Overview of Indian Ports Challenges Hinterland connectivity Present Policy framework
Sagarmala Projects undertaken Impact
To provide a well performing, efficient,environmentally sustainable and robustseaport system, shipping and shipbuildingindustry and network of coastal and InlandWaterways in the country
Maritime Transport is a critical infrastructure for thesocio‐economic development of a country.
Ministry is responsible for the formulation ofpolicies and programmes of Port and Shippingsectors and their implementation.
Shipping and Port sectors include Shipping,Shipbuilding and Ship‐repair, Major Ports, NationalWaterways, and Inland Water Transport.
Indian Coast Line : 7,517 km.
Total Ports : 212
Major Ports : 12
Non‐Major Ports :200
Ports handled around 95% of the country’s EXIM trade interms of volume & 70% by value
6 Major Ports on the East Coast viz.
Kolkata, Paradip, Visakhapatnam, Kamarajar, Chennai, V.O.Chidambaranar
6 Major Ports on the West Coast viz.
Cochin, New Mangalore, Mormugao, Mumbai, JNPT and Kandla.
Handle about 57% of total seaborne traffic
Capacity as on 31‐03‐2016 : 965.36 Million Tonnes
Traffic as on 2015‐16 : 606.36 Million Tonnes
Total No. of Berths : 239
7
Kandla
Mumbai
JNPT
Mormugao
N. Mangalore
Cochin
V.O. Chidambarnar
Chennai
Visakhapatnam
Paradip
Kolkata
Kamarajar
Krishnapatnam
Dhamra
Jaigad
7
Andaman & Nocobar Islands
Laksha-Dwwep
PORTS OF INDIA
7
Seventh Largest country
Total Area- 3,287,263 sq metres North to South- 3,214 Kms East to West- 2,933 kms
Operational/Logistical challenges Hinterland connectivity Avg distance b/w manufacturing hinterlands & ports is
700-800Kms Cargo Handling cost Fuel costs Modal Mix Rail & Road a/c for 94% of freight transport (Road -80%, Rail-20% share) Waterways share-6%
Manpower issues
Infrastructural issues Capacity utilisation (67%)
Draft in Ports Productivity (cargo handling capacity)Equipments to handle Cargo/Asset productivityMechanisation /Augmentation of manual processesLogistical efficiencies(Hinterland connectivity)
Evacuation from vessels to trucks/railway wagon
Regulatory agencies Simplification of Customs Procedures Testing by agencies-FSSAI, Textiles, Plant/Animal Quarantine
Modes Railways Roadways Inland waterways Pipelines
Proximity/linkages to Ports key for competitive industry
Increase share of Railways to 25% from present 18% Rationalisation of railway fare Development of DFCs spur lines on DFCs for last-mile connectivity
Additional ICDs
Pipelines Predominantly for liquid cargo Cost 10-15% that of rail New pipeline projects identified across Ports
Huge Potential 14,500 Kms of navigable & potentially navigable
waterway Currently 6% to logistics Identification of new water ways
Currently 5 National Waterways Augmentation of existing waterways
Depth enhancement for larger vessels Infrastructure development
fairways development through dredging ,construction of terminals and jetties with cargo handling equipments
navigational aids in the channel
13
Cost savings:
1 HP moves 150 kg on road, 500 kg on rail & 4000 kg on water
1 litre of fuel moves 24 tonne/km on road, 85 on rail & 105 on IWT
Cost of developing as well as maintenance cost of waterways much lower thanrail & road
Environment friendliness:
Least fuel consumption per tonne- km
CO2 emission is 50% that of a truck
Negligible land requirement
Safe mode for hazardous cargo
Supplementary mode:
Reduces pressure on road and rail , frees rail rakes
Reduction in congestion and accidents on road
Development of New Ports
Capacity expansion at existing ports Mechanization of existing terminals Building new terminals
Trading across borders Ease of doing business initiatives
Development of Pilot CEZs identified under Sagarmala
Development of Multi-modal logistics hub
15
Study by Ministry:- Benchmarking of efficiency & productivity to
international standards covered marine operations, jetty &vessel operations ,Yard
performance, Labor productivity, Cargo storage (containers & dry bulk ), rake operations (loading/unloading of rakes), maintenance (Equipment uptime and breakdowns), Gate-In and Gate-out operations, safety, customs and IT penetration
a clear roadmap for improvement for each port laid out covering changes in -core business processes, equipment, organization structure, people skills, information technology and infrastructure
Foreign Direct Investment upto 100% is permitted in Port Sector
Emphasis on PPPStandardisation of procedures/documents
Coordination groups between multiple agencies for faster processing of proposals
Min.of Shipping
MoEF
Min.ofCommerce/Revenue/Custo
ms
Min.ofFinance
MoRTH
State Governments
Min.ofRailways
Vision of the Sagarmala Programme is to reduce logistics cost and time for the movement of EXIM and domestic cargo and development of port-proximate future industrial capacities near the coast
National Perspective Plan comprehensive development of India’s coastline and
maritime sector more than 400 projects, at an estimated
infrastructure investment of more than Rs. 4 Lac Crore/$58974 Millions identified port modernization/capacity expansion & new port
development, port connectivity enhancement port-linked industrialization and coastal community
development
Port Connectivity Enhancement Indian Port Rail Corporation Limited (IPRCL) has
taken up works across major ports Road connectivity projects have been identified
under Sagarmala Port-linked Industrialization
CEZs have been envisaged to tap synergies with the planned industrial corridors (Eg- Vizag Chennai Industrial Corridor and Delhi Mumbai Industrial Corridor)
Energy clusters Power clusters, refinery/petrochemical clusters
development near Ports Bulk clusters
Setting up of steel ,cement manufacturing plants near Ports
Discrete Manufacturing Food processing, electronics,leather products,
furniture,apparels
Coastal Community Development Community Development Fund is envisaged Skill development/re-skilling/up-skilling in port related /non-
port related fields To support the development of fishermen community, Ministry
is part-funding select fishing harbour projects under Sagarmala development of deep sea fishing vessels and fish processing
centres in convergence with DADF
PPP PolicyProjects under operation: 34 (investment: Rs. 18273 Cr/$2694 Millions,capacity addition: 247 MTPA)Projects under implementation: 28 (investment: Rs. 30776Cr/$4537Millions, capacity addition: 298 MTPA)Overall Projects for award in 2016-17: 33 (investment: Rs. 9845 Cr/$1451Millions, capacity addition:102 MTPA)Projects for completion in 2016-17: 30 (investment: Rs. 4815Cr/$709Millions, capacity addition:100 MTPA)Master Plan for each Major Port prepared under Sagarmala. 142 projects(investment: Rs. 91,434 Cr/$13480 Millions) for capacity enhancementidentified for implementation.
New Ports6 sites identified for development of new ports under Sagarmala
24
Port Connectivity projects identified under Sagarmala
Implementation of 25 last mile projects rail works taken up by IPRCL by FY 18-19(investment: Rs. 4862 crs/$716Millions)
Implementation of 21 rail projects (investment: Rs. 28000 crs/$4128Millions)
Implementation of 79 road projects
Implementation of 7 Multi-Modal Logistics Parks
Promotion of coastal shipping by identification of coastal shipping berth in each majorport and incentivizing in non-major ports
Development of 37 National Waterways through IWAI in Phase I
25
The projects expected to:- mobilize more than Rs. 4 Lac Cr/$58974
Millions of infrastructure investment, double the share of domestic waterways
(inland & coastal) in the modal mix, generate logistic cost savings of Rs. 35,000-
40,000 Cr/$5160 Millions-$5897 Millions per annum
boost merchandize exports enable creation of new jobs