Siemens OpenlabMajor Review

February 2012

PLCs Security

Author: Filippo TilaroSupervised by: Brice Copy

Page 2: Siemens Openlab Major Review February 2012

2

PLC Security project phases

Initial Phase2009

•Security standards analysis:•IT standards do not suit for PCS: different performances, availability, network

architecture …•ISA-99 standards as reference standard•Lack of pragmatic guidelines to secure PCSs•Not finished yet

Design & Report2010

•Design of the test-bench•tools evaluation & development•Test-bench validation and report•ISA-Secure Embedded Device Security Assurance Certification

Development2011

•Fulfilling the ISCI-CRT requirements:•Integration of the CRT tests into the ‘Test-bench for Robust of Industrial

Equipments’ (TRoIE)•Releasing to Siemens a complete test definition set and implementation to be

deployed and reproduced in Siemens Labs•Starting speaking about Codenomicon tests (Protos fuzzer)

Openlab Major Review Report February 2012

Page 3: Siemens Openlab Major Review February 2012

3

Fuzzing Test Generator

Openlab Major Review Report February 2012

Target

Customized PeachFuzzing Framework

Grammars

INPUT GEN.

Generation and forging of any kind of communication load Translate experts’ knowledge into grammar rules Definition of proprietary and even not-existing protocols Scalable in terms of:

Testing files Protocol testing behavior (state-machine, mutation strategies)

Page 4: Siemens Openlab Major Review February 2012

4

ISCI Communication Robustness Test certification fulfilling

Integration of the CRT test cases into the TRoIE test-bench

Extension of the CRT for not covered protocols

5 security testing phases: Discover Protocol Functionalities and Attack

Surface Storms and Maximum Load Tests Single Field Injection Combinatorial Fields Injection Cross State Fuzzing (for stateful protocols)

Openlab Major Review Report February 2012

Page 5: Siemens Openlab Major Review February 2012

5

Test-bench Reproducibility

3-Layers ArchitectureExtended Peach

FrameworkREST Web ServiceReverse Proxy &

Access Control

Client

JSON

Authentication to run a test Built-in invariant test definitions No specific security knowledge OS Compatibility

Openlab Major Review Report February 2012

Page 6: Siemens Openlab Major Review February 2012

6

PLC I/O Monitoring

Target

Waveforms Comparison Feedback Control System:

No synchronization issues Reduced PLC Scan Cycle for a best

timing resolution

Requirements: 3 sec period:1 sec High, 2 sec Low PLC waveform generation 20 msec resolution Parametric threshold jitter

Openlab Major Review Report February 2012

Page 7: Siemens Openlab Major Review February 2012

7

Test-bench release & Expertise transfer to Siemens (Dec 2011) Installation, configuration, Documentation Next Steps:

Proprietary Network protocols testing (S7,PROFINET), Software applications, libraries and APIs, System I/O modules

Multi-Protocols (Man-in-the-middle) layer testing PLC internal status monitoring Extending to the supervision level: SCADA

system like PVSS, OPC-UA…

Openlab Major Review Report February 2012

Conclusions

Page 8: Siemens Openlab Major Review February 2012

Siemens OpenlabMajor Review

February 2012

Step7 Openness,PVSS Security,

Virtualization Author: Omer KhalidSupervised by: Renaud Barillere

Page 9: Siemens Openlab Major Review February 2012

9

Step7 Deployment - I

Step 7 / Totally Integrated Automation: Software development environment to develop software for

PLC’s that interfaces with the industrial equipment.

Aim: To bring-in modern software engineering capabilities to Step7 product line: Step7 Deployment

• To automate the deploy Siemens software on engineering workstations; Scalability: from small (10’s of machines) to large (100’s of machines); Easy and flexible to deploy, fast refresh rate

Openlab Major Review Report February 2012

Page 10: Siemens Openlab Major Review February 2012

10

Step7 Deployment - II Status: Completed

All milestones has been achieved and delivered. Verified and confirmed by Siemens.

Value for Siemens: Final strategy is implemented by Siemens in v12 of TIA. TIA portal can now be deployed in automated fashion using

3rd party standard software inventory management software.

Approach: Three strategies validated through prototyping

• Reported in detail in previous major review• Nutshell: either using chained MSI’s or SIA engine

Meets short term, medium and long terms objectives and product development plans of Step7 software

Criteria: integration with Siemens existing software tools.

Openlab Major Review Report February 2012

Page 11: Siemens Openlab Major Review February 2012

11

Step7 Security

Stuxnet worm Detected in June 2010. Attack method (0-day exploit against windows, fake certificates, rootkit, DLL replacement)

Software Security New topic was added to the project in Jul/Aug 2010

• Market survey conducted – mostly source code based analysis• Binary code based analysis identified to complement existing source

code based analysis– BitBlaze and Veracode selected as test candidates

Status: Completed Initial testing/prototyping Siemens continues in-house

Openlab Major Review Report February 2012

Page 12: Siemens Openlab Major Review February 2012

PVSS Security Objective

Improve the SCADA security and system robustness

Strategy Identifying vulnerability areas and their associated risks – including

test use cases Determine key cyber security aspects from CERN standpoint, Taking

Siemens/ETM input Evaluate risks and use cases identified, and prototype to investigate

vulnerabilities

Security Areas: Access Control, Data Integrity and Confidentiality, Auditing and

Logging, Updating and Patching, Network Resource Availability

Status: SCADA recommendation document prepared and submitted to SCADA section.

Openlab Major Review Report February 2012

Page 13: Siemens Openlab Major Review February 2012

13

Virtualization Objective:

Evaluate and deploy engineering applications on private cloud infrastructure.

Process: Various private cloud tool kits evaluated

• OpenNebula, Eucalyptus, Vmware vSphere Performance of applications benchmarked

• For distributed and shared storage• For high and low load deployment.

Outcome: A private cloud infrastructure deployed

• PVSS developers using it extensively for application development.

Results related to infrastructure performance were published in a paper in ICALEPCS 2011 conference.

Openlab Major Review Report February 2012

Page 14: Siemens Openlab Major Review February 2012

14

Khalid O., Sheikh A., Copy B., “Optimizing Infrastructure for Software Testing and Deployment for Engineering Applications", 13th International Conference on Accelerator and Large Experimental Physics Control Systems, Grenoble, France. Oct 2011.

Khalid O., “OpenNebula cloud for Engineering applications, OpenNebula Blog, Nov, 2011

Tilaro F., "Cyber security analysis for industrial control systems", CERN Computing Newsletter, 2010.

Tilaro F., Copy B., "Industrial Devices Robustness Assessment and Testing against Cyber Security Attacks", 13th International Conference on Accelerator and Large Experimental Physics Control Systems, Grenoble, France. Oct 2011.

Tilaro F., "Testbench for Robustness of Industrial Equipments (TROIE)", CERN, 2009

Copy B., Tilaro F., ”Standards Based Measurable Security For Embedded Devices” ICALEPCS 2009

Publications