Page 1: Shai ben haroosh selected projects

Shai Ben Haroosh’s profileEmail: [email protected]

2013

Page 2: Shai ben haroosh selected projects

2

About me:

- 34 years old.

- Current position: Senior Project Manger

- Education:

Btec. Industrial Engineering

Btec. Technology Engineering

- Experience:

Project manager in the telecom field

Project manager in the homeland security field

Region Manager in Thailand, Africa and the Caribbean

Senior project manager in Teva pharmaceutical

Shai Benharoosh

Page 3: Shai ben haroosh selected projects

3 Highlight projects – Barbados Coast guard

IAI (Elta) project - 4 Coast radar stations connected to control hub to protect Barbados sea borders.

Radar station included:

36 mw tower Auto lift for radar

for hurricane protection

Hurricane shelter Electronic &

servers cabinet Essential

infrastructures

Page 4: Shai ben haroosh selected projects

4

Manufacturer: Mecalux (Barcelona)Storage places: 6.552 pallets Max weight of pallet: 1.030KgBudget: 15M$

Height: 27 m. Width: 20 mLength: 78 m Floors: 15

Highlight projects – Kfar Saba Auto Warehouse

4 CranesCrane speed: 180 m/min

127 units ConveyorsConveyor speed: 20 m/minTotal length of the conveyors: 240 m

4 entrance conveyors, 4 exit conveyors.Time to take out pallet: 1 - 3 minCapacity 120 pallet in / 120 pallet out per hour

Page 5: Shai ben haroosh selected projects

5 Highlight projects - Jerusalem Warehouse

1350 pallets at equilibration

conditions: 300C/65% humidity

1000 pallets at RT conditions

4-5 ‘production days’

Stacker crane technology

4500 m³ floor (basement, warehouse

floor, 2 floors for future operation)

Future underground infrastructure

tunnel

Technical rooftop for HVAC machine

and elec. equipment

Budget 10M$

Page 6: Shai ben haroosh selected projects

6

• 630 m³ of water for fire protection

• Fire protection pumps and distribution

system

• Additional 2 transformations of

2000KVA each

• High voltage electricity boards

• Low voltage electricity boards

• Emergency 2000KVA generator

• 2 out of 4 chilled water machine and

distribution system.

• PW manufacturing and distribution

system

• LWS manufacturing and distribution

system

Energy center

• LWS steam heat exchange

generator manufacturing and

distribution system for humidity

• CAS manufacturing and

distribution system

• Budget – 10M$

Page 7: Shai ben haroosh selected projects

7

Cellular sites & networks (2G, 3G) in Israel, Thailand, Mozambique

Communication project in Cameroon Buildings Maintenance & Constructions - Main building Stability rooms Offices floors Shelter Building reconstruction Security Fence Peripheral road Potent sampling room Underground infrastructure tunnels. Safety projects 21 CFRP 11 Validation New Dining room

Other Projects - Miscellaneous