25
Company: Southern California Gas Company Well: Sesnon Fee 7 RD2 Field: Aliso Canyon County: Los Angeles State: California Los Angeles Aliso Canyon 3876.41'S, 6683.37' FROM STATION 84 Sesnon Fee 7 RD2 Southern California Gas Company FOUR ARM POWER CALIPER GAMMA RAY LOG Location: 3876.41'S, 6683.37' FROM STATION 84 Elev.: K.B. 2284.00 ft Y(N)=6390006.07 X(E)=1934473.92 G.L. 2261.00 ft CA ZONE , NAD 83 D.F. Permanent Datum: Ground Level Elev.: 2261.00 f County: Field: Location: Well: Company: Log Measured From: Kelly Bushing 23.00 ft above Perm.Datum Drilling Measured From: Kelly Bushing API Serial No. Section: Township: Range: 0403700653 33 3N 16W Logging Date 03-Nov-2018 Run Number One Depth Driller 10222.00 ft Schlumberger Depth 9104.00 ft Bottom Log Interval 9098.00 ft Top Log Interval 7507.00 ft Casing Driller Size @ Depth 7 in @ 7515.00 ft Casing Schlumberger 7515 ft Bit Size 6.125 in Type Fluid In Hole 3% KCI/GEOZAN MUD Density Viscosity 9.9 lbm/gal 14 s Fluid Loss PH 8 Source of Sample Active Tank RM @ Meas Temp 0.2 ohm.m @ 68 degF RMF @ Meas Temp 0.15 ohm.m @ 68 degF RMC @ Meas Temp Source RMF RMC Pressed RM @ BHT RMF @ BHT 0.07 @ 212 0.05 @ 212 Max Recorded Temperatures Circulation Stopped Time 28-Oct-2018 22:00:00 Logger on Bottom Time 03-Nov-2018 11:54:00 Unit Number Location: 2222 BAKERSFIELD Recorded By Omar Reid Witnessed By Mr. Tom McMahon THE USE OF AND RELIANCE UPON THIS RECORDED-DATA BY THE HEREIN NAMED COMPANY (AND ANY OF ITS AFFILIATES, PARTNERS, REPRESENTATIVES, AGENTS, CONSULTANTS AND EMPLOYEES) IS SUBJECT TO THE TERMS AND CONDITIONS AGREED UPON BETWEEN SCHLUMBERGER AND THE COMPANY, INCLUDING: (a) RESTRICTIONS ON USE OF THE RECORDED- DATA; (b) DISCLAIMERS AND WAIVERS OF WARRANTIES AND REPRESENTATIONS REGARDING COMPANY'S USE AND RELIANCE UPON THE RECORDED-DATA; AND (c) CUSTOMER'S FULL AND SOLE RESPONSIBILITY FOR ANY INFERENCE DRAWN OR DECISION MADE IN CONNECTION WITH THE USE OF THIS RECORDED-DATA. 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration Summary 7.2 Software Version 7.3 Composite Summary 7.4 Log ( PPC_Caliper_Formation ) 7.5 Parameter Listing 8. One 8.1 Integration Summary 8.2 Software Version 8.3 Composite Summary 8.4 Log ( PPC_BORE_GRAPHIC )

Upload: others

Post on 13-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

Co

mp

an

y:

So

uth

ern

Ca

liforn

ia G

as C

om

pa

ny

We

ll:S

esn

on

Fe

e 7

RD

2

Fie

ld:

Alis

o C

an

yo

n

Co

un

ty:

Lo

s A

ng

ele

sS

tate

:C

alifo

rnia

Los Angeles

Aliso Canyon

3876.41'S, 6683.37' FROM STATION 84

Sesnon Fee 7 RD2

Southern California Gas Company

FO

UR

AR

M P

OW

ER

CA

LIP

ER

GA

MM

A R

AY

LO

G

Location:

38

76

.41

'S, 6

68

3.3

7' F

RO

M S

TA

TIO

N 8

4E

lev.:

K.B

.2

28

4.0

0 ft

Y(N

)=6

39

00

06

.07

X(E

)=1

93

44

73

.92

G.L

.2

26

1.0

0 ft

CA

ZO

NE

, NA

D 8

3D

.F.

Pe

rma

ne

nt D

atu

m:

Gro

un

d L

eve

lE

lev.:

22

61

.00

f

County:

Field:

Location:

Well:

Company:

Lo

g M

ea

su

red

Fro

m:

Ke

lly B

ush

ing

23

.00

fta

bo

ve

Pe

rm.D

atu

m

Drillin

g M

ea

su

red

Fro

m:

Ke

lly B

ush

ing

AP

I Se

rial N

o.

Se

ctio

n:

To

wn

sh

ip:

Ra

ng

e:

04

03

70

06

53

33

3N

16

W

Lo

gg

ing

Da

te0

3-N

ov-2

01

8

Ru

n N

um

be

rO

ne

De

pth

Drille

r1

02

22

.00

ft

Sch

lum

be

rge

r De

pth

91

04

.00

ft

Bo

ttom

Lo

g In

terv

al

90

98

.00

ft

To

p L

og

Inte

rva

l7

50

7.0

0 ft

Ca

sin

g D

riller S

ize

@ D

ep

th7

in @

75

15

.00

ft

Ca

sin

g S

ch

lum

be

rge

r7

51

5 ft

Bit S

ize

6.1

25

in

Typ

e F

luid

In H

ole

3%

KC

I/GE

OZ

AN

MUD

De

nsity

Vis

co

sity

9.9

lbm

/ga

l1

4 s

Flu

id L

oss

PH

8

So

urc

e o

f Sa

mp

leA

ctiv

e T

an

k

RM

@ M

ea

s T

em

p0

.2 o

hm

.m @

68

de

gF

RM

F @

Me

as T

em

p0

.15

oh

m.m

@ 6

8 d

eg

F

RM

C @

Me

as T

em

p

So

urc

e R

MF

RM

CP

resse

d

RM

@ B

HT

RM

F @

BH

T0

.07

@ 2

12

0.0

5 @

21

2

Ma

x R

eco

rde

d T

em

pe

ratu

res

Circ

ula

tion

Sto

pp

ed

Tim

e2

8-O

ct-2

01

8 2

2:0

0:0

0

Lo

gg

er o

n B

otto

m T

ime

03

-No

v-2

01

8 1

1:5

4:0

0

Un

it Nu

mb

er

Lo

ca

tion

:2

22

2B

AK

ER

SF

IEL

D

Re

co

rde

d B

yO

ma

r Re

id

Witn

esse

d B

yM

r. To

m M

cM

ah

on

THE USE OF AND RELIANCE UPON THIS RECORDED-DATA BY THE HEREIN NAMED COMPANY (AND ANY OF ITS AFFILIATES, PARTNERS, REPRESENTATIVES, AGENTS, CONSULTANTS AND EMPLOYEES) IS SUBJECT TO THE TERMS AND CONDITIONS AGREED UPON BETWEEN SCHLUMBERGER AND THE COMPANY, INCLUDING: (a) RESTRICTIONS ON USE OF THE RECORDED-DATA; (b) DISCLAIMERS AND WAIVERS OF WARRANTIES AND REPRESENTATIONS REGARDING COMPANY'S USE AND RELIANCE UPON THE RECORDED-DATA; AND (c) CUSTOMER'S FULL AND SOLE RESPONSIBILITY FOR ANY INFERENCE DRAWN OR DECISION MADE IN CONNECTION WITH THE USE OF THIS RECORDED-DATA.

1. Header

2. Disclaimer

3. Contents

4. Well Sketch

5. Borehole Size/Casing/Tubing Record

6. Remarks and Equipment Summary

7. One

7.1 Integration Summary

7.2 Software Version

7.3 Composite Summary

7.4 Log ( PPC_Caliper_Formation )

7.5 Parameter Listing

8. One

8.1 Integration Summary

8.2 Software Version

8.3 Composite Summary

8.4 Log ( PPC_BORE_GRAPHIC )

Page 2: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

9. One 7" CASING CHECK

9.1 Integration Summary

9.2 Software Version

9.3 Composite Summary

9.4 Log ( PPC_Caliper_Formation )

9.5 Parameter Listing

10. Tail

Page 3: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

Bit Size ( in ) 18.375 12.25 11 6.125

Top Driller ( ft ) 0 621 4733 7515

Top Logger ( ft ) 0 621 4733 7515

Bottom Driller ( ft ) 621 4733 7515 10222

Bottom Logger ( ft ) 621 4733 7515 10222

Size ( in ) 13.375 7 7 7

Weight ( lbm/ft ) 54.5 29 23 26

Inner Diameter ( in ) 12.615 6.184 6.366 6.276

Grade J55 N80 N80 N80

Top Driller ( ft ) 0 0 59 6503

Top Logger ( ft ) 0 0 59 6503

Bottom Driller ( ft ) 621 59 6503 7515

Bottom Logger ( ft ) 621 59 6503 7515

One: Remarks

Equip name Length MP name Offset

LEH-QT 18.96

LEH-QT

DTC-H:9137 15.47

ECH-KC:9137

DTC-H:9137

ToolStatus 12.48

TelStatus 12.48

HV 0.00

CTEM 14.57

SGT-N:2864 12.47

SGH-K

SGC-TB:2864

SGD-TAA:2863

GR 11.56

PPC-B:8732 6.97

PPC-B:8732

PPC-B Calip

ers

5.83

Correlated to Schlumberger Array Induction log dated: 19-Oct-2008

Tool ran as per tool sketch

Tool pulled high tension when coming back into the casing window. No repeats attempted

Crew: M.Salazar / F.Bucio

Thank you for using Schlumberger!

Page 4: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

BNS-STD 0.46 Head Tensi

on

TOOL_ZERO

Lengths are in ft

Maximum Outer Diameter = 4.300 in

Line: Sensor Location, Value: Gating Offset

All measurements are relative to TOOL_ZERO

ICV Integrated Cement Volume GCSE_UP_PASS, FCD 0 ft3

IHV Integrated Hole Volume GCSE_UP_PASS 325.03 ft3

Maxwell 2018 SP1 8.1.99839.3100

Application Patch Wireline_Hotfix-Mandatory-2018SP1_8.1.101341

Wireline_NPD-EMIT-C-2018SP1_8.1.100393

One Log[3]:Up Up 7511.10 ft 9103.73 ft 03-Nov-2018 11:45:42 AM

03-Nov-2018 12:16:48 PM

ON 3.00 ft No

All depths are referenced to toolstring zero

Company:Southern California Gas Company Well:Sesnon Fee 7 RD2

One: Log[3]:Up:S005

Description: PPC_Caliper_Formation Format: Log ( PPC_Caliper_Formation ) Index Scale: 5 in per 100 ft Index Unit: ft Index Type: Measured Depth Creation Date: 06-Nov-2018 09:02:39

Tool_Tot.Drag

Cable Drag

IHV - Integrated Hole Volume every 10.00 (ft3)

IHV - Integrated Hole Volume every 100.00 (ft3)

ICV - Integrated Cement Volume every 10.00 (ft3)

ICV - Integrated Cement Volume every 100.00 (ft3)

TIME_1900 - Time Marked every 60.00 (s)

Relative Bearing (RB_PPC1)PPC-B

0 360deg

Hole Diameter 2 (HD2_PPC1)PPC-B

5 15in

Hole Diameter 1 (HD1_PPC1)PPC-B

5 15in

Formation From RD3 to F3

Formation From F3 to RD1

Formation From RD4 to F4

Formation From F4 to RD2

Page 5: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

Stuck ToolIndicator,

Total (STIT)

0 50ft

CableTension(TENS)

5000 0lbf

Gamma Ray (ECGR) SGT-N

50 200gAPI

Bit Size (BS) RT

6 16in

Enhanced Hole Diameter 2(ellipse-based algorithm)(EHD2_PPC1) PPC-B

5 15in

Enhanced Hole Diameter 1(ellipse-based algorithm)(EHD1_PPC1) PPC-B

5 15in

EMS Tool Center 1 (ETC1_PPC1)PPC-B

10 -10in

Radius 3 (CRD3_PPC1) PPC-B

-10 10in

Radius 1 (CRD1_PPC1) PPC-B

10 -10in

EMS Tool Center 2 (ETC2_PPC1)PPC-B

10 -10in

Radius 4 (CRD4_PPC1) PPC-B

-10 10in

Radius 2 (CRD2_PPC1) PPC-B

10 -10in

7510

7520

7530

7540

7560

7570

7580

7590

7610

7620

7630

7640

7660

7670

7680

7500

7550

7600

7650

STIT

TENS

ECGR

BS

RB_PPC1

HD2_PPC1

HD1_PPC1

EHD2_PPC1

EHD1_PPC1

ETC1_PPC1

CRD3_PPC1

CRD1_PPC1

ETC2_PPC1

CRD4_PPC1

CRD2_PPC1

Page 6: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

7690

7710

7720

7730

7740

7760

7770

7780

7790

7810

7820

7830

7840

7860

7870

7880

7890

7700

7750

7800

7850

7900

STIT

TENS

ECGR

BS

HD2_PPC1

HD1_PPC1

EHD2_PPC1

EHD1_PPC1

CRD3_PPC1

CRD1_PPC1

CRD4_PPC1

CRD2_PPC1

Page 7: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

7910

7920

7930

7940

7960

7970

7980

7990

8010

8020

8030

8040

8060

8070

8080

8090

8110

8120

7950

8000

8050

8100

STIT

RB_PPC1

HD2_PPC1

EHD1_PPC1

ETC1_PPC1

CRD3_PPC1

ETC2_PPC1

CRD4_PPC1

Page 8: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

8130

8140

8160

8170

8180

8190

8210

8220

8230

8240

8260

8270

8280

8290

8310

8320

8330

8340

8150

8200

8250

8300

STIT

TENS

ECGR

BS

RB_PPC1

HD2_PPC1

HD1_PPC1

EHD2_PPC1

ETC1_PPC1

CRD3_PPC1

CRD1_PPC1

ETC2_PPC1

CRD4_PPC1

CRD2_PPC1

Page 9: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

8360

8370

8380

8390

8410

8420

8430

8440

8460

8470

8480

8490

8510

8520

8530

8540

8560

8350

8400

8450

8500

8550

STIT

TENS

ECGR

BS

RB_PPC1

HD2_PPC1

HD1_PPC1

EHD2_PPC1

EHD1_PPC1

ETC1_PPC1

CRD3_PPC1

CRD1_PPC1

ETC2_PPC1

CRD4_PPC1

CRD2_PPC1

Page 10: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

8570

8580

8590

8610

8620

8630

8640

8660

8670

8680

8690

8710

8720

8730

8740

8760

8770

8780

8600

8650

8700

8750

STIT

TENS

ECGR

BS

RB_PPC1

HD2_PPC1

HD1_PPC1

EHD2_PPC1

EHD1_PPC1

ETC1_PPC1

CRD3_PPC1

CRD1_PPC1

ETC2_PPC1

CRD4_PPC1

CRD2_PPC1

Page 11: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

8790

8810

8820

8830

8840

8860

8870

8880

8890

8910

8920

8930

8940

8960

8970

8980

8990

8800

8850

8900

8950

9000

STIT

TENS

ECGR

BS

RB_PPC1

HD2_PPC1

HD1_PPC1

EHD2_PPC1

EHD1_PPC1

ETC1_PPC1

CRD3_PPC1

CRD1_PPC1

ETC2_PPC1

CRD4_PPC1

CRD2_PPC1

Page 12: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

9010

9020

9030

9040

9060

9070

9080

9090

9050

9100

TENS BS EHD2_PPC1

EHD1_PPC1

Description: PPC_Caliper_Formation Format: Log ( PPC_Caliper_Formation ) Index Scale: 5 in per 100 ft Index Unit: ft Index Type: Measured Depth Creation Date: 06-Nov-2018 09:02:39

Tool_Tot.Drag

Cable Drag

Stuck ToolIndicator,

Total (STIT)

0 50ft

CableTension(TENS)

5000 0lbf

IHV - Integrated Hole Volume every 10.00 (ft3)

IHV - Integrated Hole Volume every 100.00 (ft3)

ICV - Integrated Cement Volume every 10.00 (ft3)

ICV - Integrated Cement Volume every 100.00 (ft3)

TIME_1900 - Time Marked every 60.00 (s)

Gamma Ray (ECGR) SGT-N

50 200gAPI

Bit Size (BS) RT

6 16in

Relative Bearing (RB_PPC1)PPC-B

0 360deg

Hole Diameter 2 (HD2_PPC1)PPC-B

5 15in

Hole Diameter 1 (HD1_PPC1)PPC-B

5 15in

Enhanced Hole Diameter 2(ellipse-based algorithm)(EHD2_PPC1) PPC-B

5 15in

Enhanced Hole Diameter 1(ellipse-based algorithm)(EHD1_PPC1) PPC-B

5 15in

Formation From RD3 to F3

Formation From F3 to RD1

EMS Tool Center 1 (ETC1_PPC1)PPC-B

10 -10in

Radius 3 (CRD3_PPC1) PPC-B

-10 10in

Radius 1 (CRD1_PPC1) PPC-B

10 -10in

Formation From RD4 to F4

Formation From F4 to RD2

EMS Tool Center 2 (ETC2_PPC1)PPC-B

10 -10in

Radius 4 (CRD4_PPC1) PPC-B

-10 10in

Radius 2 (CRD2_PPC1) PPC-B

10 -10in

One: Parameters

Page 13: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

One: Parameters

Barite Mud Presence FlagISSBAR Borehole No

Borehole Status (Open or Cased Hole)BHS Borehole Open

Bit SizeBS WLSESSION Depth Zoned in

Casing Bottom (Logger)CBLO WLSESSION 7515 ft

Cement DensityCDEN SGT-N 2 g/cm3

Casing Outer Diameter - Zoned along driller depthsCSODDRL WLSESSION 7 in

Drilling Fluid DensityDFD Borehole 9.9 lbm/gal

Generalized Caliper Selection for WL Log Down PassesGCSE_DOWN_PASS Borehole BS(RT)

Generalized Caliper Selection for WL Log Up PassesGCSE_UP_PASS Borehole BS(RT)

Depth Zone Parameters

7500 7515BS 11

7515 9103.5BS 6.125

All depth are actual.

One: Parameters

Toolstring Maximum Logging SpeedMAX_LOG_SPEED WLSESSION 3600 ft/h

Maxwell 2018 SP1 8.1.99839.3100

Application Patch Wireline_Hotfix-Mandatory-2018SP1_8.1.101341

Wireline_NPD-EMIT-C-2018SP1_8.1.100393

One Log[3]:Up Up 7511.10 ft 9103.73 ft 03-Nov-2018 11:45:42 AM

03-Nov-2018 12:16:48 PM

ON 3.00 ft No

All depths are referenced to toolstring zero

Company:Southern California Gas Company Well:Sesnon Fee 7 RD2

One: Log[3]:Up:S005

Description: Borehole Cross Section Format for PPC Format: Log ( PPC_BORE_GRAPHIC ) Index Scale: 5 in per 100 ft Index Unit: ft Index Type: Measured Depth Creation Date: 06-Nov-2018 09:02:40

TIME_1900 - Time Marked every 60.00 (s)

Caliper#1#3

#4

-X X

-Y

Orientation Index: None

Y

Page 14: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

Ellipse Long Axis (ELA)

-20 20in

Ellipse Short Axis (ESA)

-20 20in

PPC Borehole Data

Long Axis: ELA(in)

Short Axis: ESA(in)

Std. Devi: Devi()

Orient Angle: Orient(deg)

ELA ESA Devi Orient

#2PPC - PPC BCS PPC-B

7460

7470

7480

7490

7510

7520

7530

7540

7560

7570

7580

7590

7610

7620

7450

7500

7550

76007597.5

4.97391

3.36156

4.94551

3.41843

9.91942

6.77999

0 90

7547.54.20398

3.37499

4.16976

3.47056

8.37374

6.84554

0 90

Page 15: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

7630

7640

7660

7670

7680

7690

7710

7720

7730

7740

7760

7770

7780

7790

7810

7820

7830

7840

7650

7700

7750

7800

7847.53.32603

4.03946

8.07948

6.64495

0 90

7797.53.53088

2.90132

3.48967

2.89154

7.02054

5.79286

0 90

7747.52.84275

2.92861

2.90128

3.02424

5.95284

5.74402

0 90

7697.53.06982

2.99671

3.16152

3.0507

6.23134

6.04741

0 90

7647.55.90722

4.24691

5.98972

4.1901

11.8969

8.43701

0 90

Page 16: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

7860

7870

7880

7890

7910

7920

7930

7940

7960

7970

7980

7990

8010

8020

8030

8040

8060

7850

7900

7950

8000

80508047.5

2.68647

3.01031

2.7942

3.0507

6.0615.480

670 90

7997.52.80675

2.83299

2.85373

2.9845

5.81748

5.66048

0 90

7947.52.79474

2.86034

2.90128

2.93142

5.79176

5.69602

0 90

7897.52.92659

2.83299

2.90128

2.85161

5.82786

5.68459

0 90

7847.53.31892

4.04003

48 950 90

Page 17: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

8070

8080

8090

8110

8120

8130

8140

8160

8170

8180

8190

8210

8220

8230

8240

8260

8270

8280

8100

8150

8200

8250

2.85161

8247.52.79474

2.72329

2.73456

2.91813

5.64142

5.5293

0 90

8197.52.92659

2.7919

2.85373

2.82495

5.78032

5.61685

0 90

8147.52.75869

2.94224

2.7465

2.9447

5.88694

5.50519

0 90

8097.52.87871

2.91497

2.96061

2.99775

5.91272

5.83931

0 90

Page 18: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

8290

8310

8320

8330

8340

8360

8370

8380

8390

8410

8420

8430

8440

8460

8470

8480

8490

8300

8350

8400

8450

85008497.5

2.93855

2.87751

3.40538

6.65934

5.81606

0 90

8447.52.87871

2.72329

3.03166

2.82495

5.91037

5.54824

0 90

8397.52.74666

2.96949

2.68677

2.82495

5.79444

5.43344

0 90

8347.52.7226

2.8056

2.75843

2.95797

5.76358

5.48103

0 90

8297.52.75869

2.83299

2.78228

2.85161

5.68459

5.54097

0 90

Page 19: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

8510

8520

8530

8540

8560

8570

8580

8590

8610

8620

8630

8640

8660

8670

8680

8690

8710

8720

8550

8600

8650

87008697.5

4.15804

3.09176

5.7217

3.24832

9.87974

6.34008

0 90

8647.54.82832

3.06464

5.65697

3.22205

10.4853

6.28669

0 90

8597.53.2124

5.05476

3.16152

5.07606

10.1308

6.37392

0 90

8547.52.90266

3.09176

2.78228

2.82495

5.91671

5.68494

0 90

3.25396

Page 20: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

8730

8740

8760

8770

8780

8790

8810

8820

8830

8840

8860

8870

8880

8890

8910

8920

8930

8940

8750

8800

8850

8900

8947.55.24331

3.31387

10.0716

6.37851

0 90

8897.54.34136

3.2

4.4081

3.26144

8.74945

6.46144

0 90

8847.54.22781

2.90452

4.30705

3.05367

8.53487

5.9582

0 90

8797.55.82014

3.33745

5.80721

3.60285

11.6274

6.9403

0 90

8747.55.36212

3.06464

5.44005

3.19576

10.8022

6.2604

0 90

Page 21: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

8960

8970

8980

8990

9010

9020

9030

9040

9060

9070

9080

9090

9110

9120

9130

9140

8950

9000

9050

9100

9150

9097.5

2.84948

2.16358

2.27232

6.13644

8.30002

5.1218

0 90

9047.55.14096

3.14593

5.23234

3.24832

10.3733

6.39425

0 90

8997.55.84177

3.22986

6.31723

3.89896

12.159

7.12882

0 90

8947.54.82832

3.06464

5.2433116 51

0 90

Ellipse Long Axis (ELA)

-20 20in

PPC Borehole Data

Long Axis: ELA(in)

Short Axis: ESA(in)

Page 22: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

Description: Borehole Cross Section Format for PPC Format: Log ( PPC_BORE_GRAPHIC ) Index Scale: 5 in per 100 ft Index Unit: ft Index Type: Measured Depth Creation Date: 06-Nov-2018 09:02:40

TIME_1900 - Time Marked every 60.00 (s)

-20 20in

Ellipse Short Axis (ESA)

-20 20in

Short Axis: ESA(in)

Std. Devi: Devi()

Orient Angle: Orient(deg)

ELA ESA Devi Orient

Caliper#1

#2

#3

#4

PPC - PPC BCS PPC-B

-X X

-Y

Orientation Index: None

Y

ICV Integrated Cement Volume GCSE_UP_PASS, FCD 0 ft3

IHV Integrated Hole Volume GCSE_UP_PASS 0 ft3

Maxwell 2018 SP1 8.1.99839.3100

Application Patch Wireline_Hotfix-Mandatory-2018SP1_8.1.101341

Wireline_NPD-EMIT-C-2018SP1_8.1.100393

One Log[1]:Up Up 6276.10 ft 6387.03 ft 03-Nov-2018 11:06:51 AM

03-Nov-2018 11:09:00 AM

ON 0.00 ft No

All depths are referenced to toolstring zero

Company:Southern California Gas Company Well:Sesnon Fee 7 RD2

One: Log[1]:Up:S005

Description: PPC_Caliper_Formation Format: Log ( PPC_Caliper_Formation ) Index Scale: 5 in per 100 ft Index Unit: ft Index Type: Measured Depth Creation Date: 06-Nov-2018 09:02:43

IHV - Integrated Hole Volume every 10.00 (ft3)

IHV - Integrated Hole Volume every 100.00 (ft3)

ICV - Integrated Cement Volume every 10.00 (ft3)

ICV - Integrated Cement Volume every 100.00 (ft3)

TIME_1900 - Time Marked every 60.00 (s)

Relative Bearing (RB_PPC1)PPC-B

0 360deg

Page 23: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

Tool_Tot.Drag

Cable Drag

Stuck ToolIndicator,

Total (STIT)

0 50ft

CableTension(TENS)

5000 0lbf

Gamma Ray (ECGR) SGT-N

50 200gAPI

Bit Size (BS) RT

6 16in

Hole Diameter 2 (HD2_PPC1)PPC-B

5 15in

Hole Diameter 1 (HD1_PPC1)PPC-B

5 15in

Enhanced Hole Diameter 2(ellipse-based algorithm)(EHD2_PPC1) PPC-B

5 15in

Enhanced Hole Diameter 1(ellipse-based algorithm)(EHD1_PPC1) PPC-B

5 15in

Formation From RD3 to F3

Formation From F3 to RD1

EMS Tool Center 1 (ETC1_PPC1)PPC-B

10 -10in

Radius 3 (CRD3_PPC1) PPC-B

-10 10in

Radius 1 (CRD1_PPC1) PPC-B

10 -10in

Formation From RD4 to F4

Formation From F4 to RD2

EMS Tool Center 2 (ETC2_PPC1)PPC-B

10 -10in

Radius 4 (CRD4_PPC1) PPC-B

-10 10in

Radius 2 (CRD2_PPC1) PPC-B

10 -10in6270

6280

6290

6310

6320

6330

6340

6360

6370

6380

6300

6350

Tool_Tot.Drag

Cable Drag

Stuck ToolIndicator,

Total (STIT)

0 50ft

Cable

Gamma Ray (ECGR) SGT-N

50 200gAPI

Bit Size (BS) RT

6 16in

Relative Bearing (RB_PPC1)PPC-B

0 360deg

Hole Diameter 2 (HD2_PPC1)PPC-B

5 15in

Hole Diameter 1 (HD1_PPC1)PPC-B

Formation From RD3 to F3

Formation From F3 to RD1

EMS Tool Center 1 (ETC1_PPC1)PPC-B

10 -10in

Radius 3 (CRD3_PPC1) PPC-B

-10 10in

Formation From RD4 to F4

Formation From F4 to RD2

EMS Tool Center 2 (ETC2_PPC1)PPC-B

10 -10in

Radius 4 (CRD4_PPC1) PPC-B

-10 10in

Page 24: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

Description: PPC_Caliper_Formation Format: Log ( PPC_Caliper_Formation ) Index Scale: 5 in per 100 ft Index Unit: ft Index Type: Measured Depth Creation Date: 06-Nov-2018 09:02:43

CableTension(TENS)

5000 0lbf

IHV - Integrated Hole Volume every 10.00 (ft3)

IHV - Integrated Hole Volume every 100.00 (ft3)

ICV - Integrated Cement Volume every 10.00 (ft3)

ICV - Integrated Cement Volume every 100.00 (ft3)

TIME_1900 - Time Marked every 60.00 (s)

PPC-B

5 15in

Enhanced Hole Diameter 2(ellipse-based algorithm)(EHD2_PPC1) PPC-B

5 15in

Enhanced Hole Diameter 1(ellipse-based algorithm)(EHD1_PPC1) PPC-B

5 15in

-10 10in

Radius 1 (CRD1_PPC1) PPC-B

10 -10in

-10 10in

Radius 2 (CRD2_PPC1) PPC-B

10 -10in

One: Parameters

Barite Mud Presence FlagISSBAR Borehole No

Borehole Status (Open or Cased Hole)BHS Borehole Open

Bit SizeBS WLSESSION 11 in

Casing Bottom (Logger)CBLO WLSESSION 7515 ft

Cement DensityCDEN SGT-N 2 g/cm3

Casing Outer Diameter - Zoned along driller depthsCSODDRL WLSESSION 7 in

Drilling Fluid DensityDFD Borehole 9.9 lbm/gal

Generalized Caliper Selection for WL Log Down PassesGCSE_DOWN_PASS Borehole BS(RT)

Generalized Caliper Selection for WL Log Up PassesGCSE_UP_PASS Borehole BS(RT)

One: Parameters

Toolstring Maximum Logging SpeedMAX_LOG_SPEED WLSESSION 3600 ft/h

Page 25: Sesnon Fee 7 RD2 · 11/3/2018  · 1. Header 2. Disclaimer 3. Contents 4. Well Sketch 5. Borehole Size/Casing/Tubing Record 6. Remarks and Equipment Summary 7. One 7.1 Integration

Company: Southern California Gas Company

Well: Sesnon Fee 7 RD2

Field: Aliso Canyon

County: Los Angeles

State: California

FOUR ARM POWER CALIPER

GAMMA RAY LOG