyw BC Cancer Agency - 3rd Floor

Renovationw St. Paul's MacDonald Research Labw Valley View 300w SMH Diagnosticw SPH Psychiatricw BC Children's Ambulatory Carew Holy Family Hospitalw BC Children's 3B Oncologyw BC Children's & Women's Renovationw SPH - Dr. Peters Aids Centrew Lions Gate Hospital Activation w Buildingw SPH - CF/Respirologyw Centennial Pavilion - 5th Floor

Neurosciencew VGH - Kingfishersw SPH - HRC/CTw SPH - Infectious Diseasew SPH - Healthy Heartw Lions Gate Hospital - Hot Water Tanksw SPH - Obstetricsw SPH - 9th Floor Renovationw BC Women's Hospital Renovationw BCCH - Burn Unitw Fraser Valley Cancer Centrew BC Children's PH II Renovation

Completed 1988-2018

w VGH Skin Carew St. Paul's 2Bw St. Paul's Opthomologyw St. Paul's 2C & 3w VGH Student Alumniw BCCH - Emergencyw Sunny Hill Hospitalw VGH - CP Supply Air Systemw VGH - CT Scannerw St. Mary's Hospital Additionw VGH - Radiographic Unitw VGH - Decontaminationw Lion's Gate Hospital - Nutrition Labw VGH - Centennial Pavilion 7th Floorw VGH - Heather Pavilion Prostatew VGH - Banfieldw VGH - Heather Pavilion - B,C & Dw UBC - Detwiller Pavilionw Grace Hospital Infillw MRH Cooling Unit for Trauma Roomw Mt. St. Joseph's QR #33 PH IIw Mt. St. Joseph's QR #87w Mt. St. Joseph's QR#63R PH IIw Mt. St. Joseph's QR#82 Evac Systemw Mt. St. Joseph's QR #92w Shirley Dean Pavilion - SMHw Maple Ridge Hospital Sewer Separationw Mt. St. Joseph's Medical Gas Upgradew Yaletown Senior Care Home

NR/tlr rev09/18

www.alphamechanical.ca

Page 14: Service, Skills and Commitment

Special ProjectsPools, Life Support and Water Features

NR/tlr rev09/18

Vancouver Aquarium Expansion and Revitalization Project - Completed in 2014, This VRCA Gold award winning project is the largest expansion undertaken by the Aquarium. Work consisted of plumbing, HVAC, fire protection, District Energy Systems and salt water life support systems throughout the new facility.

Killarney Community Pool - Completed in 2006, this VRCA Gold award winning project was a highly complex undertaking. Work consisted of plumbing, HVAC and extensive pool piping for the 6 metre waterslide, leisure pool and 25 metre main pool.

Vancouver Aquarium - Aquaculture Diversification Laboratory - Completed in 2005, the mechanical & life support systems for this project involved a sensitive working environment around live animals, fish, inverts and corals. Work consisted of plumbing, HVAC and fire protection for the new research lab with a separate salt water life support system.

George Wainborn Park - Completed in 2003, work included plumbing, HVAC, fire protection and a specialized fountain and piping system.

Italian Gardens, Hasting Park - Completed in 2000, work consisted of a specialized plumbing system with a design build application to make this unique fountain system functional.

Vancouver Aquarium Pool/Life Support -Completed in 2003, work included renovations to the existing labs, offices and to areas with new exhibits.

Surrey Family YMCA - Completed in 2002, work consisted of plumbing, heating, HVAC and extensive pool piping for the new facility, pool and whirlpools.

Vancouver Aquarium West Coast Exhibit - Completed in 2001, this project involved a very tight schedule coupled with a sensitive working environment (conditions such as noise and vibrations would be harmful to the sea life). This new exhibit was built over the top of the existing Killer Whale pool.

Central Park Pool, City of Burnaby - Completed in 1999, work consisted of upgrading the entire pool system and piping services.

WC Blair Pool - Completed in 1998, work consisted of upgrading the ozone system complete with the installation of new water features.

Karen Magnusen Wave Pool - Completed in 1992, work consisted of plumbing, HVAC, fire protection and sophisticated pool piping systems.

Maple Grove Pool, City of Vancouver - Completed in 1992, work consisted of a new outdoor underground pool system and piping services.

First Nations Long House -Completed in 1991, work consisted of plumbing, HVAC, fire protection systems and a specialized water feature.

Brittania Pool, City of Vancouver - Completed in 1985, work consisted of a major pool upgrade complete with additional new whirlpools.

MECHAN I CA L

www.alphamechanical.ca

Killarney Community Pool

Killarney Community Pool

George Wainborn Park Vancouver AquariumWest Coast Exhibit

Karen Magnusen Wave PoolYMCAWC Blair

Vancouver Aquarium

Page 15: Service, Skills and Commitment

MECHAN I CA L

Special ProjectsPools

w Vancouver Aquarium Expansion Fountainw Ladner Leisure Centrew Vancouver Aquarium Seismic Upgradew Killarney Community Poolw Vancouver Aquarium Discovery Ed Centre

Undergroundw Vancouver Aquarium - Aquaculture

Diversification Laboratoryw Bonsor Park Recreation Complexw George Wainborn Parkw McLean Water Park, Vancouverw Italian Gardens, Hastings Parkw Vancouver Aquarium Pool/Life Supportw Surrey Family YMCAw Vancouver Aquarium West Coast Exhibitw Central Park Pool, City of Burnabyw WC Blair Poolw 1075 West Georgia Water Featurew Karen Magnusen Wave Poolw Maple Grove Pool, City of Vancouverw First Nations Long Housew Brittania Pool, City of Vancouver

Completed 1985-2018

NR/tlr rev09/18

www.alphamechanical.ca

Page 16: Service, Skills and Commitment

Special ProjectsResidential

NR/tlr rev09/18

UBC Orchard Commons – Completed in July 2016, this LEED Gold certification project is an academic and residential space for international and domestic students. This 448,000 square foot mixed use academic/ student housing facility is the new home for the UBC Vantage College Program. Work consisted of full mechanical services for 1,049 beds, administrative space and a new commercial kitchen.

UBC Totem Hall Residences – Phase 1 & 3 Completed in 2014, Phase 2 Completed in 2013, these projects consisted of plumbing, HVAC, fire protection and specialty aquatherm systems to replace all domestic water systems

Mira On The Park - The full scope of mechanical services for this new building were completed in 2008. An elegant tower of 77 luxurious suites with a collection of 5 separate townhomes situated on the North shore of Vancouver.

Czorny Alzheimer Centre - Completed in 2006, work consisted of plumbing, HVAC and fire protection systems for this residential care facility.

The Brittany @ Champlain Gardens - Completed in 2006, this four storey project with 6 separate buildings consisted of plumbing, HVAC and fire protection for 116 residential units.

Onyx Court - Tsawwassen - Completed in 2004, this four storey wood frame project consisted of plumbing, HVAC and fire protection systems.

Carey Theological College Academic Building - UBC - Completed in 2005, this five storey concrete housing project consisted of plumbing and HVAC systems.

General Currie Town Homes - Started in 2002 this project was completed in 2003 and work consisted of plumbing and HVAC for 17 townhomes.

Dr. Peter Aids Centre - Completed in June 2003. This residential care facility project consisted of plumbing, HVAC and fire protection in extremely confined working areas.

Victoria Mews - Completed in 2002, this 4 storey residential housing project consisted of plumbing, heating, fire protection and HVAC.

Quality Inn - Completed in 1996, work on this hotel consisted of installing full mechanical services for the new addition and the renovation to the existing building.

UBC Thunderbird Housing - Completed in 1995, this 4 story project consisted of plumbing, HVAC and fire protection for 300+ residential student housing units.

Stephens Court - Completed in 1995, work consisted of plumbing, HVAC and fire protection for this multi-storied wood frame building.

UBC Green College - Completed in 1993, this wood frame building consisted of plumbing, HVAC and fire protection systems for student housing units.

1500 Alberni - This 20 story high-rise was completed in 1991. Work consisted of plumbing, HVAC and fire protection systems.

Diamond Head Place - Completed in 1991, this Squamish project consisted of plumbing and HVAC.

New Vista Care Home - Completed in 1990, work consisted of plumbing, HVAC and fire protection systems throughout the residential care facility.

Victoria Mews UBC Green College

UBC Thunderbird Housing

UBC Carey College

Onyx Court

Mira on the Park

The Brittany@ Champlain Gardens

MECHAN I CA L

www.alphamechanical.ca

1500 Alberni

UBC Orchard Commons