2013 SGS Study: Survey of Transmission Reliability Measures and Practices d
Contact
Name:FALSE
System
Name:
1. Transmission Reliability Performance Indicators Used by Your Company
Measures based on Circuit and Line Outages:
Circuit Average Outage Frequency Measures (Examples: TADS: TOF;
NERC ALR6-11 – ALR 6-13)FALSE
Length Normalized Outage Frequency Measures (Examples: FOHMY;
TADS: TCOF)FALSE
Outage Duration Measures (Examples: SARI; TADS: SODT, MTTR,
MdTTR)FALSE
Availability Measures (Examples: ASAI%; TADS: APC%, NERC ALR6-15
– ALR 6-16)FALSE
Other ALR Measures FALSE
Other TADS Measures (Examples: PCZero, MTBF, TMCOF) FALSE
Other Measures (please identify in remarks column) FALSE
Customer Impact from Transmission Outages
Transmission SAIFI and/or MAIFI (or contribution to distribution
SAIFI/MAIFI) FALSE
Transmission SAIDI and/or CAIDI (or contribution to distribution
SAIDI/CAIDI)FALSE
Other customer-based measures (please identify in remarks column) FALSE
Delivery Point Impact from Transmission Outages
Delivery Point SAIFI and/or MAIFI FALSE
Delivery Point SAIDI and/or CAIDI FALSE
Other Delivery Point measures (please identify in remarks column) FALSE
2. Load and Generation Loss
MW Affected (ASIFI) FALSE
Please do N
Please Com
Not Used or N/A
Not Used or N/A
Not Used or N/A
Not Used or N/A
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 2/21
MWh Lost (ASIDI) FALSE
Other (please identify in remarks column) FALSE
Generation Loss FALSE
3. What is your system's definition for a "Delivery Point"
High Side of a Transformer FALSE
Low Side of a Transformer FALSE
Variable; an ownership boundary FALSE
Distribution Bus or Feeder Breaker FALSE
We do not collect any delivery point interruption data (please add "why" in
remarks column J)FALSE
4. Delivery Point Impact from Transmission Outages
If you do not utilize or report load loss measures, does your system
consistently collect actual metered load loss (MW, MWh) and can data be
associated with transmission circuit or station outages?
FALSE
Do you record Delivery Point outages caused by station equipment (not
from a line outage) in the same general format as line outages?FALSE
5. Miscellaneous Questions
If your system has a formal process to exclude Major Event Days from
t ransmiss ion performance measures, which method is used:
Six Sigma FALSE
IEEE 1366 Beta Method FALSE
Named Storm/Hurricane FALSE
Other (please specify) FALSE
Can your system identify cable failures for circuits with mixed underground
and overhead construction and report them as a DISTINCT cause code?FALSE
Does your system use consistent component-level sub-causes or codes for
outage causes (e.g., "Line Failure" with sub-causes of structure, conductor,
insulator, shield wire, grounding, etc)?
FALSE
Does your system have interest in component-level sub-causes for
benchmarking or circuit-level analysis?FALSE
Does your system use Transmission Reliability Performance measures for
incentive compensation? If so, which ones (add in remarks)?FALSE
YES
YES
YES
YES
YES
YES
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 3/21
Does your system attempt to quantify the cost (to customers or total
economic losses) of automatic outages?FALSE
6. Station Equipment Data and Benchmarking
Does your system collect data for station outages in a similar format to line
outages (e.g., station ID, equipment type, date/time of event, cause code)?FALSE
What types of station equipment are outage/failure records maintained?FALSE
If you collect station equipment outage records, do they include informationindicating a failure of the equipment itself (i.e., "element initiated", not a
dependent mode outage)?
FALSE
Does your system have a high level of interest in Substation and Station
Equipment benchmarking?FALSE
7. Transmiss ion Benchmarking Forums. Please check current participation:
SGS Transmission Reliability Benchmarking Study FALSE
North American Transmission Forum FALSE
First Quartile Consulting T&D Benchmarking FALSE
Electric Utility Cost Group - Transmission FALSE
International Transmission Operations & Maintenance Study (ITOMS)
(UMS Group)FALSE
Southern Company Transmission Benchmarking (SCTBM) FALSE
Canadian Electricity Association (CEA) (COPE, BES, ERIS, etc) FALSE
Other (specify in remarks) FALSE
YES
YES
YES
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 4/21
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 5/21
FALSE
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 6/21
e f g h i
FALSE FALSE FALSE FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
T edit worksheet; only use check boxes, radio buttons and remarks colu
plete and Return to SGS by August 24, 2012 at: [email protected]
Internal/DeptUse
ExecutiveReporting
Internal/DeptUse
ExecutiveReporting
Internal/DeptUse
ExecutiveReporting
Internal/DeptUse
ExecutiveReporting
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 7/21
FALSE FALSE
FALSE FALSE
FALSE FALSE
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 8/21
FALSE FALSE FALSE
FALSE FALSE FALSE
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 9/21
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 10/21
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 11/21
j
j
Remarks Column J ONLY
Remarks Column J ONLY
Remarks Column J ONLY
Remarks Column J ONLY
mn J
om
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 12/21
Remarks Column J ONLY
Remarks Column J ONLY
Remarks Column J ONLY
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 13/21
Remarks Column J ONLY
Remarks Column J ONLY
Remarks Column J ONLY
Remarks Column J ONLY
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 14/21
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 15/21
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 16/21
- select your system name (PULL
Arizona Public Service
American Transmission Co.
Dominion Virginia Power
Duke Energy
Entergy Services Inc.
Exelon Corp.
First Energy
Florida Power & Light
Georgia Transmission Corporatio
Great River Energy
Hydro One Networks
ITC Holdings Corp.
Long Island Power Authority
National Grid USA
Nebraska Public Power District
Northeast Utilities
NorthWestern Energy
Oncor Electric Delivery
Pacific Gas & Electric
Progress Energy
Southern Company
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 17/21
Salt River Project
Tucson Electric Power
Tennessee Valley Authority
Xcel Energy
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 18/21
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 19/21
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 20/21
7/28/2019 Sgs Performance Measurement Survey
http://slidepdf.com/reader/full/sgs-performance-measurement-survey 21/21
DOWN)