sheet no - 11000 wide weir opening 148.19 147.99 fsl of clf 350 147.84 147.84 Ø 50000 drain to...
TRANSCRIPT
SHEET NO - 1
8500
7300
6100
4900
3700
2500
148.78
148.78B A C INLET CHAMBER1200MM WIDE (MIN.)
OUTLET CHAMBER1200MM WIDE (MIN.)
INLET PIPE TOAERATIONFOUNTAIN
A150.00
149.70
147.32 147.46 147.46142.80
142.80 143.99
A
149.40
149.10
148.80
148.50
148.78
147.74
147.73
B 2500 2822 2500
ELEVATED U/SCHANNEL 900 WIDE
ELEVATED D/SCHANNEL 900 WIDE 1200 2600 1200
PARSHALL FLUME FLASH MIXER148.78
1200MM WIDEWALKWAY
BYPASS CHANNEL900 WIDE INLET PIPE TO
CLARIFOCCULATOR1100 MM Ø
C
B
150.00
149.70
149.40
149.10
148.80
148.50148.78148.48
148.47
147.73
148.78
A
MOTOR &GEAR BOX
148.46
147.32 147.32
148.02 148.01
147.46148.00 148.00
148.50148.50
147.55 147.55
GL 1100 GL
INLET CHAMBER
1300
RAW WATERINLET PIPE
143.55
142.80
OPENING OF1800 x 750 MMDUCK FOOT
BEND SECTION A-A
OUTLET CHAMBER143.99
1322 600 900
225 75
SECTIONAL ELEVATION AT D-D
148.50148.78
148.47
148.78
147.73
148.78
148.46148.01
147.46147.32
147.32
DETAIL AT - B SECTION B-BSECTION C-C
D D
831 300 600
1350
DIMENSION DETAILS OF PARSHALL FLUME AT - A
GENERAL NOTES:-THESE ARE SOFTWARE GENERATED HYDRAULIC AND PROCESS1.DRAWINGS.RL'S AND INTERNAL SIZES ARE MANDATORY. FOR WALL THICKNESS AND2.OTHER DETAILS PLEASE REFER WORKING DRAWINGS.ALL DIMENTIONS ARE IN MM, LEVELS AND CO-ORDINATES ARE IN METERS3.UNLESS OTHERWISE NOTED.DO NOT SCALE THE DRAWINGS PLEASE REFER TO WRITTEN DIMENTION4.ONLY.VALES, PIPES, PUMPS, BLOWERS, MOTORS, ETC. SHALL BE OF STANDARD5.MAKE AS PER TENDER SPECIFICATION.ADMIN BUILDING LAYOUT TO BE INCORPORATE AS PER REQUIREMENT6.WITH FILTER BED IN WORKING DRAWINGS.ALL CHANNELS ARE TO BE CORVED WITH PRECAST SLAB.7.RAILING, LIGHTING ARRESTOR AND HIDDEN DETAILS ARE AS PER UNIT8.WHEREVER APPLICABLE.LENGTH OF PIPELINE TO BE TAKEN AS PER SITE LAYOUT AND WORKING9.DRAWINGS.SYMBOLS USE IN DRAWINGS:-10.
SR. NO. SYMBOL INDICATE
1. RL IN PLAN VIEW
2. RL IN SECTION VIEW
3. WATER LEVEL
4. WATER FLOW DIRECTION
11. LEGEND:-
EL - ELEVATED LEVEL
WW-V1 - WASHWATER ISOLATION TANK VALVE
WW-V2 - WASHWATER INLET VALVE
PW-V1 - WASHWATER INLET VALVE
WW-V2 - PUREWATER OUTLET VALVE
PW-V2 - PUREWATER SUMP INLET VALVE
D-V1 - DRAIN VALVE
D-V2 - WASHWATER DISPOSAL VALVE
S-V1 - SLUICE VALVE
CHIEF ENGINEER SUPERINTENDANT ENGINEER
EXECUTIVE ENGINEER DEPUTY ENGINEER
PROOF CONSULTANT CONSULTANT
- - - -
- - - -
- - - -
- - - -
- - - -
DATE DESCRIPTION REVISION NO. ENGINEER
TITLEDETAILS OF 5 STEP AERATION FOUNTAIN,PARSHALL
FLUME,FLASH MIXER FOR 40 MLD WTP
PROJECT 40MLD WTP Project by iNODE WTP Software
OWNER iNODE SOFTWARE CO. • Pune Branch • Office 508 • Nyati Emporius Near The Orchid Hotel • Baner •
Pune • India
CLIENTiNODE SOFTWARE CO.
PMCiNODE SOFTWARE CO.
CONSULTANT iNODE SOFTWARE CO.
DWG. NO: 7001-01-GA-40WTP-01
148.46
SHEET NO - 250000
15000
COLLECTIONLAUNDER
ROTATING BRIDGEWITH SCRAPER
(SHOWN INDICATIVE ONLY)
COLLECTIONLAUNDER
WALKWAY
MOTOR &GEAR BOX
148.5 148.5 148.5148.49 148.49 148.49 148.49 148.49
148 148
147.99147.99
147.99 147.99 147.99147.97
147147.02
GL0 0.15
0
F G
H
K
GL0
142.8
CLARIFIER ZONE CLARIFIER ZONE
144.49 144.49
PRECAST SLAB/STEP
144.99 OPENING OPENING 144.99OPENING 1800 x 1200 x 750 MM
143.99
143.49 800 800 143.49142.97 142.97
600
600
SLUDGEDRAIN PIPE150 DIA
SLUICE VALVE150 Ø
1300
142.47
142.32
J1100
CENTRAL WELL
1100 Ø C.I. INLET PIPE TO CLF
SLUDGEDRAIN ARRANGEMENT
OF 1500 Ø
SECTION A-A
50000
148.49
600 MM STEPPLACED 1500 MM C/C
541 148.19
SETTLED WATERCOLLECTION CHANNEL
1000 WIDE
WEIR OPENING
148.19147.99
FSL OF CLF
350
147.84 147.84
Ø 50000
DRAIN TO FINAL DISPOSAL
SLUDGEDRAIN ARRANGEMENT
OF 1500 Ø
OPENING541 x 350(5NOS)
1100Ø C.I. INLETPIPE TO CLF
HAND RAILING
STUB COLUMNS 72 NOS.(MAX. WIDTH 200 EACH)
DETAIL OF PORTIN CENTRAL SHAFT
(5NOS)
15000DETAIL AT -H
RCC COLUMNS TYPICAL OPENING541 x 350(5NOS)
Ø 15000
ELECTRICALCONDUIT
63 ØPVC PIPE
OPENING541 x 350(5NOS)
A A
1100 ROTATING BRIDGEWITH SCRAPER
(SHOWN INDICATIVE ONLY)
PLAN OF OPENINGAT R.L. 147.84
FLOCCULATION ZONE
148.5 148.5
148 147.55 147.5 148
FLASH MIXER
DETAIL AT -F
CLARIFIER100 147.99
147.92200
OPENING
400 400 400 400
DETAILS OF OPENING IN CLARIFIER WALL
144.49 144.49
ELECTRICAL CONDUIT63 mm Ø PVC PIPE
CENTRALWELL 600 Ø
800 1100 800143.49 DRAIN PIT 143.49
142.97 142.97
600
600
1300
SLUDGEDRAIN PIPE
150 DIA
1100 Ø C.I. INLETPIPE TO CLF
DETALS AT - JPRECASTSTEPS
148.49 148.49PRECAST
STEPS
147.99 147.99FSL OF CLF FSL OF CLF
147.99 147.99147.92 147.92147.99 147.97
147.02 147
500 500
COLLECTIONLAUNDER OF
CLARIFLOCCULATORAT START
COLLECTIONLAUNDER OF
CLARIFLOCCULATORAT END
DETAIL AT -G DETAIL AT -K
148.49
COLLECTIONLAUNDER
147.97 148.12 CHANNEL147.96
147146.48
SECTION X-X
COLUMN450 WIDE
FLOCCULATOR COLUMN450 WIDE144.49 144.49
OPENING 2720 WIDE OPENING 2720 WIDE
BASE SLAB
450 2720 450 2720 450
DETAILS OF OPENING FLOCCULATOR WALL @ BOTTOM
X
X
WIDE BYPASS CHANNEL
PLAN OF CLARIFLOCCULATOR
GENERAL NOTES:-THESE ARE SOFTWARE GENERATED HYDRAULIC AND PROCESS1.DRAWINGS.RL'S AND INTERNAL SIZES ARE MANDATORY. FOR WALL THICKNESS AND2.OTHER DETAILS PLEASE REFER WORKING DRAWINGS.ALL DIMENTIONS ARE IN MM, LEVELS AND CO-ORDINATES ARE IN METERS3.UNLESS OTHERWISE NOTED.DO NOT SCALE THE DRAWINGS PLEASE REFER TO WRITTEN DIMENTION4.ONLY.VALES, PIPES, PUMPS, BLOWERS, MOTORS, ETC. SHALL BE OF STANDARD5.MAKE AS PER TENDER SPECIFICATION.ADMIN BUILDING LAYOUT TO BE INCORPORATE AS PER REQUIREMENT6.WITH FILTER BED IN WORKING DRAWINGS.ALL CHANNELS ARE TO BE CORVED WITH PRECAST SLAB.7.RAILING, LIGHTING ARRESTOR AND HIDDEN DETAILS ARE AS PER UNIT8.WHEREVER APPLICABLE.LENGTH OF PIPELINE TO BE TAKEN AS PER SITE LAYOUT AND WORKING9.DRAWINGS.SYMBOLS USE IN DRAWINGS:-10.
SR. NO. SYMBOL INDICATE
1. RL IN PLAN VIEW
2. RL IN SECTION VIEW
3. WATER LEVEL
4. WATER FLOW DIRECTION
11. LEGEND:-
EL - ELEVATED LEVEL
WW-V1 - WASHWATER ISOLATION TANK VALVE
WW-V2 - WASHWATER INLET VALVE
PW-V1 - WASHWATER INLET VALVE
WW-V2 - PUREWATER OUTLET VALVE
PW-V2 - PUREWATER SUMP INLET VALVE
D-V1 - DRAIN VALVE
D-V2 - WASHWATER DISPOSAL VALVE
S-V1 - SLUICE VALVE
CHIEF ENGINEER SUPERINTENDANT ENGINEER
EXECUTIVE ENGINEER DEPUTY ENGINEER
PROOF CONSULTANT CONSULTANT
- - - -
- - - -
- - - -
- - - -
- - - -
DATE DESCRIPTION REVISION NO. ENGINEER
TITLE DETAILS OF CLARIFLOCCULATOR FOR 40 MLD WTP
PROJECT 40MLD WTP Project by iNODE WTP Software
OWNER iNODE SOFTWARE CO. • Pune Branch • Office 508 • Nyati Emporius Near The Orchid Hotel • Baner •
Pune • India
CLIENTiNODE SOFTWARE CO.
PMCiNODE SOFTWARE CO.
CONSULTANT iNODE SOFTWARE CO.
DWG. NO: 7001-01-GA-40WTP-02
SHEET NO - 3
C C3500 MIN 3250 500 3250 3250 500 3250 3250 500 3250 3250 500 3250
1200 CHAMBER CHAMBER1200 B 1200 CHAMBER CHAMBER 1200 B 1200 CHAMBER
D-V2 D-V2 D-V2 D-V2
1200
1200
1200
1200
1200LATERALS 50 MM Ø
150 NOS/UNIT(PVC 8 KG/CM2)
1175 1175 1175 1175LATERALS 50 MM Ø
150 NOS/UNIT(PVC 8 KG/CM2)
1175 1175 1175 1175DOOR
D D D DELECTRICAL ROOM
&PANEL ROOM
RAPID SANDFILTER
RAPIDSAND
FILTER
RAPID SANDFILTER
RAPIDSAND
FILTER900 500 900 500
A
8500
146.46 146.46 146.46 146.46 146.46 146.46
A
PAN
EL
WA
SH W
AT
ER
GU
TT
ER
WA
SH W
AT
ER
GU
TT
ER
DR
AIN
WA
TE
R P
IPE
GL + 0.6
PW-V1 PW-V1 PW-V1 PW-V1 DRAINPIT PW-V1 PW-V1 PW-V1 PW-V1 DRAIN
PITAIR BLOWER
1200 1200 1200 120012
00
1200
1200
1200RATE
CONTROLCHAMBER
RATECONTROLCHAMBER
RATECONTROLCHAMBER
RATECONTROLCHAMBERMOTOR FOR
BLOWER (M3) WW-V2 WW-V2 WW-V2 WW-V2 WW-V2 WW-V2 WW-V2 WW-V2WW-V11200
144.46 1200 144.46 1200144.46 1200 144.46
D-V1
PUR
E W
AT
ER
PIP
E
GL + 0.45
PUMP ROOM
600
600
600
600
INSPECTIONCHAMBER
INSPECTIONCHAMBER
INSPECTIONCHAMBER
INSPECTIONCHAMBER
WASH WATER SUMP
Var
ies
F P1
P1
144.46F
F
C C
144.96 PURE WATER CHANNEL 144.96 PURE WATER CHANNEL
CHAMBER
600
144.46
B BINSPECTIONCHAMBER
INSPECTIONCHAMBER
INSPECTIONCHAMBER
INSPECTIONCHAMBER
600
600
600
600
1200 1200 1200 1200144.46 144.46 144.46 144.46
WW-V1D-V1
WW-V2 WW-V2 WW-V2 WW-V2 WW-V2 WW-V2 WW-V2 WW-V2MOTOR FORBLOWER (M3)
1200
1200
1200
1200
RATECONTROLCHAMBER
RATECONTROLCHAMBER
RATECONTROLCHAMBER
RATECONTROLCHAMBER
1200 1200 1200 1200
AIR BLOWER
PW-V1 PW-V1 PW-V1 PW-V1 PW-V1 PW-V1 PW-V1 PW-V1 DRAINPIT
Var
ies
GL + 0.6
146.46 146.46 146.46 146.46 146.46 146.46
WA
SH W
AT
ER
GU
TT
ER
WA
SH W
AT
ER
GU
TT
ER
PAN
EL
DR
AIN
WA
TE
R P
IPE
8500
900
500
900
500
RAPID SANDFILTER
RAPIDSAND
FILTER
RAPID SANDFILTER
RAPIDSAND
FILTER
PANEL ROOM&
ELECTRICAL ROOM
D D D D
DOOR LATERALS 50 MM Ø150 NOS/UNIT
(PVC 8 KG/CM2)
1175 1175 1175 1175LATERALS 50 MM Ø
150 NOS/UNIT(PVC 8 KG/CM2)
1175 1175 1175 1175
1200
1200
1200
1200
1200
D-V2 D-V2 D-V2 D-V2
1200CHAMBER CHAMBER
1200 1200 CHAMBER CHAMBER1200 1200 CHAMBER
LAYOUT PLAN OF RAPID SAND FILTER AT BELOW CROSS TROUGH(BACK WASHING PROCESS FROM OVERHEAD BACK WASH TANK PIPE TO WATER FOR RECYCLING)
149.06 149.06 149.06
147.46 147.46
GL + 0.6GL
. 147.19 147.09 147.19GL
.
CROSS TROUGH146.76
CROSS TROUGH CROSS TROUGH500 500146.76
CROSS TROUGH
146.46 146.46
SAND 145.86 SAND SAND 145.86 SAND
GRAVELS 145.36 GRAVELS GRAVELS GRAVELS 145.36
144.46 144.463500 MIN
MANIFOLD PIPEØ 800 MM
MANIFOLD PIPEØ 800 MM900 900 900 900DETAIL-D
SECTION A-A
DETAIL-A
WW-V2 PW-V1 149.06 149.06147.96
146.48147.46
WALKWAY PURE WATER CHANNEL147.19
GL.
146.76 146.76 146.76
146.45144.96
144.46 144.46 144.46
WASH WATEROUTLET CHAMBER
SECTION B-BDEPTH OF SAND AND GRAVELS
SrNo
PARAMETER UNIT SELECTEDCRITERIA RECOMMEDATION
FOR SAND1 DEPTH OF SAND m 0.6 0.60 TO 0.75 m
2 EFFECTIVE SIZE OF SAND (D60) mm 0.75 0.75 to 0.900 mm
3 EFFECTIVE SIZE OF SAND (D10) mm 0.6 0.45 to 0.7 mm
FOR GRAVELS1 DEPTH OF GRAVELS mm 500 500 mm
GRAVELS DEPTH RANGE
SrNo
RANGE IN SIZE(mm)
RANGE IN DEPTH(mm)
DEPTH TO BEPROVIDED (mm)
1 2 TO 5 50 TO 80 70
2 5 TO 12 50 TO 80 50
3 12 TO 20 80 TO 130 100
4 20 TO 38 80 TO 130 120
5 38 TO 65 130 TO 200 160
GENERAL NOTES:-THESE ARE SOFTWARE GENERATED HYDRAULIC AND PROCESS DRAWINGS.1.RL'S AND INTERNAL SIZES ARE MANDATORY. FOR WALL THICKNESS AND2.OTHER DETAILS PLEASE REFER WORKING DRAWINGS.ALL DIMENTIONS ARE IN MM, LEVELS AND CO-ORDINATES ARE IN METERS3.UNLESS OTHERWISE NOTED.DO NOT SCALE THE DRAWINGS PLEASE REFER TO WRITTEN DIMENTION4.ONLY.VALES, PIPES, PUMPS, BLOWERS, MOTORS, ETC. SHALL BE OF STANDARD5.MAKE AS PER TENDER SPECIFICATION.ADMIN BUILDING LAYOUT TO BE INCORPORATE AS PER REQUIREMENT6.WITH FILTER BED IN WORKING DRAWINGS.ALL CHANNELS ARE TO BE CORVED WITH PRECAST SLAB.7.RAILING, LIGHTING ARRESTOR AND HIDDEN DETAILS ARE AS PER UNIT8.WHEREVER APPLICABLE.LENGTH OF PIPELINE TO BE TAKEN AS PER SITE LAYOUT AND WORKING9.DRAWINGS.SYMBOLS USE IN DRAWINGS:-10.
SR. NO. SYMBOL INDICATE
1. RL IN PLAN VIEW
2. RL IN SECTION VIEW
3. WATER LEVEL
4. WATER FLOW DIRECTION
11. legend:-
EL - ELEVATED LEVEL
WW-V1 - WASHWATER ISOLATION TANK VALVE
WW-V2 - WASHWATER INLET VALVE
PW-V1 - WASHWATER INLET VALVE
WW-V2 - PUREWATER OUTLET VALVE
PW-V2 - PUREWATER SUMP INLET VALVE
D-V1 - DRAIN VALVE
D-V2 - WASHWATER DISPOSAL VALVE
S-V1 - SLUICE VALVE
CHIEF ENGINEER SUPERINTENDANT ENGINEER
EXECUTIVE ENGINEER DEPUTY ENGINEER
PROOF CONSULTANT CONSULTANT
- - - -
- - - -
- - - -
- - - -
- - - -
DATE DESCRIPTION REVISION NO. ENGINEER
TITLELAYOUT PLAN AND DETAILS OF RAPID SAND FILTERFOR 40 MLD WTP
PROJECT 40MLD WTP Project by iNODE WTP Software
OWNER iNODE SOFTWARE CO. • Pune Branch • Office 508 • Nyati Emporius Near The Orchid Hotel • Baner •Pune • India
CLIENTiNODE SOFTWARE CO.
PMCiNODE SOFTWARE CO.
CONSULTANT iNODE SOFTWARE CO.
DWG. NO: 7001-01-GA-40WTP-03
SHEET NO - 07
INLET INLET
PW-V2 PW-V2
HAND RAILING
SUMP INLET PIPE SUMP INLET PIPE
Ø 30000
LADDER CUTOUT
SLOPE SLOPE
LADDERROLLING SHUTTER
MIN. 3000
W W
A A A A
3000
0
0.5
- 0.
75 T
IME
S T
O D
IA O
F SU
MP
3000
0
AS
PER
PU
MP
DE
TA
ILS
OUTLET
SUCTION PIPE CUTOUT OUTLET
OUTLET
W W
SLOPESLOPE
W W
AS PER PUMP DETAILS
1000MIN
PLAN OF PURE WATER SUMP PLAN OF PUMP HOUSE153.64
152.14
PUMP HOUSE
RCC GIRDER
6030
HAND RAILING
PUMP147.61
GL
SUMP INLET PIPE146.08
SUMPSUCTION PIPE
4530
M
SUCTION PIT143.08SLOPE SLOPE
142.58 RCC RAFT PCC
30000
SECTION A-A
SUCTION PIPE
MIN 1000143.08
500
MIN
142.58
DETAIL - M
WALL THK/2
CONCRETEWALL
SIZ
E
ELEVATION
D Ø × 8 THKPLATE
TYPICAL INLET PIPE
VENT PIPE 'A' NBWITH BEND
INSECTSCREEN
'F'
RO
OF
SLA
BT
HK
.
WA
LL
TH
K /
2
'C' SQ. 8 THK PLATEIS:2062 Gr.-A INSIDE FACE
OF TANK
DETAIL FOR VENT PIPE
NOTE:-
1. PUMPHOUSE SIZES SHALL BE CHANGE ACCORDING TO PUMPNUMBERS AND DETAILS.2. MINIMUM 4 NUMBERS OF VENT PIPES SHALL BE PROVIDE FORTHE PROPER VENTILATION PURPOSE.
GENERAL NOTES:-THESE ARE SOFTWARE GENERATED HYDRAULIC AND PROCESS1.DRAWINGS.RL'S AND INTERNAL SIZES ARE MANDATORY. FOR WALL THICKNESS AND2.OTHER DETAILS PLEASE REFER WORKING DRAWINGS.ALL DIMENTIONS ARE IN MM, LEVELS AND CO-ORDINATES ARE IN METERS3.UNLESS OTHERWISE NOTED.DO NOT SCALE THE DRAWINGS PLEASE REFER TO WRITTEN DIMENTION4.ONLY.VALES, PIPES, PUMPS, BLOWERS, MOTORS, ETC. SHALL BE OF STANDARD5.MAKE AS PER TENDER SPECIFICATION.ADMIN BUILDING LAYOUT TO BE INCORPORATE AS PER REQUIREMENT6.WITH FILTER BED IN WORKING DRAWINGS.ALL CHANNELS ARE TO BE CORVED WITH PRECAST SLAB.7.RAILING, LIGHTING ARRESTOR AND HIDDEN DETAILS ARE AS PER UNIT8.WHEREVER APPLICABLE.LENGTH OF PIPELINE TO BE TAKEN AS PER SITE LAYOUT AND WORKING9.DRAWINGS.SYMBOLS USE IN DRAWINGS:-10.
SR. NO. SYMBOL INDICATE
1. RL IN PLAN VIEW
2. RL IN SECTION VIEW
3. WATER LEVEL
4. WATER FLOW DIRECTION
11. LEGEND:-
EL - ELEVATED LEVEL
WW-V1 - WASHWATER ISOLATION TANK VALVE
WW-V2 - WASHWATER INLET VALVE
PW-V1 - WASHWATER INLET VALVE
WW-V2 - PUREWATER OUTLET VALVE
PW-V2 - PUREWATER SUMP INLET VALVE
D-V1 - DRAIN VALVE
D-V2 - WASHWATER DISPOSAL VALVE
S-V1 - SLUICE VALVE
CHIEF ENGINEER SUPERINTENDANT ENGINEER
EXECUTIVE ENGINEER DEPUTY ENGINEER
PROOF CONSULTANT CONSULTANT
- - - -
- - - -
- - - -
- - - -
- - - -
DATE DESCRIPTION REVISION NO. ENGINEER
TITLE CIRCULAR PURE WATER SUMP FOR 40 MLD WTP
PROJECT 40MLD WTP Project by iNODE WTP Software
OWNER iNODE SOFTWARE CO. • Pune Branch • Office 508 • Nyati Emporius Near The Orchid Hotel • Baner
• Pune • India
CLIENTiNODE SOFTWARE CO.
PMCiNODE SOFTWARE CO.
CONSULTANTiNODE SOFTWARE CO.
DWG. NO: 7001-01-GA-40WTP-07
SHEET NO - 11
MECHANICAL COMPONENT LIST
AREATION FOUNTAIN AND FLASH MIXER
Sr. No. LEGEND DESCRIPTION NUMBERS/LENGTH SIZE/CAPACITY
1 M1 MOTOR WITH GEAR 1 5 HP
2 G1 GATE-1 1 900 X 1450
3 G2 GATE-2 1 900 X 1450
4 - FLASH MIXER OUTLET PIPE 2.5 M 1100 MM
CLARIFLOCCULATOR
SR. NO. LEGEND DESCRIPTION NUMBERS/LENGTH SIZE/CAPACITY
1 M2 FLOCCULATOR MOTOR 2 1 HP
2 ROTATING BRIDGE WITH SCRAPPER 1 15
3 S-V1 SLUICE VALVE 1 150 MM
4 - SLUDGE DRAIN PIPE 12 M 150 MM
* NOTE : PIPE LENGTH WILL FINALIZE AS PER THE WORKING DRAWING.
FILTER BED
SR. NO. LEGEND DESCRIPTION NUMBERS/LENGTH SIZE/CAPACITY
1 FI-V FILTER INLET VALVE 6 400 MM
2 BP-V BYPASS VALVE 2 1200 MM
3 PW-V1 PUREWATER OUTLET VALVE 12 400 MM
4 WW-V1 WASHWATER ISOLATION TANK VALVE 2 800 MM
5 WW-V2 WASHWATER INLET VALVE 12 800 MM
6 D-V1 DRAIN VALVE 2 800 MM
7 D-V2 WASHWATER DISPOSAL VALVE 12 800 MM
8 P1 WASHWATER PUMP 1 22 HP
9 M3 MOTOR FOR BLOWER 3 1HP
10 AIR BLOWER 3 35 M3/MIN
11 - LATERALS 165 M 50 MM
12 - MANIFOLDS 51 M 800 MM
13 -PUREWATER PIPES CONNECTED TO
MANIFOLDS39 M 400 MM
14 - WASHWATER PIPES FOR WASHWATER TANK 10 M 150 MM
15 - WASHWATER PIPES FOR BACK WASHING 90 M 50 MM
16 - PUREWATER PIPE 15 M 1200 MM
* NOTE : PIPE LENGTH WILL FINALIZE AS PER THE WORKING DRAWING.
PUREWATER SUMP
SR. NO. LEGEND DESCRIPTION NUMBERS/LENGTH SIZE/CAPACITY
1 PW-V2 PUREWATER SUMP INLET VALVE 1 1200 MM
2 P2 PUREWATER PUMP 1 -
3 PH-C PUMPHOUSE CRANE 1 -
SUMMARY LIST
MOTORS
Sr. No. LEGEND NUMBERS CAPACITY
1 M1 1 5 HP
2 M2 2 5 HP
GATES
SR. NO. LEGEND NUMBERS CAPACITY
1 G1 1 900 X 1450
2 G2 1 900 X 1450
VALVES
SR. NO. LEGEND NUMBERS CAPACITY
1 S-V1 1 150 MM
2 FI-V 6 400 MM
3 BP-V 2 1200 MM
4 PW-V1 12 700 MM
5 PW-V2 1 1200 MM
6 WW-V1 2 800 MM
7 WW-V2 12 800 MM
8 D-V1 2 800 MM
9 D-V2 12 800 MM
PUMPS
SR. NO. LEGEND NUMBERS CAPACITY
1 P1 1 22 HP
2 P2 1 -
PIPES
SR. NO. DIAMETER LENGTH
1 50 MM 255 M
PIPE LENGTH WILLFINALIZE AFTER WORKING
DRAWING
2 150 MM 22 M
3 400 MM 39 M
4 800 MM 51 M
5 1100 MM 2.5 M
6 1200 MM 15 M
EQUIPMENTS
SR. NO. LEGEND NUMBERS SIZE/CAPACITY
1 PH-C 1 -
2ROTATING
BRIDGE1 -
3 AIR BLOWER 3 35 M3/MIN
GENERAL NOTES:-THESE ARE SOFTWARE GENERATED HYDRAULIC AND PROCESS1.DRAWINGS.RL'S AND INTERNAL SIZES ARE MANDATORY. FOR WALL THICKNESS AND2.OTHER DETAILS PLEASE REFER WORKING DRAWINGS.ALL DIMENTIONS ARE IN MM, LEVELS AND CO-ORDINATES ARE IN METERS3.UNLESS OTHERWISE NOTED.DO NOT SCALE THE DRAWINGS PLEASE REFER TO WRITTEN DIMENTION4.ONLY.VALES, PIPES, PUMPS, BLOWERS, MOTORS, ETC. SHALL BE OF STANDARD5.MAKE AS PER TENDER SPECIFICATION.ADMIN BUILDING LAYOUT TO BE INCORPORATE AS PER REQUIREMENT6.WITH FILTER BED IN WORKING DRAWINGS.ALL CHANNELS ARE TO BE CORVED WITH PRECAST SLAB.7.RAILING, LIGHTING ARRESTOR AND HIDDEN DETAILS ARE AS PER UNIT8.WHEREVER APPLICABLE.LENGTH OF PIPELINE TO BE TAKEN AS PER SITE LAYOUT AND WORKING9.DRAWINGS.SYMBOLS USE IN DRAWINGS:-10.
SR. NO. SYMBOL INDICATE
1. RL IN PLAN VIEW
2. RL IN SECTION VIEW
3. WATER LEVEL
4. WATER FLOW DIRECTION
11. legend:-
EL - ELEVATED LEVEL
WW-V1 - WASHWATER ISOLATION TANK VALVE
WW-V2 - WASHWATER INLET VALVE
PW-V1 - WASHWATER INLET VALVE
WW-V2 - PUREWATER OUTLET VALVE
PW-V2 - PUREWATER SUMP INLET VALVE
D-V1 - DRAIN VALVE
D-V2 - WASHWATER DISPOSAL VALVE
S-V1 - SLUICE VALVE
CHIEF ENGINEER SUPERINTENDANT ENGINEER
EXECUTIVE ENGINEER DEPUTY ENGINEER
PROOF CONSULTANT CONSULTANT
- - - -
- - - -
- - - -
- - - -
- - - -
DATE DESCRIPTION REVISION NO. ENGINEER
TITLEPOSSIBLE LIST OF MECHANICAL COMPONENTSUSED IN 40 MLD WTP
PROJECT 40MLD WTP PROJECT BY INODE WTP SOFTWARE
OWNER INODE SOFTWARE CO. • PUNE BRANCH • OFFICE 508 • NYATI EMPORIUS NEAR THE ORCHIDHOTEL • BANER • PUNE • INDIA
CLIENTINODE SOFTWARE CO.
PMCINODE SOFTWARE CO.
CONSULTANTINODE SOFTWARE CO.
DWG. NO: 7001-01-GA-40WTP-11