e-GP: The Rationale for indonesia
A Country Presentation on the policy considerations
in the decision to implemente
-GP
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 2/13
A presentation by:
Bima Haria Wibisana Deputy Chairman for Monitoring, Evaluation and Information Systems Development
National Public Procurement AgencyThe Republic of Indonesia
LKPP National Public Procurement Agency (NPPA)
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 3/13
BACKGROUND
THE MACROENVIRONMENT
• Hardest hit by the 1997 Asian Crisis, the catastrophiceconomic slump precipitated regime change in Indonesiaby 1998;
• The 1998 Reform Movement: End corruption, collusion,and nepotism and ensure that development is equitable
all throughout the archipelago;
• Shift of power: from the Executive to the Parliament;
• Lesser Centralized Control: Decentralization.
LKPP National Public Procurement Agency (NPPA)
Crredible Procurement for National Prosperity 3
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 4/13
SENSE OF URGENCY
DRIVERS FOR REFORMS
• Economic Resources are in the hands of the elite• Corrupt Patron-Client relations
• Disenfranchised Local Governments: Separatist
movements
• In this environment, consciousness for good governance
and effective public procurement grew as well as theurgency to decentralize and build capacity at the
outlying regional governments
LKPP National Public Procurement Agency (NPPA)
Crredible Procurement for National Prosperity 4
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 5/13
BROAD-BASED ACTION
• Fight high cost economy due to corruption and spreadwealth to the outlying regions
› Sets agenda for the establishment of a procurementagency;
› KPK (Anti Corruption Commission) was established in2002.
• The Strategy: Preventive and curative; and the inclusionof procurement in developing e-Gov Systems
› Procurement as part of the e-Gov strategic plan;
› All authorities across the archipelago to beempowered.
INNOVATIVE STRATEGIES
LKPP National Public Procurement Agency (NPPA)
Crredible Procurement for National Prosperity 5
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 6/13
• Proliferation of existing public procurements
standards
• ICT Insfrastructure – Geographic spread of the nation (17,000 islands spanning more
than 5,000 kilometers)
– Telecomunication and communication accessbility, internet
penetration, telecommunication access mostly in Western Indonesia
• Lack of procurement specialist capacity
• Lack of vendors’ capacity
• Lack of public awarness
LKPP National Public Procurement Agency (NPPA)
Crredible Procurement for National Prosperity 6
OBSTACLES
Major Hurdles
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 7/13
CLEARING HURDLES
• Establishment of a dedicated and empowered procurementagency – the NPPA (2007)
• Electronic transactions Law and Cyber Law (2008) aimed
at creating public trust in embracing e-commerce and
therefore the utilization of e-procurement systems
• Interagency coordination and clarifying lines ofauthorities according to mandate of establishment
• e-GP systems development for nation-wide implementation
• Massive procurement training
• Continued political commitment
CONSOLIDATION EFFORTS
LKPP National Public Procurement Agency (NPPA)
Crredible Procurement for National Prosperity 7
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 8/13
• Keppres (Presidential Decree) 80/2003-initialregulation governing national publicprocurement, amended seven times andeventually became Perpres (PresidentialRegulation) 54/2010
• Since 2005, procurement practioners have tohold National Procurement Certification
• Perpres 54/2010 to govern national publicprocurement
– Substantially complements Keppres 80/2003
– Introduction of independent procurementunits (ULPs) to process procurementactivities of national/regional budgetusers.
REGULATORY FRAMEWORKSPOLICY RESPONSES
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 9/13
• The will put binding legal powers that compell all
stakeholders and procurement entities to follow a
harmonized national procurement system and regulatory
standard, to which the NPPA is at the forefront.
• E-gp related provisions within the draft procurement
law
• A chapter is dedicated to e-GP
• That all levels of government (central and regional) are
responsible for utilizing e-GP as part of public service
delivery
• States that there is an executing agency (NPPA) responsible toimplement, regulate and consolidate national e-GP architecture
DRAFT PROCUREMENT LAWe-GP EMPOWERMENT
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 10/13
Implementation Target & Plan
Activities
Infrastructure readiness
Organizational development
Helpdesk and training
3. Roll out and service expantion
4. Service improvement
1. Systems Development
Infrastructure advancement
Organizational growth
Help desk and training
Systems and service certification
2007 2008 2009 2010 2011 2012 2013 2014
2. Piloting e-tendering
e-Proc commencement
5. Implementation of e-purchasing
Piloting e-purchasing
Intensification of e-purchasing
e-purchasing
560-600 LPSEs
Inpres 5
V 3.0; e-purchasing., inaproc, dllV 2.0
CA/PKI
e-audit, dll
LKPP National Public Procurement Agency (NPPA)
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 11/13
LKPP National Public Procurement Agency (NPPA)
Implementation Progress
Crredible Procurement for National Prosperity 11
8/3/2019 Session 3 Indonesia Bima Haria Wibisana Final 221111
http://slidepdf.com/reader/full/session-3-indonesia-bima-haria-wibisana-final-221111 12/13
• The Indonesian experience shows the importance of
gaining the mandate and maintaining the momentum toimplement reforms
• Highlights the interrelationship between politics,
institutions, and policy in the strategic
environment
• Agenda setting to adopt technology nation-wide incosideration of the risks, costs, and potential
rewards.
• Mainstreaming is key.
LESSONS LEARNT
VALUABLE EXPERIENCES
LKPP National Public Procurement Agency (NPPA)
Crredible Procurement for National Prosperity 12