shovels. william s. otis, of the firm of carmichael, fairbanks and otis, when living in canton,...

17
SHOVELS

Upload: emil-ray

Post on 12-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

SHOVELS

Page 2: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

SHOVELSWilliam S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing grading work for the Boston & Providence Railroad built the first steam excavator – a steam shovel.

Page 3: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

OTIS SHOVEL

Page 4: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

AN EARLY SHOVEL

Page 5: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

SHOVELSFront shovels are used predominately for hard digging above track level and for loading haul units.

Loading of shot rock would be a typical application.

Page 6: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 1: BUCKET SIZEShovels can usually be equipped with different size buckets. Bottom dump buckets are also available.

Page 7: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 1: BUCKET SIZE

Buckets are rated in both heaped and struck capacities.Both PCSA and SAE use a 1:1 angle of repose for evaluating heaped bucket capacity. CECE specifies a 2:1 angle of repose. Heaped Capacity is the rating of interest for Production Estimating.

Page 8: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 2: FILL FACTORThe Fill Factor adjusts Heaped Capacity in lcy based on the type of material being handled.

Table 9.1, page 258

Page 9: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 2: FILL FACTOR

HEAPED BUCKET CAPACITY

FILL FACTOR

= VOLUME (lcy)

Page 10: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 3: CYCLE TIME

There are four elements in the production cycle of a shovel:

1. Load bucket

2. Swing with load

3. Dump load

4. Return swingSee page 260

Page 11: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 3: CYCLE TIME

Height of cut affects shovel production. Optimum height of cut ranges from 30 to 50% of maximum digging height, with the lower percentage being representative of easy-to-load materials, such as loam, sand, or gravel. Table 9.2

Page 12: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 3: CYCLE TIME

Angle of swing affects shovel production. If the angle of swing is increased, the time for a cycle will be increased, whereas if the angle of swing is decreased, the time for a cycle will be decreased. Table 9.2

Page 13: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 3: CYCLE TIME

Ideal production of a shovel is based on operating at a 90° swing and optimum height of cut. The effect of the angle of swing on the production of a shovel is illustrated in Table 9.2.

Page 14: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 4: EFFICIENCY FACTOR

When selecting a minutes per hour efficiency factor visualize the work site and consider: • Materials being handled, bank or

broken

• Size of the shovels’s dumping target,

(large or small)

Page 15: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 5: CLASS of MATERIAL

Production will be in lcy, will need swell factor to adjust to bcy. TABLE 4.3

Page 16: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

STEP 6: PRODUCTION

Working mins / hr

Total cycle time (min)

X Heaped Capacity (lcy)

X Fill Factor

X height/swing factor

= Production (lcy/hr)

Page 17: SHOVELS. William S. Otis, of the firm of Carmichael, Fairbanks and Otis, when living in Canton, Massachusetts in 1834 and 1835, while his firm was performing

OTIS STEAM SHOVEL